Vinaphone WCDMA Cluster Optimization Report

YASAKA INBUILDING

WCDMA NetworkEvaluation Pre-Swap-Report

Area Khanh HoaRNC

Cluster 7_InbuildingDate 31/8/2011

Page 1

Page 2: Vms3 wcdma network evaluation report -inbuilding report finally_20110922
Page 3: Vms3 wcdma network evaluation report -inbuilding report finally_20110922

WCDMA Network Evaluation Report_pre-Swap

Acknowledgements

During the phase 1 process, we got great support and cooperation from leaders

and experts in Mobifone. Here, we will send our sincere appreciation for the leaders

of Mobifone Zone III, who all gave their support to our work. Send all of our deep

respect for your technical skills, strong devoting spirit and good attitude to be the

master of your own company!

It was due to co-endeavor of both sides that made the evaluation report go on

effectively and obtained excellent accomplishments. We hope that Mobifone can

strengthen the cooperation with ZTE continuously and make mutual progress with

us.

Sincerely wish Mobifone to win flourishing achievements in the future!

Page 4: Vms3 wcdma network evaluation report -inbuilding report finally_20110922

WCDMA Network Evaluation Report_pre-Swap

Table of Contents

1 Introduction ........................................................................................................................ 6

1.1 Evaluation Purposes ................................................................................................................. 6

1.2 Evaluation Methods ................................................................................................................. 6

3.3 In building information ............................................................................................................ 6

3.4 Inbuilding Test: YASAKA Hotel ............................................................................................. 6

3.5 Test Tools ................................................................................................................................... 7

2 Test Procedure: Idle Test .................................................................................................... 7

3 Coverage and Quality Performance .................................................................................. 7

3.1 CPICH RSCP ............................................................................................................................ 9

CPICH RSCP_G Floor ...................................................................................................... 9

CPICH RSCP_Center Floor ............................................................................................. 10

CPICH RSCP_Heighest Floor ......................................................................................... 10

3.2 CPICH Ec/Io ........................................................................................................................... 11

CPICH Ec/Io_G Floor ...................................................................................................... 11

CPICH Ec/Io_Center Floor .............................................................................................. 12

CPICH Ec/Io_Heighest Floor .......................................................................................... 13

4. Network analyze and suggestion .................................................................................... 13

4.1 Analysis on Coverage Problems ............................................................................................ 13

4.2 Problem description ............................................................................................................... 14

4.3 Suggestion ................................................................................................................................ 14

5. Legend .............................................................................................................................. 14

Comments ............................................................................................................................ 15

Page 5: Vms3 wcdma network evaluation report -inbuilding report finally_20110922

WCDMA Network Evaluation Report_pre-Swap

Page 6: Vms3 wcdma network evaluation report -inbuilding report finally_20110922

WCDMA Network Evaluation Report_pre-Swap

Overview This is the 3G network evaluation report for indoor site at Khanh Hoa. This report for pre-swap,

each in building site will has one report. Sites total in Khanh Hoa has 8 clusters & 130 sites with 3

In building sites.

Page 7: Vms3 wcdma network evaluation report -inbuilding report finally_20110922

WCDMA Network Evaluation Report_pre-Swap

3G Sites Distribution In Khanh Hoa:

Cluster. No Site_ Name Number of sites

Before swap

Number of sites

after swap

Cluster 1 KHVN 4 & 1 site island 23& 1 site island

Clsuter 2 KHNH 12 44

Cluster 3 KHDK 6 25

Cluster 4 KHCL 14 29

Cluster 5 KHCR 16 24& 2 site island

Cluster 6 KHNT 18 20

Cluster 7 KHNT 32 & 3 sites inbuilding 38 & 1 site inbuilding

Cluster 8 KHNT 21 & 3 sites island 27 & 1 site island

Total 130 235

Page 8: Vms3 wcdma network evaluation report -inbuilding report finally_20110922

WCDMA Network Evaluation Report_pre-Swap

1 Introduction

1.1 Evaluation Purposes

• Reviews quality and truthful value for current 3G network of VMS at Khanh Hoa

province before swap.

• Compare evaluator result before swap and after swap. Requirement after swap

network quality must good better or equivalent current network.

• Looking for existing problems as coverage, quality of service, capacity and others.

Make suggestion, solution to solve problems and improve network.

1.2 Evaluation Methods

• With various measurement and analysis methods such as CQT testing, DT testing,

OMC data analyzing, and analyzing representative network problems and typical

subscriber complaints, test and evaluate the network at multiple points, along

multiple lines and in multiple surfaces within the service area thus guaranteeing a

full and deep understanding on the current network quality.

• Co-operate ZTE engineer & VMS3 engineer so as to comparing the performance of

WCDMA networks and confirm.

3.3 In building information

Khanh Hoa has 3 sites of 3G in-building sites. All belong to Cluster 7. The sites information is

shown as Table 1

Table 1

3.4 Inbuilding Test: YASAKA Hotel

This report of Site in YaSaKa Hotel, there are 11 floors in YaSaKa hotel, they include:

• Ground Floor.

• 1st Floor: Meeting Room.

NodeBNAME BuildingKHNT18 Yasaka Hotel

KHNT85 Novotel Hotel

KHNT86 Sheraton Hotel

Page 9: Vms3 wcdma network evaluation report -inbuilding report finally_20110922

WCDMA Network Evaluation Report_pre-Swap

• 2nd Floor: Meeting Room.

• 3RD – 10Th Floors: Guest Rooms.

• 11TH Floor: Restaurant, City View Café.

3.5 Test Tools

ZTE uses the Nemo software for Drive Test solution to acquire received downlink signal level and

received quality for WCDMA system. The test tools are shown as below:

Software drive test : Nemo Outdoor

Software analyse : Nemo Analyze

WCDMA : Samsung U800 / Samsung U900

HSDPA/HSUPA: ZTE MF-637 / HW E173U-1

Scanner: PcTel

GPS type : Garmin 18 USB / GlobalSat BU-353 / RoyalTek RGM-3600

Software for Scanner : Nemo Outdoor

2 Test Procedure: Idle Test

• Make map of the routes in building, and drive test by walking cross point already

choose.

• Prepare the required MS and number of floors will test include the important floors as

like as: Ground floor, floor has the meeting room, floor has restaurant, Bar, Party

rooms, and corridor of building, center floor, higher floor.

• Starting from the origination point, use the UMTS idle data collection software NEMO

to record the test values.

• After testing, calculate network Ec/Io and RSCP Coverage Ratio according to test

data.

3 Coverage and Quality Performance

According to information of building, and request items from the Test Procedure (index 2).

In YaSaKa hotel, we will test 6 floors:

Ground Floor.

1st Floor: Meeting Room.

2nd Floor: Meeting Room.

3RD – 10Th Floors: Guest Rooms. They will choose 2 floors of them, and our report

Page 10: Vms3 wcdma network evaluation report -inbuilding report finally_20110922

WCDMA Network Evaluation Report_pre-Swap

they are 4th and 6th floors.

11TH Floor: Restaurant, City View Café.

Page 11: Vms3 wcdma network evaluation report -inbuilding report finally_20110922

WCDMA Network Evaluation Report_pre-Swap

3.1 CPICH RSCP

This index get logfile of scanner Idle mode test, result as show below FigureCPICH RSCP_G Floor -71.8 dBm

Page 12: Vms3 wcdma network evaluation report -inbuilding report finally_20110922

WCDMA Network Evaluation Report_pre-Swap CPICH RSCP_Center Floor -56.687 dBm

CPICH RSCP_Heighest Floor -71.014 dBm

Page 13: Vms3 wcdma network evaluation report -inbuilding report finally_20110922

WCDMA Network Evaluation Report_pre-Swap

3.2 CPICH Ec/Io

This index get logfile of scanner Idle mode test, result as show below figureCPICH Ec/Io_G Floor -3.453 dBm

Page 14: Vms3 wcdma network evaluation report -inbuilding report finally_20110922

WCDMA Network Evaluation Report_pre-Swap

CPICH Ec/Io_Center Floor -2.798 dBm

Page 15: Vms3 wcdma network evaluation report -inbuilding report finally_20110922

WCDMA Network Evaluation Report_pre-Swap CPICH Ec/Io_Heighest Floor -6.413 dBm

4. Network analyze and suggestion

4.1 Analysis on Coverage Problems

one Before Swap After SwapTotal Agg

RSCP

Total Agg Ec/Io

Voice test

HSDPA

(Mbps)

HSUPA

(Mbps)

Total Agg

RSCP

Total Agg Ec/Io

Voice test

HSDPA

(Mbps)

HSUPA

(Mbps)Ground Floor

- 66.12 dBm

- 2.73 dB

Normal 5 1

1st

Floor2nd

Floor4th

Floor6th

Floor11TH

Floor

Page 16: Vms3 wcdma network evaluation report -inbuilding report finally_20110922

WCDMA Network Evaluation Report_pre-Swap

From result, we find out that, signal is good in all floors.

4.2 Problem description

No any problems are found this site.

4.3 Suggestion

No suggestions!

5. Legend

The legends in the document are set according to the table 5

Table 1 : Legends of RSCPRSCP(dBm) The color of Legend Result

RSCP≤-105 Very bad, No coverage

-105<RSCP≤-95 Bad, Outdoor coverage can’t be guaranteed

-95<RSCP≤-85 Normal, Indoor coverage can’t be guaranteed

-85<RSCP≤-75 Better, Indoor coverage can be partly guaranteed

-75<RSCP≤-65 Good, Indoor coverage can be guaranteed

RSCP>-65 Excellent

Table 2: Legends of Ec/IoEc/Io(dB) The color of Legend Result

Ec/Io≤-20 Very bad, No coverage

-20<Ec/Io≤-14 Bad coverage, The bit rate of PS service is low, the communication quality can’t be guaranteed

Page 17: Vms3 wcdma network evaluation report -inbuilding report finally_20110922

WCDMA Network Evaluation Report_pre-Swap

-14<Ec/Io≤-12 Normal coverage for voice call, The bit rate of PS Service can’t be guaranteed

-12<Ec/Io≤-8 Video call can’t be guaranteed, The higher speed PS Service can be partly guaranteed

-8<Ec/Io≤-5 Good coverage for all service,

Ec/Io>-5 Excellent

Comments

Remarks(Further comments)

Checked by

1-Name/Designation:

Signature: Date: