Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26, 2016 Ken King, P.E., Salem District Engineer Chris Winstead, P.E., Lynchburg District Engineer

Transcript of Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation...

Page 1: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

Virginia Transportation Construction Alliance (VTCA)

Joint Conference

with

Salem and Lynchburg Districts

April 26, 2016

Ken King, P.E., Salem District Engineer

Chris Winstead, P.E., Lynchburg District Engineer

Page 2: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

2

VDOT Dashboard

Page 3: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

3

VDOT Performance Measures

Page 4: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

4

Lynchburg District

Page 5: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

5

Lynchburg District Organization

Chris Winstead

District Engineer

Don Austin

Appomattox

Residency

John Hays

ADA Business

Dale Totten

ADA Maintenance

Paula K. Jones

Communications

Scot Shippee

Dillwyn Residency

Terry Meadows

ADA Construction

Robert Guercia

ADA Preliminary

Engineering/PIM

Chris McDonald

Regional Operations

Kenneth Martin

Halifax Residency

Lynchburg District Residencies

Appomattox – Amherst, Appomattox, Campbell and Nelson

Counties

Dillwyn – Buckingham, Charlotte, Cumberland and Prince

Edward Counties

Halifax – Halifax and Pittsylvania Counties

Mike Allen

Safety

Page 6: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

• Comprised of 10 counties including Amherst, Appomattox,

Buckingham, Campbell, Charlotte, Cumberland, Halifax, Nelson,

Pittsylvania and Prince Edward

• Includes two cities, numerous towns and two of the largest

counties by land area in the Commonwealth

• Responsible for maintenance of more than 15,000 miles of

primary and secondary roads. This is the only district that does

not maintain interstate highways.

• Responsible for 1,986 structures on all roads

6

Lynchburg District

Page 7: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

7

Lynchburg District Safety Report

0

10

20

30

40

50

60

70

80

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

Cu

mu

lati

ve

Dea

ths

2015 Lynchburg District Traffic Deaths

Target 3-Year Average (2012-2014) 2015 Deaths

Page 8: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

• 2015 deaths were about 6.5 percent above the 3-year average • Overall crashes were up from 3-year average by 5.6% • Approximately 40 percent of fatal crashes in 2015 were fixed object off road

(road departure) • FY17-22 HSIP Program has over $31 M planned for road departure mitigation

projects within the district

• Other FY17 projects include pedestrian (sidewalk) projects, district-wide curve countermeasure signage, and road departure countermeasures within the paving schedule

• Locality safety projects included a Flashing Yellow Arrow Retrofit project (Danville) and an Adaptive Signal Control System installation (Lynchburg)

• Ongoing safety projects include an offset right turn lane, left-turn lanes and a roundabout.

8

Lynchburg District Safety

Action Items

Page 9: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

• Goals: Zero fatalities, zero injuries, zero preventable accidents

• This FY, 26 total injuries (6 recordable, 3 lost-time).

Most frequent injury types – struck by and sprain/strain

Most common lost-time injury types – slip/trip/fall, sprain/strain & struck by.

• This FY, 20 total accidents and 8 incident (11 preventable). Most common type –

backing.

• Continue to emphasize Slow Down to Speed Up- Safety First and communicating

expectation that employees work together in assessing risks, mitigating risks and

watching each other’s backs when it comes to safety.

• District Safety Committee continues to provide venue for lessons learned. Monthly DAC

Safety Initiative and District Safety Manager’s Meeting.

• District Management continues visits with teams across the district.

9

Lynchburg District Safety

Worker and Contractor Safety

Page 10: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

97% 100%

0%

20%

40%

60%

80%

100%

Actual VDOT Actual LAP

% Advertisement On Time- Lynchburg (01/06/15 Dashboard data)

Lynchburg Project Performance 2016 Project Development

District Continuous Improvement Strategies: Frequent/open communication among VDOT and Contractor staff at all levels

Close collaboration between Project Development and Project Delivery staff – Team work

Contract accountability and rapid collaborative response to any slippage

70% Target

2015 Project Delivery (04/12/16 Dashboard data)

Dashboard FY2016 On-Time Delivery Forecast

Fund Contract

Count

Completed

Green

Active

Green

% Green (Forecast)

Target

CN 9 8 0 89% 77%

MN 30 23 1 80% 77%

Dashboard FY2016 On-Budget Delivery Forecast

Fund

Contract

Count

Completed

Green & Yellow

Active

G & Y

% G & Y (Forecast)

Target

CN 9 9 0 100% 82%

MN 30 27 2 97% 90%

Page 11: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

11

Lynchburg District Pavement Conditions

Page 12: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

12

Lynchburg District Pavement Conditions

Primary Secondary

Target 82% 65%

Predicted 83% 73%

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

Percent Sufficient by System (by the end of CY 2016)

Target Predicted

Page 13: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

13

Lynchburg District Bridge Conditions

Page 14: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

14

Lynchburg District

Operations Performance

Measure

Target

FY15 (July-Dec)

FY16 (July-Dec)

Travel Time

Reliability Index

Vehicle Hours

of Delay TBD 14,527 32,332

Median Incident

Duration 59 58 59.98

Vehicle Hours of Delay data source = RITIS Vehicle Probe Project

Incident data source = VaTraffic: Disabled Vehicles, Vehicle Crashes and Tractor-Trailer Crashes on Interstates and at Special Facilities on Interstates

Strategies and Plans Going Forward:

• Staff are participating in NHI-sponsored event traffic

management class in May.

• Signal Optimization

• Increasing the number of signals able to

communicate to the TOC

Page 15: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

Salem District

15

Page 16: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

16

Comprised of 12 counties including Bedford, Botetourt, Carroll,

Craig, Floyd, Franklin, Giles, Henry, Montgomery, Patrick,

Pulaski and Roanoke

Includes five cities and numerous towns including the

Commonwealth’s most populous town (Blacksburg)

Responsible for maintenance of more secondary roads than any

other district—some 7,000 miles, in addition to 122 miles of

interstate and 983 miles of primary roads

Responsible for 2,878 bridges with 1,971 on secondary roads,

740 on the primary system and 217 on the interstates

Salem District

Page 17: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

17

Salem District Organization

Ken King

District Engineer

Todd Daniel

Bedford Residency

Thelma Ingle

ADA Business

Allen Williams

ADA Maintenance

Jason Bond

Communications

David Clarke

Christiansburg

Residency

Robbie Williams

ADA Construction

Tommy DiGiulian

ADA Preliminary

Engineering/PIM

Chris McDonald

Regional Operations

Lisa Hughes

Martinsville

Residency

Salem District Residencies

Bedford – Bedford and Franklin Counties

Christiansburg – Floyd, Giles, Montgomery and

Pulaski Counties

Martinsville – Carroll, Henry and Patrick Counties

Salem – Botetourt, Craig and Roanoke Counties Dan Collins

Salem Residency

Mike LaFon

Safety

Page 18: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

18

Salem District Safety Report

0

10

20

30

40

50

60

70

80

90

100

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

Cu

mu

lati

ve

Dea

ths

2015 Salem District Traffic Deaths

Target 3-Year Average (2012-2014) 2015 Deaths

Page 19: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

19

Salem District Safety

Action Items

• There were 84 fatalities in Salem District in 2015.

• 2015 fatalities were 11 percent below the 2012-2014 average; three year

average is 94.3 fatalities per year.

• 2015 fatalities were 21 percent above the target value of 69 fatalities.

• Approximately 57% of fatal crashes in 2015 were fixed object off road (road

departure).

• FY17-22 HSIP Program has over $19 M planned for road departure

mitigation projects within the district.

• I-77 ATSMS project award awarded in February 2014 for $9.6 M. Anticipated

completion by mid-summer 2016.

• Locality safety projects included Flashing Yellow Arrow (Roanoke)

• Shoulder widening, guardrail, rumble strips on three corridors

• Route 100 – Under Construction – $1.9 M

• Route 311 – Advertised December 2014 – $3.5 M

• Route 220 – Advertisement late 2015 – $3.7 M

Page 20: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

20

Salem District

Worker and Contractor Safety

• District Recordable Injury Rate and Lost Time Injury Rate continues to be

reduced.

• Leading causes include Strains, Struck by Object, and Walking Working

Surfaces (stepping in holes).

• Engage managers and employees in accountability for safe operations, using

a new Facilities Self Review checklist that informs and encourages safe

operations.

• Participate in annual Work Zone Awareness Week, April 11-15, 2016.

• Very focused on work zone training for installation and removal of traffic

control devices. Daily work zone review checklists are required of all work

areas.

• Coordination and notification for work zone is very important.

• Notify Traffic Operations Center at 1-888-782-7982 for all work zones

(sign/cone up to sign/cone down)!

Page 21: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

Salem Project Performance Project Development & Delivery

District Improvement Strategies:

• Continue working with our localities to help develop/monitor schedules and holding quarterly teleconferences to discuss project progress.

• DE, DME and DCE working closely with contractor’s senior managers and industry leaders to improve quality and program delivery.

• Added a third ACE to serve the Bedford and Martinsville Residencies and re-structured staff under the District Project Controls Engineer to improve

consistency with schedules / CTD’s and to help identify scope, constructability concerns, and industry resource constraints.

70% Target

32.8% 32.4%

District Obligations/Commitments

reporting discontinued; Measure

for this area being reworked

2016 Project Delivery (01/05/16 Dashboard data)

Year’s Active Green % Green

Contract Count On-time (Forecast)

CN 5 4 0 80% 77%

MN 86 77 1 91% 77%

CN 5 4 1 100% 82%

MN 86 80 4 98% 90%

Dashboard FY2016 On-Time Delivery Forecast

FundCompleted Green On-

timeTarget

Dashboard FY2016 On-Budget Delivery Forecast

FundCompleted Green &

Yellow On-budget

Active Green &

Yellow On-budget

% Green & Yellow (Forecast)

TargetYear’s

Contract Count

Page 22: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

22

Salem District Pavement Conditions

Page 23: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

23

Salem District Pavement Conditions

Page 24: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

24

Salem District Bridge Conditions

Page 25: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

25

Salem District Operations

Measure

Target

FY15

(July-Mar)

FY16

(July-Mar)

Travel Time

Reliability Index

Vehicle Hours of

Delay TBD 289,094 532,483

Median Incident

Duration 48 49.5 50.88

Vehicle Hours of Delay data source = RITIS Vehicle Probe Project

Incident data source = VaTraffic: Disabled Vehicles, Vehicle Crashes and Tractor-Trailer

Crashes on Interstates and at Special Facilities on Interstates

Strategies and Plans Going Forward:

• I-77 Active Traffic & Safety Management System/Variable Speed Limit

Project

• G4S – Beginning device testing with system integration to start

soon.

• Algorithm developed

• Day 1 operations program 90% developed.

• Valley View Boulevard, Southgate Drive and Exit 150 Projects continue.

• Signal Optimization

• Increasing the number of signals able to communicate to the TOC.

• Left turn phasing evaluations: Going from protected only to protect-

permissive phasing.

• Traffic Incident Management Training (2 classes)

Page 26: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

26

Robert Guercia, P.E.

and

Tommy DiGiulian, P.E.

Consulting Engineering Opportunities

Upcoming Construction Projects

Lynchburg and Salem Districts

Page 27: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

27

Intersection Improvements at Route

501 & 642

Halifax County

Est. Construction Cost -

$1.4 million

Advertisement –

November 8, 2016

Page 28: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

28

UPC Route Locality Project Description Projected AD Estimated Cost

90676 40 Charlotte County Route 40 over Louse Creek 2/9/2016 $4,963,149

106281 40 Charlotte Courthouse Pedestrian Safety in Charlotte Courthouse 3/8/2016 $494,901

104678 460 Campbell County Construct Offset Right Turn Lane at Route 656 5/10/2016 $429,154

108558 Various Districtwide DP3A17 Lynchburg Districtwide Secondary Pipe Rehabilitation 7/26/2016 $474,387

108559 Various Districtwide DP3A17 Lynchburg Districtwide Secondary Pipe Rehabilitation 7/26/2016 $242,964

107018 Various Districtwide Lynchburg Districtwide Curve Counter Measures 8/9/2016 $500,000

108200 Various Districtwide Districtwide Guardrail Upgrades 8/9/2016 $1,000,000

101037 761 Pittsylvania County Bridge and Approaches at Straightstone Creek 10/11/2016 $1,632,521

104951 501 Halifax County Construct Left and Right Turn Lanes at Route 642 11/8/2016 $1,369,211

104676 151/6 Nelson County Construct Left Turn Lane at Route 635 11/8/2016 $900,000

104677 151/6 Nelson County Construct Left Turn Lanes at Route 638 11/8/2016 $1,256,163

5240 610 Charlotte County Trench Widening and Overlay 12/13/2016 $1,238,262

12 Projects - Total Estimated Cost of $15 Million

Page 29: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

29

UPC Route Locality Project Description Projected AD Estimated Cost

105755 Revenue Sharing Campbell County Liberty Mountain Road – Construction of new alignment 3/27/2016 $6,035,929

106561

Transportation Alternatives Buckingham Buckingham Streetscapes Phase 3 5/31/2016 $224,000

107205 Revenue Sharing Danville Route 58 – Widen from 2 to 3 lanes. 6/30/2016 $1,050,000

107452 Revenue Sharing Lynchburg Liberty University Phase 2 Construction of New Road 6/30/2016 $3,200,000

107212 Revenue Sharing Lynchburg Pavement Overlay Project – Milling and Overlay of Various Streets throughout City 5/30/2016 $300,000

108420 Revenue Sharing Farmville Pavement Overlay Project – Milling and Overlay of Various Streets throughout Town 6/30/2016 $760,956

6 Projects - Total Estimated Cost of $11.6 Million

Page 30: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

Salem District

30

Page 31: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

31

Project Development

Consultant Engineering Opportunities

Route 220 Safety Improvement Project

Proposed Phases 1 and 2

Total Funding = $79 Million

RFQ Release Date – April 25, 2016

RFP Release Date – Fall 2016

Design-Build Contract

* Final project limits to be based on actual costs.

Page 32: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

32

UPC Route Locality Project Description Projected AD

Date

Estimated

CN Cost

($Millions) 56899 I-81 Montgomery/Pulaski

Counties

Interstate 81 NB Bridge and Rte. 232 Bridge Replacement 2016 $53.9

103210 220 Botetourt County Rte. 220 Replace 2 Narrow Structures 2016 $7.8

106802 99 Town of Pulaski/Pulaski

County

Rte. 99 - Paved Shoulder, Guardrail Replacement &

Lighting

2016 $1.2

97043 221 Bedford County Rte 221 & Rte 668 Intersection Improvements 2016 $0.4

107049 122 Franklin County Rte. 122 Safety Improvements 2016 $2.0

51916 668 Bedford County Rte. 668 Bridge Replacement Over Norfolk Southern

Railroad

2016 $3.5

104675 220 Henry County Rte. 220 Safety Improvements 2016 $3.5

96069 8 Montgomery County Rte. 8 & Rte. 669 Intersection Improvements 2016 $1.2

93277 122 Franklin County Rte. 616 & Rte. 122 Intersection Improvements 2016 $0.4

4544 606 Montgomery County Rte. 606 Rural Rustic Improvements 2016 $1.2

99542 81 Roanoke County Rte. 81 Exit 140 Park ‘n Ride Facility Expansion 2016 $3.1

67309 693 Pulaski County Rte. 693 Reconstruction 2016 $1.0

107053 24 Bedford County Rte. 24 Safety Improvements 2017 $1.5

107051 100 Giles County Rte. 100 Safety Improvements 2017 $3.6

11908 10th

Street City of Roanoke 10th

Street Reconstruction (Second Phase) 2016* $12.4

15 Projects - Total Estimated Construction Cost of $96.7 M

*Subject to HB2 Funding

Page 33: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

33 33 Projects - Total Estimated Cost of $39.3 M

UPC Locality Project Description Projected AD Estimated CN

Cost ($Millions)

87002 Henry Co Collinsville Streetscaping 2016 $1.30

106544 Henry Co Collinsville Street Signs, Ped Signals 2016 $0.07

98220 Roanoke Co Route 115, Plantation Road Corridor Improvements 2016 $0.90

103607 Roanoke Co Plantation Road Streetscape Improvements 2016 $3.10

101264 Pulaski Co Roundhouse St/Rte 11 Intersection Improvements 2016 $0.67

104128 Floyd Town of Floyd Heritage Pathways Phases 3-4 2016 $0.60

104241 Blacksburg Construct Sidewalk West side of Giles Road 2016 $0.40

104242 Christiansburg Storm Drainage Improvements 2016 $0.90

104248 Roanoke Franklin Rd Bridge Replacement 2016 $15.00

104252 Rocky Mount Scuffling Hill Drainage Improvements 2016 $0.72

104253 Vinton Glade Creek Greenway 2016 $0.23

105303 Montgomery Co SRTS Belview Elementary School 2016 $0.16

105304 Montgomery Co SRTS Auburn Elementary/Middle School 2016 $0.20

105738 Roanoke Glimer Ave Box Culvert Replacement Over Trout Run 2016 $0.55

105765 Blacksburg Construction of New Off Road Trail along Cohee Road 2016 $0.10

105766 Blacksburg Huckleberry Trail Segment – Downtown Blacksburg 2016 $0.10

105768 Christiansburg Drainage Improvements to Town Streets 2016 $1.00

105770 Christiansburg Storm Drains and Sidewalk Improvements 2016 $0.30

105772 Christiansburg Drainage Improvements – Hans Meadow Drive 2016 $1.00

105775 Blacksburg Research Center Drive Improvements 2016 $0.50

107275 Bedford Co Corporate Dr Extension 2016 $0.60

107281 Blacksburg Sidewalk Tripping Hazard Removal 2016 $0.03

107282 Blacksburg Traffic Signal – Glade Rd at University City Blvd 2016 $0.40

107283 Blacksburg Sidewalk Missing Links – Various Locations 2016 $0.11

107286 Christiansburg Pavement Overlays at Various Locations 2016 $1.00

107294 Giles Co Springdale Rd Reconstruction 2016 $0.12

107310 Roanoke Co Kenwick Tr Drainage Improvements 2016 $0.04

107312 Roanoke Co Belle Meade Dr Drainage Improvements 2016 $0.04

107313 Roanoke Co Merriman Rd Drainage Improvements 2016 $0.08

102763 Montgomery Co Rte 658 Meadow Creek Rd Realignment 2017 $1.09

105439 Roanoke Roanoke River Greenway – Bridge the Gap 2017 $7.00

106486 Salem Eddy Ave Bike/Ped Bridge 2017 $0.84

107298 Pearisburg Pavement Reconstruction and Overlay at Various Locations 2017 $0.12

Page 34: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

34

Dale Totten, P.E.

Maintenance Contracts

Lynchburg District

Page 35: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

• Predicted to exceed performance targets for Primary and Secondary Systems

by end of Calendar Year 2016.

• Residencies and district partners are engaged in planning pavement

solutions.

• Evaluating pavement locations and preparing for new paving projects

throughout the year.

35

Lynchburg District

Pavement Action Plan

Page 36: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

36

Lynchburg District Paving Mileage

Advertised

Page 37: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

37

Lynchburg District

Resurfacing Program

Treatment # of 2015

Contracts

2015

Quantities

Contract

Value 2015

# of 2016

Contracts

2016

Estimated

Quantities

Contract

Value

2016

Plant Mix 7 271,463 $30.5 M 6 215,000

Tons $24.3M

Latex 1

6,991

Tons

$2.4M 1 4,300

Tons $1.5M

Surface 3 5,593,335

SY $9.0M 3

5,400,000

SY $8.8M

Total 11 $42.3 M 10 $34.6M

2015 advertised Fall 2015 and Spring 2016 for CY2016

2016 advertise Fall 2016 for CY2017

Page 38: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

38

System 2016 Projects

Lane Miles

Estimated

Cost

Preliminary

2017

Lane Miles

Estimated

Cost

Primary 386 $33.0 M 216

$22.5 M

Secondary 1095 $ 9.3M 1360

$12.1M

Total 1481 $42.3 M 1576 $34.6M

Page 39: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

Lynchburg District currently has 113 structurally deficient (SD) structures:

• 81 - SD bridges

• 32 - SD culverts

Anticipate eliminating 34 SD structures in FY16:

• 17-SD bridges

• 17-SD culverts

Continued effort to target SD structures

• Focus on SD culverts (30 SD culverts on Secondary System)

Continue focus on Condition Yellow Structures

• In addition to the planned 34 SD structures;

• Replaced 2 posted (condition yellow) bridges

• Replaced 2 timber decks this year

Concentrate efforts on the Secondary System

• 98 of the 113 deficient structures

94.3% of Lynchburg’s VDOT maintained structures are non-deficient

39

Lynchburg District

Bridge Action Plan

Page 40: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

FY16

• Preventive Maintenance - $2.4 M • Restorative Maintenance - $0.7 M • Replacements - $7.3 M • Bridge Inspection - $3.3 M

FY17 • Preventive Maintenance - $2.5 M • Restorative Maintenance - $3.0 M • Replacements - $7.9 M • Bridge Inspection - $3.5 M

FY18

• Preventive Maintenance - $1.8 M • Restorative Maintenance - $1.7 M • Replacements - $7.7 M • Bridge Inspection - $3.7 M

40

Lynchburg District

Bridge Maintenance

Preventive Maintenance includes cleaning, joints, epoxy overlays and bridge painting.

Restorative Maintenance

includes rigid deck overlays and super/sub repairs.

Replacements includes

superstructure and culvert/pipe replacements.

Bridge Inspection

includes the scheduled inspections required for all structures (bridges and large culverts).

Page 41: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

Roadside

FY16 - $1.2 M

FY17 - $1.0 M

FY 18 - $1.0 M

Drainage/Pipes/Slopes

FY16 - $800K

FY17 - $800K

FY18 – 1.0 M 41

Lynchburg District

Other Maintenance Contracts

Page 42: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

42

Allen Williams, P.E.

Maintenance Contracts

Salem District

Page 43: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

43

Salem District

Pavement Action Plan

• Advertising target for paving was $53M.

• As of December 31, the district plans to pave 1327 lane miles.

• Based on planned paving, the district is predicted to meet performance

targets on the interstate and primary systems but not on the secondary

system in CY17.

• Currently the district has 0 lane miles with CCI < 30 on the interstate system.

Page 44: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

44

Salem District Paving Mileage

Advertised

Page 45: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

45

Salem District

Resurfacing Program

Treatment # of 2015

Contracts

2015

Quantities

Contract

Value 2015

# of 2016

Contracts

2016

Quantities

Contract

Value 2016

Plant Mix 27

230,255

tons

$36.6 M 30

263,448

tons

$39.2 M

Latex 3

8,807

tons

$3.5 M 3

8,958

tons

$4.1 M

Slurry Seal 2

1,421,361

SY

$3.7 M 3

1,454,706

SY

$3.5 M

Surface 6 2,66,227

SY $3.9 M 10

4,573,953

SY $6.8 M

Total 38 $47.7 M 46 $53.6 M

Page 46: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

46

System 2016 Lane

Miles

Est. Cost Preliminary

2017 Lane

Miles

Est. Cost

Interstate 25 lane miles $6.5 M 28 lane miles $7.9 M

Primary 336 lane miles $27.5 M 290 lane miles $24 M

Secondary 966 lane miles $19.6 M 718 lane miles

$17.6 M

Total 1327 lane miles $53.6 M 1036 lane miles

$49.5 M

Page 47: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

Salem District currently has 164 structurally deficient bridges.

• 86% of those bridges are in a plan.

• 22 are currently under construction.

• 96 are in the PE phase.

• 24 are in the Six-Year Program awaiting PE start.

Salem District is currently at 94.3% non-SD.

This is first time we have been above the 94% target.

We continue to target structurally deficient structures in our planning

• $11.9 million (30%) of our FY16 maintenance allocation targets SD structure

projects

• FY16 goal was to eliminate 14 SD structures (net); eliminated 41 so far but

anticipate pace of new SDs to increase in the coming quarters

We also continue to maintain our “Good” bridges

• Currently 663, 22% of our structure inventory, is rated 5

• $21.5 million (55%) of our FY16 maintenance allocation targets preventive and

restorative maintenance on “Good” structures 47

Salem District

Bridge Action Plan

Page 48: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

FY-16

• Preventive Maintenance - $12.6 M • Restorative Maintenance - $8.9 M • Replacements - $11.9 M • Bridge Inspection - $4.5 M

FY-17 • Preventive Maintenance - $5.1 M • Restorative Maintenance - $15.4 M • Replacements - $12.8 M • Bridge Inspection - $4.5 M

FY-18

• Preventive Maintenance - $6.9 M • Restorative Maintenance - $9.2 M • Replacements - $8.2 M • Bridge Inspection - $4.5 M

Preventive Maintenance includes cleaning, joints, and bridge painting.

Restorative Maintenance

includes deck overlays and super/sub repairs.

Replacements includes

superstructure and culvert/pipe replacements.

Bridge Inspection

includes the scheduled inspections required for all structures (bridges and large culverts).

48

Salem District

Bridge Maintenance

Page 49: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

49

Roadside

FY14 - $8.5 million

FY15 - $8.0 million

FY16 - $8.1 million

Drainage/Pipes/Slopes

FY14 - $12.0 million

FY15 - $14.5 million

FY16 - $17.6 million

Salem District

Other Maintenance Contracts

Page 50: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

50

Anne Booker, P.E., PTOE

Regional Traffic Engineer

Upcoming Project Opportunities

Lynchburg and Salem Districts

Page 51: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

51

Regional Operations

Strategies and Plans Going Forward

Focus on Real-Time Traffic Operations

• Signals, especially in support of detours

• Interstate 77 ATSMS with variable speed limits

• Smart Road Technology Funds will help fund ITS investments

• CCTV cameras

• Dynamic Message Boards

• 360 degree intersection cameras

Focus on Traffic Safety

• Continuing use of Flashing Yellow Arrow and backplates

• Roadway departure counter measure projects

• Residency-focused safety support and collaboration with paving schedule

Page 52: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

Statewide TOC and ATMS Programs

• As of March 1, Iteris is currently staffing the Traffic Operations

Centers (TOC) floor services in a 24-month contract.

• VDOT intends to re-procure SSP/TOC, ATMS, and ITS Maintenance

as three separate contracts.

• VDOT plans to coordinate between all three contracts using Program

Management and Support Services Contract.

52

Page 53: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

I-77 Active Traffic & Safety Management System Fancy Gap Mountain, Carroll County

• Objective: Integrated traffic management system will dynamically

adjust speed limits based on visibility

• Design Build Project awarded in February 2014 for $9.6 M

• Status: Contractor beginning sign testing with system integration with

the Salem TOC to follow soon

• Anticipated Completion: Mid-summer 2016

• System

53

Page 54: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

54

Regional Operations On-Call

Project Opportunities

• Contracts will have a one-year initial term with two, one-year

renewable terms for a maximum contract duration of three years.

• Signals - On-call regional signal contract advertisement serving

Salem, Lynchburg, and Bristol Districts (Bid Letting on 4/27/16).

• Guardrail - Upgrade existing guardrail or new installation. Scheduled

for completion by December 2017.

• Salem Guardrail – $2.1 M

• Lynchburg Guardrail – $1.6 M

• Pavement Markings – Refresh existing pavement markings, markers

and messages. Scheduled for completion by December 2017.

• Salem Pavement Markings – $3 M

• Lynchburg Pavement Markings – $1.7 M

Page 55: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

55

Regional Operations

Project Specific Opportunities

• Lynchburg District - Guardrail

− One scheduled advertisement in the next 6-8 months for guardrail

upgrades with an estimate of $1M

• Lynchburg District – Signs and Pavement Markings

− One scheduled advertisement in the next 18-24 months to replace

curve signage with an estimate of $900,000

• Salem District - Guardrail

− Four scheduled advertisements in the next 6-8 months for

guardrail upgrades with a grand total of $6M

• Salem District - Signs

− Three scheduled advertisements in the next 18-24 months to

replace ground mount signs with a grand total estimate of $2M

Page 56: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

56

Terry Meadows, P.E.

and

Robbie Williams, P.E.

District Construction Programs

Page 57: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

57

Focus Areas for 2016 Construction Season

• Project safety and work zone safety

• Pavement markings and work zone maintenance

• Quality construction both pavements and bridges

• Uniform tack application

• Schedule required prior to starting work

• Starting work within 15 days after Notice to Proceed

• Material invoices to be submitted prior to payment for work

Page 58: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

58

Specification Changes (Asphalt)

• Section 211 - 50 gyration mixes to improve quality

• Section 310 - Tack & Bond - Tack as a pay item

• Section 305 - RAP use as shoulder stone

• Section 315 - Scratch & Leveling Course – defines quantitative and

compensation

• Section 515 – Cold Planing (Milling) Operations – Requirements

(time and disincentives)

• Pilot Projects to emphasis quality (increased density and

consistency)

Page 59: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

59

MITS/PLAID

MITS/PLAID - MITS (Materials Inventory and Tracking System)

PLAID (Producer Lab Analysis and Information Details)

• Further implementation of system adding

• TL-102

• Control Charts

• Quality Management Report (QMR)

• Automatic Notifications

• Comparison Analysis (D2S) with flag

• Refined Access Control

Page 60: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

• Localities, consultants, inspectors and contractors should be

guided by the Locally Administered Projects Manual (Updated

February 2014)

http://www.virginiadot.org/business/locally_administered_projects

_manual.asp

• This Locally Administered Projects manual has been written to

assist the Local Public Agency (LPA) in the administration of

federal and state funded transportation projects.

• FHWA and VDOT are making concentrated efforts to ensure that

LAP projects are being executed in accordance with the

requirements of the LAP Manual.

60

Locally Administered Projects (LAP)

Page 61: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

61

Materials Certification School Program

• Transitioning to the Virginia Community College System.

Self Study Exams and Proficiencies

• Please contact Toni Quesenberry in Salem at 540-387-5381 or Bill Wise in

Lynchburg at 434-856-8105 for out-of-sequence “self study” and proficiency

exams.

• In Salem District, these exams are typically scheduled for every other Friday,

with a maximum of eight exams per date. Cut-off date for these exams is

November 30.

• In Lynchburg District, these exams are scheduled periodically. The cut-off

date is mid-December.

Page 62: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

62

Civil Rights

On-the-Job Training Manual for Standard Pre-Approved Job

Classifications

• A committee consisting of VTCA, VDOT, contractor, FHWA and Department of

Labor representatives was formed to update the training manual (last revised Jan.

1995)

• A draft of the manual was submitted by VTCA to the construction industry for

comment.

• Comments are due by Monday, May 2, 2016

If you have any questions about this manual,

Please contact:

VTCA at 804-330-3312

or any

VDOT Civil Rights Manager

Page 63: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

63

Environmental and VPDES Changes

Read permits and special provisions carefully.

• Permit conditions and time of year restrictions regarding

threatened and endangered species (i.e. bats, logperch, bog

turtles, others) continue to be major factors affecting projects.

Rain gauges and log are required.

• Inspections and completion of the Construction Runoff Control

Inspection Forms (C107) every seven calendar days and within

48 hours following a measurable storm event (0.25 inches).

Page 64: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

64

Environmental and VPDES Changes

• Temporary seeding required when operations are anticipated to be

suspended for greater than 14 days. Permanent seeding within 24

hours of reaching final grade.

• Concrete trucks may not be washed out on the ground.

• The SWPPP and VPDES permits for off-site facilities must be obtained

by the Contractor.

• Obtaining SWM (inspector) certifications will become a priority for both

VDOT and consultant inspectors.

Page 65: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

65

Contracts 2016 2017 2018 2019

Contract 1

(2014)

$1.5 m $1.65 m $1.65 m

Contract 2

(2014)

$1.5 m $1.65 m $1.65 m

New District

Wide

TBD TBD

New District

Wide

TBD TBD

TOTAL $3 m $3.3m $3.3 m TBD

Page 66: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

66

Contracts 2016 2017 2018 2019

Contract IV $1.5 M

Contract II

(2014)

$3.75 M $3.25 M

Contract III $3.75 M $3.25 M

Southgate $1.2 M $1.0 M $1.0 M

Exit 105 $0.6 M $1.2 M $1.2 M $1.2 M

New District

Wide

$1.25 M $3.0 M $3.0 M

New District

Wide

$1.25 M

$3.0 M $3.0 M

New District

Wide

$3.0 M

$3.0 M

Total $ 10.8 M

$ 11.2 M $11.2 M

$10.2 M

Page 67: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

67

Chris Winstead, P.E.

Lynchburg District Engineer

and

Ken King, P.E.

Salem District Engineer

Page 68: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

68

State of Good Repair

Page 69: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

69

State of Good Repair

Prioritization Process Schedule

Page 70: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

70

State of Good Repair Requirements

§33.2-369(B) and (C)

Page 71: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

71

State of Good Repair – Preliminary

Percentage by District

Page 72: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

72

HB2

District Number of Projects COST

Lynchburg 23 $ 85,765,598

Salem 19 $ 113,441,188

Page 73: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

73

HB2 Revised Funding Scenario

Salem District

Organization Name Project Title Project

Benefit Score PROJECT_HB2_COST

Score Divided

by HB2 Cost

GRTC Transit Accessibility Improvement on

Edgewood St.(Roanoke) 1.234 $ 350,811 35.162

Roanoke Valley TPO U.S. 220 Communications and Adaptive

System Project 1.154 $ 422,500 27.306

Henry County US 58 East Turn Lane Construction at US

58/220 By-Pass 3.403 $ 1,654,198 20.573

City of Galax Cranberry Road Improvements 6.220 $ 3,067,161 20.280

City of Salem Multimodal Improvements along

Boulevard-Roanoke for Veterans 1.537 $ 884,881 17.369

Carroll County Route 52 North Spot Improvements 5.172 $ 3,731,701 13.858

City of Roanoke Colonial Avenue Improvements 2.631 $ 2,545,000 10.336

City of Salem UPC 8753 East Main Street Route 460

Phase I 2.847 $ 2,912,984 9.772

County of Franklin Safety Improvements to Route 122 at

Route 636 Intersection 2.585 $ 2,718,576 9.510

Town of Blacksburg North Main Intersection Improvements at

460 Bypass 3.110 $ 3,316,565 9.377

New River Valley MPO Route 460 at Franklin Street EB Ramp

Construction 1.439 $ 2,124,395 6.772

Page 74: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

74

HB2 Revised Funding Scenario

Salem District

Organization Name Project Title Project

Benefit Score PROJECT_HB2_COST

Score Divided

by HB2 Cost

County of Roanoke Route 311 / Route 419 Int. Safety &

Congestion Improvements 1.143 $ 1,957,006 5.842

County of Roanoke Route 419 Widening, Safety, and

Multimodal Improvements 2.714 $ 4,853,432 5.591

Town of Christiansburg N. Franklin Street - Peppers Ferry Road

Connector Phase II 2.482 $ 9,340,000 2.657

County of Roanoke Lila Drive / Route 115 Intersection Safety

Improvements 0.280 $ 1,269,396 2.203

Roanoke Valley TPO Roanoke River Greenway--Green Hill Park

to Riverside Park 0.949 $ 4,542,105 2.090

Central Virginia MPO Route 221 Congestion and Safety

Improvements 1.456 $ 8,137,995 1.790

Botetourt County I-81 Safety Improvements from MM 166.5-

168.5 5.762 $ 35,151,285 1.639

Town of Christiansburg N Franklin St - Cambria St Intersection/N

Franklin Corridor 1.195 $ 7,841,152 1.524

City of Roanoke 10th Street Reconstruction 1.538 $ 12,451,245 1.235

Page 75: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

75

HB2 Funding Scenario Revisions

Salem District

Page 76: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

76

Adopted HB2 Recommendations Lynchburg District

Organization Name Project Title Project

Benefit Score PROJECT_HB2_COS

T Score Divided by

HB2 Cost

County of Prince

Edward US 460 at VA 307 16.859 $ 2,744,657 61.424

Nelson County Route 29/655 Intersection Improvement 2.915 $ 1,133,329 25.722

Central Virginia

Metropolitan Planning

Organization Waterlick Congestion and Safety

Improvements 6.954 $ 3,233,297 21.507

County of Charlotte Crafton Gates US 360/Rt.47 Intersection

Improvements Project 0.508 $ 255,691 19.849

Danville MPO Route 58-Route 311 Intersection

Improvement 6.241 $ 3,393,452 18.391

County of Halifax Route 601, Buckshoal Road Safety

Improvements 5.088 $ 3,016,656 16.866

County of Prince

Edward US 15/VA 692 Intersection (Kingsville) 4.460 $ 2,808,037 15.882

County of Buckingham Intersection 15 & 636 (Shepards Corner) 3.771 $ 2,652,279 14.218

Nelson County Route 151/664 Turn Lane 1.234 $ 925,177 13.340

County of Buckingham Intersection of W James Anderson Hwy & S

James River (60&56) 3.142 $ 2,967,687 10.588

City of Danville Mount Cross Road Widening Phase 1 1.248 $ 1,283,365 9.721

Page 77: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

77

Adopted HB2 Recommendations Lynchburg District

Organization Name Project Title Project

Benefit Score PROJECT_HB2_COS

T Score Divided by

HB2 Cost

Greater Lynchburg

Transit Company Central Business District Circulator 0.400 $ 479,348 8.351

Campbell Route 501 Turn Lanes @ Route 633 1.947 $ 2,478,998 7.853

County of Prince

Edward US 15/ VA 665 Intersection (Worsham) 3.445 $ 4,989,509 6.905

County of Charlotte Heartland Regional Business Park Entrance 0.514 $ 789,197 6.508

Campbell Route 501 Shoulder Widening 1.405 $ 2,171,487 6.470

Appomattox County 460/609 Turn Lanes 0.690 $ 1,182,981 5.834

Pittsylvania County Climax Road Improvements 0.495 $ 1,317,000 3.759

Town of Altavista Main Street and Lynch Mill Road

Intersection 0.847 $ 2,370,161 3.574

Appomattox County 460/630 Turn Lanes 0.232 $ 721,625 3.213

County of Amherst Route 682 Woody's Lake Road 2.029 $ 7,855,088 2.583

County of Halifax US 501 Passing Lanes and Shoulder

Widening 3.473 $ 19,794,412 1.754

Lynchburg Oddfellows Road Segment B2 2.796 $ 17,202,165 1.625

Page 78: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

Emphasis:

Virginia Unique Standards are more stringent than Federal standards.

Review applicable standards for compliance

Global Harmonization becomes effective June 1, 2016 to include labeling,

SDS and training of employees

Virginia Administrative Regulations Manual requires training and usage of

equipment and tools be in compliance with manufacturers

recommendations.

Reporting fatalities and catastrophes. Fatalities within 8 hours

Any work-related inpatient hospitalization, amputation or loss of eye within 24 hours

78

Safety Points

Worker and Contractor Safety

Page 79: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

• Review and update required

training

• Prepare personnel for the

day’s tasks.

Ensure staff is knowledgeable of:

• SDS Data and how to obtain

access while on site. Time is paramount in an emergency

• Virginia and OSHA emphasis on misclassification of workers – claiming

employees as independent contractors

79

Safety Points

Worker and Contractor Safety

Page 80: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

Lynchburg District Contacts

Chris Winstead, P.E., District Engineer

434-856-8173

Robert Guercia, P.E., Engineering, Planning & Investment

434-856-8174

Terry Meadows, P.E., Construction

434-856-8317

Dale Totten, P.E., Maintenance

434-856-8175

Anne Booker, P.E., PTOE, Traffic Engineering

540-375-0143

Chris McDonald, Operations

540-375-0114

80

Page 81: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

Salem District Contacts

Ken King, P.E., District Engineer

540-387-5348

Robbie Williams, P.E., Construction

540-387-5482

Tommy DiGiulian P.E., LS, Engineering, Planning & Investment

540-387-5356

Allen Williams, P.E., Maintenance

540-387-5346

Anne Booker, P.E., PTOE, Traffic Engineering

540-375-0143

Chris McDonald, Operations

540-375-0114

81

Page 82: Virginia Transportation Construction Alliance (VTCA) Joint ... · Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts April 26,

82

Questions?