Transcript of Webinar Series 4 of 5 Johnny Vaughn, Senior System...
CFC BudgetPro v4™, Clearing
Accounts – Capital PlantWebinar Series 4 of 5
Johnny Vaughn, Senior System AnalystThursday, July 21
How to Submit Your Question
Step 2: Click on the Send
button.
Step 1: Type in your
question here.
CFC BudgetPro v4™, Clearing
Accounts – Capital PlantWebinar Series 4 of 5
Johnny Vaughn, Senior System AnalystThursday, July 21
CFC BudgetPro speakers and
topics include:
FridayFriday
Financial Statements and Integration -- John Grant
CPE Guidelines…
� Attend the webinar for the full session.
� Submit at least one question during the
webinar’s Q&A section.
� Complete the evaluation at the end of
the session.
Learning Goals and Objectives
At the end of the webinar, participants will know:
•Transportation Equipment & Stores worksheet basics
•Capital Plant Expenditure worksheet basics
•Data requirements for both worksheets tabs
– “Transportation & Equipment,” Vehicles (Miles/Hours)
– “Stores,” Material Clearing Account
– “Plant Accounts,” Work Plan and General Plant
According to USGOVERNMENTSPENDING.com
about how much do federal, state and local
governments combined pay for education
each day?
• $900 million
• $1.5 billion
• $2 billion
• $2.5 billion
• $3 billion
Polling Question
Johnny Vaughn,
Senior Systems Analyst,
CFC
Learning Goals and Objectives
At the end of the webinar, participants will know:
•Transportation Equipment & Stores worksheet basics
•Capital Plant Expenditure worksheet basics
•Data requirements for both worksheets tabs
– “Transportation & Equipment,” Vehicles (Miles/Hours)
– “Stores,” Material Clearing Account
– “Plant Accounts,” Work Plan and General Plant
Transportation & Equipment Worksheet Basics
• Used to handle the allocation of vehicle expenses
• Can allocate on the basis of miles driven or hours equipment is used or can use both
– Transportation allocates on miles per vehicle
– Equipment allocates on hours per equipment
• Vehicles can be enter individually or as a group
• Method to allocate to functional categories is the same as for payroll
Accessing Clearing Accounts Worksheets
Transportation Worksheet: Vehicles – Annual Miles Driven
Equipment Worksheet: Equipment – Annual Hours Worked
Stores Worksheet: Materials Handling Clearing Account
“Transportation” Worksheet
Group vehicles by
same functional
categories.
“Transportation” Worksheet
Allocation to
functional
categories works
the same as in
Payroll.
“Transportation” Cost Allocation
**Not all columns
are shown.**
Group vehicles that can be allocated the same. Department code ties them back to GL department, which should tie back to payroll’s allocation.
Percent to each
functional area
“Equipment” Cost AllocationEquipment works the same as
“Transportation” except allocation is on
basis of annual hours vehicle is used.
Percent to each
functional area.
**Not all columns
are shown.**
“Transportation” or “Equipment” Expenses
Enter vehicle
expenses
to be allocated to
all vehicles (look
at last year’s
clearing
accounts).
Labor & Benefits
come from the
Payroll Allocation
Worksheet.
Depreciation will
be handled in
Capital Plant
Worksheets.
Expenses are allocated per vehicle by miles or by hours and spread based on the allocation selected on prior slide.
“Transportation” or “Equipment” Spread
“Transportation” or “Equipment” Spread
Uncheck to manually
spread costs.
“Transportation” or “Equipment” Spread
Stores Expenses will be spread in
the “Stores “ Worksheet.
“Stores” Allocation
Depreciation will be handled in Capital Plant Worksheets.
Uncheck to allocate
these cost manually.
These expenses come
from prior worksheets.
“Stores” Spread
Same options as
in Transportation
and Equipment.
Must equal 0
Uncheck to manually
spread costs.
Capital Plant Expenditures Worksheet Basics
• Used to handle all Capital Plant Needs
– Accumulate Plant Costs for depreciation and allocate depreciation expense to clearing accounts
– Control Work in Progress
– Contributions in Aid of Construction
• Contains 6 Worksheets
– Four worksheets for Plant Construction
• Not all sections are applicable to every cooperative
Accessing Capital Plant Worksheets
Production Plant Worksheet: Not likely used
Transmission Plant Worksheet: Transmission plan
Distribution Plant Worksheet: Construction plan
General Plant Worksheet: General funds
Total New Construction: Summary of all construction
Total Plant in Service Worksheet: Total changes in Utility Plant
Production and Transmission Plant are similar to
Distribution and General Plant but are not shown in this
presentation.
Plant Worksheets – Contractual & Fixed Charges
At a minimum, Contractual
and Fixed Charges must be
entered.
Direct allocation to accounts
and subaccounts is allowed.
Plant Worksheets – Contractual & Fixed Charges
Other Plant Worksheets are the
same――――just different account
numbers.
Plant Worksheets – Contractual & Fixed Charges
At a minimum,
Contractual and Fixed
Charges must be
allocated to accounts.
Direct allocation to accounts
and subaccounts is allowed for
other costs too.
Plant Worksheets – Contractual & Fixed Charges
Default account numbers are provided for
each plant worksheet; additional account
numbers also are allowed and entered here.
Total New Construction Worksheets
Changes in Contribution in Aid of Construction and
Work in Progress can be made for each plant
worksheet by month. Enter contributions as negative
amounts.
Total Utility Plant in Service Worksheets
Total additions are shown for each month.
Total Utility Plant in Service Worksheets
Retirements by plant account can be
entered each month for all plant worksheets.
End-of-month total utility plant will be shown.
Total Utility Plant in Service Worksheets
Depreciation Expense is entered here. As well as
allocating depreciation expense to transportation,
equipment and stores. Salvage values also can be
entered.
Total Utility Plant in Service Worksheets
Depreciation Expense is entered here for production
and transmission and distribution as a percentage of
plant totals. For general plant, either a percentage or a
manual calculation can be entered. Check and
uncheck to change method.
All that work and finally we get to total Net Utility
Plant.
Total Utility Plant in Service Worksheets
That’s it!
These worksheets are completed, and
you’re on to the next section.
Thanks for your time.
Now…let’s turn it over to our audience!
How to Submit Your Question
Step 2: Click on the Send
button.
Step 1: Type in your
question here.
Please take a minute to complete
the NRECA survey.
If you are requesting CPE credits, this is If you are requesting CPE credits, this is
a requirement.a requirement.
WWW.NRUCFC.COOP
Events &
Training Tab
Look for the
replay of this
program early
next week
Friday, July 22,
1 p.m. Eastern Time
The Topic isThe Topic is……
CFC BudgetPro: Financial CFC BudgetPro: Financial Statements and Integration Statements and Integration
withwith
John GrantJohn Grant