Verification “Auditability” Can Be “Free” James H. Jones Optants Documented Decision Support...

22
Verification “Auditability” Can Be “Free” James H. Jones Optants Documented Decision Support Company (ODDSCO) www.optants.com
  • date post

    20-Dec-2015
  • Category

    Documents

  • view

    216
  • download

    1

Transcript of Verification “Auditability” Can Be “Free” James H. Jones Optants Documented Decision Support...

Page 1: Verification “Auditability” Can Be “Free” James H. Jones Optants Documented Decision Support Company (ODDSCO) .

Verification “Auditability” Can Be “Free”

James H. Jones

Optants Documented Decision Support Company (ODDSCO)

www.optants.com

Page 2: Verification “Auditability” Can Be “Free” James H. Jones Optants Documented Decision Support Company (ODDSCO) .

2

Verification “Auditability” Can Be “Free”1. Definitions of Key Words

• Auditability: Requirements clarity and traceability from elicitation through V&V.

• Permutation: A distinct and meaningfully separate instance of a requirement that must be part of a comprehensive verification.

• Requirement: A statement specifying a mandatory characteristic or some functional behavior to be provided by product/process.

Page 3: Verification “Auditability” Can Be “Free” James H. Jones Optants Documented Decision Support Company (ODDSCO) .

3

Verification “Auditability” Can Be “Free”1. Definitions of Key Words (Continued)

• Validation: Determining if “the right system was built” (for customer/user).

• Verification: Determining that “the system was built right” (according to specification).

• Verification Audit Support Standards: (VASS) Use of Requirements Management methods that automate the “auditability” of requirements verification.

Page 4: Verification “Auditability” Can Be “Free” James H. Jones Optants Documented Decision Support Company (ODDSCO) .

4

Verification “Auditability” Can Be “Free”2. Benefits of Audit Support Standards

• Assists proper system allocations.

• Supports % Complete project metrics, from each requirement to entire specification.

• Assists detailed technical review of plans and procedures for requirements V&V.

• Supports audit of V&V development tasks at any time during the project.

Page 5: Verification “Auditability” Can Be “Free” James H. Jones Optants Documented Decision Support Company (ODDSCO) .

5

Verification “Auditability” Can Be “Free”3. System Engineering 101 (FRAT)

• Functions are product “needs” from the user or customer perspective.

• Requirements specify mandatory function, performance, and qualification objectives.

• Architecture is an implementation concept for a specification fulfilling product.

• Testing (V&V) confirms (or denies) that the system fulfills all of its requirements.

Page 6: Verification “Auditability” Can Be “Free” James H. Jones Optants Documented Decision Support Company (ODDSCO) .

6

Verification “Auditability” Can Be “Free”4. Typical RVTM Format

[SYSTEM] REQUIREMENTS VERiCATION TRACE MATRIX

PS ID System Requirement SS ID# Allocated Requirement VP ID# Comment

3 Functional Requirements S_3 Functional Requirements N/A Header Label

3.1 Subsection 1 Title N/A N/A N/A Header Label

3.1.1 Category 1 Title N/A N/A N/A Header Label

3.1.1.1 System shall (requirement 1) E_3.4.7.3 CPU shall (provide function) E_3.1.2

3.1.1.1 S_3.3.2.1 SW shall (provide function) S_3.3.14

3.1.1.2 System shall (requirement 2) M_3.3.2.1 SW shall (provide function) S_3.2.1

... ... ... ... ... ...

4 Design Qualification S_3 Design Qualification N/A Header Label

4.1 Subsection 1 Title N/A N/A N/A Header Label

4.1.1 Category 1 Title N/A N/A N/A Header Label

... ... ... ... ... ...

Page 7: Verification “Auditability” Can Be “Free” James H. Jones Optants Documented Decision Support Company (ODDSCO) .

7

Verification “Auditability” Can Be “Free”5. Basic Requirements Writing Rules

• Although they may swap designation with priority change, differentiate requirements and “desirements” (non-mandatory items).

• Limit requirements to one function, unless listing closely affiliated items.

• Avoid implicit requirements.

• Avoid “shall not” wording that requires test of universe to prove a negative.

Page 8: Verification “Auditability” Can Be “Free” James H. Jones Optants Documented Decision Support Company (ODDSCO) .

8

Verification “Auditability” Can Be “Free”5. Requirement Writing Rules (Continued)

• Avoid redundancies of “be capable of”or “be able to” (use direct action verb).

• Until fully verifiable by instrumented test, demonstration, inspection, or analysis, a requirement is not valid. (So, be cautious with adverbs and, when possible, replace adjectives with measurable values, ranges, or limits.)

Page 9: Verification “Auditability” Can Be “Free” James H. Jones Optants Documented Decision Support Company (ODDSCO) .

9

Verification “Auditability” Can Be “Free”5. Requirement Writing Rules (Continued)

• A Formal Specification Language approach uses the following standard form for all the requirement statements:

[Optional qualifier,] The (system/subsys-tem/process name) shall [use “should” or “will” if a desirement] (direct action verb statement of function) [, alternate position for the optional qualifier].

Page 10: Verification “Auditability” Can Be “Free” James H. Jones Optants Documented Decision Support Company (ODDSCO) .

10

Verification “Auditability” Can Be “Free”5. Requirement Writing Rules (Continued)

• The foregoing basic “rules” are a small subset of many commonly listed constraints and suggestions in requirements writing training courses, but they are sufficient to provide most users a consistently effective approach.

Page 11: Verification “Auditability” Can Be “Free” James H. Jones Optants Documented Decision Support Company (ODDSCO) .

11

Verification “Auditability” Can Be “Free”6. SRVTM (Tracking Permutations)

SUBSIDIARY REQUIREMENTS VERIFICATION TRACE MATRIX (Electrical, Mechanical, or Software Subsystem)

SS ID SS Requirement VP ID# Permutations List Comment 3 Functional Requirements N/A Header Label 3.1 Subsection 1 Title N/A Header Label 3.1.1 Category 1 Title N/A Header Label 3.1.1.1 The [subsystem] shall

(requirement 1) Permutation 1,

Permutation 2, Permutation 3 (To do)

(Probably all in ?_3.3.2)

3.1.1.2 The [subsystem] shall (requirement 2)

?_3.3.1.1/4/7/14

Permutation 1, Permutation 2, Permutation 3 (Done) Permutation 4, Permutation 5, Permutation 6, Permutation 7 (To do)

(4 VPs necessary for coverage)

... ... ... ... ...

Page 12: Verification “Auditability” Can Be “Free” James H. Jones Optants Documented Decision Support Company (ODDSCO) .

12

Verification “Auditability” Can Be “Free”6. SRVTM (Hazard Abatement Trace)

• When a requirement in a subsidiary hardware or software specification has been assigned to accomplish necessary reduction of risk level for an item in system Hazard Analysis, insert a column for showing that hazard identifier. [Such a column is put in the System RVTM, because assignments in Hazard Analysis are to the System Spec.]

Page 13: Verification “Auditability” Can Be “Free” James H. Jones Optants Documented Decision Support Company (ODDSCO) .

13

Verification “Auditability” Can Be “Free”7. Test Procedure Suggestions (VASS)

• Identify all Test Procedures (TPs) used for Verification of the permutations of each requirement in the Subsidiary RVTM.

• To support reviewers and auditors (when more than one TP used), list in order every requirement tested therein [and number of instances, when multiple permutations are tested] in the introduction section of each.

Page 14: Verification “Auditability” Can Be “Free” James H. Jones Optants Documented Decision Support Company (ODDSCO) .

14

Verification “Auditability” Can Be “Free”7. Test Procedure Suggestions (Continued)

• In the Expected Results column (or in the automated test scripts or test program code comment statements [or output to the results file]), annotate each test step with both the requirement identifier and extent of testing (such as which permutation was exercised and identification of a Hazard depending on its fulfillment for risk level reduction).

Page 15: Verification “Auditability” Can Be “Free” James H. Jones Optants Documented Decision Support Company (ODDSCO) .

15

Verification “Auditability” Can Be “Free”7. Test Procedure Suggestions (Continued)

• To ensure test step will confirm risk level reduction for an assigned Hazard, annotate the requirement identifier with that Hazard identifier.

• Reported verification success for that test step then becomes evidence that the hazard was abated by the identified action.

Page 16: Verification “Auditability” Can Be “Free” James H. Jones Optants Documented Decision Support Company (ODDSCO) .

16

Verification “Auditability” Can Be “Free”8. Percent Complete Metric (PD/TP * 100)

SUBSIDIARY SPECIFICATION REQUIREMENTS VERIFICATION TRACE MATRIX SS ID SS Requirement VP ID# TP PD Permutations List % Complete 3 Functional Requirements N/A 7362 1106 15 % 3.1 Subsection 1 Title N/A 184 157 85 % 3.1.1 Category 1 Title N/A 33 12 36 % 3.1.1.1 The [subsystem] shall

(requirement 1) 3 0 Permutation 1,

Permutation 2, Permutation 3 (To do)

(Probably all in ?_3.3.2)

3.1.1.2 The [subsystem] shall (requirement 2)

?_3.3.1.1 /4/7/14

7 3 Permutation 1, Permutation 2, Permutation 3 (Done) Permutation 4, Permutation 5, Permutation 6, Permutation 7 (To do)

(4 VPs necessary for coverage)

... ... ... ... ...

Page 17: Verification “Auditability” Can Be “Free” James H. Jones Optants Documented Decision Support Company (ODDSCO) .

17

Verification “Auditability” Can Be “Free”9. Related Metrics Expansion

• Because each Subsidiary RVTM is separate, spreadsheets can be used to automate the results of updates computation.

• RVTMs can include a new column for each Verification development milestone. (Such as Design Done, Dry Run, Verified, and Reported.)

Page 18: Verification “Auditability” Can Be “Free” James H. Jones Optants Documented Decision Support Company (ODDSCO) .

18

Verification “Auditability” Can Be “Free”9. Related Metrics Expansion (Cont.)

• The verification procedure development milestone completion entry for each requirement is summed into its requirements specification subsection.

• Each subsection development milestone completion total is summed into its requirements specification section.

Page 19: Verification “Auditability” Can Be “Free” James H. Jones Optants Documented Decision Support Company (ODDSCO) .

19

Verification “Auditability” Can Be “Free”9. Related Metrics Expansion (Cont.)

• Each verification development milestone completion section total is summed into its requirements specification document total.

• Using requirements permutations totals for each subsection, section, and specification, compute actual verification development milestones % complete values for reporting to self, supervisor, and project management.

Page 20: Verification “Auditability” Can Be “Free” James H. Jones Optants Documented Decision Support Company (ODDSCO) .

20

Verification “Auditability” Can Be “Free”10. Requirements Management Tools

• For simpler projects, the RVTM and metrics computations are appropriately developed with an ordinary spreadsheet.

• For medium to large projects, requirements management tools such as DOORS support for producing the RVTMs as reports and permitting the recommended % complete metrics computation.

Page 21: Verification “Auditability” Can Be “Free” James H. Jones Optants Documented Decision Support Company (ODDSCO) .

21

Verification “Auditability” Can Be “Free”11. Conclusions

• VASS can provide comprehensive rigor at less cost than previous practices would, so “auditability” can be considered “free”.

• Requirements Verification development metrics that reflect reality and help you know and report your part of the project status are superior to traditionally estimated percent complete values.

Page 22: Verification “Auditability” Can Be “Free” James H. Jones Optants Documented Decision Support Company (ODDSCO) .

22

Optants Documented Decision Support Co.www.optants.com