U.S. Army Corps of Engineers Omaha District · Society of American Military Engineers U.S. Army...
Transcript of U.S. Army Corps of Engineers Omaha District · Society of American Military Engineers U.S. Army...
Society of American Military Engineers
U.S. Army Corps of Engineers Omaha District October 2011
US Army Corps of Engineers BUILDING STRONG®
BUILDING STRONG® 2
MILCON FY12($463 M) 18 Active Installations 3 Readiness Centers
> 400 Projects
Military boundary Civil Works boundary
• 700,000 square miles • Nearly 60 locations • 27 Dams (including 6 hydropower main stems) • 247 miles River Navigation • 284 Recreation Areas • 99 miles Missouri National Recreation River • 6,627 miles of Shoreline • 4,910 Regulatory Permit Applications • 53 Federally-recognized Tribal Nations • Protected Cultural Sites • > 1,200 projects
• Protective Design MCX • Transportation MCX • USACE Rapid Response
• Interior Design CX • Hydrant Fuels CX • MMRP Design Center • Religious Facilities Center of Standardization (CoS) • Access Control Points CoS • Regulatory Program in 6 states • Real Estate Services in 10 states
ER FY12 ($179 M) > 550 Projects
Special Projects FY12($282 M)
CIVIL WORKS FY12 ($227 M) Flood Protection, Navigation, Hydropower,
Recreation, Regulatory, Ecosystem Restoration, Flood Control and Coastal
Emergencies (FCCE)
BUILDING STRONG® 3
Omaha District Missions MILITARY BRANCH
• Design & Construction Management • 10 Active Air Force Installations • 2 Air Force Reserve Installations • 1 Army Installation & 1 Reserve • 3 Army Ammunition Plants • 2 Major Reserve Commands
ENVIRONMENTAL BRANCH • Environmental Remediation Work • EPA, FUDS, MMRP • More than 550 Projects Nationwide
SPECIAL PROJECTS BRANCH • DLA Fuels Program & SRM
CONUS/OCONUS • MILCON SRM • Rapid Response Nationwide
CIVIL WORKS BRANCH • Flood Protection, Navigation, Hydropower,
Water Supply, Water Quality, Recreation, Irrigation, Fish & Wildlife, Regulatory, Ecosystem Restoration, Flood Control and Coastal Emergencies (FCCE)
BUILDING STRONG®
COLORADO
WISCONSIN
IOWA
MINNESOTA
NORTH DAKOTA
SOUTH DAKOTA
MONTANA
NEBRASKA
WYOMING
Fitzsimons Medical Facility
Fort Carson
Pueblo DA
Cornhusker AAP Iowa AAP
Fort McCoy Badger
AAP
Twin Cities AAP
Military Works Boundary US Army Facilities US Air Force Facilities
Peterson AFB NORAD
USAF Academy Lowry AFB
F.E. Warren AFB
Minot AFB Grand Forks
AFB
Ellsworth AFB
Offutt AFB
Gen. Mitchell Field
Minn.-St Paul IAP
Schriever AFB
Buckley ANG
Civil Works Boundary
Regulatory Offices Operations Projects
Omaha
Missouri River
Niobrara River
Platte River
Helena
Bismarck
Cheyenne
Denver
Kearney
Pierre
Omaha
Black Hills
Rocky Mountain
Fort Crook
Area Offices
Regulatory Boundary
District Mission Areas
BUILDING STRONG® 5
Omaha District Workload
FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15
CW 244 197 243 240 304 227 189 191 192 MIL 640 661 591 576 254 463 299 535 215 ER 193 186 296 230 235 179 170 170 184 SP NA NA 143 220 370 282 279 288 282 $M 1077 1044 1273 1266 1163 1151 937 1184 873
BUILDING STRONG® 8
Project Location/Type of Project Cost Range Adv Date
Western Sarpy, NE
- Segment #5 Clear Creek Levee $1M - $5M 03/2012
- West Bank Chute $1M - $5M 03/2012
Missouri River Recovery
- SWH – Desoto Bend/Boyer Chute $1M - $5M 06/2012
- SWH – River Structure Modifications $1M - $5M 07/2012
- SWH – Deer Island/Little Sioux (Phase 2) $1M - $5M 08/2012
- SWH – Backwater Construction $1M - $5M 08/2012 - ESH – Modifications (North Dakota) $100K - $500K 04/2012
- ESH – Modifications (NE & SD) $100K - $500K 04/2012
Big Sioux River, Sioux Falls, SD
- Closure Structures $1M - $5M 01/2012
Civil Works Opportunities
BUILDING STRONG® 9
Project Location/Type of Project Cost Range Adv Date
Jamestown SE Project, ND
- Riprap Bank Stabilization $100K - $500K 11/2011
Yellowstone Corridor Study, MT and ND
- Socioeconomic Study $100K - $500K 07/2012
Big Bend Project
- Rehab Powerhouse Crane $100K - $500K 07/2012
- Thrust Bearing Cooler $500K - $1M 01/2012
Fort Peck Project
- Upgrade Campground Electric $100K - $500K 07/2012
- Rehab Unit 2 $5M - $10M 09/2012
Civil Works Opportunities
BUILDING STRONG® 10
Project Location/Type of Project Cost Range Adv Date
Fort Randall Project
- Rehab Tailrace Crane $100K - $500K 08/2012
- Sequencing Study $100K - $500K 11/2011
- 115KV Switchyard Upgrade $5M - $10M 02/2013
Gavin’s Point Project
- Power Plant Generator Step-Up Transformers $1M - $5M 10/2012
- Trash Racks $500K - $1M 05/2012
Oahe Project
- Replace Transformer Accessories $100K - $500K 09/2012
- Switchyard Upgrade $5M - $10M 02/2013
Civil Works Opportunities
BUILDING STRONG®
CW – NWO Successes Antelope Creek in Lincoln, NE
► Great example of Collaboration
Use of ARRA $
► Met our commitments and then some ► Improved infrastructure Within Missouri River basin.
11
BUILDING STRONG®
Military Programs Branch Wilderness Road Brigade Battalion HQ
4th ID HQ
Brigade Battalion HQ
Soldier Family Activity Center
BUILDING STRONG®
FY12 Military Construction Army (MCA)
Location Description Advertise Bid Open Cur/ActAward QTR CCL
($000) Remarks
Ft CarsonBrigade Headquarters PN 65602 P2:
3365432-Nov-10 2-Dec-10 31-Dec-10 1 $12,973 In House Design Development ongoing.100% -
DESIGN BID BUILD IFB - SB
Ft Carson Barracks PN 77264 P2:336548 25-Oct-10 30-Nov-10 14-Dec-10 1 $60,360Design Build - RFP - Directive Code 7 - SWF Preparing RFP - in house site work design. SWF will Procure using COS MATOC
Ft Carson Barracks PN 77265 P2:336545 25-Oct-10 30-Nov-10 14-Dec-10 1 $41,441Design Build - RFP - Directive Code 7 - SWF Preparing RFP - in house site work design. SWF will Procure using COS MATOC
Ft CarsonASB Maintenance Hangar PN 77306
P2: 3365586-Nov-10 8-Dec-10 31-Dec-10 1 $54,955
Design Build - RFP -Directive Code 7 - Mobile preparing RFP - in house sitework. CENWO will execute contract action - UNRESTRICTED SITE SPECIFIC RFP
Ft Carson Control Tower PN 77302 P2:336560 2-Nov-10 2-Dec-10 31-Dec-10 1 $12,252
Design Build - RFP -Directive Code 7 - Mobile preparing RFP - in house sitework. CENWO will execute contract action. UNRESTRICTED SITE SPECIFIC RFP
Ft CarsonAircraft Loading Apron - Infrastructure
PN 77319 P2:33656129-Oct-10 30-Nov-10 14-Dec-10 1 $30,631
Design Bid Build - Directive Code 6 - In House 100% Design. Executing Surveys and Borings for entire CAB Complex Facilties and Sitework - 100% DESIGN BID BUILD IFB -SB
BUILDING STRONG® 15
FY12 Military Construction Air Force (MCAF)
Location Description Advertise Bid Open Cur/ActAward QTR CCL
($000) Remarks
Minot Dormitory (168 Room) QJVF092001 P2:334786
18-Oct-11 15-Nov-11 15-Dec-11 1 $19,820 Unrestricted - 100% Design Bid Build
Minot
B-52 3-BAY CONVENTIONAL MUNITIONS - QJVF092010 P2: 334785
18-Oct-11 15-Nov-11 22-Dec-11 1 $10,450 TBD - Design Build RFP
Minot
B-52 TWO-BAY PHASE MAINTENANCE DOCK - QJVF092012 P2: 334784
7-Oct-11 15-Nov-11 22-Dec-11 1 $30,631 Unrestricted - Design Build RFP
AF Academy
Large Vehicle Inpspection XQPZ044003
18-Oct-11 15-Nov-11 22-Dec-11 1 $12,072 TBD - Design Build RFP
BUILDING STRONG®
Environmental Remediation Branch
MacDill AFB, FL Soil Remediation Seymour Johnson AFB, NC
Well drilling at FE Warren AFB, WY, former Atlas Missile Site
BUILDING STRONG® 17
Environmental Remediation Mission
Value-added environmental services to Federal agencies including: Investigations Studies Remedial Design Remedial Actions, including rapid response Long-Term Operation/Long-Term
Maintenance (LTO/LTM) Military Munitions Response Program
(MMRP) Emphasis is on remedy in place (RIP),
response complete (RC) and site closeouts.
BUILDING STRONG® 18
Omaha District Major Installations
Langley AFB (ACC)
Seymour Johnson AFB (ACC)
Andrews AFB (AFD-W)
Legend Omaha District Military Boundaries
Northwestern Division Boundaries
Travis AFB (AMC)
Minot AFB (ACC)
Grand Forks AFB (AMC)
Ellsworth AFB (ACC)
Offutt AFB (ACC) F.E. Warren AFB
(AFSPC)
Buckley AFB (AFSPC) Shriever AFB (AFSPC)
USAF Academy Peterson AFB (AFSPC)
Ft Carson NORAD
Pueblo Depot
Ft McCoy
Badger AAP
Iowa AAP
Twin Cities AAP
Cornhusker AAP
Pope AFB (AMC)
Myrtle Beach AFB (BRAC)
McConnell AFB (AMC)
MacDill AFB (AMC)
Shaw AFB (ACC)
Moody AFB (AFSPC)
Holloman AFB (ACC)
Cannon AFB (ACC)
Eglin AFB (AFMC)
Kirtland AFB (AFMC)
Davis-Monthan AFB (ACC)
Nellis AFB (ACC)
Dover AFB (AMC)
Dyess AFB (ACC)
Goodfellow AFB (AETC)
KI Sawyer AFB (BRAC)
Mountain Home AFB (ACC)
Maxwell AFB (AETC)
Scott AFB (AMC)
Vandenberg AFB (AFSPC)
Charleston AFB (AMC)
Beale AFB (ACC)
Barksdale AFB (ACC)
Whiteman AFB (ACC)
BUILDING STRONG® 19
Environmental Remediation Current Workload
INSTALLATIONS STATES
ER 44 26 MMRP 106 38 ER/MMRP 122 41 RAPID RESPONSE (RR) 22 18
TOTAL ER/MMRP/RR 135 41
BUILDING STRONG® 21
~95% of environmental work is contracted out.
Primarily utilize Environmental Remediation Services (ERS) Indefinite Delivery Indefinite Quantity (IDIQ)
Emphasis on developing and utilizing small business (SB) firms.
Project Acquisition Strategy Board determines appropriate method of execution.
Regional sharing of ERS contracts within NWD.
Environmental Remediation Execution Methods
BUILDING STRONG® 22
• Multi Environmental Government Acquisition (MEGA):
• MEGA is a combined acquisition strategy with multiple USACE Districts. • The acquisition strategy includes combinations of Unrestricted and Small
Business ERS; A-E; Pre-Placed Remedial Action (PRAC); and Environmental Consultation Services contracts that are national and/or regional.
• Current Status:
• Acquisition Strategy and Plan has been approved. • MEGA Management Plan has been approved • Statement of Work developed collaboratively by all eight Districts. • Kansas City District submitted first solicitation and made first award – AE.
Environmental Remediation Opportunities
BUILDING STRONG®
MEGA Participants The 3 USACE Divisions involved in the MEGA are:
► Northwestern Division (NWD) • Omaha • Kansas City • Seattle
► Southwestern Division (SWD) • Tulsa • Fort Worth
► South Pacific Division (SPD) • Sacramento • Albuquerque • Los Angeles
23
BUILDING STRONG®
MEGA Specifications
Total $7.07B 5 Year strategy – Based on approval of
MEGA Acquisition Plan Acquisition Strategy approved by OSD on
March 27, 2011 Acquisition Plan approved by PARC on
May 23, 2011
24
BUILDING STRONG®
MEGA Specifications
Total MEGA approved capacity - $7.07B 95 MATOC pools (Total of 447 contracts) 27 Brooks Act A-E pools Most MATOC pools will have 5 Contractors Contracts 3 year base plus 2 year option A Total of 474 Contracts may be Awarded!
25
BUILDING STRONG®
Approved MEGA Strategy ► Environmental Remediation Services – 562910
• Nationwide $2B • NWD, SPD, SWD Regional $2B
► Military Munitions Response Program • NWD Regional $750M
► Pre-Placed Remedial Action Contracts • NWD Regional $1.5B
► A-E Services – NAICS 541330 • NWD Regional $320M
► Environmental Consulting Services - 541620 • NWD, SPD, SWD Regional $500M
26
BUILDING STRONG®
Unprecedented Support of Small Business
SDVOSB $423.5 Million = 6% 68 Contracts
HUBZone $311 Million = 4% 63 Contracts
Small Business (no subcategory) $2.587 Billion = 37% 133 Contracts
Unrestricted $2.77 Billion = 39% 104 Contracts
Section 8 (a) $978.5 Million = 14% 106 Contracts
61 % Small
Business
MEGA $7.07 Billion
27
BUILDING STRONG®
Multiple Environmental Government Acquisition - $7.07B Plan
MEGA Progress
28
Advertized Total * A-E Brooks Act contracts
13
22
10 12
4
10*
20
6 4 4
BUILDING STRONG®
MEGA Points of Contact
Linda White, PE, PMP (technical) ►[email protected] ►402-995-2743
Loreen Blume (contractual) ►[email protected] ►402-995-2092
BUILDING STRONG®
MEGA Contacts Albuquerque – (C) Erica.M.Talley@ Fort Worth – (P) Mark.E.Simmons@; (C) Elizabeth.A.Crawford@ Kansas City – (C) Shelley.Thomas@ Los Angeles – (C) Patricia.B.Bonilla@ Omaha - (C) Loreen.K.Blume@; (P) Linda.J.White@ Sacramento – (P) Christopher.E.Prescott@
(C) Colette.C.Nalley@ Seattle – (P) Robert.l.Frazier@; (C) Bonnie.I.Kirmse@ Tulsa – (C) Brenda.K.Anderson@ @USACE.Army.mil (C) Contracting (P) Project Management
30
BUILDING STRONG® 31
Cost Proposed Proposed Project Location/Type of Project Range Adv Date Awd Date (Mo/Yr) (Mo/Yr) •MEGA - Small Business ERS w/MMRP IDIQ $250M 5/11 12/11 Multi Award Task Order Contract (MATOC) Nationwide , 5 contract pool •MEGA - Small Business Environmental $60M 10/11 4/12 Consulting IDIQ Multi Award Task Order Contract (MATOC) NWD Boundaries and existing USACE customers, 3 contract pool
Environmental Remediation FY12 Omaha Opportunities
BUILDING STRONG® 32
Cost Proposed Proposed Project Location/Type of Project Range Adv Date Awd Date (Mo/Yr) (Mo/Yr) •MEGA – 8a Environmental $60M 2/12 6/12 Consulting IDIQ Multi Award Task Order Contract (MATOC) NWD Boundaries and existing USACE customers, 3 contract pool •MEGA - Small Business Military Munitions $112.5M 2/12 6/12 Response Program (MMRP) IDIQ MATOC NWD Boundaries and existing USACE customers, 5 contract pool
Environmental Remediation FY12 Omaha Opportunities
BUILDING STRONG® 33
Environmental Remediation Opportunities – FY12
Cost Proposed Proposed Project Location/Type of Project Range Adv Date Awd Date (Mo/Yr) (Mo/Yr)
•MMRP SATOCs (NWD boundaries and existing USACE customers)
•Small Business $9.9M TBD TBD •Small Business $9.9M TBD TBD
•Pueblo Chemical Depot , CO $ 9M 10/12 12/12 Remediation Services, Site Specific (BRAC)
BUILDING STRONG®
Special Projects Branch
Indiana Dunes National Lakeshore, IN – DOI NPS
Temporary Pumping Stations USACE HPO
Detroit Powerhouse Fire, OR Portland District
BUILDING STRONG® 35
Special Projects Mission & Function
Special Projects Branch mission: Execution of programs and projects formally known as “Support for Others”, “Environmental Support for Others”, and “Interagency and International Services (IIS)”
Branch is responsible for assembling project delivery teams to manage reimbursable funded customers such as:
EPA, DOI, DOE, DoD-FSRM (Facility Sustainment, Restoration & Modernization)
DHS, DLA/ DESC and VA
BUILDING STRONG® 36
Special Projects Mission & Function
Provide national and international time-sensitive as well as non time-sensitive support of homeland security/defense, disaster, and infrastructure work
Utilize Internal District & External USACE staff resources to manage project execution
Execution tools include discretionary/flexible cost reimbursement contract mechanisms to accomplish the mission to, serving the nation and all Federal Agencies
BUILDING STRONG® 38
Cost Proposed Proposed Contract / Project Range Adv Date Awd Date (Mo/Yr) (Mo/Yr) Rapid Response 5 IDIQ (four contracts) $245M Total Environmental Response Contract (SATOC)
• Unrestricted $80M 4/22/11* 8/11 • Small Business $95M 4/22/11* 10/11 • Service Disabled Vet $35M 10/11 5/12 • 8a $35M 10/11 5/12
Note * Actual Advertised
Special Projects Opportunities
BUILDING STRONG® 39
Omaha District Points of Contact
Deputy District Engineer Ted Streckfuss 402-995-2003
Chief, Civil Works Branch Bradley Thompson 402-995-2718 Chief, Environmental Remediation Randy Petersen Branch 402-995-2736 Chief, Military Branch Vincent Turner 402-995-2781 Chief, Planning Branch Kayla Eckert-Uptmor 402-995-2693 Chief, Special Projects Branch Greg Herring 402-995-2644