Update on ESS John Womersley, Director General UK Neutron and Muon Science and User Meeting 2019

Transcript of Update on ESS

Page 1: Update on ESS

Update on ESS John Womersley, Director General UK Neutron and Muon Science and User Meeting 2019

Page 2: Update on ESS

Scientific and technological innovation is essential

• global challenges of energy, climate, environment, healthcare

• economic and societal challenges of stalled productivity and long term wage stagnation

First a quick reminder why we are here

Page 3: Update on ESS

Materials and molecules

Where are the atoms and what do they do?

New materials, new drugs, new processes, new energy technologies

3

Page 4: Update on ESS

How a spallation source works

4

proton accelerator target

moderator

sample

instrument

“spallation” is the process that releases neutrons from the target nuclei

Page 5: Update on ESS

5

Superconducting Proton Accelerator

Neutron Production Target

Experiments

Page 6: Update on ESS

Some numbers

1843 M€ construction cost, 47.5% from 🇸🇪 🇩🇰

5 MW world’s most powerful particle accelerator 2MW at start of operation

15 Instruments in construction budget

Aim for > order of magnitude increase in sensitivity of experiments

800 experiments per year

2023 first science for users

13 ERIC member nations

Page 7: Update on ESS

7

ESS In-kind Partners

Aarhus University

Atomki - Institute for Nuclear Research

Bergen University

CEA Saclay, Paris

Centre for Energy Research, Budapest

Centre for Nuclear Research, Poland, (NCBJ)

CNR, Rome

CNRS Orsay, Paris

Cockcroft Institute, Daresbury

Elettra – Sincrotrone Trieste

ESS Bilbao

Forschungszentrum Jülich

Helmholtz-Zentrum Geesthacht

Huddersfield University

IFJ PAN, Krakow

INFN, Catania

INFN, Legnaro

INFN, Milan

Institute for Energy Research (IFE)

ISIS - Rutherford-Appleton Laboratory, Oxford

Laboratoire Léon Brilouin (LLB)

Lund University

Nuclear Physics Institute of the ASCR

Oslo University

Paul Scherrer Institute (PSI)

Polish Electronic Group (PEG)

Roskilde University

Tallinn Technical University

Technical University of Denmark (DTU)

Technical University Munich (TUM)

Science and Technology Facilities Council

University of Copenhagen (KU)

University of Tartu

Uppsala University

Wigner Research Centre for Physics

Wroclaw University of Technology

Warsaw University of Technology

Zurich University of Applied Sciences (ZHAW)

Page 8: Update on ESS

Civil Construction Groundbreaking

8

September 2014

Page 9: Update on ESS
Page 10: Update on ESS

ESS is 58 % complete

• Peak of construction activity

• Accelerator commissioning now started

• First Instrument hall handover this summer

• Schedule for first science in 2023

10

Page 11: Update on ESS

Target Monolith – Highbay vault

11

Page 12: Update on ESS

D01 & D02 Experimental Hall 1 + Target Building

12

Page 13: Update on ESS

E-buildings

13

Page 14: Update on ESS

E01 overhead crane installation

14

Page 15: Update on ESS

15

E-buildings E02 Beamline NMX

Page 16: Update on ESS

E03/E04 labs interior works

16

Page 17: Update on ESS

Accelerator & Klystron Gallery + F03

17

Page 18: Update on ESS

Accelerator Proton piping

18

Page 19: Update on ESS

19

Ion source & LEBT installation

Page 20: Update on ESS

Klystron Gallery Racks, waveguide support systems, klystrons

Page 21: Update on ESS

21

Klystron Gallery Test Stand - Bunker

Page 22: Update on ESS

Klystron Gallery Coldbox 22

ESS is now producing liquid helium

Page 23: Update on ESS

Commissioning activities ongoing

23

Page 24: Update on ESS

Organisation and People

24

447 Employees

50 Nationalities

~ 100 Collaborating Institutions

Page 25: Update on ESS

25

Bus Stop

Current ESS temporary offices

Permanent Office Campus 2021

Lund Tramway Depot under construction

Page 26: Update on ESS

Data Management and Software Centre COBIS, Copenhagen University North Campus

Provide world leading scientific software and scientific computing support for neutron scattering at ESS

Scientific Software

ESS experiment control system, Data acquisition, Data correction software, visualization, and software to model and analyze experimental data sets.

Data center operations

Store and catalogue ESS datasets, provide ESS users remote access to their data, computing for live data correction, and analysis software during and after experiments.

User support

Support ESS users with data treatment and analysis.

26

Page 27: Update on ESS

• Good environmental building standards (BREEAM)

• Green construction site

• Purchase all electrical power from renewable sources

• Waste heat recovery into district heating system

And of course the research done at ESS will have a major impact on the energy sector

Sustainability is a core value of ESS

ESS

MAX IV

Page 28: Update on ESS

Summary Schedule and Critical Path for Remaining Work

Accelerator + ICS Accelerator + ICS

CF + Target + NSS (Bunker+TBL) + ICS CF + Target + NSS (Bunker+TBL) + ICS

2018 2019 2020 2021 2022 2023 2024 2025

Beam on Dump (570 MeV)

Accelerator Schedule Float

Accel RBOT

Warm LINAC Commissioning Steps BOT SOUP EOC

Access for Monolith Installation

Target RBOT Bunker and Test Beam Line RBOT

NSS Instruments + ICS NSS Instruments + ICS

Start beam commissioning for 1st Instruments

15th Instrument Complete (Ready for hot commissioning)

Instrument Hall Access for Start of Installation

Hi-Beta Install

Hi-Beta Install

1.3 GeV Capability Installed

BOT - Beam on Target ES - Early Science SOUP - Start of User Programme EOC - End of Construction project RXXX - Ready for XXX

• CF, Target, and NSS (Bunker) teams holding zero-float Critical path to BOT, working to mitigate delays

• Float to Accelerator RBOT now reduced from 14 months to 10 months due to IK delivery slippage

Red line indicates critical path

ES

Page 29: Update on ESS

ESS Instrument Layout (December 2016)

Lead Partners for instrument construction

+ Nuclear Physics

Institute

+

29

ODIN

DREAM

NMX

MIRACLES

BEER

C-SPEC

T-REX

MAGIC

BIFROST

HEIMDAL

FREIA

LoKI

SKADI

VESPA

ESTIA

+

15 ESS instruments in construction

First Instruments - foreseen to be online in 2023

Page 30: Update on ESS

Key activities in 2019

• Install and start commissioning next stages of the linac

• Completion of concrete work; Target Building access granted for start of technical equipment installation

• Start instrument installation in long beamline Experimental Hall

• Begin construction of Campus and Laboratory Buildings

30

Page 31: Update on ESS

Thank you! @johnwomersley @essneutron europeanspallationsource.se

ESS is coming First science with three instruments in 2023