TÜV SÜD Industrie Service GmbH Determinations with regard to a JI track 2 Nairobi, 14 th November...
-
Upload
silvia-jenkins -
Category
Documents
-
view
214 -
download
1
Transcript of TÜV SÜD Industrie Service GmbH Determinations with regard to a JI track 2 Nairobi, 14 th November...
![Page 1: TÜV SÜD Industrie Service GmbH Determinations with regard to a JI track 2 Nairobi, 14 th November 2006 JI-SC side event at COP/MOP Thomas Kleiser TÜV SÜD.](https://reader035.fdocuments.net/reader035/viewer/2022072014/56649e875503460f94b8b2c7/html5/thumbnails/1.jpg)
TÜV SÜD Industrie Service GmbH
Determinations with regard to aDeterminations with regard to a
JI track 2JI track 2
Nairobi, 14Nairobi, 14thth November 2006 November 2006JI-SC side event at COP/MOP JI-SC side event at COP/MOP
Thomas KleiserThomas Kleiser
TÜV SÜD Industrie Service GmbHTÜV SÜD Industrie Service GmbH
![Page 2: TÜV SÜD Industrie Service GmbH Determinations with regard to a JI track 2 Nairobi, 14 th November 2006 JI-SC side event at COP/MOP Thomas Kleiser TÜV SÜD.](https://reader035.fdocuments.net/reader035/viewer/2022072014/56649e875503460f94b8b2c7/html5/thumbnails/2.jpg)
TÜV SÜD Industrie Service GmbH
TÜV SÜD:
12.500 employees active world wide in the field of inspection and certification (especially for products, management systems, plants, airplanes, cars etc.)
worldwide presence with offices in more than 50 countries
Carbon Management Service
Currently 12 fix employed persons in Munich (economists, experts in different fields of natural sciences, engineers, foresters) Furthermore pool of experts worldwide (in total 55 trained auditors) - 7 of them also working full-time in CDM/JI business - Validation, verification and certification of GHG projects (national/JI/CDM) - Verification and certification of emission inventories (EU-Directive) - Certification of energy from renewable sources + Knowledge management (www.netinform.net and newsletter
TÜV SÜD - Overview
![Page 3: TÜV SÜD Industrie Service GmbH Determinations with regard to a JI track 2 Nairobi, 14 th November 2006 JI-SC side event at COP/MOP Thomas Kleiser TÜV SÜD.](https://reader035.fdocuments.net/reader035/viewer/2022072014/56649e875503460f94b8b2c7/html5/thumbnails/3.jpg)
TÜV SÜD Industrie Service GmbH
Excerpt from Reference List (JI)
TÜV Standard
CMS 022
VerifiziertesCDM - Projekt
Klima-
schutz
TÜV Standard
CMS 022
VerifiziertesCDM - Projekt
Klima-
schutz
Locations:
- Bulgaria - Czech Republic- Estonia- Hungary- Latvia- Poland- Romania- Russia
- Slovakia - Ukraine
Main project types:
- renewable energy - energy efficiency - fuel switch- landfill gas
- agriculture - afforestation
- coal mine methane - N2O
![Page 4: TÜV SÜD Industrie Service GmbH Determinations with regard to a JI track 2 Nairobi, 14 th November 2006 JI-SC side event at COP/MOP Thomas Kleiser TÜV SÜD.](https://reader035.fdocuments.net/reader035/viewer/2022072014/56649e875503460f94b8b2c7/html5/thumbnails/4.jpg)
TÜV SÜD Industrie Service GmbH
Accreditation under CDM
Experience (actual status):
JI:
• determination of around 35 JI projects (10 in Ukraine; 9 in Russia)
• verification (started) of around 10 JI projects 2 Projects currently published at JI-SC; 4 more expected for publication in the next two weeks
![Page 5: TÜV SÜD Industrie Service GmbH Determinations with regard to a JI track 2 Nairobi, 14 th November 2006 JI-SC side event at COP/MOP Thomas Kleiser TÜV SÜD.](https://reader035.fdocuments.net/reader035/viewer/2022072014/56649e875503460f94b8b2c7/html5/thumbnails/5.jpg)
TÜV SÜD Industrie Service GmbH
Experiences in the determination of JIExperiences in the determination of JI
projectsprojects
![Page 6: TÜV SÜD Industrie Service GmbH Determinations with regard to a JI track 2 Nairobi, 14 th November 2006 JI-SC side event at COP/MOP Thomas Kleiser TÜV SÜD.](https://reader035.fdocuments.net/reader035/viewer/2022072014/56649e875503460f94b8b2c7/html5/thumbnails/6.jpg)
TÜV SÜD Industrie Service GmbH
Project types: Project types:
- - Rehabilitation/Improvement of district heating networks and power plants
- Coal mine methane utilization projects
- Cogeneration
- Energy Efficiency
- Fuel Switch to Biomass
- Animal waste management system – methane utilisation
- Renewable energy (wind and hydro power)
- Cement projects
![Page 7: TÜV SÜD Industrie Service GmbH Determinations with regard to a JI track 2 Nairobi, 14 th November 2006 JI-SC side event at COP/MOP Thomas Kleiser TÜV SÜD.](https://reader035.fdocuments.net/reader035/viewer/2022072014/56649e875503460f94b8b2c7/html5/thumbnails/7.jpg)
TÜV SÜD Industrie Service GmbH
Experiences from determination of JI-projects
Positive:
- well-developed PDDs already in the initial phase of validation
- in most cases good data basis
- high standard in technical planning and technical solutions
- in most cases development of a project-specific methodology
- very complex projects (bundle of measures in on project)
- well-developed monitoring concept
![Page 8: TÜV SÜD Industrie Service GmbH Determinations with regard to a JI track 2 Nairobi, 14 th November 2006 JI-SC side event at COP/MOP Thomas Kleiser TÜV SÜD.](https://reader035.fdocuments.net/reader035/viewer/2022072014/56649e875503460f94b8b2c7/html5/thumbnails/8.jpg)
TÜV SÜD Industrie Service GmbH
Experiences from determination of JI projects
More critical:
- In some cases limited understanding of “additionality”
- International accepted values (IPCC) not always applied
- Problems in defining project boundaries correctly and to include all emission sources
- Changes of project measures during project lifetime
- Changes in the monitoring plan (missing sensibility what a JI project means)
- Limited local stakeholder process
- Not all “JI-documents” in English available
- LoA
![Page 9: TÜV SÜD Industrie Service GmbH Determinations with regard to a JI track 2 Nairobi, 14 th November 2006 JI-SC side event at COP/MOP Thomas Kleiser TÜV SÜD.](https://reader035.fdocuments.net/reader035/viewer/2022072014/56649e875503460f94b8b2c7/html5/thumbnails/9.jpg)
TÜV SÜD Industrie Service GmbH
Resumee and Expectations
Resumee:
- Nearly all JI projects determined by us can or could run under Track 2 and are able to fulfil the requirements set up by the JI-SC
- In some cases major adjustments will be necessary; also experiences from CDM should be considered in the baseline concept and monitoring plan.
- Problem: Early projects
![Page 10: TÜV SÜD Industrie Service GmbH Determinations with regard to a JI track 2 Nairobi, 14 th November 2006 JI-SC side event at COP/MOP Thomas Kleiser TÜV SÜD.](https://reader035.fdocuments.net/reader035/viewer/2022072014/56649e875503460f94b8b2c7/html5/thumbnails/10.jpg)
TÜV SÜD Industrie Service GmbH
Resumee and Expectations
Expectations:
- Individual project and country-specific approach for baseline and monitoring concept should be accepted also in cases when a CDM methodology is available
- Smooth, transparent registration process.
- Stable rules! Avoid setting up a bureaucratic framework,
- Trust the (applicant) independent entities!
- Exchange of experiences between invoveld parties (JISC, IE, project developers, investors etc.) at least every six months
![Page 11: TÜV SÜD Industrie Service GmbH Determinations with regard to a JI track 2 Nairobi, 14 th November 2006 JI-SC side event at COP/MOP Thomas Kleiser TÜV SÜD.](https://reader035.fdocuments.net/reader035/viewer/2022072014/56649e875503460f94b8b2c7/html5/thumbnails/11.jpg)
TÜV SÜD Industrie Service GmbH
Thomas KleiserTel. ++49 89 57 91 – 11 86
Thank you for your attention!