Umm Al Quwain Entrance Project
CLIENT: UAE Ministry of Public Works
LOCATION: Umm Al Quwain - UAE
PERIOD: 2013 – on going
COST OF THE WORKS: 175 Million AED
SCOPE OF WORKS: study, design and supervision of a complete interchange free flow 4 legs two levels as
improvement of the intersection of Al Ittihad Road (E11) with Umm Al Quwain – Falaj Al Mualla road (E55).
• Three lane dual carriageway along Eithad Road E11 and
two lane dual carriageway along Fullaj Ul Muallah Road
E55
• Six viaducts including overheads, directional ramps and
two underpass structures
• Uninterrupted pedestrian mobility
• Total project duration is 18 months
• Project is under construction