United States Army Corps of Engineers Addicks and Barker ... AB presentation.pdf · US Army Corps...
Transcript of United States Army Corps of Engineers Addicks and Barker ... AB presentation.pdf · US Army Corps...
![Page 1: United States Army Corps of Engineers Addicks and Barker ... AB presentation.pdf · US Army Corps of Engineers BUILDING ... Inform the public on the role of the U.S. Army Corps of](https://reader031.fdocuments.net/reader031/viewer/2022021801/5b4f0e897f8b9a396e8b7b5c/html5/thumbnails/1.jpg)
US Army Corps of Engineers BUILDING STRONG®
Addicks and Barker Dam Safety Overview
COL Richard P. Pannell District Commander, Galveston District U.S. Army Corps of Engineers Oct. 29, 2014
United States Army Corps of Engineers
![Page 2: United States Army Corps of Engineers Addicks and Barker ... AB presentation.pdf · US Army Corps of Engineers BUILDING ... Inform the public on the role of the U.S. Army Corps of](https://reader031.fdocuments.net/reader031/viewer/2022021801/5b4f0e897f8b9a396e8b7b5c/html5/thumbnails/2.jpg)
BUILDING STRONG®
Purpose & Agenda
Inform the public on the role of the U.S. Army Corps of Engineers (USACE) Galveston District and improve awareness and
understanding of the Addicks and Barker Dam Safety Program.
History of Addicks & Barker Reservoirs
Dam Safety Findings
Interim Risk Reduction Measures
Remediation Measures
![Page 3: United States Army Corps of Engineers Addicks and Barker ... AB presentation.pdf · US Army Corps of Engineers BUILDING ... Inform the public on the role of the U.S. Army Corps of](https://reader031.fdocuments.net/reader031/viewer/2022021801/5b4f0e897f8b9a396e8b7b5c/html5/thumbnails/3.jpg)
BUILDING STRONG®
USACE Vision Engineering solutions for the nation’s
toughest challenges.
USACE Mission Deliver vital engineering solutions, in
collaboration with our partners, to secure our nation, energize our economy and reduce risk
from disaster.
USACE Vision
![Page 4: United States Army Corps of Engineers Addicks and Barker ... AB presentation.pdf · US Army Corps of Engineers BUILDING ... Inform the public on the role of the U.S. Army Corps of](https://reader031.fdocuments.net/reader031/viewer/2022021801/5b4f0e897f8b9a396e8b7b5c/html5/thumbnails/4.jpg)
BUILDING STRONG®
1929 1935 1946 1948 1992 2005 2009 2013 2014 2015 2018
Houston Flood
Barker Dam Completed
Addicks Dam Completed
Record Pools Addicks (El. 110.58ft) Barker (El. 95.89ft)
Corps Launches Nationwide
Infrastructure Analysis
Interim Risk Reduction
Measures Initiated
Addicks & Barker Dam Safety Modification
Report Approved
Design of Remediation Measures Complete
Construction of Remediation Measures Begins
Houston Flood
Construction of Remediation Measures Complete
Timeline
Post Implementation Risk Assessment
![Page 5: United States Army Corps of Engineers Addicks and Barker ... AB presentation.pdf · US Army Corps of Engineers BUILDING ... Inform the public on the role of the U.S. Army Corps of](https://reader031.fdocuments.net/reader031/viewer/2022021801/5b4f0e897f8b9a396e8b7b5c/html5/thumbnails/5.jpg)
BUILDING STRONG®
Early Houston Floods 1929 and 1935
![Page 6: United States Army Corps of Engineers Addicks and Barker ... AB presentation.pdf · US Army Corps of Engineers BUILDING ... Inform the public on the role of the U.S. Army Corps of](https://reader031.fdocuments.net/reader031/viewer/2022021801/5b4f0e897f8b9a396e8b7b5c/html5/thumbnails/6.jpg)
BUILDING STRONG®
Houston Proposed Plan 1940
L – Likelihood of Flood Risk C – Consequences to Greater Houston Community
C L
![Page 7: United States Army Corps of Engineers Addicks and Barker ... AB presentation.pdf · US Army Corps of Engineers BUILDING ... Inform the public on the role of the U.S. Army Corps of](https://reader031.fdocuments.net/reader031/viewer/2022021801/5b4f0e897f8b9a396e8b7b5c/html5/thumbnails/7.jpg)
BUILDING STRONG®
Construction of Addicks and Barker Dams 1942-1948
![Page 8: United States Army Corps of Engineers Addicks and Barker ... AB presentation.pdf · US Army Corps of Engineers BUILDING ... Inform the public on the role of the U.S. Army Corps of](https://reader031.fdocuments.net/reader031/viewer/2022021801/5b4f0e897f8b9a396e8b7b5c/html5/thumbnails/8.jpg)
BUILDING STRONG®
Construction of Addicks and Barker Dams 1942-1948
![Page 9: United States Army Corps of Engineers Addicks and Barker ... AB presentation.pdf · US Army Corps of Engineers BUILDING ... Inform the public on the role of the U.S. Army Corps of](https://reader031.fdocuments.net/reader031/viewer/2022021801/5b4f0e897f8b9a396e8b7b5c/html5/thumbnails/9.jpg)
BUILDING STRONG®
Houston with Addicks & Barker Dams 1950’s
L – Likelihood of Flood Risk C – Consequences to Greater Houston Community
C L
Addicks Dam and Reservoir
Barker Dam and Reservoir
![Page 10: United States Army Corps of Engineers Addicks and Barker ... AB presentation.pdf · US Army Corps of Engineers BUILDING ... Inform the public on the role of the U.S. Army Corps of](https://reader031.fdocuments.net/reader031/viewer/2022021801/5b4f0e897f8b9a396e8b7b5c/html5/thumbnails/10.jpg)
BUILDING STRONG®
Houston - 1950’s
![Page 11: United States Army Corps of Engineers Addicks and Barker ... AB presentation.pdf · US Army Corps of Engineers BUILDING ... Inform the public on the role of the U.S. Army Corps of](https://reader031.fdocuments.net/reader031/viewer/2022021801/5b4f0e897f8b9a396e8b7b5c/html5/thumbnails/11.jpg)
BUILDING STRONG®
1963 Gated the conduits to provide additional protection from flooding to the downstream
1978-1982 Constructed seepage control at both dams (included slurry trench cutoff walls and seepage blankets)
1986-1991 Raised the main dam embankment to provide freeboard (eliminate possibility of waves overtopping)
1987-1988
Armored the uncontrolled spillway at the ends of the dams with roller-compacted-concrete
Improvements to Addicks and Barker Dams
![Page 12: United States Army Corps of Engineers Addicks and Barker ... AB presentation.pdf · US Army Corps of Engineers BUILDING ... Inform the public on the role of the U.S. Army Corps of](https://reader031.fdocuments.net/reader031/viewer/2022021801/5b4f0e897f8b9a396e8b7b5c/html5/thumbnails/12.jpg)
BUILDING STRONG®
Houston - 1992
L – Likelihood of Flood Risk C – Consequences to Greater Houston Community L
C
![Page 13: United States Army Corps of Engineers Addicks and Barker ... AB presentation.pdf · US Army Corps of Engineers BUILDING ... Inform the public on the role of the U.S. Army Corps of](https://reader031.fdocuments.net/reader031/viewer/2022021801/5b4f0e897f8b9a396e8b7b5c/html5/thumbnails/13.jpg)
BUILDING STRONG®
Reservoir Record Pools ► Addicks Reservoir (Top of Dam – El. 122.7)
► Record High Pool - El. 100.58 ft. on March 9, 1992 ► Recent High Pool – El. 100.02 ft. on April 30, 2009
► Barker Reservoir (Top of Dam – El. 114.7) ► Record High Pool - El. 95.89 ft. on March 7, 1992 ► Recent High Pool - El. 91.14 ft. on May 1, 2009
City of Bunker Hill - March 4, 1992
Addicks Reservoir - April 29, 2009
![Page 14: United States Army Corps of Engineers Addicks and Barker ... AB presentation.pdf · US Army Corps of Engineers BUILDING ... Inform the public on the role of the U.S. Army Corps of](https://reader031.fdocuments.net/reader031/viewer/2022021801/5b4f0e897f8b9a396e8b7b5c/html5/thumbnails/14.jpg)
BUILDING STRONG®
Corps continually inspects its dams nationwide. It owns and operates 707 dams at 557 projects. These projects reduce risk and strengthen the nation’s economy through infrastructure.
Life and safety are paramount. Living with dams is a shared responsibility. Addicks and Barker Dams Assessment (2009)
o Reliability of Structural Features o Outlet Structures Seepage and Piping o Ends of the Dams
o Potential Consequences
o Densely Populated Urban Environment o Critical Economic Infrastructure
Corps’ Dam Safety Assessment
![Page 15: United States Army Corps of Engineers Addicks and Barker ... AB presentation.pdf · US Army Corps of Engineers BUILDING ... Inform the public on the role of the U.S. Army Corps of](https://reader031.fdocuments.net/reader031/viewer/2022021801/5b4f0e897f8b9a396e8b7b5c/html5/thumbnails/15.jpg)
BUILDING STRONG®
Dam Safety Findings – Seepage, Piping & Voids
Flow
![Page 16: United States Army Corps of Engineers Addicks and Barker ... AB presentation.pdf · US Army Corps of Engineers BUILDING ... Inform the public on the role of the U.S. Army Corps of](https://reader031.fdocuments.net/reader031/viewer/2022021801/5b4f0e897f8b9a396e8b7b5c/html5/thumbnails/16.jpg)
BUILDING STRONG®
L C
L – Likelihood of Flood Risk C – Consequences to Greater Houston Community
Houston 2009
![Page 17: United States Army Corps of Engineers Addicks and Barker ... AB presentation.pdf · US Army Corps of Engineers BUILDING ... Inform the public on the role of the U.S. Army Corps of](https://reader031.fdocuments.net/reader031/viewer/2022021801/5b4f0e897f8b9a396e8b7b5c/html5/thumbnails/17.jpg)
BUILDING STRONG®
Interim Risk Reduction Measure (IRRM) Grouting of Conduits
![Page 18: United States Army Corps of Engineers Addicks and Barker ... AB presentation.pdf · US Army Corps of Engineers BUILDING ... Inform the public on the role of the U.S. Army Corps of](https://reader031.fdocuments.net/reader031/viewer/2022021801/5b4f0e897f8b9a396e8b7b5c/html5/thumbnails/18.jpg)
BUILDING STRONG®
IRRM - Granular Filter Around Ends of Conduits
![Page 19: United States Army Corps of Engineers Addicks and Barker ... AB presentation.pdf · US Army Corps of Engineers BUILDING ... Inform the public on the role of the U.S. Army Corps of](https://reader031.fdocuments.net/reader031/viewer/2022021801/5b4f0e897f8b9a396e8b7b5c/html5/thumbnails/19.jpg)
BUILDING STRONG®
IRRM - Gate Replacement at Barker
![Page 20: United States Army Corps of Engineers Addicks and Barker ... AB presentation.pdf · US Army Corps of Engineers BUILDING ... Inform the public on the role of the U.S. Army Corps of](https://reader031.fdocuments.net/reader031/viewer/2022021801/5b4f0e897f8b9a396e8b7b5c/html5/thumbnails/20.jpg)
BUILDING STRONG®
IRRM - Gate Operators & Emergency Generators
![Page 21: United States Army Corps of Engineers Addicks and Barker ... AB presentation.pdf · US Army Corps of Engineers BUILDING ... Inform the public on the role of the U.S. Army Corps of](https://reader031.fdocuments.net/reader031/viewer/2022021801/5b4f0e897f8b9a396e8b7b5c/html5/thumbnails/21.jpg)
BUILDING STRONG®
IRRM - Parabolic Chute Slab Steel Plate
![Page 22: United States Army Corps of Engineers Addicks and Barker ... AB presentation.pdf · US Army Corps of Engineers BUILDING ... Inform the public on the role of the U.S. Army Corps of](https://reader031.fdocuments.net/reader031/viewer/2022021801/5b4f0e897f8b9a396e8b7b5c/html5/thumbnails/22.jpg)
BUILDING STRONG®
Summer 2013 Dam Safety Modification Report and
Environmental Assessment Approved
Finding of No Significant Impact Signed
Dam Safety Modifications will address issues related to seepage and piping beneath, around and near the conduits.
Approved Risk Management Plan consists of the construction of new: outlet structures parabolic spillway stilling basin and outlet channel
Dam Safety Modification Study
![Page 23: United States Army Corps of Engineers Addicks and Barker ... AB presentation.pdf · US Army Corps of Engineers BUILDING ... Inform the public on the role of the U.S. Army Corps of](https://reader031.fdocuments.net/reader031/viewer/2022021801/5b4f0e897f8b9a396e8b7b5c/html5/thumbnails/23.jpg)
BUILDING STRONG® 23
New Outlet Structure
Addicks Reservoir
Addicks Dam Proposed Modification Design 3-D Model Rendering
![Page 24: United States Army Corps of Engineers Addicks and Barker ... AB presentation.pdf · US Army Corps of Engineers BUILDING ... Inform the public on the role of the U.S. Army Corps of](https://reader031.fdocuments.net/reader031/viewer/2022021801/5b4f0e897f8b9a396e8b7b5c/html5/thumbnails/24.jpg)
BUILDING STRONG®
L – Likelihood of Flood Risk C – Consequences to Greater Houston Community L
C
Houston 2018
![Page 25: United States Army Corps of Engineers Addicks and Barker ... AB presentation.pdf · US Army Corps of Engineers BUILDING ... Inform the public on the role of the U.S. Army Corps of](https://reader031.fdocuments.net/reader031/viewer/2022021801/5b4f0e897f8b9a396e8b7b5c/html5/thumbnails/25.jpg)
BUILDING STRONG®
Benefits
Has protected the 4th largest city in the nation against loss of life for nearly 70 years
Has enabled continued growth to city
Protects against $60 billion in potential flood damage
Reduces risks against loss of life and property
Provides recreational opportunities
![Page 26: United States Army Corps of Engineers Addicks and Barker ... AB presentation.pdf · US Army Corps of Engineers BUILDING ... Inform the public on the role of the U.S. Army Corps of](https://reader031.fdocuments.net/reader031/viewer/2022021801/5b4f0e897f8b9a396e8b7b5c/html5/thumbnails/26.jpg)
BUILDING STRONG®
Houston is NOT in imminent danger of flooding from Addicks and Barker ► Addicks and Barker are normally dry reservoirs ► Addicks and Barker are continually monitored, inspected, and maintained ► Improvements have been undertaken over the years—this is an ongoing
process
Public safety is our number one priority Dam failure is not likely due to completed “Interim Risk Reduction Measures” Living with dams is a shared responsibility. We will continue to work closely with
local agencies and partner with the greater Houston Community for flood reduction and recreation
Construction updates will be posted online at www.swg.usace.army.mil
Summary
![Page 27: United States Army Corps of Engineers Addicks and Barker ... AB presentation.pdf · US Army Corps of Engineers BUILDING ... Inform the public on the role of the U.S. Army Corps of](https://reader031.fdocuments.net/reader031/viewer/2022021801/5b4f0e897f8b9a396e8b7b5c/html5/thumbnails/27.jpg)
BUILDING STRONG®
![Page 28: United States Army Corps of Engineers Addicks and Barker ... AB presentation.pdf · US Army Corps of Engineers BUILDING ... Inform the public on the role of the U.S. Army Corps of](https://reader031.fdocuments.net/reader031/viewer/2022021801/5b4f0e897f8b9a396e8b7b5c/html5/thumbnails/28.jpg)
BUILDING STRONG®
New Outlet Structure
Addicks Dam Proposed Modification Design 3-D Model Rendering
Addicks Reservoir
Existing Outlet Structure To be replaced by new structure