U.S. Environmental Protection Agency Lovers Lane Lead Site Jeffrey A. Lippert, OSC.

17
U.S. Environmental Protection Agency Lovers Lane Lead Site Jeffrey A. Lippert, OSC

Transcript of U.S. Environmental Protection Agency Lovers Lane Lead Site Jeffrey A. Lippert, OSC.

Page 1: U.S. Environmental Protection Agency Lovers Lane Lead Site Jeffrey A. Lippert, OSC.

U.S. Environmental Protection Agency

Lovers Lane Lead Site

Jeffrey A. Lippert, OSC

Page 2: U.S. Environmental Protection Agency Lovers Lane Lead Site Jeffrey A. Lippert, OSC.

U.S. Environmental Protection Agency

• Emergency Response Actions:– Pipeline Breaks, Train

Derailments, Chemical and Biological Attacks, Oil Spills, Chemical Fires

• Time-Critical Removals:– Drums, Abandoned Chemicals,

Soil Contamination, Radiological Sources

Page 3: U.S. Environmental Protection Agency Lovers Lane Lead Site Jeffrey A. Lippert, OSC.

U.S. Environmental Protection Agency

4407 Lovers Lane, Plainfield Charter Township, Kent County, Michigan

Page 4: U.S. Environmental Protection Agency Lovers Lane Lead Site Jeffrey A. Lippert, OSC.

U.S. Environmental Protection Agency

Page 5: U.S. Environmental Protection Agency Lovers Lane Lead Site Jeffrey A. Lippert, OSC.

U.S. Environmental Protection Agency

• On 9/27/11, Battery casing discovered during water main installation on Lovers Lane

• On 11/4/11 DEQ requested EPA assistance with buried lead-acid battery casings at 4407 Lovers Lane.

• Site walk with DEQ on November 22.• Site Assessment on December 20, 2011

Page 6: U.S. Environmental Protection Agency Lovers Lane Lead Site Jeffrey A. Lippert, OSC.

U.S. Environmental Protection Agency

• Buried, crushed lead-acid car batteries beneath the ground’s surface.

• Levels of lead above hazardous waste criteria and above direct contact criteria

Page 7: U.S. Environmental Protection Agency Lovers Lane Lead Site Jeffrey A. Lippert, OSC.

U.S. Environmental Protection Agency

Time-Critical• Removal action began

on May 7, 2012;• Removal of casings and

contaminated soil;• Backfill with clean fill;• Municipal water;• Well abandonment;• Site restoration.

Page 8: U.S. Environmental Protection Agency Lovers Lane Lead Site Jeffrey A. Lippert, OSC.

U.S. Environmental Protection Agency

• Air samples collected before and during Removal;

• Particulate monitoring before and during Removal;

• Particulate data compared to sample data;

• Action level of 150 ug/M3 established;

• 3000 pages of monitoring data collected;

• No exceedances.

Page 9: U.S. Environmental Protection Agency Lovers Lane Lead Site Jeffrey A. Lippert, OSC.

U.S. Environmental Protection Agency

• X-Ray Fluorescence (XRF) screening tool to verify lead levels in floor of the excavation.

• Levels of lead were either ND or background.

Page 10: U.S. Environmental Protection Agency Lovers Lane Lead Site Jeffrey A. Lippert, OSC.

U.S. Environmental Protection Agency

• Could not excavate 3’ from foundation;

• Installed a plastic liner to prevent infiltration of precipitation;

• Anchored into clean backfill.

Page 11: U.S. Environmental Protection Agency Lovers Lane Lead Site Jeffrey A. Lippert, OSC.

U.S. Environmental Protection Agency

• Approached by resident at 4435;

• Sampled well, 0.0016 mg/L;• Contacted KCHD;• Results above MCL for

Lead of 0.0015 mg/L;• Connected 4435 to

municipal water.

Page 12: U.S. Environmental Protection Agency Lovers Lane Lead Site Jeffrey A. Lippert, OSC.

U.S. Environmental Protection Agency

• EPA’s policy is to be open with the public;

• EPA distributed a Fact Sheet to homes in the neighborhood;

• Interacted with site visitors.

Page 13: U.S. Environmental Protection Agency Lovers Lane Lead Site Jeffrey A. Lippert, OSC.

U.S. Environmental Protection Agency

• 2,123 tons of hazardous waste shipped for disposal;

• Air sampling – Non-Detect for lead;

• Air monitoring – No results above Action Levels.

Page 14: U.S. Environmental Protection Agency Lovers Lane Lead Site Jeffrey A. Lippert, OSC.

U.S. Environmental Protection Agency

Page 15: U.S. Environmental Protection Agency Lovers Lane Lead Site Jeffrey A. Lippert, OSC.

U.S. Environmental Protection Agency

• Cleanup cost was $448,628.32

• Cleanup began on May 7 and concluded on June 7.

Page 16: U.S. Environmental Protection Agency Lovers Lane Lead Site Jeffrey A. Lippert, OSC.

U.S. Environmental Protection Agency

• The area surrounding the Lovers Lane Lead Site will be further investigated.

• EPA has referred the site to DEQ for soil and well sampling.

• DEQ is in the planning stage and has secured funding for well sampling.

Page 17: U.S. Environmental Protection Agency Lovers Lane Lead Site Jeffrey A. Lippert, OSC.

U.S. Environmental Protection Agency