Two Years Experience of the BioDME Project Two Years Experience of the BioDME Project - A complete Wood to Wheel Concept A complete Wood to Wheel Concept tcbiomass2013 Chicago, September 4, 2013 Ingvar Landälv, Luleå University of Technology Sweden

Transcript of Two Years Experience of the BioDME Project -- A … A complete Wood to Wheel ConceptA complete Wood...

Page 1: Two Years Experience of the BioDME Project -- A … A complete Wood to Wheel ConceptA complete Wood to Wheel Concept tc biomass ... per.salomonsson@volvo.com Total budget 28.4 M ...

Two Years Experience of the BioDME ProjectTwo Years Experience of the BioDME Project-- A complete Wood to Wheel ConceptA complete Wood to Wheel Concept

tcbiomass 2013Chicago, September 4, 2013

Ingvar Landälv,Luleå University of Technology

Sweden

Page 2: Two Years Experience of the BioDME Project -- A … A complete Wood to Wheel ConceptA complete Wood to Wheel Concept tc biomass ... per.salomonsson@volvo.com Total budget 28.4 M ...

Agenda

• Why was the BioDME project initiated?

• The project at a glance in 3.5 minutes

• How does the process work ?

• How was the Start-Up?

• How has the availability been?

• Did we meet BioDME Production goals?

• Is BioDME distribution difficult?

• Do the trucks function according to expectation?

• Where do we go from here?

European Project BioDME7th Framework Programme2

Page 3: Two Years Experience of the BioDME Project -- A … A complete Wood to Wheel ConceptA complete Wood to Wheel Concept tc biomass ... per.salomonsson@volvo.com Total budget 28.4 M ...

Volvo Group Trucks Technology3 European Project BioDME

7th Framework Programme

From VOLVO’s ”Climate Issues in Focus”Summary of results for different criteria and fuels

7 Trucks on show

Source: http://www.volvogroup.com/SiteCollectionDocuments/V olvo%20AB/values/environment/climate_issues_in_focu s_eng.pdf

Why

was

the

Bio

DM

E p

roje

ct in

itiat

ed?

Page 4: Two Years Experience of the BioDME Project -- A … A complete Wood to Wheel ConceptA complete Wood to Wheel Concept tc biomass ... per.salomonsson@volvo.com Total budget 28.4 M ...

CO2 emissions and primary energy usage per km of dr iving differs a lot depending on selected well-to wheel p athway

26 February 2013

4

Fuels 2010

-200

-100

0

100

200

300

400

0 100 200 300 400 500 600

Total WTW energy (MJ / 100 km)

WT

W G

HG

em

issi

ons

(g C

O2

eqv

/ km

)

Conventional gasoline

Conventional diesel

RME: Gly as chemical

RME: Gly as animal feed

Syn-diesel: CTL

Syn-diesel: GTL

Syn-diesel: Farmed wood

Syn -diesel: Waste wood, Black liqour

DME: CTL

DME: GTL

DME: Farmed wood

DME: Waste wood, Black liqour

EtOH: Wheat, Straw CHP, DDGS as AF

EtOH: Sugar cane (Brazil)

EtOH: Wheat, Straw CHP, DDGS as fuel

EtOH: Farmed wood

EtOH: Wheat straw

EtOH, Wheat, Lignite CHP, DDGS as AF

EtOH, Wheat, Lignite CHP, DDGS as fuel

EtOH, Wheat, NG GT+CHP, DDGS as AF

EtOH, Wheat, NG GT+CHP, DDGS as fuel

Biogas, municipal waste

Biogas, liquid manure

Biogas, dry manure

CTL

GTL-DME

GTL-syndiesel

Ethanol

Biogas, liquid manure

Gasoline and diesel

Source: WtW study Eucar/Concawe/JRC 2005, 2010 Vehicles(basis for EU RED/FQD default values)

RME

DME & FT

Biogas

Why

was

the

Bio

DM

E p

roje

ct in

itiat

ed?

The BioDMEconcept

Page 5: Two Years Experience of the BioDME Project -- A … A complete Wood to Wheel ConceptA complete Wood to Wheel Concept tc biomass ... per.salomonsson@volvo.com Total budget 28.4 M ...

Production of DME from Biomass and utilisation as fuel for transport and for industrial use

Starting date: 1 September 2008Duration 52 monthsContact: [email protected]

Total budget 28.4 M€EU funding: 8.2 M€Energimyndigheten: 9.6 M€

EUROPEAN PROJECTGrant agreement No:TREN/FP7EN/218923

Page 6: Two Years Experience of the BioDME Project -- A … A complete Wood to Wheel ConceptA complete Wood to Wheel Concept tc biomass ... per.salomonsson@volvo.com Total budget 28.4 M ...

BioDME Project Partners

- BioDME Plant engineering, construction and operation

- BioDME Plant owner

BioDME Project Coordinator- Engine development- Vehicle manufacturing- Field test responsible

- DME injection systemdevelopment

- Laboratory support toplant operation

- DME production technology provider

- BioDME distribution- BioDME filling stations

- DME fuel specification- Fuel Additive development

Page 7: Two Years Experience of the BioDME Project -- A … A complete Wood to Wheel ConceptA complete Wood to Wheel Concept tc biomass ... per.salomonsson@volvo.com Total budget 28.4 M ...

The Project at a Glance

In June 2012 Volvo together with Project Partners p roduced a film which in 3 ½ minute summarizes the BioDME pr oject covering e.g.

• Location

• Principle of the DME production concept utilizing B lack Liquor

• Potential for a Pulp Mill and for Sweden

• Truck performance

• Etc

European Project BioDME7th Framework Programme7

FILM

Page 8: Two Years Experience of the BioDME Project -- A … A complete Wood to Wheel ConceptA complete Wood to Wheel Concept tc biomass ... per.salomonsson@volvo.com Total budget 28.4 M ...

Pre-commissioning, Commissioning & Start-Up 2011

European Project BioDME7th Framework Programme8

June 2011

Page 9: Two Years Experience of the BioDME Project -- A … A complete Wood to Wheel ConceptA complete Wood to Wheel Concept tc biomass ... per.salomonsson@volvo.com Total budget 28.4 M ...

European Project BioDME7th Framework Programme9

Aminewash

H2S / CO2 to pulp mill incinerator

COshift

Carbonfilter

MeOHSynthesis 1

MeOHSynthesis 2

First single-pass MeOH synthesis featuring > 95% yie ld

Sulphurguard

MeOH (recycled)DME Product

DMEsynthesis

Water

DP-1unit

SyngasCompressor

Gas conditioning & Cleaning

DME synthesis &product purification

Off gases

Black LiquorOxygen

Gasification

Raw Methanol

DME storage

Block Flow Diagram

DME day tanks

How does the process work ?

Page 10: Two Years Experience of the BioDME Project -- A … A complete Wood to Wheel ConceptA complete Wood to Wheel Concept tc biomass ... per.salomonsson@volvo.com Total budget 28.4 M ...

Black Liquor Gasification

European Project BioDME7th Framework Programme10

Syngas

Carbonfilters

Filtercloggingresolved

Black Liq.

Changed qualitydue to alteredash recyclein mill fr 2009

Operate with lower syngas ratethan design

Installedon-stream

steam regene-ration

20 ton bls/d but withlower LHV than design

How was the Start-Up?

Page 11: Two Years Experience of the BioDME Project -- A … A complete Wood to Wheel ConceptA complete Wood to Wheel Concept tc biomass ... per.salomonsson@volvo.com Total budget 28.4 M ...

Synthesis Gas Preparation

Feed Gas

Steam

Water

Synthesis Gas

MDEA

WGS

AGRSGS-cat CO2, H2S

• Demonstration of Sulphur-rich synthesis gas water s hift

Added superheat via extra heater

MoreS componentsthan design

How was the Start-Up?

Page 12: Two Years Experience of the BioDME Project -- A … A complete Wood to Wheel ConceptA complete Wood to Wheel Concept tc biomass ... per.salomonsson@volvo.com Total budget 28.4 M ...

Single-pass Methanol synthesis– breaking the equilibrium limitation

Guard-reacto r

MPS

Raw MeOH

Synthesis GasLPS

S-guard

MeOH-cat

Carbonyl-guard MeOH reactors

• Stoichiometric syngas at P > 130 bar in synthesis

• Sulphur & Carbonyl Guards demonstrated

Membranefailure

Shorterlife thanPlanned*

How was the Start-Up?

*) due to higher S load than design

Page 13: Two Years Experience of the BioDME Project -- A … A complete Wood to Wheel ConceptA complete Wood to Wheel Concept tc biomass ... per.salomonsson@volvo.com Total budget 28.4 M ...

DME Synthesis & Distillation

• 99.5% DME directly from raw methanol

• Reduced wax production and wax removal demonstrated

DME reactor DME Purification

Light byproduct

Wax

MeOHDME

MeOH

DME-cat

Water

Minorredesign

How was the Start-Up?

Page 14: Two Years Experience of the BioDME Project -- A … A complete Wood to Wheel ConceptA complete Wood to Wheel Concept tc biomass ... per.salomonsson@volvo.com Total budget 28.4 M ...

BioDME Production

European Project BioDME7th Framework Programme14

Over 4 ton DME/dwas reached in Sep -12

The plant incl. gasification isoperated by 2 operators per shift

Key operation data:Gasification at 30bar/1050˚CMethanol synthesis at 130 barDME synthesis at 15 bar

BioDME toStorage

Black Liquorto gasification

Gasification

GasCleaningGas Shift,

Synthesis&

Distillation

SmurfitKappaKraftlinerPulp Mill

Did we meet BioDME Production goals?

Page 15: Two Years Experience of the BioDME Project -- A … A complete Wood to Wheel ConceptA complete Wood to Wheel Concept tc biomass ... per.salomonsson@volvo.com Total budget 28.4 M ...

BioDME Plant Non-availability 1H, 2012

European Project BioDME7th Framework Programme15

How has the availability been?

On stream factor, PLANNED: 50% of calendar timeOn stream factor, ACHIEVED: approx. 65% of calendar timeOn stream factor, ACHIEVED: approx. 78% of planned operation timeLongest run: 26 days followed by a planned stop

Page 16: Two Years Experience of the BioDME Project -- A … A complete Wood to Wheel ConceptA complete Wood to Wheel Concept tc biomass ... per.salomonsson@volvo.com Total budget 28.4 M ...

BioDME Quality Control

• Quality control of BioDME and participating in DME ISO standardization process

– Development of analysis methods for BioDME from storage tank, from the trailer and from filling stations

– LPG residues observed in filling stations, originating from trailer [1].

European Project BioDME7th Framework Programme16

Typical analysis of produced BioDME ISO draft [2]

C2 ppm wt 15

10000C3 ppm wt 160

C4 ppm wt 600

Methanol ppm wt 120 500

Water ppm wt 40 300

CO2 ppm wt 100 1000

DME (by difference)

% wt > 99.8 > 98.5

First unloading Dec. 201113 000 kg BioDME

[2]. Bollon, F. 7th Asian DME Conference, Niigata, Nov 16-18, 2011

[1]. Öhrman, O. et al. Quality control of BioDME produced via black liquor gasification. 7th Asian DME Conference, Niigata, Nov. 16-18, 2011.

Did we meet BioDME Production goals?

Page 17: Two Years Experience of the BioDME Project -- A … A complete Wood to Wheel ConceptA complete Wood to Wheel Concept tc biomass ... per.salomonsson@volvo.com Total budget 28.4 M ...

BioDME Production 390 tons by end of Project

European Project BioDME7th Framework Programme17

0

50

100

150

200

250

300

350

400

450

dec-11

jan-12

feb-12

mar-12

apr-12

maj-12

jun-12

jul-12

aug-12

sep-12

okt-12

nov-12

dec-12

jan-13

feb-13

mar-13

apr-13

maj-13

Pro

du

ced

Bio

DM

E,

ton

B

C

D

E

A

F 500 tons April 20, 2013

A. Authority inspectionB. Change of ceramics and catalystsC. HolidaysD. Main DME storage full + ceramic repairE. Rebuild for steam supported atomizationF. No operation during change of ownership

Did we meet BioDME Production goals?

Page 18: Two Years Experience of the BioDME Project -- A … A complete Wood to Wheel ConceptA complete Wood to Wheel Concept tc biomass ... per.salomonsson@volvo.com Total budget 28.4 M ...

Piteå

Stockholm

Jönköping

Göteborg

Fuel distribution as for LPG

European Project BioDME7th Framework Programme18

• Available technology modified for DME

• Safety regulations based on LPG

• ~200 k€ per filling station (+33% vs diesel)

• Easy to achieve

Four filling stations

200 m3 storage tank in Piteå

34 m3 trailer

Is BioDME distribution difficult?

Page 19: Two Years Experience of the BioDME Project -- A … A complete Wood to Wheel ConceptA complete Wood to Wheel Concept tc biomass ... per.salomonsson@volvo.com Total budget 28.4 M ...

Field test status 2012-12-31

• 10 field test trucks

• Accumulated mileage: 824 798 km / 512 600 mi

• Max truck mileage : 183 588 km / 115 000 mi

European Project BioDME 7th Framework Programme

0

100000

200000

300000

400000

500000

600000

700000

800000

900000

1000000

km

Date

Total Field test mileage

Do the trucks function according to expectation?

Page 20: Two Years Experience of the BioDME Project -- A … A complete Wood to Wheel ConceptA complete Wood to Wheel Concept tc biomass ... per.salomonsson@volvo.com Total budget 28.4 M ...

Emission verificationPEMS – Portable Emission Measurement System

European Project BioDME7th Framework Programme20

Cycle NOx(g/kWh)

PM(g/kWh)

HC (g/kWh)

CO (g/kWh)

EU-V EEV limits (ETC)

2.0 0.02 0.40 3.0

PEMS 20ton

1.66 0.00* 0.25 2.34

PEMS 60ton

1.72 0.00* 0.31 1.82

* Measured with AVL 483 Micro Soot Sensor

• Independent (AVL) verification after 183 000 km (11 5 000 mi) • EU-V Emissions still fulfilled

Do the trucks function according to expectation?

Page 21: Two Years Experience of the BioDME Project -- A … A complete Wood to Wheel ConceptA complete Wood to Wheel Concept tc biomass ... per.salomonsson@volvo.com Total budget 28.4 M ...

CHEMRECEnergy to Succeed

Chemrec Status January 2013

21

� Dec 31, 2012: Chemrec Piteå companies including pilot plants sold by

Chemrec AB to LTU Holding AB,

� Jan 1, 2013: 17 pilot plant staff employed by LTU.

� Dec 31, 2012: License agreement between licensor Chemrec AB &

HaldorTopsøe with LTU and LTU Holding. Technology rights stay with

licensors.

� Jan 30, 2013: Consortium Agreement between parties involved in

continued R&D.

� Chemrec has reduced staff awaiting long term stable regulations for

advanced biofuels. Two Chemrec Stockholm staff temporarily on leave

assigned to LTU

� Continued operation of the plants as part of LTU Biosyngas Program

10/18/2009 16

FLARE

Raw Syngas

GREENLIQUOR

Black Liquor

GAS COOLER

Oxygen

Atomizing medium

GASIFIER

QUENCH

C.W

BFW

MP-Steam

Weak Wash

CLEANSYNGAS

BFW

SULPHUR ABSORPTION

Condensate

White/Green Liquor

LP-St.

Whe

re d

o w

e go

from

her

e?

Page 22: Two Years Experience of the BioDME Project -- A … A complete Wood to Wheel ConceptA complete Wood to Wheel Concept tc biomass ... per.salomonsson@volvo.com Total budget 28.4 M ...

Volvo Group Trucks Technology

0

100000

200000

300000

400000

500000

600000

700000

800000

900000

1000000

km

Date

Total Field test mileage

Extended Volvo field test8 trucks, 2013-01-01 to 2014-06-30

(1000 Km / 1000 mi) Status2013-04-08

TargetJune 2014

Total mileage 970 / 603 1 475 / 917

1 truck 200 / 124 300 / 186

Extended field test

1 million kmMay, 2013

Whe

re d

o w

e go

from

her

e?

Page 23: Two Years Experience of the BioDME Project -- A … A complete Wood to Wheel ConceptA complete Wood to Wheel Concept tc biomass ... per.salomonsson@volvo.com Total budget 28.4 M ...

Fuel consumption

European Project BioDME7th Framework Programme23

TruckApplication

Gross weight(Min/Max/Avg)

Typical FC Diesel Equivalent(l /10 km & mi/gal))

FH-787Regional and local haul

14/26/21 ton 2.3 / 10.2

FH-711long haul

25/50/ ton 4.1 / 5.7

FH-842local start/stop

21/57/53 ton 6.1 / 3.8

Volvo through their US branch on June 6, 2013 decided to start commercial production of

DME fuelled vehicles in the US in 2015.See:

http://www.volvotrucks.com/TRUCKS/NA/EN-US/PRODUCTS/ALTERNATIVEFUELS/

CNG/Pages/DME.aspxThe link includes:

Volvo introduction, a YouTube filmDME – “The future is here”, a YouTube filmDME – “It is all around us”, a YouTube film

and other material.

See also:www.biome.euBioDME Video