CCIT2248 Appendix a Individual Household SampleDistribution(2010G) 09 Oct 2013 v1.1
Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the...
-
Upload
ruth-hodge -
Category
Documents
-
view
214 -
download
0
Transcript of Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the...
![Page 1: Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.](https://reader030.fdocuments.net/reader030/viewer/2022032414/56649eec5503460f94bfe510/html5/thumbnails/1.jpg)
Tuesday, November 16, 2010 G. Favre EN/MME 1
PIMS prototype construction experience
Details of the construction procedure elaborated by CERN for the PIMS prototype
![Page 2: Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.](https://reader030.fdocuments.net/reader030/viewer/2022032414/56649eec5503460f94bfe510/html5/thumbnails/2.jpg)
Tuesday, November 16, 2010 G. Favre EN/MME 2
Construction sequence for standard rings type 3
![Page 3: Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.](https://reader030.fdocuments.net/reader030/viewer/2022032414/56649eec5503460f94bfe510/html5/thumbnails/3.jpg)
Tuesday, November 16, 2010 G. Favre EN/MME 3
Table 1: Construction sequence for standard rings type 3 (1/2)
pieces p. cav.
drawing number sequence responsibility/task
sub parts
4 SPLACPMT0001 Tuner port machining (this part integrates a backing support designed to receive the welding root)
IPJ - task 1
4 SPLACPMB0037 Flange rough machining, stabilization, final machining
IPJ - task 1
4 SPLACPMT0002 Vacuum brazing IPJ - task 1
main parts
4 SPLACPMT0012 1. Ring rough machining (+1 mm) IPJ - task 1
2. Milling of port apertures according to the requirements by FZJ
IPJ - task 1
3. Cleaning IPJ - task 1
4. Packing and transport of rings and port tubes to FZJ
IPJ - task 1
4 5. Welding of port tubes FZJ - task 2
6. Leak test of ports FZJ - task 2
7. Packing and transport to IPJ FZJ/IPJ - task 2
![Page 4: Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.](https://reader030.fdocuments.net/reader030/viewer/2022032414/56649eec5503460f94bfe510/html5/thumbnails/4.jpg)
Tuesday, November 16, 2010 G. Favre EN/MME 4
![Page 5: Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.](https://reader030.fdocuments.net/reader030/viewer/2022032414/56649eec5503460f94bfe510/html5/thumbnails/5.jpg)
Tuesday, November 16, 2010 G. Favre EN/MME 5
![Page 6: Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.](https://reader030.fdocuments.net/reader030/viewer/2022032414/56649eec5503460f94bfe510/html5/thumbnails/6.jpg)
Tuesday, November 16, 2010 G. Favre EN/MME 6
![Page 7: Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.](https://reader030.fdocuments.net/reader030/viewer/2022032414/56649eec5503460f94bfe510/html5/thumbnails/7.jpg)
Tuesday, November 16, 2010 G. Favre EN/MME 7
+ 2 mm
+ 2 mm
- 2 mm
Rough machining: oversize + 1 mm
![Page 8: Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.](https://reader030.fdocuments.net/reader030/viewer/2022032414/56649eec5503460f94bfe510/html5/thumbnails/8.jpg)
Tuesday, November 16, 2010 G. Favre EN/MME 8
![Page 9: Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.](https://reader030.fdocuments.net/reader030/viewer/2022032414/56649eec5503460f94bfe510/html5/thumbnails/9.jpg)
Tuesday, November 16, 2010 G. Favre EN/MME 9
pieces p. cav.
drawing number sequence responsibility/task
main parts
SPLACPMB0018 8. Port backing support machining IPJ - task 3
9. X-ray testing IPJ – task 3
10. Leak test of ports IPJ - task 3
SPLACPMB0018 11. Ring final machining IPJ - task 3
12. Cleaning IPJ - task 3
13. Metrological report IPJ - task 3
14. Packing and transport to CERN IPJ - task 3
Table 1: Construction sequence for standard rings type 3 (2/2)
![Page 10: Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.](https://reader030.fdocuments.net/reader030/viewer/2022032414/56649eec5503460f94bfe510/html5/thumbnails/10.jpg)
Tuesday, November 16, 2010 G. Favre EN/MME 10
![Page 11: Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.](https://reader030.fdocuments.net/reader030/viewer/2022032414/56649eec5503460f94bfe510/html5/thumbnails/11.jpg)
![Page 12: Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.](https://reader030.fdocuments.net/reader030/viewer/2022032414/56649eec5503460f94bfe510/html5/thumbnails/12.jpg)
Tuesday, November 16, 2010 G. Favre EN/MME 12
Construction sequence for pick-up rings
![Page 13: Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.](https://reader030.fdocuments.net/reader030/viewer/2022032414/56649eec5503460f94bfe510/html5/thumbnails/13.jpg)
Tuesday, November 16, 2010 G. Favre EN/MME 13
Table 2: Construction sequence for pick-up rings (1/2)
pieces p. cav.
drawing number sequence responsibility/tasks
sub parts
2 SPLACPMT0001 Tuner port machining (this part integrates a backing support designed to receive the welding root)
IPJ - task 1
2 SPLACPMB0037 Flange rough machining, stabilization, final machining
IPJ - task 1
2 SPLACPMT0002 Vacuum brazing IPJ - task 1
2 SPLACPMT0003 Pick-up port machining (this part integrates a backing support designed to receive the welding root)
IPJ - task 1
2 SPLACPMB0038 flange rough machining, stabilisation, fine machining
IPJ - task 1
2 SPLACPMT0002, SPLACPMT0004
Vacuum brazing IPJ - task 1
![Page 14: Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.](https://reader030.fdocuments.net/reader030/viewer/2022032414/56649eec5503460f94bfe510/html5/thumbnails/14.jpg)
Tuesday, November 16, 2010 G. Favre EN/MME 14
![Page 15: Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.](https://reader030.fdocuments.net/reader030/viewer/2022032414/56649eec5503460f94bfe510/html5/thumbnails/15.jpg)
Tuesday, November 16, 2010 G. Favre EN/MME 15
![Page 16: Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.](https://reader030.fdocuments.net/reader030/viewer/2022032414/56649eec5503460f94bfe510/html5/thumbnails/16.jpg)
Tuesday, November 16, 2010 G. Favre EN/MME 16
![Page 17: Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.](https://reader030.fdocuments.net/reader030/viewer/2022032414/56649eec5503460f94bfe510/html5/thumbnails/17.jpg)
Tuesday, November 16, 2010 G. Favre EN/MME 17
![Page 18: Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.](https://reader030.fdocuments.net/reader030/viewer/2022032414/56649eec5503460f94bfe510/html5/thumbnails/18.jpg)
Tuesday, November 16, 2010 G. Favre EN/MME 18
![Page 19: Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.](https://reader030.fdocuments.net/reader030/viewer/2022032414/56649eec5503460f94bfe510/html5/thumbnails/19.jpg)
Tuesday, November 16, 2010 G. Favre EN/MME 19
![Page 20: Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.](https://reader030.fdocuments.net/reader030/viewer/2022032414/56649eec5503460f94bfe510/html5/thumbnails/20.jpg)
Tuesday, November 16, 2010 G. Favre EN/MME 20
Table 2: Construction sequence for pick-up rings (2/2)
pieces p. cav.
drawing number
sequence responsibility/tasks
main parts
2 1. Ring rough machining (+1 mm) IPJ - task 1
SPLACPMT0013 2. Milling of port apertures according to the requirements of FZJ
IPJ - task 1
3. Cleaning IPJ - task 1
4. Packing and transport of rings and port tubes to FZJ
IPJ - task 1
2 5. Welding of port tubes FZJ - task 2
6. Leak test of ports FZJ - task 2
7. Packing and transport to IPJ FZJ/IPJ - task 2
SPLACPMB0020 8. Port backing support machining IPJ - task 3
9. X-ray testing IPJ – task 3
10. Leak test of ports IPJ - task 3
SPLACPMB0020 11. Ring final machining IPJ - task 3
12. Cleaning IPJ - task 3
13. Metrological report (the ring shall be unclamped to carry out the measurements)
IPJ - task 3
14. Packing and transport to CERN IPJ - task 3
![Page 21: Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.](https://reader030.fdocuments.net/reader030/viewer/2022032414/56649eec5503460f94bfe510/html5/thumbnails/21.jpg)
Tuesday, November 16, 2010 G. Favre EN/MME 21
![Page 22: Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.](https://reader030.fdocuments.net/reader030/viewer/2022032414/56649eec5503460f94bfe510/html5/thumbnails/22.jpg)
Tuesday, November 16, 2010 G. Favre EN/MME 22
![Page 23: Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.](https://reader030.fdocuments.net/reader030/viewer/2022032414/56649eec5503460f94bfe510/html5/thumbnails/23.jpg)
Tuesday, November 16, 2010 G. Favre EN/MME 23
Construction sequence of central ring type 4
![Page 24: Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.](https://reader030.fdocuments.net/reader030/viewer/2022032414/56649eec5503460f94bfe510/html5/thumbnails/24.jpg)
Tuesday, November 16, 2010 G. Favre EN/MME 24
Table 3: Construction sequence of central ring type 4
pieces p. cav.
drawing number sequence responsibility
Sub parts
1 SPLACPMB0025 square flange: rough machining, stabilization, final machining
IPJ - task 1
1 SPLACPMB0026 tube machining IPJ - task 1
1 SPLACPMB0027 pick-up tube machining IPJ - task 1
1 SPLACPMB0028 fitting elbows machining IPJ - task 1
1 SPLACPMB0029 nipples machining IPJ - task 1
1 SPLACPMB0037 flange rough machining, stabilisation, final machining
IPJ - task 1
1 SPLACPMB0038 flange rough machining, stabilisation, final machining
IPJ - task 1
![Page 25: Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.](https://reader030.fdocuments.net/reader030/viewer/2022032414/56649eec5503460f94bfe510/html5/thumbnails/25.jpg)
Tuesday, November 16, 2010 G. Favre EN/MME 25
![Page 26: Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.](https://reader030.fdocuments.net/reader030/viewer/2022032414/56649eec5503460f94bfe510/html5/thumbnails/26.jpg)
Tuesday, November 16, 2010 G. Favre EN/MME 26
![Page 27: Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.](https://reader030.fdocuments.net/reader030/viewer/2022032414/56649eec5503460f94bfe510/html5/thumbnails/27.jpg)
Tuesday, November 16, 2010 G. Favre EN/MME 27
![Page 28: Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.](https://reader030.fdocuments.net/reader030/viewer/2022032414/56649eec5503460f94bfe510/html5/thumbnails/28.jpg)
Tuesday, November 16, 2010 G. Favre EN/MME 28
![Page 29: Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.](https://reader030.fdocuments.net/reader030/viewer/2022032414/56649eec5503460f94bfe510/html5/thumbnails/29.jpg)
Tuesday, November 16, 2010 G. Favre EN/MME 29
![Page 30: Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.](https://reader030.fdocuments.net/reader030/viewer/2022032414/56649eec5503460f94bfe510/html5/thumbnails/30.jpg)
Tuesday, November 16, 2010 G. Favre EN/MME 30
![Page 31: Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.](https://reader030.fdocuments.net/reader030/viewer/2022032414/56649eec5503460f94bfe510/html5/thumbnails/31.jpg)
Tuesday, November 16, 2010 G. Favre EN/MME 31
![Page 32: Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.](https://reader030.fdocuments.net/reader030/viewer/2022032414/56649eec5503460f94bfe510/html5/thumbnails/32.jpg)
Tuesday, November 16, 2010 G. Favre EN/MME 32
Table 3: Construction sequence of central ring type 4
pieces p. cav.
drawing number sequence responsibility
Main parts
1 SPLACPMT0014 1. Ring rough machining (+1 mm) IPJ - task 1
2. Cleaning IPJ - task 1
3. Stabilisation (heat treatment) IPJ - task 1
SPLACPMT0015 4. Ring rough machining (+0.5 mm) IPJ - task 1
5. Cleaning IPJ - task 1
6. Stabilisation (heat treatment) IPJ - task 1
SPLACPMB0024 7. Ring final machining IPJ - task 1
8. Cleaning IPJ - task 1
9. Metrology (the ring shall be unclamped to carry out the measurements)
IPJ - task 1
SPLACPMB0017 10. Brazing of ports, fitting elbows, nipples and square flange
IPJ - task 1
11. Leak test IPJ – task 1
12. Water pressure test IPJ – task 1
13. Metrology IPJ – task 1
11. Packing and Transport to CERN IPJ - task 3
![Page 33: Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.](https://reader030.fdocuments.net/reader030/viewer/2022032414/56649eec5503460f94bfe510/html5/thumbnails/33.jpg)
Tuesday, November 16, 2010 G. Favre EN/MME 33
![Page 34: Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.](https://reader030.fdocuments.net/reader030/viewer/2022032414/56649eec5503460f94bfe510/html5/thumbnails/34.jpg)
Tuesday, November 16, 2010 G. Favre EN/MME 34
![Page 35: Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.](https://reader030.fdocuments.net/reader030/viewer/2022032414/56649eec5503460f94bfe510/html5/thumbnails/35.jpg)
Tuesday, November 16, 2010 G. Favre EN/MME 35
![Page 36: Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.](https://reader030.fdocuments.net/reader030/viewer/2022032414/56649eec5503460f94bfe510/html5/thumbnails/36.jpg)
Tuesday, November 16, 2010 G. Favre EN/MME 36
![Page 37: Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.](https://reader030.fdocuments.net/reader030/viewer/2022032414/56649eec5503460f94bfe510/html5/thumbnails/37.jpg)
Tuesday, November 16, 2010 G. Favre EN/MME 37
![Page 38: Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.](https://reader030.fdocuments.net/reader030/viewer/2022032414/56649eec5503460f94bfe510/html5/thumbnails/38.jpg)
Tuesday, November 16, 2010 G. Favre EN/MME 38
Construction sequence of central disc type 1, type 3 and & disc type 3
![Page 39: Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.](https://reader030.fdocuments.net/reader030/viewer/2022032414/56649eec5503460f94bfe510/html5/thumbnails/39.jpg)
Tuesday, November 16, 2010 G. Favre EN/MME 39
Table 4: Construction sequence of central disc type 1, type 3 and & disc type 3
pieces p. cav.
drawing number sequence responsibility
2 1. Disc rough machining including coupling slots (all +1 mm)
IPJ - task 1
2. Drilling of cooling circuits IPJ - task 1
3. Installation of temporary threaded plugs to protect cooling circuits during final machining and cleaning
IPJ - task 1
4. Final machining IPJ - task 1
5. Cleaning IPJ – task 1
6. Leak test of cooling circuits IPJ – task 1
7. Pressure test of the cooling circuits IPJ – task 1
8. Metrology control (the disc shall be unclamped to carry out the measurements)
IPJ - task 1
9. Packing and Transport to CERN IPJ - task 3
![Page 40: Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.](https://reader030.fdocuments.net/reader030/viewer/2022032414/56649eec5503460f94bfe510/html5/thumbnails/40.jpg)
Tuesday, November 16, 2010 G. Favre EN/MME 40
Rough machining: oversize + 1 mm
![Page 41: Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.](https://reader030.fdocuments.net/reader030/viewer/2022032414/56649eec5503460f94bfe510/html5/thumbnails/41.jpg)
Tuesday, November 16, 2010 G. Favre EN/MME 41
Rough machining: oversize + 1 mm
![Page 42: Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.](https://reader030.fdocuments.net/reader030/viewer/2022032414/56649eec5503460f94bfe510/html5/thumbnails/42.jpg)