Vedanta Aluminium Ltd.

37
CAPTIVE POWER PLANT ( 9x135MW ) VEDANTA ALUMINIUM LIMITED, JHARSUGUDA

description

 

Transcript of Vedanta Aluminium Ltd.

Page 1: Vedanta Aluminium Ltd.

CAPTIVE POWER PLANT ( 9x135MW )

VEDANTA ALUMINIUM LIMITED, JHARSUGUDA

Page 2: Vedanta Aluminium Ltd.

INDIA

ODISHA

PLANT SITE

CPP VAL – PLANT LOCATION

04/10/2023

Page 3: Vedanta Aluminium Ltd.

AWARDS & RECOGNITION

CPP-VAL has been Awarded 1st Prize in “National Energy Conservation Award-2012” by Bureau of Energy Efficiency in Thermal Power Sector.

CPP-VAL was Awarded 2nd Prize in “National Energy Conservation Award-2011” by Bureau of Energy Efficiency in Thermal Power Sector.

CPP- VAL along with Smelter is Awarded by Frost & Sullivan Green Manufacturing Award-2013.

CPP-VAL is certified ISO-50001:2011 Energy Management System (EnMS).

CII award for “Excellence in Energy Management-2013”

Page 4: Vedanta Aluminium Ltd.

PLANT PROFILE

Largest Captive Power Plant in India

Fastest completed CPP in India.

Water Source – Hirakud Reservoir

Coal Source- Mahanadi Coal Fields

High Concentration Slurry Disposal

Hybrid ESP with SPM level < 40mg/Nm3

An ISO 9001, 14001, 50001 & OHSAS 18001 Certified Company

04/10/2023

Page 5: Vedanta Aluminium Ltd.

04/10/2023

ELECTROSTATIC PRECIPITATORAN INTRODUCTION

Page 6: Vedanta Aluminium Ltd.

04/10/2023

ESP OVERVIEW

Page 7: Vedanta Aluminium Ltd.

04/10/2023

PROCESS OF PRECIPITATION

INITIAL PARTICLE CHARGING

CORONA DISCHARGE

PARTICLE COLLECTION & REMOVAL PARTICLE CHARGING

GAS IONIZATION

Page 8: Vedanta Aluminium Ltd.

OLD ESP TO HYBRID ESP STEP TOWARDS SUSTAINABILITY

Page 9: Vedanta Aluminium Ltd.

CHALLENGE

SPM levels of all the Units were slightly higher than the standard norms.

Anticipated more stringent norms of emissions (< 50 mg/Nm3) to be enforced in near future.

STATUTORY ENVIRONMENTAL NORMS

Apr-11 May-11 Jun-11 Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12

0

40

80

120

160

200

136

105 113125 126 119 125 127

11199 92

81

AVERAGE SPM (2011-12)Average SPM

Page 10: Vedanta Aluminium Ltd.

CHALLENGE

CPP was designed for coal of 3300 kcal / Kg and 41 % ash.

The average GCV and Ash content of used coal was 2500 kcal / kg & ash of 50-55 %.

Ash has a high resistivity.

Characteristics of coal and ash not consistent with the design.

Reduction in the collection efficiency of ESP’s.

COAL & ASH CHARACTERSTICS

Page 11: Vedanta Aluminium Ltd.

04/10/2023

BRAINSTORMING&

IDEA GENERATION

Page 12: Vedanta Aluminium Ltd.

CAUSE & EFFECT

MATERIALMACHINE

METHODSMEN

High Ash

High resistivity

Distribution screen

Electrode alignment PF Coal/Ash grain size

Ash Evacuation

Control of O2

Uniform coal feeding

Conveying air flow/pressure

Rapping cyclesTemp monitoring

ESP Controllers

Slurry disposal/SILO level control

Maintenance practices

Ash evacuation cycle timing

Size of Fields

SPM around 100 mg/Nm3

High flue gasvolume

Transformer sizingHigh SCC

Page 13: Vedanta Aluminium Ltd.

ALTERNATIVES CONSIDERED

a) Continue to run with present ESPs with ammonia dosing:

b) Going for dual conditioning system Ammonia

c) Going for Retrofitting of current ESP with addition of extra fields

d) Retrofit the ESP and install a fabric filter plant with high temperature bags:

Page 14: Vedanta Aluminium Ltd.

04/10/2023

HYBRID ESPAN INTRODUCTION

Page 15: Vedanta Aluminium Ltd.

CONCEPT OF HYBRID ESP’s

ESP-FF hybrid precipitator is a combination of ESP & Fabric filter.

It has an advantage of both ESP & Fabric filter.

Gases are separated from dispersed particles by passing it through fabric medium.

Particles that are not able to penetrate will remain on the surface of medium so called “Filter cake”.

90% dust collection is done by ESP fields rest by bag filters.

Page 16: Vedanta Aluminium Ltd.

FABRIC FILTERS

Fabric filters has one or more compartment containing cylindrical fabric bags.

Compartment system generally contain multiple rows of bags.

Normally service life of fabric filter is 3 to 4 years.

Fabric filter system is fitted with high temperature bags - Polyphenylenesulphide (PPS).

Low temperature bags - Polyacrylonitrile (PAN) may also be used.

Page 17: Vedanta Aluminium Ltd.

04/10/2023

HYBRID ESP - THE PROJECT

Page 18: Vedanta Aluminium Ltd.

HYBRID ESP- THE PROJECT

VAL-CPP has undergone Bag filter modification in a phased manner.

Last two fields of ESP were removed and bag filter was installed.

Modification completed for all the 9 units.

EPC contractor – SEPCO.

Page 19: Vedanta Aluminium Ltd.

HYBRID ESP- THE PROJECT

Project Zero date – Nov-2011.

Manpower involved in each unit is around 300.

53 m3 of concreting was done.

454 tones of steel erection.

Timely completion of the project as per schedule.

Page 20: Vedanta Aluminium Ltd.

DISMANTLING OF OLD ESP

Top penthouse & monorail Hoist are dismantled.

Outer roof along with Inner roof are dismantled with insulator compartments.

Collecting plates along with Emitters are separated out along with suspension frame & rapping mechanism.

Distribution plates with hopper baffles & recti formers are dismantled.

Total 2700 Tones of structure was dismantled from Old ESP.

Page 21: Vedanta Aluminium Ltd.

DISMANTLING OF OLD ESP

Dismantling of Flue gas duct before & after ID Fan.

ID Fan dismantling along with bearing housing, Impeller motor & support structure.

Rectifier Transformers along with cables & insulators are dismantled.

Page 22: Vedanta Aluminium Ltd.

ERECTION OF HYBRID ESP

Erection of outer & inner roof with roof beam.

Commissioning of Air tanks & guide equipment.

Erection of gas path system, pre coating pipelines , cage & bag filters arrangement.

ID Fans support structure installation.

Erection of bypass duct & dampers.

Page 23: Vedanta Aluminium Ltd.

ERRECTION OF HYBRID ESP

Installation of Flue gas duct along with motor dampers.

Installation of ID Fans with Casing ,Impeller , Rotor, Bearing house & Expansion Joints.

Installation of new Compressors with driers & filters.

Insulation of total System.

Page 24: Vedanta Aluminium Ltd.

GLIMPSES OF HYBRID ESP

Page 25: Vedanta Aluminium Ltd.

PROJECT SAFETY

COMMIT TOWARDS

SAFETY

ZERO LOSS OF TIME DUE

TO INJURY

ZERO FATALITY

DURING THE PROJECT

SAFETY TRAININGS &

DRILLS DURING

PROJECT

Page 26: Vedanta Aluminium Ltd.

04/10/2023

PERFORMANCE&

EFFICIENCY

Page 27: Vedanta Aluminium Ltd.

HYBRID ESP- AFTER COMMISSIONING

Fabric filter system is fitted with high temperature bags - Polyphenylenesulphide (PPS) were considered taking the worst scenario.

The performance of the plant is good with emission values consistently

below the 40mg/Nm3.

 Filter Plant Type : Pulse Jet Filtration Velocity : 1.04 m/minBag Material : PPS (PTFE Impregnation Treatment)Bag Quantity : 5002Bag Specification : Dia 130 X 8065Injection Pressure : 0.25 -0.35 MPa

Page 28: Vedanta Aluminium Ltd.

HYBRID ESP- PERFORMANCE

Reductions in SPM < 40 mg/Nm3.

Improvement in collection efficiency and stable operation of ESP’s.

Reduction in energy consumption of ESP’s.

Increase in life of bag filters due to small pressure difference across filter bags.

Maintenance friendly.

OPTIPOW pulse valve adopted to guarantee high efficiency and for. stable and reliable ash removal.

The operation of the equipment is controlled by PLC through the temperature, pressure differential pressure, current, voltage and the travel feedback signal.

Page 29: Vedanta Aluminium Ltd.

HYBRID ESP - PERFORMANCE

Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12 Oct-12 Nov-12 Dec-12 Jan-13 Feb-13 Mar-13 Apr-13 May-13 Jun-13

0

40

80

120

160

200

127111

99 9281

71 6655 47 41 45

24 22 20 23 25 26 28 24 26

Average SPMAverage SPM

Before

After

Page 30: Vedanta Aluminium Ltd.

04/10/2023

HYBRID ESPO&M PRACTICES

Page 31: Vedanta Aluminium Ltd.

HYBRID ESP – BAG CLEANING SYSTEM

Fiber filter adopts differential pressure control mode for cleaning the ash deposited on bag.

Differential pressure of dust collector is the criterion for ash removal from bag filters.

Ash removal will not stop until differential pressure of bag filter drops below the set value.

When the differential pressure of the dust collector surpasses a setting value, PLC will transmit a signal to the pulse controller, then the pulse valve will open, the compressed air in the air tank will instantly release and enter into the filter bag. The dust cake accumulated on the outside will break and get loose and then drop into dust hopper when the filter bag expands

Page 32: Vedanta Aluminium Ltd.

HYBRID ESP – OPERATION

Amount of moist, acid and sticky dust collected on the filter bags during the start-up phase to be minimized.

The FF shall not be connected to the flue gas stream until coal starts to be fired in the boiler and the thermal power achieves 80% above the total thermal power.

The flue gas temperature ought to be at least 20 above the acid dew ℃point.

Main monitoring Screen

Page 33: Vedanta Aluminium Ltd.

HYBRID ESP – MAINTENANCE

Regular checking of differential pressure of dust collector.

Monitoring of gas flow.

Checking the compressed air of pulse cleaning dust collector.

Checking nozzle compartments and dust hopper for dust accumulations.

When about 10% of the bags in a compartment have been blocked, all damaged bags shall be replaced.

Page 34: Vedanta Aluminium Ltd.

BEST PRACTICES

The most common and usual problem with pulse injection FF is the water and oil content in compressed air which is used for ash discharge from filter bag.

The water and oil permeates the filter material, wetting the dust, which chokes the filter bag.

This increases the pressure drop and finally the bag is to be replaced.

HIGH QUALITY OF COMPRESSED AIR

Page 35: Vedanta Aluminium Ltd.

BEST PRACTICES

During commissioning pre coating of bag filters is required before taking the system into service.

After long shutdown of the unit or if bag purging is done in shutdown condition Pre-coating is required.

PRE COATING OF BAG FILTERS AFTER LONG SHUTDOWNS

Page 36: Vedanta Aluminium Ltd.

BEST PRACTICES

In case of tube leakages unit shutdown should be taken immediately, otherwise pressure drop in bags may increase.

In case of If Oil Gun is taken into service the bag filters need to be bypassed.

During light up or Shutdown of the Unit bag filters will only be taken into service after removal of Oil Guns.

IMMEDIATE SHUTDOWN OF UNIT IN CASE OF TUBE LEAKAGES

Page 37: Vedanta Aluminium Ltd.

THANK YOU