VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS...

74
CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING JOB TO VERIFY GAS FLOW 2) CONTACT PRESSURE SUPERWSOR FOR RECONNECTION OF CONTROL LINE 2" ,154 109' 2" SPEC. # ________ PLASTIC .216 1,732' 4" STEEL ,188 SPEC. # ________ ~ 5,493' 4" SPEC. # ________ ___ ,188 2.536' 6" 6" 8" STEEL ,188 2,351' 2,867' UTILITY LOCATION CONTACTS a" PLASTIC .639 2.1 70' ,219 12" STEEL ,250 6' TELEPHONE: 513-533-3154 16" STEEL ELECTRIC: 513-421 -9500 TOTAL ACTUAL INSTALLED SAN SEWER: 859-578-7460 Ch%vTEST CONN PER STANDARD 7 7.1 SPEC. # ________ SrEEL 7,122' SPEC. # ________ -SrrEL- PLASTIC ,491 3,808' PLASTIC .395 --_I___ P _I_______- CORROSION ENGINEERING ,":',",:'iT - INSPEC ON M OPFRATI ON SUPERVISX DESIGN REVlEW OF COMPLETED CONSTRUCTION JOB STORM SEWER: 8 5 9 - 5 7 8 - 7 4 6 0 WATER: 859-441-0482 CABLE T V : 859-431 -0.300 MUNICIPALITY: 859-859-3666 ?:?JES AND NUMBERS REVIEWED REVIEW BY SPONSOR DATE- TYPE PATCH MATERIAL DATE NO PROPOSE0 45 NO INSTALLED ~ NO TESTED OK ~ (P/S INDICATOR) VSUALb ' JEEP -__-__--_--__-__- FIELD CHANGE REQUEST DOCUMENT REQUIRED: YES 0 NO 0 CONDITION DEUVERED OF TO PIPE JOB: COATING M E N PLASTIC SEPARATIONS INSTALLED GOOD[7 FAIR0 pooRO CONTINUITY OF COUPUNGS CHECKED 0 TRANSMISSION DESIGN DOCUMENT VALVES THAT H A M BEEN REQUIRED: YES 0 NO 0 INSULATION CHECKED GAS CONTACTS CONSTRUCTION: S FARLEY ---- CASING CHECKED FOR SHORT ABANDONED AND BOX REMOVED NO CHECKED (W): 51.3-287-2588 SUPERVISOR BLOCK = - = ! ! 8 - 8 - -I! = - FIELD PRESSURE TEST ALL PIPELINES REWIRED TESTING BEFORE PLACING INTO SERVICE, PRESSURE CHARTS AND FORMS SHOULD BE FORWARDED TO GAS ENGINEERING AND PLANNING REQUIRED TEST PRESSURE RANGE sUPERVsOR OR RECORDED BY ENGINEERING SPONSOR: D SCHULER (C): 513-509-0328 = - = - (W): 513-287-2152 = - =E.---.- DATE PLACED IN SERVICE M I N , L PSIG TO MAX 100 PSIG HOURS- MEDIUM ~ = ! ! = - DATE STARTED

Transcript of VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS...

Page 1: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

CPCN Filing April, 2008 Module 323

VI Cl Nl TY M AP N T S

CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING JOB TO VERIFY GAS FLOW 2) CONTACT PRESSURE SUPERWSOR FOR RECONNECTION OF CONTROL LINE

2" ,154 109'

2" SPEC. # ________ PLASTIC .216 1,732' 4" STEEL ,188 SPEC. # ________

~ 5,493' 4" SPEC. # ________ ___ ,188 2.536' 6" 6" 8" STEEL ,188 2,351'

2,867' UTILITY LOCATION CONTACTS

a" PLASTIC .639 2.1 70' ,219 12" STEEL

,250 6' TELEPHONE: 513-533-3154 16" STEEL ELECTRIC: 513-421 -9500 TOTAL ACTUAL INSTALLED SAN SEWER: 859-578-7460

Ch%vTEST CONN PER STANDARD 7 7.1

SPEC. # ________ SrEEL 7,122'

SPEC. # ________ -SrrEL- PLASTIC ,491 3,808'

PLASTIC .395

--_I___ P

_I_______-

CORROSION ENGINEERING

,":',",:'iT - INSPEC ON

M OPFRATI ON SUPERVISX DESIGN REVlEW OF COMPLETED CONSTRUCTION JOB

STORM SEWER: 859-578-7460 WATER: 859-441-0482 CABLE T V : 859-431 -0.300 MUNICIPALITY: 859-859-3666

?:?JES AND NUMBERS REVIEWED

R E V I E W BY SPONSOR DATE- TYPE PATCH MATERIAL

DATE

NO PROPOSE0 45 NO INSTALLED ~

NO TESTED OK ~

(P/S INDICATOR)

V S U A L b ' JEEP

-__-__--_--__-__- FIELD CHANGE REQUEST DOCUMENT REQUIRED: YES 0 NO 0 CONDITION DEUVERED OF TO PIPE JOB: COATING M E N PLASTIC SEPARATIONS INSTALLED

GOOD[7 F A I R 0 pooRO CONTINUITY OF COUPUNGS CHECKED 0 TRANSMISSION DESIGN DOCUMENT VALVES THAT H A M BEEN REQUIRED: YES 0 NO 0 INSULATION CHECKED

GAS CONTACTS

CONSTRUCTION: S FARLEY

---- CASING CHECKED FOR SHORT ABANDONED AND BOX REMOVED

NO CHECKED (W): 51.3-287-2588 SUPERVISOR BLOCK =- = ! !

8- 8-

- I ! =- FIELD PRESSURE TEST

ALL PIPELINES REWIRED TESTING BEFORE PLACING INTO SERVICE, PRESSURE CHARTS AND FORMS SHOULD BE FORWARDED TO GAS ENGINEERING AND PLANNING

REQUIRED TEST PRESSURE RANGE

sUPERVsOR OR

RECORDED BY ENGINEERING SPONSOR: D SCHULER

(C): 513-509-0328

=- =- (W): 513-287-2152 =- =E.---.-

DATE PLACED IN SERVICE

M I N , L PSIG TO MAX 100 PSIG

HOURS- MEDIUM ~

= ! ! =- DATE STARTED

Page 2: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

GAS D E P A R T M E N T R DUKE ENERGY 1 7 v-9

SOUTHEAST DISmlCT INSERTION FIELD PRESSURE TEST INSERTION FIELD PRESSURE E S T DIRECT FIELD PRESSURE TEST DIRECT FIELD PRESSURE TEST A U PIPELINES REWIRE TESnNC BEFORE PLACING INTO SERVICE. PRESSURE MARTS AN0 FORMS SHOULD BE FORWAROED TO GAS ENUNEERING AN0 PLANNING

A U PIPELINES REWIRE TESnNC BEFORE PLACING INTO SERWCE. PRESSURE WARTS AN0 FORMS SHOULD BE FORWAROED TO GAS ENGINEERING AND PLANNING

ALL PIPEUNES REQUIRE TESnNC BEFORE PLACING INTO P R W C E . PRESSURE CHARTS AN0 FORMS 4-1OULD BE FORWARDED To GAS ENGINEERING AND PLANNING

A U PIPEUNES REQUIRE TESTING BEFORE PLACING INTO

FORWAROEO TO GAS ENUNEERING AN0 PLANNING SERWCE PRESSURE C t i m r s AND FORMS mourn BE

A U JMNTS MUST BE SOAP TESTEO PER ST0 2 18 52:

REWIREO Esr PRESSURE RANGE: MIN P S G TO MAX P 9 G

HOURSpMEOIUM -

A U JMNTS MUST BE SOAP TESTEO PER ST0 2 I8 52 AU m i m w s r BE SOAP ESTEO PER sm 2 $8 5 2

REQUIRED E S T PRESSURE RANGE: MIN PSIG To MAX PSIG

ALL JOINTS MUST BE SOAP TESIED PER Sm 2 I8 52:

REOUIRED TEST PRESSURE RANGE MIN P s c To MAX JG

HOURS-.-----MEDlUN ~

TESTE0 BY DATE

REWIRED Esr PRESSURE RAN= MIN A S I C TO MAX P S I G

nouas-...---~~oi~~ ____ TEsm BY OATE

LEAK SURMY BY DATE

STREET

TESTED BY DATE

LEAK SURMY BY DATE

INSERTION FIELD PRESSURE TEST I I DIRECT FIELD PRESSURE TEST I INSERTION FIELD PRESSURE A U PIPEUNES REWIRE TESTING BEFORE PLACING INTO SEf?MCE. PRESSURE MARTS AND FORMS SHWLD BE FORWARDED TO GAS ENGINEERING AN0 PLANNING

DIRECT FIELD PRESSURE TEST W. PIPEUNES REQUIRE TESnNG BEFORE PLACING INTO SERVICE. PRESSURE CHARTS AND FORMS mmm BE FORWARDED To GAS ENGINEERING AND PLANNING I A U PIPEUNES REGUIRE TESTING BEFORE PLACING INTO

SERMCE. PRESSURE CHARTS AND FORMS mourn BE FORWARDED To CAS ENUNEERING AND PLANNING I I A U PIPELINES REWIRE TESTING BEFORE PLACING INTO

SERVICE. PRESSURE M A R 7 3 AND FORMS SHOULD BE FM~WARDED To CAS ENQNEERINC AND PLANNING

A U JMNTS MUST BE SOAP TESTED PER SKI 2 18 52

REWIRED TEST PRESSURE RANGE MIN PSIG To MAX p90

HOURSpMEDIUM ~

ALL JOINTS MUST BE SOAP TESTED PER STD 2 18 52:

REQUIRED TEST PRESSURE RANGE: MlN P S I G TO MAX P S I G

ALL mNrs M u s r BE SOAP TEsm PER sm 2 ia 5 2 I I ALL JCiNTS MUSr BE SOAP TESTED PER ST0 2 18 5 2

REQUIRED Esr PRESSURE RANGE NIN P s c To MAX pn~

REWIRED =si PRESSURE RANGE: MIN -sc To MAX p c l c HOURSpMEDIUM -

TESIED BY DATE

STREET

FROM TO

HWRS-MEDIUM - TESTED ar OATE

LEAH SURMY BY DATE

HOURS-.-----MEOlUN ____ TESTED BY DATE

STREET

FROM To I T E S ~ B y DATE

LEAK SURMY BY D A E

I STREET I 1 sram FROM TO --

INSERTION FIELD PRESSURE TEST INSERTION FIELD PRESSURE TEST DIRECT FIELD PRESSURE TEST DIRECT FIELD PRESSURE TEST A U PIPELINES REWIRE TESnNG BEFORE PIACING INTO SERVICE. PRESSURE CHARTS AN0 FORMS SHOULD BE FORWARDED To GAS ENGINEERING AND PLANNING

A U PIPELINES REWIRE lESnNG BEFORE PLACING INTO SERVICE. PRESSURE CHARTS AN0 FORMS SHWLD BE FORWARDED To GAS ENGINEERING AND PLANNING

ALL PIPEUNES REQUIRE TESIING BEFORE PLACING INTO I E R W C E . PRESSURE CHARTS AND FORMS SHWLD BE FORWARDED To GAS ENGINEERING AND PLANNING

A U PIPEUNES REaUIRE TESTING BEFORE PLAaNG INTO SERWCE. PRESSURE CHARTS AN0 FORMS SHOULD BE FORWAROEO io GAS ENUNEERING ANO PLANNING

A U JOINTS NUST BE SOAP TESTED PER Sm 2 18 52: AU mNrs Musr BE SOAP TESTED PER sm 2 18 52

REWIRED TEST PRESSURE RANGE MIN P S I G TO MAX p 9 1 G

HWRSpMEOIUM

TEsm BY DATE

DATE LEAK N R M Y B Y

A U JMNTS MUST BE SOAP TESTED PER Sm 2 18 5 2

REWIREO Esr PRESSURE RANGE. MIN P S G TO NAY P S I C

HOURSpMEDIUM _____ T E S m BY DATE

STREET

maM To

ALL .JOINTS M u s r EE SOAP i E s m PER sm 2 is 52:

REQUIRED Ksr PRESSURE RANGE MIN LSG To MAX p n c HOURSpMEOIUN ~

TESTED BY DATE

srmr

REQUIRED nzsr PRESSURE RANCE: MIN PSIG To MAX JG

HWRS-MEDIUM - TESTED ay DATE

LEAK SURMY BY O A K

FROM ro

INSERTION FIELD PRESSURE TEST INSERTION FIELD PRESSURE TEST DIRECT FIELD PRESSURE TEST DIRECT FIELD PRESSURE TEST

A U PIPELINES REWIRE TESTING BEFORE PLACING INTO SERWCE. PRESSURE MARTS AND FORMS mourn BE FORWARDED To GAS ENGINEERING AND PLANNING

A U PIPELINES REWIRE TESnNG BEFORE PLACING INTO SERWCE. PRESSURE CHARTS AND FORMS SHWW BE FORWARLIE0 TO GAS ENGINEERING AN0 PLANNING

ALL PIPEUNES REOUIRE TESTING BEFORE PLACING INTO SERVICE. PRESSURE CHARTS AND FORMS WWul BE FORWARDED To GAS ENGINEERING AND PLANNING

A U PIPEUNES REQUIRE TESllNC BEFORE PLACYNG INTO

FORWARDED TO GAS ENUNEERING AND PLANNING SERVICE. PRESSURE CHARTS AND FORMS mourn BE

A U JOINTS NUST BE SOAP TESTED PER SlD 2 I8 52: A U JMNTS MUST BE SOAP TESTED PER SKI 2 I 8 52

REWIRED Esr PRESSURE RANGE MIN ASIC To MAX p n c HOURS-MEOIUM ____

TEsm BY DATE

LEAK S U R M Y BY DATE

A U JMNTS MUSr BE SOAP TESTED PER Sm 2 I8 52

REWIREO xsr PRESSURE RANGE: MIN P S G TO MAX 4 G

HOURSpMEDIUM - TEsm BY OATE

STREET

ALL JOINTS uusr BE SOAP ~ s m PER sm 2 18 52:

REQUIRED TEST PRESSURE RANGE MIN PSG To MAX P ~ G

HOURS-------MEOlUM ______ TESTED BY DATE

REQUIRE0 TEST PRESSURE RANGE: MIN ASIC To MAX ~ 9 1 ~

HWRS-MEDIUM ~

TESTE0 BY OATE

LEAK SURMY BY DATE

STREET

INSERTION FIELD PRESSURE TEST INSERTION FIELD PRESSURE TEST A U PIPEUNES REWIRE TESTING BEFORE PLACING INTO SERVICE. PRESSURE CHARTS AND FORMS snoum BE FM~WAROED To CAS ENUNEERINC AND PLANNING

A U PIPELINES REWIRE TESTING BEFORE PLACING INTO SERMCE. PRESSURE MARTS AN0 FORMS SHOULD BE FORWARDED To GAS ENGINEERING AND PLANNING

DIRECT FIELD PRESSURE TEST

SERMCE PRESSURE cHmTs AND FORMS mourn BE FORWARDED To GAS ENGINEERING ANO PLANNING

REWIRED Esr PRESSURE RANGE:

A U PIPEUNES REQUIRE TESllNC BEFORE PLAaNC INTO

A U JMNTS MUST BE SOAP TESIEO PER Sm 2 I8 52

MIN P S G TO NAX P S l G

H O U R S ~ M E O I U M ~

TESTED BY DATE

STREET

FROM TO .-

DIRECT FIELD PRESSURE TEST ALL PIPEUNES REQUIRE TESTING BEFORE PLACING INTO I E R W C E . PRESSURE CHARTS /wD FORMS %WLD BE FORWARDED TO CAS ENGINEERING AND PLANNING ALL JOINTS MUST BE SOAP TESTED PER Sm 2 18 52: A U JMNTS MUST BE SOAP TESTED PER SKl 2 18 52.

REWIRED TEST PRESSURE RAN= MIN P S I G TO MAX P S I G

HWRS-------MEDlUM ____ T E S ~ B y DATE

DATE LEAK SRMY a y

REQUIRED r s r PRESSURE RANGE: MIN PSIG To MAX JG

HOURS-NEDlUM ~

TESTED BY DATE

LEAK SURMY BY OATE

ALL JOINTS MUST BE SOAP TESIED PER Sm 2 I8 52:

REauiRED m r PRESSURE RANGE: NIN PSG To MAX PSIG

HOURS-------MEOlUN ~

TESTED BY OATE

srmr FROM TO

STREET

FROM TO

Page 3: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

GAS DEPARTMEN DUKE ENERGY

0 100 200 DISTRICT 26 INSTALL 382' OF 6' SWPC - SP e* OF 2' PL - IP E?

=OF 6' PL - SP

-OF 6' PL - SP w' OF 6' PL - SP

OF 6' PL - SP

P O F 4- SWPC - SP

rn 3 INSTALL 331' OF 8' SWPC - SP

0 3 INSTALL 38' OF 8' SWPC - SP

p 3rn 11 INSTALL 378' OF 12' SWPC- SP

12 INSTALL 383' OF 8' SWPC - SP

3 m 8 ' OF 2' PL - SP

3-2. OF 2' PL - SP

203' OF 12' SWPC - SP

30' OF 12' swpc - SP 3j 17 INSTW. 382' OF 8' SWPC - SP

Dm 18 INSTAU. 180' OF 6'SWPC .- SP

a $ OF 6' PL - SP

Q-2' OF 6' PL - SP

=> @ INSTALL 383' OF 12' SWPC - SP

113' OF 6 ' S W '- SP

E? 29 INSTALL 619' OF 4" SWPC - IP

41' OF 4" SWPC - IP

32 INSTALL 28' OF 4' SWPC - SP E?

41 INSTALL 383' OF 12" SWPC - SP E?

-4, OF 6' PL - SP

- SHEET iy 1 3

\

E. ROBBINS ST.

SHEET #19

==E== _ _ - - -

MATCH LINE SEE SHEET 4 OF 73

PIPE SHEET ALL PIPE TO BE DIRECT BURY UNLESS OTHERWISE NOTED. DETAILS MAY HAVE SMALL AMOUNTS OF FOOTAGE LISTED.

75' OF 6" SWPC - SP 1 0 1 8 1 - ) 8 1 3 1 2 1 3 1 - 1 1

Page 4: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

383' OF 6' SWPC - SP

=* OF 2' PL - IP

E? 61 INSTAU 35' OF 6' SWPC - SP

41' OF 4' SWPC - SP

E? 91 INSTU 383' OF 6' SWPC - SP

58' OF 6' SWpc - Sp

OF 8' SwpC - Sp E? 95 INSTU 245' OF 6' SWPC - SP

=3l* OF 8' PL - SP

OF 2' p~ - ~p @ INSTAU. 422' OF 4- PL - IP

@ INSTALL 146' OF 2' PL - IP OF 2' PL - [p

OF 2' p~ - [p @ INSTAU. 495' OF 8' PL - SP

@ INSTALL 229' OF 2' PL - IP

@ INST' 480' OF 4- R - 1P

INSTAU. 383' OF 2' PL - IP Y

@ I N S T U 68' OF 8' PL - SP

m 2 4 ' OF 6' PL - SP

m m I@ INSTAU. 76' OF 8" PL - SP

@ INSTALL 349' OF 8" PL - SP

@NSTU 82' OF 4' SWPC- SP

S T U 54' OF 4' SWPC- SP

I@ INSTAL 229' OF 8' PL - SP

m O * OF 6" PL - SP F 118 INSTAU. 111' OF 4' PL - SP

-

w 3 Z 0

Q 2

v, n

W. 14TH ST.

GAS D E P A R T M E N T a DUKE ENERGY

MATCH LINE SEE SHEET 3 OF 73

PIPE SHEET ALL PIPE TO BE DIRECT BURY UNLESS OTHERWISE NOTED. DETAILS MAY HAM SMAU- AMOUNTS OF FOOTAGE USTED.

Page 5: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

C 0 f 101 7 13010 7 13013

7 13017

7 339670 7 13019

7 13020

7 13021

7 13023

7 15021

7 13027

7 12993

7 I5031

7 13032

7 13035

7 13036

7 m 2 3 7

7 100239 7 13039

7 I3011

7 4002Io 7 399903

7 I3050

7 13052

7 13051

7 13057

7 130%

7 13059

7 1 ~ 0 6 0

7 13061

7 13062

7 11725

7 3669

7 3677 7 3670 7 3680 7 3681

7 3682 7 3685

** GAS MAIN REPLACEMENT **I ** SERVICE CHECK LIST I

(SUBJECT TO STANDARD FIELD CH I l l I L,F*CI *.-.

IO# HSEn STREET NAME SlZE KIND LENGTH 0ST 14199 217 1ZTH E 1 PL 21 8

369563 218 12TH E I 1 / 1 PL 8 2

1 E

t

GAS D E P A R T M E N T m DUKE ENERGY

n In 7n \cJ/ SOUTHEAST DISmRICT "-I

Page 6: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

5269 5270 5271 5272 5273

GAS D E P A R T M E N T m DUKE ENERGY

w SOUTHEAST DISTRICT

Page 7: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

GAS DUKE ENERGY

SOUTHEAST DIS~RICT

Page 8: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

7 7 7 7 7 7 7 7

7 7 7 7 7 7 7 7 7

GAS D E P A R T M E N T m DUKE ENERGY

10685 312 P m w r 1 P L 8 3 E w

10686 3 1 s Pmmr I PL i a I EW

10687 31+ PLEAsmr I PL 9 8 W E

316 p m m r I PL 8 5 W E

10689 317 P W R N T I PL 17 3 Ew 10690 318 P m r 1 PL 17 1 W E

10691 319 P m r 1 PL I0 2 Ew 10692 320 Pmmr I PL 7 6 W E

10693 322 P m m r l P L 9 2 E w

10695 324 p m m r I P L B 2 E w

10696 325 masrnr 1 PL I8 2 Ew 10698 328 PLEASANT 1 P L 8 8 E w

10700 331 PLOSANT I PL 21 7 Ew 10703 335 P W T I PL 19 3 W E

10706 338 w x m r 1 P L 9 5 E w 10613 339 P m w r I 114 PL 21 2 1 EW

10708 31(1 Pmmr i 114 cu 8 3 N(

0 Y.9 SOUTHEAST, DISIRIC~

7 I 10709 312 P m m r I 114 PL 8 z EW

Page 9: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

GAS DUKE ENERGY

SOUTHEAST D I S ~ ~ l ~ ~

7 15488 1228 WHEDlR I PL 7 7 NS

I PL 7 1 NN 7 15489 1230 WHEaER 7 15490 1310 WEaER I 1/4 S 8 8 NS

7 15191 1316 WEaER I 1/4 CU 9 10 NS 7 15492 1318 WEaER I CU 8 7 SN

7 15943 I320 WE- 3/1 CU 7 9 NS

7 1519k 1322 WEaER t l / 2 S 7 4 SN

7 15495 1324 WEaER 1 1/4 S 7 I SN

7 154996 I327 WHEaER I 1/4 CU IS 1 SN --___--

Page 10: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

GAS DUKE ENERGY

SOUTHEAST olSmlCT '&

E L 1 4 4' - 4 5 DEG. WELD ELL 0 0 5 0 0 5 7 5 3 7 3

E L 1 6 8 " - 45 OEG. WELD ELL 0050057561 7 .EL17 1 2 " - 4 5 OEG. WELD ELL 0 0 5 0 0 5 7 5 4 9 6 E L 3 7 2' - 9 0 OEG. IPS BUTT FUSION ELL 0050057553 2 EL38 4' - 4 5 LEG. IPS BUTT FUSION ELL 0 0 5 0 0 5 7 5 5 4 4 .EL39 4 " - 9 0 DEG. IPS BUTT FUSION ELL 0050057555 5 E L 4 0 3" - 4 5 OEG. IPS BUTT FUSION ELL 0 0 5 0 0 9 1 3 9 4 4 EL43 6' - 45 OEG. IPS BUTT FUSION ELL 0 0 5 0 0 8 8 4 0 5 6 E L 4 4 6' - 9 0 OEG. IPS BUTT FUSION ELL 0 0 5 0 0 8 8 4 0 6 4

EL15 6" - 4 5 OEG. WELO ELL 0 0 5 0 0 5 7 5 5 9 a

c

I I

WE21

MAIN MATERIAL LIST

16" OR 3 9 - 6 2 C - S COUPLING 0 0 5 0 0 5 7 4 5 1 1 16" MJ CAP 0 0 5 0 1 1 6 4 4 9 3 16" ELL 45 DEGREE NON-STOCK 2 1 6 " OR 3 9 COUPLING 0 0 5 0 0 5 7 4 2 3 3 16" ELL 90 DEGREE 00501 1 7 8 7 5 1 16" X 8" REDUCING BUTT WELOOLET 00500 I I9656 2

I ITEM I DESCRIPTION I STOCK NO I EST IACTUA

MAIN MATERIAL LIST

I I I I I I I I I I I 1

I 1

RETIREMENT MATERIAL LIST

Page 11: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

GAS DUKE ENERGY

SOUTHEAST O,Sm,CT '&

EX. 16' (TO BE

INST+L 6" PL-SP AT 3 OF COV.

SEE SHEET 46

I I I 28 I I I* INSTALL 12" SWPC-SF

AT 3' OF CQV.

1+3* 15' I--+ 6'

I I SARATOGA ST. I I

e---

~ --+ q4-m

1+3* 15' I--+ 6'

I I SARATOGA ST. I I

e---

~ --+ q4-m I d- - - ? C Y f - -

Page 12: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

GAS DUKE ENERGY

SOUTHEAST oIsTR,cr

4 EX 6" GIG-SP (TO BE ABAN )

INSTAU 6' HEAT SHRINKABLE WRAP AT ALL 6" WELDS. (2 REQUIRED) INST$LL 6" SWPC-SP

AT 3 OF COV.

~ DETAIL "D" SEE SHEET 47 g g

IJt: 2b I

\ 3' SNCL E. 8TH ST. 2' WWCL GREENUP ST.

I I 1 i \ ! I ' I 34'

E. 8TH ST. INSTALL 6" PL-SP AT 3' OF COV. \

3' 10' \

\EX. 6" CIES-SP (TO BE AEAN)

HOUSE HOUSE # 1 1 1 #113

HOUSE HOUSE # I 2 5 #127

*INSTALL AT 3' OF 8' COV. SWPC-SP

SHRINKABLE WELDS.

INSTALL 8" HEAT WRAP AT ALL 8" (8 REQUIRED)

15'

SARATOGA SP. 8" SWPC-IP

-0" COV.) I I / I I DETAIL 'F"

SEE SHEET 48 \ I / - - - -

EX 16" SWPC-SP (3'-0" COV.) EX. 16" cias-sp

/" 3' OF cov* 4' I

210' W C L GREENUP ST. , I i i I I i l

Q Pr-

EX. 6" (TO BE

Page 13: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

w SEE MATCH SHEET LINE 10 SOUTHEAST D ~ S ~ ~ C T '&

EX 8" SWPC-SP

CONTEMPMTED 8" PL-SP MODlJLE 469

_____-I__. _ _ _ - - -

r--- --I ' I ----- s c L

28'

E. 10PH ST.

GAS D E P A R T M E N T m DUKE ENERGY 7 7

EX. 16" ClBS-SP< ' (TO BE ABAN.) I n,

I II

IP J

U i;

I I 1 1 I I

EX. 16" ClBS-SP (TO BE ABAN.)

* -*- -%.-..-'+- .-.,,-@-,,- -.*-...--.r-.-=.r--r-::

L!!I.L .: .-.... ,.. -. "<,:-.. .. . ..c .. .:.; ........... ..... . . .I ..... $,:.I c:^ .I*

,4 ,. -" 1 , ~ _.--

#'S

1 4 w 826 HOUSE - 8

18 '

I I E. 9TM ST.

I EX. 10" CIBS-SPI (TO BE ABAN.) w

m 2 2 m I I z*

I

INSTALL 12' HEAT SHRINKABLE ' WRAP AT ALL 12' WELDS. I (1 0 REQUIRED)

I

I I I AT INSTALL 3' OF 12" COV. SWPC-SP

I 1

I

26'

E. IOTH ST. DETAIL "H" SEE SHEET 49

Page 14: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

GAS D E P A R T M E N T m DUKE ENERGY

0 v.9 SOUTHEAST o,sm,cr && MATCH LINE SEE SHEET 1

EX. 6" CIBS-SP I (TO BE AEAN) > NOTE:

CONVERT ALL SP SERVICES ON E. 9 T H ST. EAST OF GREENUP ST. TO IP.

18'

E. 9TH ST. 24'

E. 9TH ST.

/EX. 10" CIBS-SP (TO BE ABAN)

I HOUSE #903

I \EX 10" CIBS-SP (TO BE ABAN )

I I ' I I I I I I I I I I I I

I I I CONC" INSTtL 2" PL-IP

DR AT 3 OF COV. HOUSE #213

HOUSE HOUSE 3' NSCL E. 9M ST. #209 #211

l---J- 3'

I 1 10' EECL GREENUP ST.

EX 6" SIPHON 1 2 9 7 (TO BE ABAN ) REMOVE BOX, STEM AND BURY

I ' I I I I I I IC i

1w

w

_I z

I I ' INSTA;U 8' SWPC--SP AT 3 OF COV.

I 1 I 2 I ;$ I $L I

> I I % C Y

=& I g* 26'

E. 10TH ST. G- EX 4" SW+PH-SP

0!3"L "J" (3'-0' COV )

I I I 1 I I I I 26'

I E. 10TH ST. -+ -G- ,,,,,,/EX. (3'-0" 4" SWPC+PH-SP COV )

DR. /-----I---

,/ /

4 3 c - - - - HOUSE

-7'1#1002 MATCH I INF

Page 15: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

GAS DEPARTMENT DUKE ENERGY 1 SOUTHEAST o,sTR,cT '1p?O Y . 9

NOTE: CONVERT ALL SP SERVICES ON E. 9TH ST. TO IP.

24'

E. 9TH ST.

EX 12" PL-IP (3'"" COV) /

\ \ \ \ \ \ \ \ \ G , \ \ \ \

\ I BIT DR I I CONC I DR.

HOUSE #231

INSTW 2" PL-IP AT 3 OF COV.

/Ex'

/--

STATION 72 EX 8" SWPC-AM0

/ ( 3 ' - 0 " COV ) / lAM01-003.3

EX 8" (3'-0"

SWPC-AM0 1 CQV )

Page 16: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

GAS D E P A R T M E N T O 7 7 DUKE ENERGY

HOUSE # 2 2

HOUSE #24

26'

E. ROBBINS ST. HOUSE

#26

L SE

EX 16' CIBS-SP (TO BE AEAN)

1 HOUSE #lo13 I

I I

I

I #lo19 ,

HOUSE #lo15 I HOUSE #lo17 I

HOUSE I

INSTALL 12" SWPC-SP AT 3' OF COV.

1 I I I I 1 I v/

W I ? cnn 3 0 0 - I*

L'

I SI

LINE SOUTHEAST ~ , s ~ , c ~ 'a w :T 13

INSALL 12' SWPC-SP AT 3' OF COV.

Q N C L _ _ _ _

'EX 16" CIBS-SP (TO BE ABAN )

w m (nN 3 0 0 - I=?=

Page 17: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

\

26'

E. ROBBINS ST.

MATCH LINE SEE SHEET 1 4

EX 6" CIBS-SP (TO BE ABAN )

HOUSE # 1028

MATCH LINE

, 1 3 '

I I I I I ~

INSTALL 8' SWPC-SP AT 3 OF COV.

3 0 0 - I%

' I 1; I W I

INSTALL 8" HEAT WRAP AT ALL 8" (1 0 REQUIRED)

Wu)

UlO 30 0- I*

GAS DUKE ENERGY

SOUTHEAST, DiSmlCT

SHRINKABLE wms.

26'

-E. ROBBINS ST. I HOUSE #220

Page 18: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

L

MATCH LINE SEE SHEET 15

GAS DUKE ENERGY

SOUTHEAST O,Sm,CT '&

INSTALL 4" PL DRIP PER STO. 2.18.53 3' NSCL E. ROBBINS ST. 158' WWCL PROSPECT AM.

MATCH LINE SEE SHEET 21 O l 8 l - l S l 3 1 2 1 3 1 - l l

Page 19: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

INSTALL 12" HEAT SHRINKABLE WRAP AT ALL 12' WELDS. (1 0 REQUIRED)

INSTALL 6" HEAT SHRINKABLE WRAP AT ALL 6" WELDS. (3 REQIJIRED)

INSTALL 4" HEAT SHRINKABLE WRAP AT ALL 4' WELOS. (3 REQUIRED)

30 '

E. 1 I T H ST.

' i \

\ /

I I I $ 1

INSTALL 12' SWPC-SP AT 3' OF COV.

I / I / I 1

DETAL "N" (KY 1 1 20)

I [ SEE SHEET CONTEMPLATED 9'' SWPC-SP MODULE 469

I BIT I I -___...-. 4 DR. +-...-.- I

_ _ 1 - - _ _ 1 - - -

DETAL "0" SEE SHEET 53

GAS DUKE ENERGY

MATCH LINE SOUTHEAST O , S ~ , C T '& SEE SHEET 1 6 ...

CIBS-SP ABAN.)

I 26'

I I I E. 1 ITH ST. I I I 1 I (KY 1 1 2 0 ) I

EX (TO BE 16" ABAN CIBS-SP ) _ _ _ _ - _ _ _ _ _

' EX 16" CIBS-SP \ ' (TO BE A B A N ) l

L...-.--

1 I

EX 8" CI S SP A \ /(TO B h k )

--l_...-.---...-. '/ N.CL 17 TO 4" BE CIBS-SP ABAN )

Page 20: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

GAS D E P A R T M E N T m DUKE ENERGY

MATCH LINE SEE SHEET 1 7

0 w SOUTHEAST &

m

it; w - z

W

Vvi t-

SL? VI

22'

LYNN ST. INSTALL 4" SWPC-SP AT 3' OF COV. ), I

END OF EX MAIN

I T _ I_

I BIT I I DR I

I BIT I I DR I

HOUSE #i i a

HOUSE

26'

#120 HOUSE HOUSE #124 #126

I I I I I I 1-

7- I I I

eri m o

I

I I I

I I I

-;I $1 1

I I I

$ 1

c j

I

MATCH LINE

U a 8 '

,DETAIL *a'' SEE SHEET 54 I:/ , I

HOUSE # l o 4 4

INSTALL 8" SWPC-SP AT 3' OF COV.

1 - 4 3 ,

INSTALL 8" HEAT SHRINKABLE WRAP AT ALL 8" WELDS. (8 REQUIRE[))

INSTALL 6" HEAT SHRINKABLE WRAP AT ALL 6" WELDS. (1 1 REQUIRED)

INSTALL 4' HEAT SHRINKABLE WRAP AT ALL 4" WELDS. (16 REQUIRED)

HOUSE #'S 153 - 157

28'

E. 1 I T H ST.

c W N z it;

W xx

Q W Z W v)

DETAIL "S"

I l l '

55

NOTE:

HOUSE HOUSE HOUSE HOCISI #211 #21.3 a215 #219

INSTALL 6" SwPC-SP CONVERT ALL SP SERVICES ON AT 3' OF COV. E. 11TH ST. EAST OF GREENUP ST. TO IP.

Page 21: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

GAS DUKE ENERGY

SEE MATCH SHEET LINE 1 8 SOUTHEAST DISTRICT

NOTE: CONVERT ALL SP SERVICES TO IP

EX 6" P7+PH-IP \ \ (3'"'' COV) \ \

\ \ \ \ \ \ \ \ \ \

\ $

\

INSTALL 4' HEAT SHRINKABLE WRAP AT ALL 4' WELDS. (1 5 REQLJIRED)

@ INSTALL 2" HEAT SHRINKABLE WRAP AT ALL 2" WELDS. (2 REQLJIRED)

3' WECL GARRARD ST.

HOUSE #lo1

HOUSE HOUSE # l o 2 # l o 3 0

2 W 01

HOlJSE HOUSE HOUSE HOUSE HOUSE HOUSE #152 #150 #137 #136 #135 #133

HOUSE HOUSE HOUSE I #117 # 1 1 5 #113 HOUSE #110

HOUSE # 1 30

HOUSE #151

28' HOUSE HOUSE HOUSE # 1 3 4 #132 #131

HOlJSE HOUSE HOUSE HOUSE # 1 16 # 1 1 4 #112 #111

' E. 11TH ST. (KY 1 120)

INSTALL 4" SWPC-IP AT 3' OF COV. / I / I

E. 11TH ST. (KY 11 20)

----

----e-------- ---- -$ -- -- -- -- -- - - -

--- INSTALL 2" SWPC-IP AT 3' OF COV.

EX. (TO 4" BE CIBS-SP ABAN) \EX 4" CIBS-SP (TO RE ABAN)

EX 4' CIC-SP HOUSE (TO BE ABAN)

I I I

#219 EX 4" CIC-RS-SP (TO BE ABAN)

HOUSE #331 \EX. 4" CIBS-SP

(TO BE ABAN.)

HOUSE #323

HOUSE HOUSE #313 #315

HOUSE HOUSE HOUSE #303 #305 #307

' I 1 - I 3' WECL GARRARD ST.

5' SSCL E. llTH ST.

0 -t

EX. 4" CIC-SP- (TO BE ABAN.)

Page 22: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

GAS D E P A R T M E N T O 7 7 DUKE ENERGY w

SOUTHEAST O I S m I C ~

5 il L il

NOTE: CONVERT ALL SP SERVICES TO IP \

\ \

/EX 6" P7i-PH-IP

INSTALL 4" H U T SHRINKABLE WRAP AT ALL 4- WELOS. (7 REQUIRED)

3' SNCL E. 11M ST.

26'

c 4 I T U cl-

,INSTALL 2' PL-IP AT 3' OF COV. /

----

EX 4" CIBS-SP (TO BE ABAN )

\ \ HOUSE HOUSE HOUSE HOUSE HOUSE HOUSE \ #403 #405 #407 #409 #41 1 #413 \ \ I \

' \ \

HOUSE HOUSE \ '\ #333 #335

\ \ \

-. MATCH LINE

SEE SHEET 26 I

Page 23: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

I GAS D E P A R T M E N T O 7 7 DUKE ENERGY

I PER STD. 2.18.53

I 67' E C L SCOTT ST. 2' SNCL BUSH ST.

11 19

I f l I I I

-7 I-6' I I I

__L I r 3

e I I I

I I I I I I I I I

I I I

22' I? I

I BUSH ST. I I ~ flNST+L AT 3 OF 2" COV. PL-SP

1 u T L =,_/SEE - ----- NOTE

-+ +EX. 3" SWPC-SP

SERVICE IO # l 1529 I

W P UlN 3 - 0- I* 7' r-

16" CIBS-SP BE ABAN)

26'

# 1220

I 1 Q E X (TO BE 16" ABAN CIES-SP )

Page 24: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

MAT( SEE c

24'

SH

BIT QR N.C.L.

22'

BUSH ST. ST. HOUSE BU #1116

I -I

HOUSE #2lO

I I--- L E k .

NOTE: CONVERT ALL SP SERVICES ON BUSt AND E. 12TH ST. EAST OF GREENUP

c

WINSTALL 6' SWPC-SP I I AT 3' cov. ST.

ST. TO IP. I t - : I ("n

I I I$ I

INSTALL 6" HEAT SHRINWLE WRAP AT ALL 6" WELDS. (9 REQUIRED)

E l * I

EX. 6" CIES-SP -)i I I

(TO BE AEAN.)

26' 26'

E. 12TH ST. (KY 1 120)

P ---0 I M

" ^ ---I- I

I ! I

;-I

v- ! I

MATC SEE S

INF

Page 25: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

GAS DUKE ENERGY

SOUTHEAST oIsmIcr EX 4" (TO BE

CIC-BS- ABAN )

0 d-

2 4'

HOUSE BUSH

HOLJSE HOUSE 31 4 316 320

m 4

INSTALL 2" PL-If' AT 3' QF COV. 24'

BUSH ST. HOUSE INSTALL 2" PL-IP #310

/AT 3' OF COV.

HOUSE HOUSE 328 330 HOUSE

#312 : I DETAIL "u" SEE SHEET 58

I I t;fR + 4 4 ' P;; I 1 I I t;f:

3 -

3 -

HOUSE #221

I HOUSE #223

I \EX 4" CIBS-SP (TO BE ABAN )

HOUSE #319

HOUSE #315

0 - I*

W N vlm 3.- 0- L*

-3' 26'

E. 12TH ST. 26'

E. 12TH ST. (KY 1 120)

\ I OR 3

-G- EX 4" PL-SP (3'-0" COV) TO BE CONVERTEfl TO IP \CONC{

1 - 1 1

L 4 r G-

EX 4" PL-SP

TO (3'-0" BE CONVERTED COV.) TO IP

(KY 1 120)

/ DET'L "2" SEE SHEET 58

I

' INSTALL 2" PL-IP AT 3' OF CQV.

NOTE:

Page 26: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

GAS w DUKE ENERGY

SOUTHEAST oIsIRIcT

20' 2'-

22'

BUSH ST. HOUSE HOUSE HOUSE HOUSE HOUSE #408 #410 #412 #414 #416

EX 2' PL VALVE #35763 . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

- _ $ _ _ - - - - - - . - - - . - - - - - - - - - - - - - - - - - ~ N C L

EX 2" P7+PH-IP

----------4liiiTiii----- - - - - - - - 7--- - - -- - - -

e+--- _ _ - - - - _ I

W M ---

(TO BE ABAN )

__ - - - __ - - J I/ / / / / < /

5" ST. / // ' / ' \ /

L - J /' ---'/ . ////

@$2) . , /' I --. ---. E.

I

/ 1 / vy -- -- <GL- . -.-- --- /. .

/' I'

/ /

/ /

- _/-- /

*- I

/ /. -- __ ---- _ - - - _ / . - - - - /-

- - - - - - ~ - - - - -

- __------- A-- / 0

--I-

/ / /-

/ /

.--

E. 12TH ST.

/ I / /

/. / I I

/ /

/ I

/ /-@--- I

I .--- I

/- /

--- ---SCL, / EX 6" SWPC-IP - --I- -c

.--- I

.--- /- / /-

, /

_rc -c . /

-c ---- .

/ /

/ ---------- /

/ /

/ + +-- /-- _ - - - - - - - - c---

_ _ _ _ _ - - - - - - - - - ------7- I r--=::,->

NOTE:

WEST OF PROSPECT AVE. AND ON E. 12TH ST. WEST OF WHEELER ST. TO IP.

EX 6" SWPC-SP CONVERT ALL SP SERVICES ON BUSH ST. (TO BE ABAN )

MATCH LINE - 8 1 - 1 8 1 3 ( 2 1 3 1 - 1 1

SEE SHEET 30

Page 27: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

GAS D E P A R T M E N T O -77 DUKE ENERGY

v2Y SOUTHEAST DlsTRlcr '& MATCH

SEE SHt E 2 3

I I

I I I I I I I I I I I I I I I I

I I I I I I I

I

I

I 3'+

I I

$ I _ _ -

I I I I I I

I 1 I1 I1 I1 I1

EX 2" P5-SP (INSERTED IN 2" S)

EX. 8" CIBS-SP' I (TO BE ABAN) 1\

'4. I I I

I I I I I I I I I I I I I I

I I I I I I I I I I I I I I I

I 10' -1

1 , CIBS-SP

ABAN ) I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I -I I I I I I I I

9-

I InN 3 - O N S*

15' I I l l

1 I I I I TREVOR ST. i 1 1 I

i I ~ i I 15'

ALLEY

EX 4" CIBS-SP

/INSTALL I 6" PL-SP AT 3' OF COV.

I

I 1 k3& & I

I Fl- / E I

415 01" 3 0

0 3

SHRINKABLE WELDS. I

I I I I I I I I I I I I I

I HOUSE I

#20

INSTALL 12' HEAT WRAP AT A U 12" (1 0 REQUIRED)

INSTALL 12' SWPC-SP AT 3' OF COV.

I

i 1 0 I B

I I I $ 1 I I

EX. 8" CIBS-SP (TO BE ABAN)

W P lnr) 3 N 0- riltr

,EX 4" P7-SP (3"O" COV.)

II/

26'

E. 13TH ST. 26'

E. 13TH ST. I 13'- b i EX. 4" CIBS-SP

(TO BE ABAN.) __ __ - - - - -

DETAIL "M" 1 a SEE SHEET 59

\ I I ,

J - INSTALL 6' PL-SP' MATCI AT 3' OF COV. SEE SI

Page 28: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

GAS DUKE ENERGY

SOUTHEAST oIsmlcT

I i 4

I I I I

-I I I 4 I I I I I I I I

T-

T

-P W

.It. k

I I I I I I I I I I I I -I 1.' 4 I I I I I I I I

$ 1 ' I I

* I

='

3

MATCH I SEE SHE€

NOTE: I 1 I I I I I I I I I+ Iw I I I I I I I--

J I 7 1

I I I I

4 - 9 I I I I I

lj/ I 1:1 I / I I / I I I 1 I I I I / I I I I I

I- 3'1

I ! I

I

I I I

I

c7"

I

I I I

I

-l

CONVERT ALL SP SERVICES ON E. 13 TH ST. AND TREVOR ST. EAST OF GREENUP ST. TO IP.

I I I I I I I .I

I I I I I I

+ ;I

1 I I I I I Ii Is I

EX (TO 6" BE CIBS-SP< ABAN ) ii I 4 i

=I Ji

I

I

I I 15'

I ! I I HOUSE HOUSE

15'

TREVOR ST. ST.

HOtJSE HOUSE #122 #124 EX. 4" CIBS-SP

(TO BE ABAN) / 2'

,EX 4" CIBS-SP (TO BE ABAN )

3 '

/EX. 4" CIBS-SP (TO BE ABAN ) 3'

I I

I I I I I I I I

I H;E

L 1: I I I I I I I I

I I r -

I HOW #21

--

HOUSE HOUSE HOUSE #207 8209 #211 HOUSE HOUSE

I I

1 I 14' EECL GREENUP ST. , , 2'-6" NSCL TREVOR ST.

I I I I I I I I I I I I I

.... I l l $: I

I

I I I

$1 9

I I N S T W 6" SWPC-SP 1 /(AT 3 OF cov. I I I I 22 INSTALL 6" HEAT SHRINKABLE

24' 22 I* (10 REQUIRED)

WRAP AT ALL 6" WELDS. I I I I I 26'

E. 13TH ST I '

I ! I I E . 13TH ST. I I HOUSE

#122 #124 1128 #130 # l 3 2 #134 I

TO BE ABAN) I

HOUSE HOUSE HOUSE HOUSE HOUSE , F X . 4" CIBS-SP

HOtJSE #112

HOUSE HOUSE HOlJSE I I

#2lO #212 #214 I HOUSE #116 I

I I I I I

I 1 BIT BIT EX. 4" GIBS-SP

i ( T 0 BE ABAN ) DR OR - 7 1

I I L - - - - - - - - - - . - - - - - --------

I I

_I_.- .................... . ." ll.-l..l_ .. .... ........... ........ .+,.. *- X I "--

i ... n

5

-

W \ 10' EECL GREENUP ST. 3' NSCL E. 13TH ST. AT 3' OF COV. [ O l S l - / S l 3 1 2 1 3 1 - l 1

'-$ - - - - - - 5

ii -T 7; ~~z-z-x-T -E-~~~~-cY-z-TT p 3: ___ ___ _ _ - - - - S - - - - - - - - - - - - - - L ' INSTALL 4" PL-IP

J L MATCH LINE

SEE SHEET 32

Page 29: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

GAS D E P A R T M E N T m DUKE ENERGY w

SOUTHEAST OISTRICT MATCH LINE SEE SHEET 24

NOTE: CONVERT ALL SP SERVICES TO IP

w 4

1 1 0' EECL GARRARD ST. 3' SNCL TREVOR ST. 22'

HOUSE HOUSE HOUSE HOUSE TREVOR ST

HOUSE HOUSE HOUSE HOUSE # 308 #310 #314 #316 #318 # 320 #322 #324 #326 #328 #330

14'

TREVOR ST. 3' WECL GARRARO ST.

- - - -_ . -

INSTALL 2" PL-IP AT 3' OF COV.

' INSTALL 2' PL-IP AT 3' OF COV.

2' 6' / HOUSE HOUSE HOUSE #217 #219 #221 #.31 1

HOUSE HOUSE #321 #323

HOUSE HOUSE #327 #329

u 1 1 0' EECL GARRARO ST. HOUSE 3' NSCL TREVOR ST. # 3 1 3

HOUSE #325

W u ) UIN 3 N 0- I*

I I I

w m UIN

0 - T'lt

EX 4" CIBS-SP (TO BE ABAN) -1 , , 4 I

1. n

EOK m Q

K K Q c3

3' SNCL E. 13M ST.

HOUSE HOUSE #316 26' #320

E. 13TH ST.

HOUSE HOUSE #222 #224

24'

E. 13TH ST.

HOUSE #314

HOUSE HOUSE #322 #326

HOUSE #218

HOUSE #220

HOUSE HOUSE #332 #334

3' SNCL E. 13M ST.

I

I

LINE ZT 32

100' EECL GARRARO ST. ST. 3' NSCL E. 13TH

'INSTALL AT 3' OF 4" COV. PL-IP lOl81-lEl312131-ll 3' 7'

30' WWCL GARRAR~ST. MAT I 3' NSCL E. 13M ST. SEE '

Page 30: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

GAS DUKE ENERGY

MATCH LINE SEE SHEET 26

NOTE: CONVERT ALL SP SERVICES ON TREVOR ST. 8c E. 13TH ST. WEST

3 N 0 -

w o 3N 0 - W7- m - OF WHEELER ST. TO IP. 3N

---- INSTALL 2" PL-IP AT 3' OF COV.

34' WWCL WHEELER ST. 2' NSCL TREVOR ST.

t-: v,

01 & w - _ _ I

w w 1 2:

26'

E. 13TH ST. E. 26'

13TH ST.

EX 2" P7-IP (INSERTED IN 4" CI) (2"" COV )

26'

E. 13TH ST. I I

SEW 0 ---"----+-"--

_.--e :- P

- - 7- - - - - - I 1 \ '- 'EX 2" SWPC-IP \

I I \INSTAU 4- PL-IP 3' 7' MATCH LINE EX. 6" SWPC+PH-IPY (3 ' -0" COV.) SEE SHEET 3 4 3' 7 ' AT 3' OF COV.

I

Page 31: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

GAS D E P A R T M E N T m DUKE ENERGY

EX 6" S-SP SERVICE ID# 008426 / MATC H-CLNE

I I

W - CnO 3r) 0 - S*

5'

9'

I INSTALL 6" PL-SP AT 3' OF COV. fl

I - , I

15'

PLEASANT ST.

I I I I

I I

12 121 I I I I I I

I I

w o I 0 - I =* I

I

CnN 3 0

HOUSE HOUSE HOUSE #27 #29 #31

15' 4" SWPC-SP

-0" COV) PLEASANT ST.

w t l ln0 3r) Q - IJt;

WlC CnO 3r) 0 - IJt;

W P , ln0 3r) 0 - I*

5" -1

I I I I I I I I I

I I I I I I I I I I

A

I

' I I I t I

4-l I J

I I

/ I

i ! 4

G I J

I

I I

E

4=---4- I I I I I I 1 ' I 1 1 I I I I I I I I 2; I. I =*

W N

0 -

I I $;fp $E WRAP INSTALL AT 8" ALL HEAT 8' WELLS. SHRINKABL

(1 0 REQUIRED) 1 1 , INSTALL 8" SWPC-SP

AT 3' OF COV. 3 24'

I PLEASANT ST. I 8 I Y % EX. 4" CIBS-SP

1 $: /(TO BE ABAN ) 1 . 4' 8'

I

I I I W ln

MATCH LINE SEE SHEET 36

I

Page 32: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

GAS D E P A R T M E N T m DUKE ENERGY

w SOUTHEAST o,slRlci '& INE

'T r 28

I I

-4 I I I I I I I

T

4 I I I I I I I

-I- I I I I

zg " F ,I

I I

4 I I I I I I I I I I

4 I I I

--I -1

I y I

I I I HOUSE I #I17

I I I I I

I I

I I I I

HOUSE HOUSE HOUSE HOUSE I # lo9 # 1 1 1 #113 #115

HOUSE #121

HOUSE #125

HOUSE #209

HOUSE #129

INSTAU. 6" HEAT SHRINKABLE WRAP AT ALL 6" WELDS. (1 0 REQUIRED)

I I /AT INSTALL 3' OF 6" cov. SWPC-SP I

I I/

i I

I I

w m m 0 3 m 0- I*

w o m - 3 m 0- 1%

W N m - 3r) 0- I*

NOTE: CONVERT ALL SP SERVICES ON PLEASANT EAST OF GREENUP ST. TO IP.

ST

I I 22'

HOUSf 220

I I - - - I I \INST+L 4" PL-SP

AT 3 OF COV. W - m N 3r) 0 - I"; HOUS HOUSE HOUSE

#215 #217 HOUSE HOUSE e209 #2 1.3 #211 HOUSE

#lo9 HOUSE

# 1 1 1 HOUSE # 1 1.3

HOUSE HOUSE HOUSE #117 #119 #121

W

5 2 8-

m m W P - m w 3 m 0 - I";

W o , mnt 3 m 0 - I*

Page 33: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

GAS DEPARTMENT 3 a DUKE ENERGY v2Y

SOUTHEAST D I S m l ~ ~

1 I ;

I HOlJSE HOUSE HOUSE HOUSE HOUSE I

#229 #221 #223 #225 #227

I I I -

22'

PLEASANT ST. 22'

PLEASANT ST. HOUSE #320 HOUSE

#222 HOlJSE I HOUSE HOlJSE

#230 #232 #234 I

I I I

tE;,C;,- - - EX. 4" STW+C-SFf@ - - - -

(TO BE ABAN) wl-

2 3 mr4 (TO BE ABAN)

HOUSE HOUSE #223 #225

HOlJSE #229

HOUSE HOUSE HOUSE #333

HOUSE #313 #319 #331

u- r*

W " m N 3" 0- r*

t-: v,

m N

EX (3'-0" 3" COV) PL-SP

EX 3" SYPHON #2544 END OF EX MAIN (TO BE ABAN )

W N In" 3" 0 - 1%

T! El NOTE: CONVERT ALL SP SERVICES TO IP

m N

I I

Page 34: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

HOUSE #336

HOUSE #338

EX (TO

22 '

PLEASANT ST. HOUSE HOUSE HOUSE #34O #342 #344

I I

_ _ - - - - - - - -

HOUSE #335

\EX (TO '4" BE ClBS-SP ABAN) I /X 4" SWPC+PH-Sf i ~~

(TO BE ABAN ) EX 4" DRIP BO EX 4" 5 w p c - s ~ (To BE (TO BE AEAN) y , REMOVE BOX, STEM AND BURY

go I ii 1 - EX 4" S T - S f ' Y l _ -

(TO .BE ABAN ) E- If) l ' , 1 1

3' WECL WHEELER ST. 3' SNCL PLEASAM ST.

GAS DUKE ENERGY

SOUTHEAST olsmlci '&

0 I l l =

EX 6" SWPC+PH-IP

I I I

I I I I I I I I I 1 1 I I I I I l l I 11 I I /I I I II I I X - 2

II I I 11 I IC3 I l l I t

: I f :

w o mv- 3 m 0 -

MATCH I INF

Page 35: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

I Y QUl I

I

d: I

26' -77 GAS D E P A R T M E N T O DUKE ENERGY

i"" W. 14TH ST. SOUTHEAST o~smcr

I 'L

INSTALL 4" PL-SP AT 3' OF COV.

G I I cn

I I

w m m - 3 P 0 - I*

- A -

3' ---.

L

I

c

IL-

I I I ,

I

EX 4" SWPC-SP

w o ln- 3 6 0 - TJt;

EX 6" CIMJ-SP (TO BE ABAN )

----- 1 CONC r - - - - DR

I I

Page 36: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

6PlDR

INSTAU. 6' PL DRIP PER SID. 2.18.53 '2

GAS DUKE ENERGY

SOUTHEAST O I ~ m R I ~ ~ MATCH I INF

Wm fflb 317 0 - 1%

I I I I

r- 4.i- z

S Y UY) t-

it; W

zttl m

I' PL-SI cov.

Page 37: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

>- A L L ]

Q 2 j

W U I

3 p 1 0- I*

m n

I I

b 5-

7-

I I i 1, *.I

I Y

I I I I I I I I I I I

I I I I I I

3

\I I I I I

4 X

I I I

Y I I

] I I I I

I \ I INSTALL 6' SWPC.-SP AT 3'.-a* cov.

w m mp1 3rl 0- T*

I ! I I / I I I I p!$ I I - O -

INSTALL 6" HEAT SHRINKABLE WRAP AT ALL 6" WRDS. (1 0 REQUIRED)

GAS DEPARTMENT(S1 7 7 DUKE ENERGY

Y 9 SOUTHEAST DIsTRIc~

NOTE: CONVERT ALL SP SERVICES ON BYRD ST. EAST OF GREENUP ST. TO IP

\ E EX 6" CIES-SP (TO BE AEAN)

W 6 v)O 3 d - 0- I*

HOUSE HOUSE 1 I HOUSE #211 #215

I I #209

I I

I I I I I I I I

Page 38: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

NOTE: CONVERT ALL SP SERVICES TO IP

26'

BYRD ST. HOUSE HOUSE HOUSE HOUSE #216 #218 #220 #222

W r ) UId 3r) 0- 1-

I I lDRl CONC.

HOUSEDR #217

'EX 6" CIBS-SP (TO BE ABAN)

INSTALL 2" PL-IP I

G 39 AT 3'-0" COV.

cn a

b E

E E Q c3

Ir_ " Q 1 1:

I I

I ! I I 1 ,

6'

3 I

I I

I

I

i .i I

;1 I

I

I

I

-j d d

-1 - - I

0 Z w Y

2 4

GAS D E P A R T M E N T m -77 DUKE ENERGY

v-9 SOUTHEAST oIsRRIc~

)I W u )

cnr) 3 m 0 - I*

w m c n n 3r) 0 - I*

w o cn-3 3 m 0 - r*

EX 3" PL-SP

TO (3'-0" BE CONVERTED COV) TO IP

' I BYRD ST. HOUSE

I / I 1 #326

I I ,DETAIL SEE SHEET "U" 64 I I I

Page 39: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

GAS D E P A R T M E N T R DUKE ENERGY

MATCH LINE SEE SHEET 34

,INSTALL 2" PL-IP e6, ,,,,-' AT 3'-0" COV

I I I

W O m m 3 m

EX 6" SWPC+PH-IP I , I (3'"'' COV)

NOTE: CONVERT ALL SP SERVICES ON WHEELER ST. AND BYRD ST. TO IP.

W l n m m 3 M 0- x*

EX, 4" ST-SP (TO BE ABAN)

Wr. v)M 3 M

0 - 1*

W l n v)M 3 M 0 - r*

cl z - 4 z >

!x Q I

LfL k LJJ N J

w w

I 1 1 I L - - t I

26' DETAIL 'MM" SEE SHEET 65

BYRD ST.

HOUSE HOUSE HOlJSE #402 #404 #406

I

71: %

r i I I I I

26'

BYRD ST. 26'

BYRD ST. ,

EX, 4" CIBS-SP (TO BE ABAN.)

I I I I

HOUSE # 3.32

HOUSE # 336

HOUSE #33a

HOUSE #340

HOUSE HOUSE #342 # 3 4 4

I I CONC

I ' DETAIL 'NN' SEE SHEET 65

I DR/

- ------I L- - - - -

ilNSTAU 4" PL-IP AT 3'-D" COV.

I I 3 ' 7 d L _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ - - - - -- T - i - . . _ - - -

I I I (TO BE ABAN) AND BURY

HOUSE HOUSE I HOUSE I I #409 #411 #413

I ,

I 1 I I #421 #423 #425 #427 HOlJSE I I HOUSE HOUSE HOlJSE HOUSE

#407

i L! 3

HOUSE HOUSE HOUSE #337 #339 #341 t-:

v,

!x * w

LLI w 71:

:-I

3:

>- LLI 1 -1 Q

J I

EX. 4" CIBS-SP (TO BE ABAN )

L

Page 40: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

GAS D E P A R T M E N T m DUKE ENERGY

106' W C L 3' SNCL W

W K

MATC SEE c

I ,I .

SNE T 35

I 1 I INSTALL 4" PL-SP AT 3'-0" COV.

3' RNCL NEAVE ST.

25'

W. 15TH ST. HOUSE HOUSE HOUSE

#la # 1 2 # l o

INSTALL 4" PL-SP / A T 3'-0" COV.

v-9 SOUTHEAST D I S ~ l C T '1p?O

-/-- - - - - - - - - //i . _ _ _ _ _ _ - - - -

EX. 3" CIES-SP

s c L -F - - - - - - - - - - -

L-------------------~---~

I I I I

EX 3" CIES-SPI (TO BE ABAN)

EX 3" CIBS-SP 1 , (TO BE AEAN) \

HOUSE I HOUSE HOUSE #29 HOUSE #27 #31

I I 3

I I I I I I I j # 2 3

HOUSE

#21 #19 #17 # 1 3

Page 41: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

GAS D E P A R T M E N T m DUKE ENERGY w

SOUTHEAST o,sTR,cr '6 INSTALL 6" PL-SP AT 3'-0" COV. \ MATCH LINE

SEE SHEET 36 I I 3 =

W M WlO 36- 0 - I* I I

! I 3' 0'

w w WlO 36 0 -

w m

39- 0 - L*

I l l I W - Wl- 39- 0 - r =I* 25'

W. 15TH S

W N

r*

AT 3'-0' COV.

I w 1 INSTALL 8" HEAT SHRINKABLE WRAP AT ALL 8" WELDS. I (6 REQUIRED)

EX. 12" . (TO BE

4 r -.I- ' I mn

tlr m n

! ' I-- -1-

I I I t

26

E. 15TH ST.

HOUSE #14

SEE SHEET 6 INSTALL 8" PL-SP AT 3'-0' COV. _- - - - - - - - - - - - - - - - - ;I' I

HOUSE # la

(TO BE ABAN)

Y

Page 42: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

GAS DUKE ENERGY

SOUTHEAST o I s ~ l c T '& INSTAU 4' PL-SP

/AT 3' OF cw.

i l I I I I I I I I I I I I I I I I I + I; I I I I I I I I I I I I I

0

I I I I I I I I I I I I I I I

41

I I I I I I I I I I I I I

L! 31

I I I I I I I I I I I I I I I I I I I I I I I I I I I

/ 4

I I I I I JNI

HOUSE #117

HOUSE #1410

2 3' L 4 9'

I

I

I

I

I

i I

I I

I

I

I I I

I

HOUSE # j i g HOUSE

#121

HOUSE #1409

I I I I I I I I I I I I I I I I I I I I

I I HOUSE

#212

I I j 1 1 I

HOUSE #1414

HOlJSE #1411 I I I INSTALL 6' HEAT SHRINKABLE

I I I (6 REQUIRED) WRAP AT ALL 6" WELDS.

1 1 I

I l l I 1 1 I

wlNST+L 6" SWPC-SP I ' 1 AT 3 OF COV.

HOUSE #1416

m r) HOUSE

# i 4 i a HOUSE #1417

EX 4" (TO BE

CIES-SP ABAN )

HOUSE #1422

HOUSE #214

HOUSE #216 HOUSE

28' #114

E. 15TH ST.

HOUSE #118

HOUSE #120 28' 28' HOlJSE

#1421

E. 15TH ST. E. 15TH ST.;

I INSTALL 8' PL-SP I AT 3'-0' COV.

DETAIL "TT" SEE SHEET 69 e _ _ _ _ _ - _ _ - _ -

I I I I I I

3' 10'

Y

'EX 4" CIC-SP c, (TO BE AEAN)

8- - --Ey-4~~~-. ------------------- (TO BE AEAN )

HOUSE #209 HOUSE #211

I I I I I I

I I a- m >

1 AS I I I I

K

Page 43: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

GAS D E P A R T M E N T O 7 7 DUKE ENERGY

28'

E. 15TH ST.

MATCH LINE SEE SHEET 38

Wu3 VI- 36- 0 - I*

w m ulr 36- 0 - r*

.EX 4" CIC-SP (TO BE ABAN)

I EX 4" CIBS-SP I (TO BE ABAN)

c-:

HOUSE HOUSE HOUSE HOUSE #217 #219 #221 #223

EX 6" SWPC-SP I (3'-0" COV) 4

HOUSE I I 1511

#225 1 I <

t

NOTE: CONVERT ALL SP SERVICES ON GARRARD ST. AND KENDALL ST. NORTH OF E. 15TH SP. TO IP.

I EX. 8" CIMJ-SP'

I I I

I (TO BE ABAN)

INSTALL 4" PL-SP AT 3' OF COV. \

%% MAIN ON E. 15TH ST. TO BE INSTALLED AT 15' SNCL OR 11' NSCL THIS MAY BE IN ME CENTER OF STREET CAR RAILS.

96' SSCL E. 15TH ST. 9' WECL ALLEY

'EX. 4" GVF # lo69 I (TO BE ABAN.) I

EX. 4" SWPC-SP (TO BE ABAN.)

r - +EX. 4" ST-SP SERVICE ID #357747

SOUTHEAST OISmlCT 0 & w

/,/,/a= 2' 12' WECL NNCL KENDALL E. 15TH ST. ST.

Page 44: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

GAS D E P A R T M E N T m DUKE ENERGY

Y

W N mr- 36 0 - I*

4 5’

I I I I i I I I I 1%

I i I I I >

I i I I

1 1

I I 5

W b VI- 2 b 0 - riff

WCD m - 36 0 -

urn In- 39- 0 - I*

INSTALL 2” PL-IP >AT 3’ OF COV.

NOTE: CONVERT ALL SP SERVICES ON WHEELER ST. NORTH OF E. 15TH ST. TO IP.

V I 0 30 0 - I*

UP. W O 30 0 - x*

w a l u 1 0 310

NOTE: 8” PL MAIN ON E. 15TH ST. TO BE INSTALLED AT 15’ SNCL OR

CENTER OF STREET CAR RAILS. 11 ’ NSCL. THIS MAY BE IN THE 0- I-

I I I

Page 45: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

UI

6 iii 5 W a!

20'

E. 15TH ST.

, , , ", , . , , . . . [ O l 0 l - l S l 3 1 2 1 3 1 - l 1

HOUSE #410

,EX. 4" CIBS-SP (TO BE ABAN ) I $ 1 I I

INSTALL 6" PL-SP AT 3' OF COV. zz

Page 46: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

Scn 3' SNCL E. ETH ST.

-

EX 6" SWPC-SPP (4'-0" COV)

- G -

S$,2'- - N C L E 8TH ST

~~~ INSTALL 6" PL-SP ,= / C U T d r c A P

EX. 6" CIBS-SP (TO BE ABAN )

,

DETAl L "A" (FROM SHEET 11)

N T S

A

a v)

EX. 12" DRIP if2398 u7 (TO BE ABAN)

REMOVE BOX. STEM AND BURY

1.4' CCPl c a m CT

GAS DUKE ENERGY

SOUTHEAST oIsTRIcT

D ETA1 L "B" (FROM SHEET 11)

N T S

Page 47: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

SWPC-SP

\EX 16" CIES-SP (3'"'' COV ) G I - INSTALL 6" HEAT SHRINKABLE WRAP AT ALL 6" WELDS. (4 REQUIRED)

D ETA1 L "C " (FROM SHEET 11)

N T S

GAS D E P A R T M E N T O 7 7 DUKE ENERGY

SOUTHEAST

6 a * *- a t 2

.o 9) j

""j+ Xt-

fy z

DETAl L "D" (FROM SHEET 12)

N TS.

Page 48: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

7-

3' SNCL E. 8TH ST.

---N C L E 8TH ST INSTALL 6" SWPC-SP

cnz m 14 I

o m u ~4 a - w 3 -,a

D ETA1 L "E" (FROM SHEET 12)

N T S

GAS D E P A R T M E N T m DUKE ENERGY 7 7

I DISTRICT

w w E (3

I '

Y

0' WWCL GREENUP ST. 4' SNCL SARATOGA ST.

EX 8 CIf35. \ \ (TO BE AEAF

N C L SARATOGA ST - - - - - N C L PARKING LOT

EX 16" C l E S - S P k - -

6' EECL GREENUP ST. c)

VCL SARATOGA ST.

DETAIL "F" (FROM SHEET 12)

N T S

Page 49: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

INSTALL 38' OF 8" S AT 3' OF COV.

OF a- SWPC-S?

N C L E 9TH S

CONTEMPLATED 8" PL-SP M ST ST.

CONTEMPLATED

CONTEMPLATED 8" SWPC-SP MAIN -a = -0 N

MODULE 469 (TO BE AEAN)

INSTALL 8" HEAT SHRlNKAB1.E WRAP AT ALL 8- WEUS. l - - c

Y

CONTEMPLATED 10" SWPC-SP M (4 REQUIRED) X A MODULE 469 " 2

2 (TO BE ABAN )

DETAIL "G" (FROM SHEET 13)

N T S

-G -t EX

a. v) I GAS DEPARTMEN a 2 DUKE ENERGY x;z Li SoUTHEAST DISTRICT

E. 10Tti ST. SCOTT ST.

- N C L E lOTH ST - --\EX 4" SWPC+PH-SP - G - (3"" COV )

EX 16" SWPC-SP (3'-0" COV)

C L E lOTH ST

E?;% $ =$:: t= G ; z ; a -9: j

5

I < I

0 - x w d w

z DETAIL "H"

(FROM SHEET 13) N T S

Page 50: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

a

/ 3' SNCL E. 9TH ST. 3' WECL GREENUP ST.

- N C L E 9TH ST INSTALL 8"

DETAl L "I " (FROM SHEET 14)

N T S

a v,

GAS DUKE ENERGY

sou- DISTRICT

a- Cl. cn z v) INSTALL 4" HEAT SHRINWELE I

m (4 REQUIRED) WRAP AT ALL 4" WELDS. A 2 2

0, 5

DETAIL "J" (FROM SHEET 14)

N T S

Page 51: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

c/> PL fl ' 4 \- - -\- - -

3' NSCL E. 9TH ST. 1NSl"AL.L 2' P L M ' 12' EECL PROSPECT AVE.

G"9 \', 0 9' EECL PROSPECT AM. $

7 9.r-1. \ 3' NSCL E. 9 m sr.

B fl

D ETA1 L "K" (FROM SHEET 15)

N T S

INSTALL 6" HEAT SHRINKABLE WRAP AT ALL 6" WELDS. (4 REQUIRED)

GAS n I

m a

ffl

n o DUKE ENERGY

INST+L 3' OF 6" SWPC-SP AT 3 OF COV. li.- 3' WECL SCOTT ST.

3' NSCL E. ROBBINS ST. w INSTALL 30' OF 12' SWPC-SP

3' EWCL SCOTT ST. AT 3' OF COV. 3' NSCL E. ROBBINS ST.

D ETA1 L "L" (FROM SHEET 16)

N T S

Page 52: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

A n

INSTALL 4' HEAT SHRINKABLE WRAP AT ALL 4" WELDS. (2 REQIJIRED)

@) INSTALL 6' HEAT SHRINKABLE WRAP AT ALL 6" WELDS. (2 REQUIRED)

3' WECL GREENUP ST.

3' WECL GREENUP ST. EX 4" CIBS-SP EX. 4" CIC-SP

INSTALL 6" PL-SP

>-c- - S C L E ROBBINS ST S C L E ROBBINS ST

3' NSCL E. ROBBINS ST. 5' WWCL GREENUP ST.

&: w w

INSTALL 40' OF 6' SWPC-SP AT 3' OF COV. 0

i c! 3

LL

3' WECL GREENUP ST.

DETAl L "M " (FROM SHEET 17)

N T S

E. ROBBINS ST. GREENUP ST.

3' SNCL E. 1 1TH ST.

AT 3' OF COV. a \ \ \./ 3' 25' SNCL WWCL E. S C \ T \ 1 1TH ST. \% N C L E 11TH ST

CONTEMPLATED ~*SWPC-SP MAI- 71 I

* , - - - 7 - - MODULE 469

CONTEMPIATED 4"PL-SP MAIN MODULE 469

(TO BE ABAN)

CONTEMPLATED 3" SWPC-SP MAIN MODULE 469

(TO BE ABAN)

EX. 4" CIBS-SP (TO BE ABAN)

D ETA1 L "N " (FROM SHEET 19)

N T S

GAS DEPARTMENT DUKE ENERGY

SOUTHEAST D I S m I ~ ~

7, I IINSTALL 6" SWPC-SP

EX. 4" CIBS-SP (TO BE ABAN ) _ - - _ . _ l _ l -

5' 3' SNCL EWCL E. SCOTT l l T H ST. ST. &"l -E x w

Page 53: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

n cn I 0

" c n ;$

DETAIL "0" (FROM SHEET 19)

N T S

SWPC -SP

GAS DEPARTMENT DUKE ENERGY

S O U T H E A S T DISmicr

a 3 7 w INSTALL CONCRETE w

RESTRAlM BLOCK PER STD. 2.18.40

N C L LYNN S T - - - INSTALL 4" SWPC-SP

- G - --.\EX. 4" CIES-sP (TO BE AEAN)

EX (3'-0" 4" PL-SP COV )

DETAIL "P" (FROM SHEET 20)

N T S

Page 54: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

Q

INSTALL 4" SWPC-SP

EX 4" CIBS-S (TO RE ARAN

a0 X t k l W

z_

11 2J DETAIL Q (FROM SHEET 20)

N T S

GAS DEPARTMENT DUKE ENERGY

ST= DISTRICT

a ffl

INSTALL 6" SWPC-SP EX 4" CIES-SP

(TO RE AEAN)

I $ ffl

% m i 5 2 %

5

m i m 6; P (D

X -- w _ I -I

z

DETAIL "R" (FROM SHEET 20)

N T S

Page 55: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

INSTALL 4" SWPC-

DETAIL "S" (FROM SHEET 20)

N T S

INSTALL 22' OF 4" PL-IP

fl 0 0' NNCL E. 11M ST.

AT 3' O F 7

25' WECL PROSPECT AM. 'C

GAS DEPARTMENT DUKE ENERGY

SOUTHEAST OISm,CT -

3' WECL PROSPECT AM. CUT TO FIT 0' WWCL PROSPECT A M .

3' SNCL E. 11M ST.

a ' x \ - ' N C L E l l T H ST

INSTALL 2' PL-IP N C L E 11TH ST -

INSTALL 4" SWPC-IP

DETAl L "T" (FROM SHEET 22)

N T S

Page 56: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

-0 T t x5

I / P 5"

21' SSCL E. 12TH ST. 9' EWCL MADISON AVE.

\

w P

i c! 3

9' EWCL MADISON A M .

-4 U'

2 1 ' SSCL t. l 2 l H SI. 12' RNCL MADISON AVE.1

-4 U'

2 1 ' SSCL t. l 2 l H SI. 12' RNCL MADISON AVE.1

I 21' SSCL E. 12TH ST. Lj 9' M C L MADISON A M . > a z 0 v, n 6 z a- a.

m z i -1 AS a 4 :: m m z

~-~~ I 21' SSCL E. 12TH ST.

9' M C L MADISON A M .

I g 6

z a- a. m z i

-1 AS a 4 :: m m

me X &' W z

D ETA1 L "U " (FROM SHEET 23)

N T S

n v) I 2

$ %

GAS DEPARTMENT DUKE ENERGY

DISTRICT

AT 3' OF COV.

INSTALL 2" HEAT SHRINKABLE WRAP AT ALL 2" WELDS. (2 REQUIRED)

6

J i m IF THERE ARE NO SERMCES ON BUSH ST. DO NOT INSTALL 2" MAIN.

L CL? m z (As

-e ./ m a C ) w . m

x

u3

W

D ETA1 L "V" (FROM SHEET 23)

N T S

Page 57: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

I v x (TO RE ABAN )

$! W

D ETA1 L "W" (FROM SHEET 23)

N T S I

R w LL:

R A!? GAS DEPARTMENT DUKE ENERGY

DISTRICT

L E. 12lH ST. GREENUP ST.

EX 6" PL-SP

- S C L E 12TH ST

EX 6" PL-SP (TO BE ABAN )

3' WECL GREENUP ST.

PL-SP

x - - (FROM SHEET 24) w J A d e N T S

z t ; w

Page 58: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

2.5' SNCL BUSH ST.

$ 4' WECL GARRARD ST. - 5.5' SNCL BUSH ST. I

E! . CU

D ETA1 L "Y" (FROM SHEET 25)

N T S

3' WECL GARRARD M.\ 3' NSCL E. 12TH ST.

- _ ) - - - - - I

EX. 4" PL-SPE\ TO BE CONVERTED TO IP - - - - 4

-G--

S C L E 12TH ST -. \ I INSTALL 36' OF 2' SWPC-IPI

I AT 3' OF cov"

GAS DEPARTMENT DUKE ENERGY

SOUTHEAST OlSTRlCr

INSTALL CONCRETE RESTRAINT BLOCK PER STD. 2.18.40 ' / I

\ "- - - N C L E 12TH ST - - +EX 4" PL-SP G - TO BE CONVERTED TO IP

4' WECL GARRARD ST. 3' NSCL E. 12TH ST.

c - S C L . E 12TH ST /

(FROM SHEET 25) N T S

Page 59: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

DETAIL "AA" (FROM SHEET 27)

N T S

GAS DUKE ENERGY

DISTRICT

%? t $6 EX 4" PL-SP (3'-0" COV) \ . I

(TO BE ABAN )

INSTALL 6" PL-SP

DETAIL "BB" (FROM SHEET 27)

N T S

Page 60: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

a cn I x 5 c f . 2 z

38' OF 4" SWPC-SP AT 3' OF COV. a

m i

2; m WRAP AT ALL 4" WELDS. 4 (2 REQUIREO)

y.. <

s. z T \

\ ------ - N C L TREVOR ST

I

--.I- 3' I , - --\EX. 4" CIBS-SP (TO BE ABAN) /

S.C L ALLEY - - - I 0 - - - S C L TREVOR ST - _ _ _ _ _ _ wE7Xeos)- c-..- -

I 3' EWCL SCOTT ST. 3' NSCL TREVOR ST. I

I

5' EECL SCOTT ST. 3' NSCL TREVOR ST.

N C L E 13TH ST- -

4 ' 0 Z L T :

\ I I I

\ '--

7 7 GAS D E P A R T M E N T m

DUKE ENERGY w SOUTHEAST o,sIR,cr

N C L E 13TH ST

EX 4" C I B S - S P k - ---- (TO BE ABAN )

INSTALL 3' OF 6' AT 3' OF COV.

INSTALL 6' PL-S

INST+LL 25' OF 12" SWPZ-SP x W u

z INSTALL 3' OF 6' SWPC-SP AT 3' OF COV.

INSTALL 6" HEAT SHRINKABLE WRAP AT ALL 6" WELDS. (4 REQUIRED)

D ETA I L " D D " (FROM SHEET 27)

N T S

Page 61: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

+EX. 4" CIBS-SP I (TO BE ABAN )

EX 4" CIBS-SP* - - - - - - _I

(TO BE ABAN)

c! INSTALL 65' OF 4' SWPC-SP 3 AT 3' OF COV. m

\---/ INSTALL 4" HEAT SHRINKABLE WRAP AT ALL 4" WELDS. (2 REQUIRED)

D ETA1 L "E E" (FROM SHEET 28)

N T S

9 0' WWCL GREENUP ST. = AT 3' OF COV.

INSTALL 6' HEAT SHRINKABLE WRAP AT ALL 6' WELOS. (2 REQUIRED)

DETAIL "FF" (FROM SHEET 28)

N.T.S.

GAS DUKE ENERGY

DISTRICT

a. v1

a 1 cn- 0 a. g m v)

04 :

A5 z

3' WECL GREENUP ST.

Page 62: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

3' EECL WHEELER ST. 3' SNCL E. 13TH ST.

I - ' I '.

- - N C L E 13TH ST

AND BURY

EX 4" CIES-SP

S C L E 13TH ST

z g %

Z L i 'Cro j .t4

z

3' WECL WHEELER ST. 5' NSCL E. 13TH ST. W

W W I iz i :

DETAIL "GG" (FROM SHEET 30)

N.T S

GAS DEPARlMENT DUKE ENERGY

SOUTHEAST DISTRICr

DETAIL "HH" (FROM SHEET 31)

N T S

Page 63: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

GREENUP ST - 1 / &

Y v)

a c: cn- 1 2 cn

a m < 3 z W

W

E$

W CY a #

u

i c! 3

I I

I I

I I / I

I I I

I /

/ /

I N C.L GREENUP ST -

INSTALL 4" PL-SP

I

I I I I L

w z A8

S C L I N S T W 35' OF 4" SWPC-SP I AT 3' OF COV.

INSTALL CONCRETE RESTRAINT BLOCK PER STO. 2.18.40

$

a cn

3 ar: V I 2

w E < V W lx

W m . o ' m a 4 e j i x- u

3 2 -

REMOVE BOX. STEM AND BURY.

3' SNCL PLEASANT ST.

- - N C L PLEASANT ST INSTALL 2" PL-IP

(TO BE ABAN )

8' SNCL PLEASANT ST.

INSTALL 6" ST. DRIP \ PER STD. 2.18.53

t- ffl

a 3 z w W

[r D ETA1 L "I I " (FROM SHEET 32)

N T S

GAS DEPARTMENT DUKE ENERGY

AT 3' OF COV. INSTALL 41' OF 4" SWPC-SP

SOUTHEAST DISmlCi a P v)

@ INSTALL 4" HEAT SHRINI(ABE WRAP AT ALL 4" WELDS. (2 REQUIRED)

MARTIN ST - EX 6" CIBS-SP (TO BE AEAN) I -. -.

\ \

3' WECL SCOTT ST. J

0 3 E t - - I

DETAIL "JJ" z

(FROM SHEET 36) N T S

Page 64: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

k- ' " a < a g.!l

3' 3'

N C L BYRD ST- INSTALL 2' PL-IF'

EX 6" CIES-SP END OF EX MAIN

EX 4 ' SCPC-SP I (TO BE ARAN) N

DETAIL "KK" (FROM SHEET 38)

N T S

GAS DEPARTMENT DUKE ENERGY

DISTRICT

3' SNCL BYRD ST.

INSTALL 4" PL-

EX 6" PIES-SP

D ETA1 L "LL" (FROM SHEET 38)

N T S

Page 65: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

2' WECL WHEELUi ST. 3' SNCL RYRD ST.

INSTAU 4' PL-IP - N C L BYRD ST _ _ . - -

EX. 4" cIc-sp)- - - - - - - - (TO BE ABAN )

D ETA1 L "M M '' (FROM SHEET 39)

N T S

E?:

n o I

0 Ek? w

T I - 3'- I-\ 3' SNCL BYRD ST.

6' WECL MARYLAND INSTALL 4' P ~ , C041

- - N C L BYRD ST

"'; I z z

c3 $0 a1

GAS D E P A R T M E N T R -77 DUKE ENERGY

DISTRICT

(D

X W

D ETA1 L "N N " (FROM SHEET 39)

N T S

1 0 1 8 1 - 1 8 1 3 1 2 1 3 1 - 1 1 1

Page 66: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

L i

3 % z l l o a K! n ' Q . a

4 L! 3 I

5' EWCL MADISON AVE.

I

I

N C L W 1 5 T H S T ; / l W

INSTALL 4" PL-SP

EX. .3" ClBS-SPt- - - - - - (TO BE ABAN)

/

5: EWCL MADISON AM. 5 SNCL W. 15M ST.

D ETA1 L "00" (FROM SHEET 41)

N T S

GAS DUKE ENERGY

DISTRICT

DETAIL "PP" (FROM SHEET 41)

N T S.

Page 67: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

1 1 'EWCL MADISONI\VE. 3' SNCL E. 15TH ST.

' I +p-lINsTALL 8" PL-SP

- - +EX. 3" PL-SP (TO BE AEAN.)

I 3 >I DETAIL QQ (FROM SHEET 41)

N T S

A GAS DEPARTMENT

DUKE ENERGY

SOUTHEAST D15TR,cr G lA

WRAP AT ALL 8' WELDS. (4 REQUIRED)

INSTAU_ 78' OF AT 3' OF COV.

N C L E 15TH

EX 4" SWPC-SP\- - - - - - (TO BE AEAN )

TO REMAIN IN SERVICE ' I i - EX 8" DRIP #12622

D ETAI L "R R (FROM SHEET 41)

N T S

Page 68: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

P 4 INSTALL 4' HEAT SHRINKABLE WRAP AT ALL 4" WELDS. (2 REQUIRED)

CUT TO Fm 0' WWCL GREENUP ST. 3' SNCL MARTIN ST. I

GAS DEPARTMENT DUKE ENERGY

DISTRICT

REMOVE BOX. STEM ' I I AND BlJRY

EX. 6" CIBS-SP (TO BE ABAN.)

D ETA1 L " S S " (FROM SHEET 42)

N T S

Page 69: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

a m - A$ E$

xg T I

u - w h m

w .-*

N C L E. 15TH S T - - - '

AT 3' OF COV.

\ S C L E 15TH ST - ---- \

\

I I I I I I I

I

I c v)

a 3 z w w e 0

4 c! 3

WECL GREENUP ST. SNCL E. 15TH ST.

WECL GREENUP ST. SNCL E. 15TH ST.

3' SNCL E. 15rH ST.

3' SNCL E. 15TH ST. -N.C L E 15TH ST

INSTALL 8" PL-SP

- - - - - - - -\EX. 4" CIC-SP (TO BE ABAN)

58' OF 4" SWPC-SP AT 3' OF COV.

/ - - S C L E 15TH ST / /

/ /

INSTALL 4" HfXT SHRINKAJ3LE WRAP AT ALL 4" WELDS.

/ I (4 REQUIRED)

I 4i TI I

GAS DUKE ENERGY

SOUTHEAST D,STRICT

DETAIL "TT" (FROM SHEET 42)

N T S

i d L

Page 70: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

INSTALL N c L E 8" i5Tn PL-SP sTw-21~ INSTALL 8" PL-SP

EX 4" C I C - S P F - - - - - --\EX. 4" ClBS-SP (TO RE ABAN ) n (TO BE ABAN.)

INSTAU. 70' OF 6' PL-SP AT 3' OF COV.

S C L E i 5 ~ n ST,

a INSTALL CONCRETE RESlRAlNT BLOCK PER STD. 2.18.40

3' MlCL GAI 11'SSCL E.

iRAf?P ST. 15TH ST.

I +EX. 8" CIMJ-SP (TO BE ABAN.)

D ETA1 L "U U " (FROM SHEET 43)

N T S

GAS D E P A R T M E N T m DUKE ENERGY

INSTALL 8" PL-SP

15' SNCL E. 15TH ST. 9' WECL ALLEY t

DETAIL "W" (FROM SHEET 43)

N T S

Page 71: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

P 4 N C L E 15TH c L E I ~ T H ST

EX 4" CIES-SP EX 4" CIES-SP

I N S T W STALL 8" PL-SP AT 3 0

INSTALL 8" PL DRIP PER STD. 2.18.53

15' SNCL E. 1 5 M ST. 35' WWCL MARRAND W

.: # 2

X -2 W

DETAIL " W x (FROM SHEET 44)

N T S

GAS D E P A R T M E N T m DUKE ENERGY

SOUTHEAST oIsmIcI

15' SNCL E. 15TH ST.

INSTALL 8" PL-SP INSTALL 8' PL-SP

INSTALL 68' OF 8" PL-SP AT 3' OF COV.

EX 4" CIES-SP END OF EX MAIN

_I

V w

D ETA1 L " X X " (FROM SHEET 44)

N T S

Page 72: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

/EX. 4" DRIP 15306

EX 4" CIES-SP (TO RE ARAN )b

N C L E 15TH ST,

15' SNCL E. 15TH ST.

3' WECL EASTERN AM. J,, \ 17' SNCL E. 15TH ST. INSTAU 6' pL PER STD. 2.18.53

?!

;..Q K ' 2 Gh- w

c3

I > < JO

t

D ETA1 L "YY" (FROM SHEET 45)

N.T.S.

P 4 GAS DEPARTMEN

DUKE ENERGY

SOUTHEAST oIsTRIcT

J

c! 3 I L i I I I

\ ' - _ _ _ _ N C L E 12TH ST INSTALL 4" PL-IPt ,

3' NNCL E. 12M ST. 7' WECL WHERER ST. I

N C L E 12TH ST __ __ __ __ __

I I, __ __ __ __ EX. 6" SWPC -1P

- j ~ 3 ' - 0 " COV.)

G--

D ETA1 L "ZZ (FROM SHEET 26)

N.T S.

Page 73: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

G- EX. 4" PL - SP (TO BE CONVERTED TO

GAS DEPARTMEN DUKE ENERGY

SOUTHEAST D,sTR,cr

3' 4' 2' P 47' WWCL WHEELER ST.

4" E

PL-IP 12TH ST

I N C L E 12TH ST _ _ _ _ _ _ _ _ _ -f _ _ _ _ _ _ _ _ _

L - _I 4 E X . 6" SWPC -IP (To BE ABAN.)

DETAIL "MA" (FROM SHEET 26)

N T S

Page 74: VI Nl TY M AP cases/2008-00139/Duke_Maps...CPCN Filing April, 2008 Module 323 VI Cl Nl TY M AP N TS CONSTRUCTION NOTES: 1) CONTACT GAS SYSTEMS OPERATIONS SUPERWSOR PRIOR TO STARTING

, D ETA1 L " A M " (FROM SHEET 26)

N.T.S.