Uttarakhand FloodsA Comprehensive Report
(2013-2015)
Setting a Base Camp
Assessment SurveyNetwork of Locals
Our Major challenges
Constant rainfalls and landslides.
Small and far flung villages.
Disrupted roads in already tough terrain.
Very large scale devastation,requiring
long term intervention.
A total of 225 truck-loads of material reached Uttarakhand so far..
In the initial phase, reached the cut off areas even through mules and porters..
Regular medical camps organised, reaching medical aid to cut off areas..
Cloth for Work: Dignifying Relief Work
More than 400 development activities so far..
Before After
Before After
30 X3.5 ft bridge Village Seku, Bhatwari Block
Developing a bridge at Village Naugaon
Before After
Before After
Women taking lead in cleanliness activities
Before After
Before After
Marking the damaged parts of the road for safety.
Making bridge at Vill. Naugaon, Sangam Chatti
Before After
Before After
Cleaning of Pond in Vill. Ginoti
Making of Dustbin in Vill. Bongadi
After
Before BeforeAfter
Making of safety wall in Village Jakhol
Pandals (Tent House): Established 19 so far
Some unconventional approaches..
Wedding kits:330 marriages supported
Sujni Centres in Rishikesh and Uttarkashi:A sustained livelihood source for over 100 women
Approx.23,000 Sujinies made, converting over 90,000 kgs of absolute waste cloth into a daily utility
product..
Uttarkashi Centre
Washing of clothes: Another source of employment
Study Centres for quality education: 9 operational in Uttarakhand
Initiated/SupportingComputer centres
11 Stitching Centres
A knitting centre
Not Just a Piece of ClothAddressing the basic need of women
Over 2,50,000 My Pads (cloth sanitary pads) reached so far
Up in the hills, silence is being broken and women are curious to know more about good menstrual hygiene practices and are
happily accepting the change..
Awareness
Learning to make My Pad
Reaching out My Pads
Filling NJPC-A million voices forms
School to School: Filling material gap, and reviving the education system in the flood affected areas and beyond
Reached over 520 schools and anganwadies…
Construction: Repairing of schools
Construction of toilets with community participation
Before
After
Repair of Prasuti Greh
2,300Utensil kits
5,700Labour kits
27,000 Winter kits
Some facts and figures…
8900School kits
6200Ration Kits
78,000Shoes
2,50,000My Pads
2,500Solar lights and torch
Summary and Future Plans• In last two years Goonj has successfully reached over 600 villages with relief
material and much more.
• In phase 1, relief material was reached to cut off areas and medical help was provided by supporting medical camps.
• In phase 2, comprehensive Winter kits were given as a reward for various Cloth for work activities, extensive work was done to improve the condition of schools and aaganwadies.
• We will be continuing the support in terms of labour kits to the Migrant labourers.
• Menstrual hygiene has been an important area of work, since the very beginning and much more work is planned in the same field.
• Employment was generated for women, through Sujni centres, stitching and knitting centres as well as by setting up 3 major Goonj’s offices and processing centres.
• In future apart from carrying forward all these activities, Goonj is also planning to focus on Solar energy as a solution to the village problems.
• Also planning to address the acute need of constructing toilets and repairing damaged structures.
GOONJ (H.O.)- J-93, Sarita Vihar, New Delhi- 110076Write to us- [email protected] , Web- www.goonj.org
www.facebook.com/goonj.orgwww.twitter.com/goonj
For the detailed report of initial Phase, please refer http://goonj.org/?p=304