vit Modified Academic Calendar for Winter 2012-13 Semester

2
VIT/ De Ref.: The Aca cited ab 1. 2. 3. 4. The mo Copy to Library/ ean(Acad)/ 2 (1) Circular (2) Circular ademic Cale bove is mod 1 st May 20 above. Finalization Reopening longer peri instruction This Circula odified Acad o: Core Grou Manager (C 2013/ Calen r No. VIT/ D r No. VIT/A endar for th dified with t 13 is declar n of Fall 201 dates for iod to carry al days of a ar supersed demic Calen up/ All Dean TS)/ Transpo ndar/ 1 C Dir(Acad)/ 2 DHR/2012 he Winter 2 the followin red as a ho 1314 semes all M.Tech y out their regular sem es Circular ndar is enclo ns & Directo ort Section/ A CIRCULAR 012/ Calend dt.: 11.12.2 201213 Sem ng details. oliday for th ster reopen . programm Master’s T mester as th No. (1) cite osed as Ann ors/ Registra All Hostel No R dar/ 6 dt. 0 2012 mester ann he Universit ning dates fo mes are pre hesis, while heir third se d above. nexure – 1. ar/ CoE/ Ch otice Boards/ 9112012 ounced as ty as per th or all progra eponed so e having th emester. Di ief Warden/ / allvitians/ a 220 per the Circ he Circular ( ammes. that they e same nu D.S irector (Aca / All Section allstudents.v 1 012013 cular (1) (2) cited will get mber of ubhakar ademics) n Heads/ vellore

description

vit calender

Transcript of vit Modified Academic Calendar for Winter 2012-13 Semester

Page 1: vit Modified Academic Calendar for Winter 2012-13 Semester

 

VIT/ De

Ref.:  

 

 The Aca

cited ab

1.

2. 3.

4.  The mo  

Copy  toLibrary/ 

 

ean(Acad)/ 2

(1)  Circular

(2)  Circular

ademic Cale

bove is mod

1st May 20above. 

Finalization

Reopening longer periinstruction

This Circula

odified Acad

o:  Core  GrouManager (C

2013/ Calen

r No. VIT/ D

r No. VIT/A

endar for th

dified with t

13  is declar

n of Fall 201

dates  for iod  to carryal days of a

ar supersed

demic Calen

up/  All  DeanTS)/ Transpo

ndar/ 1  

C

Dir(Acad)/ 2

D‐HR/2012 

he Winter 2

the followin

red as a ho

13‐14 semes

all M.Techy out  their  regular sem

es Circular 

ndar is enclo

ns  &  Directoort Section/ A

 

CIRCULAR

012/ Calend

dt.: 11.12.2

2012‐13 Sem

ng details. 

oliday for th

ster reopen

.  programmMaster’s Tmester as th

No. (1) cite

osed as Ann

ors/  RegistraAll Hostel No

 

R

dar/ 6 dt. 0

2012 

mester ann

he Universit

ning dates fo

mes  are  prehesis, whileheir third se

d above. 

nexure – 1.

ar/  CoE/  Chotice Boards/

9‐11‐2012

ounced as 

ty as per th

or all progra

eponed  so e having  themester. 

Di

ief Warden// allvitians/ a

             22‐0

per the Circ

he Circular (

ammes. 

that  they e same nu

D.Sirector (Aca

/  All  Sectionallstudents.v

01‐2013 

cular (1) 

(2) cited 

will  get mber of 

ubhakar ademics) 

 n  Heads/ vellore 

Page 2: vit Modified Academic Calendar for Winter 2012-13 Semester

Annexure - 1

Academic Calendar – Winter 2012-13 Semester (Modified)

Description  Period Remarks 

Commencement of Winter semester 

2nd January 2013 (Wednesday)  1st Instructional day 

Pongal and Thiruvalluvar day  14th – 15th January 2013  No Instruction days 

Republic day  26th January 2013 (Saturday)  No Instruction day 

Quiz – I week  28th January – 1st February 2013  Instructional Days 

Riviera  6th – 9th February 2013  No Instruction days 

CAT‐I  16th – 24th February 2013  After 28 days 

Quiz – II week  11th – 15th March 2013  Instructional Days 

Holi  27th March 2013 (Wednesday)  No Instruction day 

Good Friday  29th March 2013 (Friday)  No Instruction day 

CAT‐II  30th March – 7th April 2013  23 days after CAT‐I 

Telugu New Year’s day  11th April 2013 (Thursday)  No Instruction day 

Tamil New Year’s day and  Dr. B.R.Ambedkar’s birthday 

14th April 2013 (Sunday)  No Instruction day 

Quiz – III week  22nd ‐ 26th April 2013  Instructional Days 

May Day  1st May 2013 (Wednesday)  No Instruction day 

Term End Lab exams  To be announced by Schools  To be conducted during the last lab class(es) 

Last Instructional Day  8th May 2013 (Wednesday)  72 instructional days (21 days after CAT‐II) 

Term End THEORY exams  9th – 27th May 2013  As per registered course‐slots 

Summer vacation for students  28th May – 10th July 2013  44 days 

Summer 2012‐13 Semester$  29th May – 7th July 2013  28 instructional days 

Commencement of  Fall 2013‐14 semester for all Senior M.Tech. students 

10th June 2013 (Monday)  First Instructional Day for all senior M.Tech. students who shall be having their 3rd semester as a full regular semester 

Commencement of  Fall 2013‐14 semester for Seniors (other than M.Tech.) 

11th July 2013 (Thursday)  First Instructional Day of Fall 2013‐14 semester for all Programmes (except M.Tech.) 

Note: 

1. Any  Instructional  day  declared  as  ‘No  instruction  day’  will  be  compensated  by making  a  subsequent 

Saturday as instructional day. 

2. $ Separate academic calendar will be announced for the Summer 2012‐13 Semester.