Union Dredgers and Marine Contracting

20
www.uniondredgers.com

description

Union Dredgers and Marine Contracting (UDMC) is a member of the Union Group of Companies, a group of local companies active in the UAE market since 2001. Established in 2007 UDMC is focused on becoming a specialist service provider focused on marine activities. With our head office in Dubai and a 6,800sqm facility in Ras Al Khaimah we are well placed to carry out services in the entire UAE and abroad. Since inception UDMC has carried out a number of large projects successfully for government, public and large private companies earning it a reputation as a quality service provider. By drawing on our ever increasing fleet of plant and equipment and skilled workforce UDMC has been able to achieve significant growth and maturity over a short period of time. UDMC is committed to product innovation, engineering excellence, total quality management and customer satisfaction. We strive to understand the need of our clients and are determined to meet our client’s requirements using our complete line of standard and custom design solutions.

Transcript of Union Dredgers and Marine Contracting

7/17/2019 Union Dredgers and Marine Contracting

http://slidepdf.com/reader/full/union-dredgers-and-marine-contracting-56904c8ce40e6 1/20www.uniondredgers.com

7/17/2019 Union Dredgers and Marine Contracting

http://slidepdf.com/reader/full/union-dredgers-and-marine-contracting-56904c8ce40e6 2/20

7/17/2019 Union Dredgers and Marine Contracting

http://slidepdf.com/reader/full/union-dredgers-and-marine-contracting-56904c8ce40e6 3/20

About the companyUnion Dredgers and Marine Contracting is a dynamic and highly respected company operating out of theUAE since 2007 and is part of the Union Group of companies. During this period we have established areputation for providing excellent service and knowledgeable solutions at all levels of business as wecontinue to grow and expand our operation.

Operating out of our head office inUnited Arab Emirates, UDMC

manage and control all aspects ofthe company activities which stretchalong the coast of the Arabian Gulf,down the Eastern Arabian Peninsulaand to the shores of India. Backingup our operations are facilities inDubai Maritime City, Ras Al Khaimahand Muscat Oman.

Our expanding fleet of Barges, TugBoats, Dredgers, Supporting marineequipment and dedicated staff areready to serve you and your team on

your next marine project.

Whether it is a small weeklymaintenance contract or a long term

dredging contract, UDMC are ready toaccept the challenge.

Working together as a close team, weare committed to product innovation,engineering excellence, total qualitymanagement and customersatisfaction. UDMC always strive tounderstand the need of our clients andare totally focused on meeting ourclient’s requirements.

DREDGING MARINE

CONSTRUCTION

OFFSHOREPIPELINE

INSTALLATION

MARINE

SERVICES

CUSTOMFABRICATION

EQUIPMENTHIRE

7/17/2019 Union Dredgers and Marine Contracting

http://slidepdf.com/reader/full/union-dredgers-and-marine-contracting-56904c8ce40e6 4/20

At UDMC, quality is second nature. It is our policy andcommitment to provide the highest quality goods andservices available, thereby allowing our customers to receivethe end product they envisioned. Whether it is the beginning,middle or end of a project, our QHSE team works with eachdepartment to reinforce the need for clear and precisecommunication and an emphasis on quality. We believe with

greater communication comes a greater awareness, leading toan increase in efficiency and effectiveness of our services.

Quality

 To be the market leader in coastal

marine contracting and coastalmaintenance services within ourchosen markets recognizable to ourclients and stakeholders by ourreliability, delivery, technical capability,safety, quality and development ofhighly skilled staff.

 To be the market leader in coastal

marine contracting and coastalmaintenance services within ourchosen markets recognizable to ourclients and stakeholders by ourreliability, delivery, technical capability,safety, quality and development ofhighly skilled staff.

Our Vision

At UDMC we pride ourselves on our

committed workforce. All our seniormanagement, dedicated engineersand hardworking ground forces havevast experience in marine contracting.By efficiently utilizing our experiencedwork force and project managementsystems, our team completes turnkeyprojects to the highest standard,within budget and within the agreedtime frame. They are truly our greatestasset.

Our Team

UDMC’s continued endeavours to

deliver excellent quality encouraged usto make a commitment towards theenvironment therefore becoming anISO 14001 certified company. Withfocus on continually developingefficient ways to reduce environmentalharm for the whole duration of anygiven project, our QHSE department isconstantly monitoring and improvingprocesses to ensure that we minimizeour impact on the planet.

Environment

Our employees are our greatest asset; they are our workmates, friends and part of the team. Therefore every effort ismade to ensure their health, safety and wellbeing at work.With continued focus on training and consistent monitoring

we can ensure that all staff are made aware of the potential forinjuries and actions that can be taken to mitigate risks. Wehave OHSAS 18001 accreditation, further demonstrating ourcommitment to health and safety.

Health and Safety

Union Dredgers & Marine Contracting | About Company

7/17/2019 Union Dredgers and Marine Contracting

http://slidepdf.com/reader/full/union-dredgers-and-marine-contracting-56904c8ce40e6 5/20

SERVICES

7/17/2019 Union Dredgers and Marine Contracting

http://slidepdf.com/reader/full/union-dredgers-and-marine-contracting-56904c8ce40e6 6/20

Union Dredgers & Marine Contracting | Services

Union Dredgers Marine Contracting has developed a broad knowledge ofdredging throughout its years of operation within the UAE and other GCCcountries. Projects that have been and can be undertaken by UDMC within themarine industry include:• De-silting marinas/channels • Dredging of pipeline trenches• Dredging of existing channels • Creation of new water channels• Beach reproling • Miscellaneous Operations

UDMC’s ability to compete with other top competitors in the dredging of variousprojects and soil types stems from its years of experience in the marine industryand its expanding fleet of vessels and marine equipment. UDMC’s vessels include:• Backhoe dredger • Cutter suction dredger• Portable pontoon • Flat top barges

In addition to its larger vessels UDMC maintains a number of smaller dredgingunits including:

• Electrical submersible dredging pumps • Hydraulic dredging pumps• Jetting suction pumps • Dredging booster pumps

UDMC’s competence in dredging operations is further achieved with our skilledengineers and technicians who are capable of executing large scale projects withexcellence.

 

DREDGING

DREDGING

www.uniondredgers.com

7/17/2019 Union Dredgers and Marine Contracting

http://slidepdf.com/reader/full/union-dredgers-and-marine-contracting-56904c8ce40e6 7/20

Union Dredgers & Marine Contracting | Services

OFFSHORE

PIPELINE

INSTALLATION

When it comes to offshore pipeline installation works, UDMC are the specialists.We supply, install and commission HDPE, concrete and GRP pipelines of varioussizes and configurations throughout the GCC for both government and privateprojects, with the vast majority being pipeline installation projects fordesalination and power plants. Our proven capabilities includes supply andmanufacturing of pipelines, diffusers, intake screens, manholes, concrete blocks,gabions and other accessories as required. Union Dredgers is able to handle thecomplete scope, from onshore and offshore excavation, pipe welding, laying,testing and commissioning.

Our experienced design team is capable of designing and managing a full turnkeymarine system to meet all your needs from feed to final approval. A few examples

of some of the design aspects we can produce are:• Conceptual design of concrete ballast blocks for pipelines .• Conceptual design and general arrangement drawings of intake well and

velocity cap.• Conceptual design of diffuser systems.• General arrangement of land side pipe routing .• General arrangement of pumping machinery and allied accessories.• Sizing of sea water intake pipes.• Sizing of sea water intake pumps.• Hydraulic ow diagram.• General arrangement for a gravity based intake and outfall pipeline. 

OFFSHORE PIPELINE INSTALLATION

www.uniondredgers.com

7/17/2019 Union Dredgers and Marine Contracting

http://slidepdf.com/reader/full/union-dredgers-and-marine-contracting-56904c8ce40e6 8/20

Union Dredgers & Marine Contracting | Services

MARINE

SERVICES

MARINE SERVICES

As you would expect from a leadingmarine company we have a team offully certified professional divers whoare qualified to undertake specializeddiving services as per our clientrequirements. Some of the operationsour diving team undertake are asfollows:• Intake screen cleaning.• Vessel surveys .• Underwater video/photo surveys .

• Underwater installation (Pneumatic).• Underwater welding .• Underwater cleaning.• Beach cleaning .• Salvage.• Cable laying .

Diving ServicesUMDC currently manage severalcontracts in which our clients requiretheir facility to be at its best. Our teamperiodically conducts maintenance,cleaning and surveying operationsand then submit a comprehensivereport on every visit, thereby allowingthe client to enjoy their facilitiesknowing all equipment is safe andoperational.

Marina & Beach Maintenance

With our fully certified survey team,boats and equipment we are fullyqualified in providing the followingsurvey services.• Bathymetric survey.• Geotechnical survey.• Side scan sonar survey.• Single beam and multi beam sonar

scan survey.

Surveys

www.uniondredgers.com

7/17/2019 Union Dredgers and Marine Contracting

http://slidepdf.com/reader/full/union-dredgers-and-marine-contracting-56904c8ce40e6 9/20

Union Dredgers & Marine Contracting | Services

MARINE

CONSTRUCTION

Sheet piles are long structuralsections with interlockingconnections, driven into the groundwith impact or vibratory hammers toform an impermeable barrier. With ourvast experience in erecting sheetpiling with our specialized equipmentwe can ensure that trenches andexcavation pits are safe to work andreach desired depths.

Sheet Piling

UDMC has installed a number ofpermanent and temporary floatingmarinas. The team at UDMC candesign, supply and install marinas inaccordance with client’s requirements.

Floating Marina Installation

UDMC have successfully completed thedesign and installation of rock armorbarriers around marinas, fishing harborsand as part of beach protection works.We also carry out rock armor repairs andscour protection

Revetment and Scour Protection

UDMC has actively been involved in thesupply & installation of geotextiletubing for beach protection. We usegeotextile sheets and other materialsto protect the beaches from erosiondue to the shifting tides, storm damageand other natural occurrences. We canalso supply silt curtains to protectdebris from dredging works spreadingto other areas.

Geotextile Tubing

UDMC designs and constructs slipwaysfor various marinas within the UAE. Ourslipways are constructed using costeffective methods providing minimaldisruption to the environment andoffering completion in record time.

Slipway Design and construction

MARINE CONSTRUCTION

www.uniondredgers.com

7/17/2019 Union Dredgers and Marine Contracting

http://slidepdf.com/reader/full/union-dredgers-and-marine-contracting-56904c8ce40e6 10/20

Union Dredgers & Marine Contracting | Services

EQUIPMENT

HIRE

EQUIPMENT HIRE

UDMC has a large range of marine equipment ranging from barges to tug boats,to dredging pumps and more. All our equipment is well maintained and in goodworking condition. The Marine Equipment we have available to hire includes :• Tug Boats• Flat top barges .• Excavator barges.• Pontoons.• Dredging pumps.• Dredgers.• Sheet piling equipment.• Dredging discharge pipes.

• Winches.• Excavators.• Backhoe dredgers.• Many more...

www.uniondredgers.com

7/17/2019 Union Dredgers and Marine Contracting

http://slidepdf.com/reader/full/union-dredgers-and-marine-contracting-56904c8ce40e6 11/20

Union Dredgers & Marine Contracting | Services

CUSTOM

FABRICATION

CUSTOM FABRICATION

Our design and fabrication team have the ability to design and manufacture smallpontoons, barges and any customized equipment required by the client. Thesecan be custom fabricated to suit clients specific needs and can be designed to bedisassembled for easy transportation. Some of the fabricated items we havemanufactured for our clients include:• Diffuser• HDPE passive intake screen• Marker buoys• Barrier Systems• Pontoons• Concrete blocks• Many more...

www.uniondredgers.com

7/17/2019 Union Dredgers and Marine Contracting

http://slidepdf.com/reader/full/union-dredgers-and-marine-contracting-56904c8ce40e6 12/20

PROJECTS

7/17/2019 Union Dredgers and Marine Contracting

http://slidepdf.com/reader/full/union-dredgers-and-marine-contracting-56904c8ce40e6 13/20

Union Dredgers & Marine Contracting | Projects

www.uniondredgers.com

EQUIPMENT

HIRE

Al Ghubrah DesalinationPlant, Oman

SCOPE OF WORK

• 4.5 KMS of 1830 mm & 2053 mm

Diameter HDPE pipeline

• Dredging Works

• Hdpe Welding & Hydrostatic Testing

 The Supply, Installation, Testing and Commissioning of an Intakeand Outfall Line for the Al Ghubrah Desalination Plant in Oman. The Scope of the project included:• Supply, install, test and commission 4.5kms of 2200mm and

1800mm diameter HDPE intake and outfall pipes.• Offshore dredging works• HDPE Welding utlising our 2200mm butt fusion welding

machine.• Hydrostatic testing .

• Diving operations to aid with installation and surveying.• Supply and installation of Passive Intake screens, Diffuser’s and

Scourer Protection.

Client:  Muscat City Desalination Plant S.A.O.C.

Consultant: Mott MacDonald.

Main Contractor: International Water Treatment

7/17/2019 Union Dredgers and Marine Contracting

http://slidepdf.com/reader/full/union-dredgers-and-marine-contracting-56904c8ce40e6 14/20

9Union Dredgers & Marine Contracting | Projects

www.uniondredgers.com

EQUIPMENT

HIRE

SCOPE OF WORK

• Desilting of Marina Waterways.

• Videographic & Bathymetric Survey.

• Custom Fabricated Pontoons.

Desilting and dredging operations within Dubai Marina.The project required the removal and disposal of silt andconstruction waste using a combination of dredgingtechniques. Silt curtains and custom fabricated dredgingpontoons were deployed along with strict procedures toprotect the sensitive environment within the marina. Ourdivers also conducted a detailed video survey of the areabefore, during and after excavation and dredging works.

Client:  Emaar

Dredging in

Dubai Marina - Dubai

7/17/2019 Union Dredgers and Marine Contracting

http://slidepdf.com/reader/full/union-dredgers-and-marine-contracting-56904c8ce40e6 15/20

Union Dredgers & Marine Contracting | Projects

www.uniondredgers.com

EQUIPMENT

HIRE

SCOPE OF WORK

• 65,000 LM of beach reproled.

• Dredging between fronds.

• Customised low impact equipments.

Beach reclamation and proling work’s for the Palm Jumeirah. With65 Kilometers of beaches and constant erosion, UDMC werecontracted to carry out the beach reclamation works. Sand wasdredged from the water between the fronds using specialized lowimpact, custom fabricated, dredging equipment before beingdeposited onto depleted beaches. Earthmoving equipment wasthen utilized to return the beaches to the original profile.

Client:  Nakheel.

Beach Reclamation onPalm Jumeriah - Dubai

7/17/2019 Union Dredgers and Marine Contracting

http://slidepdf.com/reader/full/union-dredgers-and-marine-contracting-56904c8ce40e6 16/20

9Union Dredgers & Marine Contracting | Projects

www.uniondredgers.com

Rock Revetment in Al-

Maryah Island, Abu Dhabi

• Dredging Works underneath the bridge to increase the depthof the Waterway.

• Supply and installation of Rock protection under two bridges inAbu Dhabi. The project required excavation, dredging andlevellingof the existing ground area. Geotextiles were then installed forthe base of the rock armour.

• Revetment rocks were then positioned as per design drawings

using heavy equipment.

Client:  Mubadala.

Consultant: Atkins & Overseas Partners

Main Contractor: Al Naboodah National Contracting Group LLC

SCOPE OF WORK

• Dredging.

• Rock Revetment.

• Videographic & Bathymetric Survey.

7/17/2019 Union Dredgers and Marine Contracting

http://slidepdf.com/reader/full/union-dredgers-and-marine-contracting-56904c8ce40e6 17/20

10Union Dredgers & Marine Contracting | Projects

www.uniondredgers.com

EQUIPMENT

HIRE

• Supply, Installation and commissioning of 1.2 metre diameterHDPE Intake Pipeline, Air Burst and Chlorination Pipeline

• HDPE Welding of the 1208 Metres of HDPE Pipes• Supply and Installation of Intake Screens• Excavating and Backlling of the 1200 Metre Offshore Trench

Client:  Sharjah Electricity & Water AuthoritySCOPE OF WORK

• 1.2m Dia HDPE intake pipeline.

• 1208m HDPE Pipeline Welding.

• Dredging

Offshore Pipeline Installa-

tion in Khorfakkan-Sharjah

7/17/2019 Union Dredgers and Marine Contracting

http://slidepdf.com/reader/full/union-dredgers-and-marine-contracting-56904c8ce40e6 18/20

Union Dredgers & Marine Contracting | Project List

• Installation of Slipway in Al Hamra .  Al Hamra Construction, Ras Al Khaimah

• Hire of Barge and Heavy Equipment for Dredging works.  Saif Bin Zayed Al Nahayan, Abu Dhabi

• Sheet Piling and Dredging.  Atco General Contracting Co. L.L.C., Abu Dhabi

• Annual Maintenance Contract for Cleaning of Intake Screens forGovernment Desalination plants.

  Federal Water and Electricity Authority, Ajman

• Dredging works on Al Raha beach.  Dutco Balfour Beatty L.L.C., Abu Dhabi

• 630mm HDPE Offshore Pipeline Installation for a Power Plant .  Private Company, Ras Al Khaimah

• Supply and Installation of a custom manufactured Oil Lagoon FloatingPlatform.

  Beea’h Sharjah Development Company, Sharjah

• 3.9km 750mm Diameter HDPE Offshore Pipeline Installation forDesalination plant in Duqm.

  VA Tech Wabag Ltd., Oman

• 2.7km 1400mm Diameter HDPE Offshore Pipeline installation for AlZawrah Desalination Plant.

  Federal Water and Electricity Authority, Ajman

• 710mm Diameter Offshore Pipelines Installation for a Desalination Plant.  Fujairah Fresh Water Co., Fujairah

• 355mm Diameter Offshore Pipeline Installation Project for aDesalination plant.

  Nagarjuna Construction Company International, Oman

• 1200mm Diameter HDPE Offshore Pipeline Installation for a Desalinationplant.

  Emirates Sembcorp Water and Power Company Fujairah

Other Key Projects

UAE

Oman

P O BOX 85348, Dubai , UAEPhone: 043389479Fax: [email protected]

www.uniondredgers.com

H E A D O F F I C E

7/17/2019 Union Dredgers and Marine Contracting

http://slidepdf.com/reader/full/union-dredgers-and-marine-contracting-56904c8ce40e6 19/20

7/17/2019 Union Dredgers and Marine Contracting

http://slidepdf.com/reader/full/union-dredgers-and-marine-contracting-56904c8ce40e6 20/20

Get in Touch

P.O Box 85348 , Dubai, UAEPhone: +971 4 3389479 | Fax: +971 4 3389483

Email: [email protected] | Website: www.uniondredgers.com