VDOT eConstruction - vaasphalt · PlanGrid: Pilot Program Results Add a footer 12 3.6 Average Total...
Transcript of VDOT eConstruction - vaasphalt · PlanGrid: Pilot Program Results Add a footer 12 3.6 Average Total...
VDOTeConstruction
eConstructionV i r g i n i a D e p a r t m e n t o f Tr a n s p o r ta t i o n
J u l i a S i m o, P. E .
TABLET BASED INSPECTION
• PlanGrid for advanced PDF tools• Headlight Pilot for Field Data
Capture
JOBSITE TECH & FURTHER RESEARCH• Headlight Data Usage• RFID• Team Member• eTicketing• Augmented Reality• 3D Printing• Further Research & Development
UNMANNED AERIAL SYSTEMS• Progress Photos• Plan Verification
• As-Builts
DOCUMENT MANAGEMENT
SYSTEMS• Submittal processes• Workflow mapping• Project Document Management
DIGITAL STRATEGY• Project Analytics and Dashboarding• Evaluation of Current Systems
• Business Process Re-development• Seamless Integration
3D/4D MODELING• 3D engineered model linked to
project schedule (4D)• Automated Machine Guidance
(AMG)
2
eConstruction
Add a footer 3
Key Priorities
Time, Budget, Quality
Business Process Reengineering
Complexity Reduction
Change Management
Strengthen Core Competencies
Digital Transformation
User FocusReduce
FragmentationData Driven
Decision MakingEliminate Paper
Processes
Add a footer 4
Test Field User Applications
• Asses program strengths and limitations
• Collect User Feedback
• Identify additional areas for use
Develop Best Practices
• Help set standard for larger scale use
• Establish internal experts/power users
Asses Value
• Formal return-on-investment analysis
• Usability Assessment
Digital Transformation Strategy: Pilot Programs
Add a footer
VDOT eConstruction’s Tiered Approach
ProjectWiseCentralized data and
document management system
PlanGrid PDF and collaboration tool for inspectors
AWP* Contract Management
Provide the right tools for the right ROLE
Headlight Field data collection tool
5
Add a footer
Digital Transformation
iPads in Field
PlanGrid
Headlight
DMS/Submittal Workflow
Integrations
6
Add a footer 7
ProjectWise Explorer/ ProjectWise Deliverables Management
Digital Plans & DocumentsPunchlistProgress Photos
SiteManager – Contract Management/ Payment
PlanGrid HeadLightDigital Plans & DocumentsPunchlistProgress PhotosAs-Builts
Field Data Capture• Materials Testing• Daily Reports
eConstruction Integrations
Dashboarding/Analytics
Jobsite Tech &Further Research
• Jobsite Technologies• RFID• eTicketing• AMG• Advanced Survey Tools
• Data Management• Dashboarding• Project Level Analytics• Systems Integrations
• Further Research and Policy• Evaluation of Alternatives• Upcoming Technologies• Policy guidance
8
FR
Tablet Based Inspection
9
Three Parts to Tablet Based Inspection Program
• iPad Deployment
• PlanGrid Implementation
• Headlight Pilot
PlanGrid
• Digital Plans & Documents
• Mark ups
• Progress Photos Tied to Plans
• Real-Time Field Collaboration
• Punchlist
10
PlanGrid: Pilot Program
Add a footer 11
75 Pilot Program Participants
50Projects• Design Build• I-66 OTB Mega-Project• Emergency, on-call,
schedule
8 Districts Participating
PlanGrid: Pilot Program Results
Add a footer 12
3.6Average Total hours/wksaved
4.2Additional hours/wk spent on jobsite by inspectors
16Additional photos taken per week per inspector
FR
HeadLight
13
Real-Time Field Data Capture Tool
Headlight: Pilot Program
Add a footer 14
• Used to collect data in field
• Real Time Data
Cloud-based Reporting Tool
• Starts with Data, populates reports as needed
• Metadata associated with each observation
• Benefits Include:
• More Data
• Higher Quality Data
• Easier to find data
• Programmatic Level Analytics
Data First Reporting
What is Data-First Reporting?
Add a footer 15
Work is performed
Observation is made
Picture is taken
Notes are recorded
Material test is recorded
Pay item quantity is
input
Compiled into Daily Work Report
Feeds into applicable systems.
Add a footer
Headlight: Field Data Collection
16
Phase 1: Materials
Division Only
Phase 2: eConstruction
Field Data Capture
Phase 3: eConstruction
Data Automation
Implementation March 2021
Add a footer
Headlight: Phase 2 Details
17
45 Users
9Projects
8 Districts
Add a footer
Headlight: Preliminary Findings
18
Phase 1: Materials
Division Only
Phase 2: eConstruction
Field Data Capture
Phase 3: eConstruction
Data Automation
Implementation March 2021
Saves inspectors time and keeps them in the field longer
•~230 hours admin work eliminated per inspector per year
•~ 280 additional hours spent in the field per inspector per year
Improves documentation of projects
•Over 1,100 additional photos per inspector per year
• Improved project visibility for ACE/CM
• Improved timeliness and availability of reports and data
Improves communication
•Real time monitoring of projects
•VDOT/Contractor workflow
Headlight: Survey Highlights
19
Field Users
4.4 hoursAverage time saves per week on data entry
5.4 hours Average added time per week in field
21.4Average # of additional pictures
Office Users
13Average # additional observations
All Users
81%HeadLight Reports submitted within
24 hours
Add a footer 21
Phase 3
Additional Projects/More Users
Administrative Side
Integrations
Design Build??
Materials Notebook???