US 377 at Basswood Boulevard and Kroger Drive

City Project No. 101015Council District 4

Presenting: Raul E. Lopez, P.E. City of Fort Worth – Department of Transportation and Public Works

December 13, 2018

Page 2: US 377 at Basswood Boulevard and Kroger Drive - pid6.orgpid6.org/doc/US_377_Basswood_Kroger_20181213.pdf · 12/13/2018 · US 377 at Basswood Boulevard and Kroger Drive City Project

Project Location

2

Kroger Drive

Baswood Blvd

Ray

Whi

te R

d

Page 3: US 377 at Basswood Boulevard and Kroger Drive - pid6.orgpid6.org/doc/US_377_Basswood_Kroger_20181213.pdf · 12/13/2018 · US 377 at Basswood Boulevard and Kroger Drive City Project

Project Limits and Phasing

Basswood Parkwood Hill Blvd/ Starwood Cir to US 377

3

Kroger DriveFrom Ray White to US 377

Phase 1 (Basswood + Int. Kroger at US377)

Phase 2 (Kroger Dr)

Page 4: US 377 at Basswood Boulevard and Kroger Drive - pid6.orgpid6.org/doc/US_377_Basswood_Kroger_20181213.pdf · 12/13/2018 · US 377 at Basswood Boulevard and Kroger Drive City Project

Project Scope – Basswood Blvd.Increase eastbound capacity of Intersection ofBasswood at US 377

• Existing intersection• Two through lanes both directions• West approach has 1 left, 1 through

and 1 right turn lane at US 377

• Proposed Intersection (west approach)• Two left turn• Two through• One right turn lane

Railroad Crossing Improvements• Quiet Zone

4Existing Basswood Intersection at US 377

Page 5: US 377 at Basswood Boulevard and Kroger Drive - pid6.orgpid6.org/doc/US_377_Basswood_Kroger_20181213.pdf · 12/13/2018 · US 377 at Basswood Boulevard and Kroger Drive City Project

Basswood – Existing Layout

5

Basswood Blvd

Page 6: US 377 at Basswood Boulevard and Kroger Drive - pid6.orgpid6.org/doc/US_377_Basswood_Kroger_20181213.pdf · 12/13/2018 · US 377 at Basswood Boulevard and Kroger Drive City Project

Basswood - Proposed Layout

6

Page 7: US 377 at Basswood Boulevard and Kroger Drive - pid6.orgpid6.org/doc/US_377_Basswood_Kroger_20181213.pdf · 12/13/2018 · US 377 at Basswood Boulevard and Kroger Drive City Project

Basswood Typical Section

7

Page 8: US 377 at Basswood Boulevard and Kroger Drive - pid6.orgpid6.org/doc/US_377_Basswood_Kroger_20181213.pdf · 12/13/2018 · US 377 at Basswood Boulevard and Kroger Drive City Project

Project Scope – Kroger DrivePHASE 1

(Park Vista Cir to US 377)

• Intersection Capacity Improvements at US 377Increase from 3 to 5 lanes

• New eastbound traffic signal with new timing

• Railroad crossing quiet zone with solid median

Existing Kroger Dr. Intersection at US 377

Kroger Drive

Page 9: US 377 at Basswood Boulevard and Kroger Drive - pid6.orgpid6.org/doc/US_377_Basswood_Kroger_20181213.pdf · 12/13/2018 · US 377 at Basswood Boulevard and Kroger Drive City Project

9

Kroger Dr. at US377- Proposed Layout

Phase 2Phase 1

Page 10: US 377 at Basswood Boulevard and Kroger Drive - pid6.orgpid6.org/doc/US_377_Basswood_Kroger_20181213.pdf · 12/13/2018 · US 377 at Basswood Boulevard and Kroger Drive City Project

Project Scope – Kroger DrivePHASE 2

(Ray White to Park Vista Cir East)

• Corridor improvements from Park Vista Circle east to Ray White Road

3 to 4 lane road Kroger Distribution to Ray White: 2 westbound lanes + left turn lane

• Roundabout at intersection with Park Vista Circle west

• Shared pedestrian and bicycle facility

• No major drainage improvements

• Median opening on Ray White at school driveway

Page 11: US 377 at Basswood Boulevard and Kroger Drive - pid6.orgpid6.org/doc/US_377_Basswood_Kroger_20181213.pdf · 12/13/2018 · US 377 at Basswood Boulevard and Kroger Drive City Project

11

Existing Kroger Drive

Kroger Drive

Park Vista Circle

Kroger Distribution Center

Page 12: US 377 at Basswood Boulevard and Kroger Drive - pid6.orgpid6.org/doc/US_377_Basswood_Kroger_20181213.pdf · 12/13/2018 · US 377 at Basswood Boulevard and Kroger Drive City Project

Kroger Drive - Proposed Layout

12

Page 13: US 377 at Basswood Boulevard and Kroger Drive - pid6.orgpid6.org/doc/US_377_Basswood_Kroger_20181213.pdf · 12/13/2018 · US 377 at Basswood Boulevard and Kroger Drive City Project

Kroger Dr. - Proposed Layout (1 of 3)

13

Page 14: US 377 at Basswood Boulevard and Kroger Drive - pid6.orgpid6.org/doc/US_377_Basswood_Kroger_20181213.pdf · 12/13/2018 · US 377 at Basswood Boulevard and Kroger Drive City Project

14

Kroger Dr. - Proposed Layout (2 of 3)

Page 15: US 377 at Basswood Boulevard and Kroger Drive - pid6.orgpid6.org/doc/US_377_Basswood_Kroger_20181213.pdf · 12/13/2018 · US 377 at Basswood Boulevard and Kroger Drive City Project

15

Kroger Dr. - Proposed Layout (3 of 3)

Phase 1Phase 2

Phase 1

Page 16: US 377 at Basswood Boulevard and Kroger Drive - pid6.orgpid6.org/doc/US_377_Basswood_Kroger_20181213.pdf · 12/13/2018 · US 377 at Basswood Boulevard and Kroger Drive City Project

16

Ray White Median Opening and Left Turn Lane

North

Page 17: US 377 at Basswood Boulevard and Kroger Drive - pid6.orgpid6.org/doc/US_377_Basswood_Kroger_20181213.pdf · 12/13/2018 · US 377 at Basswood Boulevard and Kroger Drive City Project

Kroger Dr. Typical Sections

17

Page 18: US 377 at Basswood Boulevard and Kroger Drive - pid6.orgpid6.org/doc/US_377_Basswood_Kroger_20181213.pdf · 12/13/2018 · US 377 at Basswood Boulevard and Kroger Drive City Project

Project Cost *

18

Construction………………………………..$3.8 million…………………………………$3.9 millionFunding - 2018 Bond Program…………...$5.4 million…………………………………$5.5 million

* Funding in excess of construction cost is for Right-of-Way acquisition, engineering, permitting, etc.

BASSWOOD / KROGER at US 377 (Phase 1)

KROGER DRIVE (Phase 2)

Page 19: US 377 at Basswood Boulevard and Kroger Drive - pid6.orgpid6.org/doc/US_377_Basswood_Kroger_20181213.pdf · 12/13/2018 · US 377 at Basswood Boulevard and Kroger Drive City Project

Phase 1 Project Schedule• Preliminary Design ……………………………………………Completed• Design Complete ……………………………………………..Mar 2019• Right of Way Acquisition ……………………………………..N/A• Utility Clearance ………………………………………………Jun – Dec 2019• Construction …………..………………………………………Apr 2020 – Jan 2021

Phase 2 schedule longer than Phase 1 due to ROW and greater complexity. Details to be shared at next meeting.

Next Public Meeting: Phase 1 Final Design Date and location: To be announced

19

Page 20: US 377 at Basswood Boulevard and Kroger Drive - pid6.orgpid6.org/doc/US_377_Basswood_Kroger_20181213.pdf · 12/13/2018 · US 377 at Basswood Boulevard and Kroger Drive City Project

Contact InformationRaul E. Lopez, P.E.

Project Manager817-392-2457

[email protected]

20

QUESTIONS?