US Army Corps of EngineersBUILDING STRONG®
Gary Hinkle, PEJune 10, 2014
Mid-West Electric Consumers AssociationBoard of Directors MeetingSylvan Lake, SD
U.S. Army Corps of EngineersOmaha District Update
![Page 2: U.S. Army Corps of Engineers Omaha District Update](https://reader035.fdocuments.net/reader035/viewer/2022070420/56815f13550346895dcddb4b/html5/thumbnails/2.jpg)
US Army Corps of EngineersBUILDING STRONG®
Customer Funded Projects
• Since 2004, 51 Projects • Over $105M• Past, Present & Future
![Page 3: U.S. Army Corps of Engineers Omaha District Update](https://reader035.fdocuments.net/reader035/viewer/2022070420/56815f13550346895dcddb4b/html5/thumbnails/3.jpg)
BUILDING STRONG®3
Generators
Big Bend Generator Rewinds - $24MFuture: Preparation of Rewind Specifications; GP, FR, OA,
FP
![Page 4: U.S. Army Corps of Engineers Omaha District Update](https://reader035.fdocuments.net/reader035/viewer/2022070420/56815f13550346895dcddb4b/html5/thumbnails/4.jpg)
BUILDING STRONG®4
Garrison Rewind Autotransformer $1MOahe Rehab GSU’s, Spare GSU, Containment $3.4MOahe Parallel Autotransformer $3MBig Bend Rehab GSUs, Oil Containment $2.4MGavins Point Replace GSUs $5.3MFuture: Fort Randall Replace GSU Transformers $15M
Transformers
![Page 5: U.S. Army Corps of Engineers Omaha District Update](https://reader035.fdocuments.net/reader035/viewer/2022070420/56815f13550346895dcddb4b/html5/thumbnails/5.jpg)
BUILDING STRONG®5
Relay Replacements
Line Relays $1MBig Bend Generator Relays $500KFort Randall Generator Relays $500KFuture: Fort Peck $400K, Misc Requests
![Page 6: U.S. Army Corps of Engineers Omaha District Update](https://reader035.fdocuments.net/reader035/viewer/2022070420/56815f13550346895dcddb4b/html5/thumbnails/6.jpg)
BUILDING STRONG®6
Switchyards
Gavins Point Breaker Replacement $1.5MFort Randall – Switchyard Upgrades $15MOahe – Switchyard Breaker Replacement - $4MOahe – Switchyard Upgrades - $7.6M
![Page 7: U.S. Army Corps of Engineers Omaha District Update](https://reader035.fdocuments.net/reader035/viewer/2022070420/56815f13550346895dcddb4b/html5/thumbnails/7.jpg)
BUILDING STRONG®7
Exciters
Fort Randall Exciters, $5.5MBig Bend Exciters, $6.5MOahe & Gavins Point Exciters; $6.5M
![Page 8: U.S. Army Corps of Engineers Omaha District Update](https://reader035.fdocuments.net/reader035/viewer/2022070420/56815f13550346895dcddb4b/html5/thumbnails/8.jpg)
BUILDING STRONG®8
Gavins Point Vacuum Breakers $1MOahe – SF6 Breakers - $3.5MBig Bend Unit Breakers - $4M
Unit Breakers
![Page 9: U.S. Army Corps of Engineers Omaha District Update](https://reader035.fdocuments.net/reader035/viewer/2022070420/56815f13550346895dcddb4b/html5/thumbnails/9.jpg)
BUILDING STRONG®9
Station Service Equipment
Completed Station Service Rehabs at GA, BB, FPRequesting Station Service Rehabs at FR & GPFuture Requests for Oahe
![Page 10: U.S. Army Corps of Engineers Omaha District Update](https://reader035.fdocuments.net/reader035/viewer/2022070420/56815f13550346895dcddb4b/html5/thumbnails/10.jpg)
BUILDING STRONG®
Governors
10
Design Governor Upgrades $250KGovernor Upgrades Supply Contract $2MGovernor Installation $3M / Plant
![Page 11: U.S. Army Corps of Engineers Omaha District Update](https://reader035.fdocuments.net/reader035/viewer/2022070420/56815f13550346895dcddb4b/html5/thumbnails/11.jpg)
BUILDING STRONG®
Mechanical Repairs
11
Oahe Generator Air Coolers $1.3M
Big Bend Bearing Oil Coolers / Shaft Sleeves / HP Oil Lift $800K
Fort Randall Penstock Packing; $525K
Gavins Point Trash Racks $80K
Unwatering Valves / Station Drainage, Big Bend & Fort Randall
![Page 12: U.S. Army Corps of Engineers Omaha District Update](https://reader035.fdocuments.net/reader035/viewer/2022070420/56815f13550346895dcddb4b/html5/thumbnails/12.jpg)
BUILDING STRONG®12
TurbinesGarrison Major RehabFort Peck Unit 2Future: Fort Randall, Big Bend,
Fort Peck, Gavins Point, Oahe
![Page 13: U.S. Army Corps of Engineers Omaha District Update](https://reader035.fdocuments.net/reader035/viewer/2022070420/56815f13550346895dcddb4b/html5/thumbnails/13.jpg)
BUILDING STRONG®
2015 Request - $16.3M Station Service Breakers & Dry Type
Transformers; (Gavins Point & Fort Randall) Unwatering Valves, Raw Water Header,
Drainage Piping (Big Bend & Fort Randall) Replace Excitation Systems (Oahe & Gavins
Point Upgrade Governor Controls (GP, BB, OA) New Designs (Fort Randall GSU Transformers,
Generator Rewinds @ 3 projects)