18 th BC MEND Metal Leaching Workshop – Vancouver Nov. 30, 2011 Uranium Tailings Management at AREVA Resources Canada Part 2: the Kiggavik Project in Nunavut Frederic Guerin, Nicola Banton (AREVA Resources Canada) John Mahoney (Mahoney Geochemical Consulting) Greg Newman (Newmans Geotechnique)

Transcript of Uranium Tailings Management at AREVA Resources Canada Part ...

Page 1: Uranium Tailings Management at AREVA Resources Canada Part ...

18th BC MEND Metal Leaching Workshop – Vancouver Nov. 30, 2011

Uranium Tailings Management at AREVA Resources Canada

Part 2: the Kiggavik Project in Nunavut

Frederic Guerin, Nicola Banton (AREVA Resources Canada) John Mahoney (Mahoney Geochemical Consulting)Greg Newman (Newmans Geotechnique)

Page 2: Uranium Tailings Management at AREVA Resources Canada Part ...

Location

18th BC MEND Metal Leaching Workshop – Vancouver Nov. 30, 2011

Page 3: Uranium Tailings Management at AREVA Resources Canada Part ...

Kiggavik Project

Resources 51,000 tU (133 Mlbs)0.46% U

4 open pits1 underground mine

Project ProposalNov. 2008

Draft EISDec. 2011

Construction2017

18th BC MEND Metal Leaching Workshop – Vancouver Nov. 30, 2011

Andrew Lake and End Grid deposits

Main, Centre and East deposits

Page 4: Uranium Tailings Management at AREVA Resources Canada Part ...

Tailings Management - Design Principles

To avoid interaction between tailings and natural water bodies

To maximize the use of mine workings for long-term management of tailings

To ensure the long-term protection of Kiggavik’s terrestrial, aquatic and human environment

Potential for future deposits to be considered Stability, integrity and geochemical performance should

not rely on maintaining present temperatures and permafrost conditions

18th BC MEND Metal Leaching Workshop – Vancouver Nov. 30, 2011

Page 5: Uranium Tailings Management at AREVA Resources Canada Part ...

Project Overview – Kiggavik Site

18th BC MEND Metal Leaching Workshop – Vancouver Nov. 30, 2011

Page 6: Uranium Tailings Management at AREVA Resources Canada Part ...

Main Zone Geology

Permafrost 220m

10-10 m/s < K < 10-7 m/s

18th BC MEND Metal Leaching Workshop – Vancouver Nov. 30, 2011

Page 7: Uranium Tailings Management at AREVA Resources Canada Part ...

Kiggavik vs JEB

18th BC MEND Metal Leaching Workshop – Vancouver Nov. 30, 2011

AthabascaSandstoneKh ~ 10-5 m/s

500m

TailingsMass

Kh < 10-7m/s

Jeb TMF – McClean Lake

TailingsMass

Kh < 10-7m/s

Metasedimentsand granite-FrozenKh < 10-10 m/s-UnfrozenKh < 10-7 m/s

Lake

2500mLake

Kiggavik Project

Page 8: Uranium Tailings Management at AREVA Resources Canada Part ...

Typical Ore Assay AverageAnalyte Kiggavik Project Deposits Athabasca

basinMain Zone Centre Zone

East Zone

Andrew Lake

End Grid

U (ppm) 4,570 5,683 744 4,625 2390.6 35,000As (ppm) 2.2 20.4 3.0 7.1 19.4 58,000Co (ppm) 16.8 16.4 8.5 7.1 15.8 3,400Cu (ppm) 38.1 63.5 6.1 13.7 115.9 1,700Mo (ppm) 113.5 9.6 1.9 19.7 19.5 1,020Ni (ppm) 47.3 69.7 18.9 73.4 80.5 38,000Pb (ppm) 199.8 226.8 47.5 184.5 114.5 4,000Se (ppm) 3.0 0.2 1.5 1.2 12.7 24V (ppm) 484.4 410.0 233.1 526.5 230.8 780

18th BC MEND Metal Leaching Workshop – Vancouver Nov. 30, 2011

Sulphur Content from < 0.1% to 1%S Fe2O3 %(w/w) 2.6 to 7%

Clean oreReasonably easy to leach, Recovery > 96%

Page 9: Uranium Tailings Management at AREVA Resources Canada Part ...

Ferric Sulphate

Tailings

Barren Eluate

Sumpage

Neutralization Tanks

NeutralizationFeedbox

Lime

AdditionalRetentionTimeTank

Lime

Barium Chloride Thickener

Water cover ≥5m

TailingsPumpbox

Sumpage

Flocculant

Sumpage

KiggavikWTPUnderflow

ReclaimWater

Overflow

Judge Sissons lake

TMF

TreatedEffluent

Tailings Management System Schematic Diagram

pH 4 pH 7

18th BC MEND Metal Leaching Workshop – Vancouver Nov. 30, 2011

Mill circuitsCrushing – Grinding – Leaching – Resin In Pulp – Elution – Gypsum Precipitation – Uranium precipitation

Tailings Neutralization

Page 10: Uranium Tailings Management at AREVA Resources Canada Part ...

Uranium

18th BC MEND Metal Leaching Workshop – Vancouver Nov. 30, 2011

Eh-pH diagram for the system U, C, H and O at 25°C – Total U 2.4 mg/L

Uraninite U(IV) stable form under reducing conditions

Schoepite is the most likely U(VI) bearing phase that will form

Page 11: Uranium Tailings Management at AREVA Resources Canada Part ...

Measured vs Calculated Uranium Concentrations

0.001

0.01

0.1

1

10

3 4 5 6 7 8 9

Ura

nium

Con

cent

ratio

n (m

g/L)

pH

U (tot) Test 1

U (tot) Test 3

U (diss) Test 1

U (diss) Test 3

U on HFO model V not included

U on HFO model with V

U_ppm mont included

U_ppm_Schoepite NEA

18th BC MEND Metal Leaching Workshop – Vancouver Nov. 30, 2011

Importance of surface complexation reactions

Page 12: Uranium Tailings Management at AREVA Resources Canada Part ...

Initial vs Neutralized Tailings

18th BC MEND Metal Leaching Workshop – Vancouver Nov. 30, 2011

Parameter Initial Solution Neutralized Tailings Ratio

As 1 0.0176 57

Cd 0.0317 0.003 11

Co 5.79 0.0556 104

Cr 63.2 0.34 186

Cu 443 0.4 1,108

Mo 0.159 0.141 1

Ni 33.3 0.31 107

Se 0.1 0.05 2

U 5.94 0.109 54

Zn 79.5 3 27

Ra-226 (Bq/L) 80 10 8

Units in mg/L unless specified

Page 13: Uranium Tailings Management at AREVA Resources Canada Part ...

Tailings and water surface temperature for 1m water layer

Tailings and water surface temperature for 3m water layer

Prevention of Ice Lens Formation

18th BC MEND Metal Leaching Workshop – Vancouver Nov. 30, 2011

Tailings deposition under a minimum 3 m of free water will prevent freezing of the tailings

Design based on a 5m water cover during deposition and early consolidation

Page 14: Uranium Tailings Management at AREVA Resources Canada Part ...

Decommissioning – Centre Zone

18th BC MEND Metal Leaching Workshop – Vancouver Nov. 30, 2011

Page 15: Uranium Tailings Management at AREVA Resources Canada Part ...

Decommissioning – Main Zone

18th BC MEND Metal Leaching Workshop – Vancouver Nov. 30, 2011

Page 16: Uranium Tailings Management at AREVA Resources Canada Part ...

Thermal profile in pits – no warming

20 years after closure

200 years after closure

2000 years after closure

18th BC MEND Metal Leaching Workshop – Vancouver Nov. 30, 2011

Page 17: Uranium Tailings Management at AREVA Resources Canada Part ...

Permafrost vs Climate Warming

18th BC MEND Metal Leaching Workshop – Vancouver Nov. 30, 2011

Assumed Climate Warming Trends

-8

-7

-6

-5-4

-3

-2

-1

0

0 50 100 150 200

Time (yrs)

Tem

pera

ture

(C)

Case 1: -6 to -1 °C

Case 2: -7 to -2 °C

Complete melting of permafrost was conservatively assumed to assess long term performance

Page 18: Uranium Tailings Management at AREVA Resources Canada Part ...

Conceptual Model of Groundwater Flow

18th BC MEND Metal Leaching Workshop – Vancouver Nov. 30, 2011

Main Zone

Page 19: Uranium Tailings Management at AREVA Resources Canada Part ...

Pathlines Analysis

Current permafrost conditions(pathlines at 10,000 years)

No-permafrost scenario (pathlines at 1,000 years)

18th BC MEND Metal Leaching Workshop – Vancouver Nov. 30, 2011

Flow through the tailings 1.4 m3/day

Page 20: Uranium Tailings Management at AREVA Resources Canada Part ...

Mass Transport

18th BC MEND Metal Leaching Workshop – Vancouver Nov. 30, 2011

Page 21: Uranium Tailings Management at AREVA Resources Canada Part ...

Long-term concentrations in Pointer Lake

18th BC MEND Metal Leaching Workshop – Vancouver Nov. 30, 2011

Predicted Incremental

Reference Values Surface Water ConcentrationsParameter Baseline Guideline Current Permafrost No-Permafrost

As 21 5 4.0E-06 6.9E-04

Cd < 0.1 0.017 1.0E-05 1.7E-03

Co <0.1 2.0E-06 3.5E-04

Cr <0.5 1 to 8.9 7.1E-05 1.2E-02

Cu 0.8 2 8.1E-05 1.4E-02

Mo <0.1 73 4.0E-05 6.9E-03

Ni 0.4 25 to 150 8.1E-05 1.4E-02

Se <0.1 1 1.0E-05 1.7E-03

U <0.1 15 2.8E-05 4.8E-03

Zn 5.8 30 6.1E-04 1.0E-01

Ra-226 (Bq/L) <0.005 0.5 1.9E-06 3.2E-04

Units in ug/L unless specified

Page 22: Uranium Tailings Management at AREVA Resources Canada Part ...

Conclusion

Laboratory tests and geochemical models confirmed the performance of the proposed tailings treatment system for the Kiggavik mill, with estimated long term pore water concentrations for U and most metals lower than 1 mg/L

Groundwater flow and solute transport models confirmed the performance of the tailings containment system and the limited interaction between tailings and natural surface water bodies under current permafrost and ‘no-permafrost’ conditions