PIMS Presentation 2012

download PIMS Presentation 2012

of 27

Transcript of PIMS Presentation 2012

  • 7/31/2019 PIMS Presentation 2012

    1/27

    Big enough to deliver Small enough to care

  • 7/31/2019 PIMS Presentation 2012

    2/27

    OMEGAI N B R I E F

  • 7/31/2019 PIMS Presentation 2012

    3/27

    Offices

    USA

    Stavanger

    lensvg (Head Office)

    Bergen Oslo Trondheim Kristiansund Haugesund Stord

    USA Canada Singapore Australia UK Lithuania

  • 7/31/2019 PIMS Presentation 2012

    4/27

    Summary

    1987: Futura Datasenter A/S

    1991: Omega A/S

    1994: Statoil-contract signed

    2001: International expansion

    Organic growth

    Project oriented

    Entrepreneurial spirit

    Close and lasting client relations

    Big enough to deliver

    Small enough to care

    0

    100

    200

    300

    400

    500

    600

    700

    800

    900

    1991 1993 1995 1997 1999 2001 2003 2005 2007 2009 2011

    Employees

  • 7/31/2019 PIMS Presentation 2012

    5/27

    Organisation

  • 7/31/2019 PIMS Presentation 2012

    6/27

    PIMSProject Information Management System

  • 7/31/2019 PIMS Presentation 2012

    7/27

    Quick Facts

    Been on the market for over 15 years

    Over 10.000 users world-wide

    Used in projects ranging from $100 to $10+ billion

    AppFrame Technology platform Module based

    One common client

    One common user-interface

    Easy access to information

    Easy gathering of information

    Supports interaction with other systems

  • 7/31/2019 PIMS Presentation 2012

    8/27

    TechnologyBuilt on standard Microsoft products

    Database

    Microsoft SQL Server 2005/2008/2012

    Standardised platform

    Enhanced data security

    Communication

    Network-connection

    Internet-connection

    Clients

    Windows (.NET WinForms)

    Web

    Automatic installation and updates

    Reporting

    Built-in report designer

    Multiple export formats supported

  • 7/31/2019 PIMS Presentation 2012

    9/27

    Infrastructure

  • 7/31/2019 PIMS Presentation 2012

    10/27

    PIMS Module OverviewP r o j e c t I n f o r m a t i o n M a n a g e m e n t S y s t e m

  • 7/31/2019 PIMS Presentation 2012

    11/27

    Project Control Basis

    Allocate estimates to WBS, OBS or PBS

    Time phasing of estimates and total forecast

    Track and analyze actual, planned, earned, commitment, progress and

    forecast

    Inflation / deflation of cost and currency deviation handling

    Archive and freeze estimates and plans and perform baseline updates

    Monitor, analyze and report actual cash flow

    Summary and detailed reports

    Report on unlimited alternative structures

    Cost trending

  • 7/31/2019 PIMS Presentation 2012

    12/27

    Contract Management

    Full contract register - including all types of contracts

    Maintain commitment and build up a contract forecast with

    changes, options, expected growth etc

    Use of several currencies on the same contract

    Contract milestones to track original, actual and forecast dates

    Establish and follow up time phasing of a contract

    Store files linked to each contract

  • 7/31/2019 PIMS Presentation 2012

    13/27

    Cost Change Management

    Tracking and documentation of changes to Control Estimates

    Manage Contingency

    Identification and segregation of pending and approved cost

    transfers

    Integrated with Project Baseline and Contract Managementmodules

  • 7/31/2019 PIMS Presentation 2012

    14/27

    Invoice Verification

    Allows full tracking of all invoices

    Code cost details on numerous coding structures

    Integrate with Corporate AP System

    Use Invoice Approval Processes

    Powerful reports

    E-Mail alerts

  • 7/31/2019 PIMS Presentation 2012

    15/27

    Resource Management

    Easy set-up of required structures

    Breakdown of activities to any required level

    Estimating and forecasting of resource cost

    Link to WBS and project baselines

    Set-up of calendars for rotations and different work schedules

    Allocation of resources to activities or positions

    Extensive reporting capabilities

  • 7/31/2019 PIMS Presentation 2012

    16/27

    Completion Management

    Modules: Engineering, Mechanical Completion, Commissioning and Preservation

    Progressive verification of physical installation work

    Achieve a smooth and timely handover of pre-defined systems

    Automatic generation of all barcode readable certificates/checklists

    Administration of punch items and Carry Over Work

    Status logging against each Tag based on verified documentation

    Status reporting as required: By system, area, contractor etc

    Can be interfaced with (sub)contractors management systems

    Download automatically from Engineering Databases

    Enter dynamic commissioning procedures within the system

  • 7/31/2019 PIMS Presentation 2012

    17/27

    Document Management Template-based creation of documents

    Structured numbering of documents

    Allow custom meta-data

    Full revision history and tracking

    Distribution matrix and generation of transmittals

    Formal Review Processes

    Bulk uploading and downloading

    Status and audit reporting

    E-Mail notifications

    Handle correspondence

    Handle vendor documentation

  • 7/31/2019 PIMS Presentation 2012

    18/27

    Quantity Management

    Enables electronic reception of Contractors measurement

    Enables identification and Quality Control of discrepancies

    Enables tracking of discrepancies and their mutually agreed

    clearance

    Enables control of quantity update data

    Enables tracking of discrepancies and their mutually agreed

    clearance

    Enables establishment of project forecasts, estimates and

    trend graphs

  • 7/31/2019 PIMS Presentation 2012

    19/27

    Quality Management

    Audit and Examination plans

    Checklists and Observation registers

    Planned versus executed Audit and Examination activities

    Auto generated reminder emails for actions and activities

    File attachments

  • 7/31/2019 PIMS Presentation 2012

    20/27

    Risk Management

    Increase probability and impact of positive events, and

    decrease the probability and impact of events adverse to theproject

    Flexibility to organize the module to meet individual project

    needs

    Assign actions to mitigate risks or capture opportunities

    Top Ten lists based on importance

    Risk Matrix gives a graphical representation of all open

    uncertainties

  • 7/31/2019 PIMS Presentation 2012

    21/27

    CostResources

    Complete CTR-register covering the entire scope of your projects

    Easy structuring -and organising of CTRs into WBS-structures.

    Periodic reporting of actual progress and man-hours.

    Registration of resource-requirements and allocation of personnel.

    Integrated Personnel-module for project staffing and man-power plans.

    Enhanced reporting capabilities

    Cost, Time & Resources

  • 7/31/2019 PIMS Presentation 2012

    22/27

    HSE

    Follow up Project HSE incidents

    Provide a function to link up HSE incidents with Risks Elements

    on a current Project

    Add attachments related to HSE incidents

    Append Activities on HSE incidents and assign Actions to theproject staff

    HSE Reports (Plan & Status, Activity bar chart, HSE Program)

  • 7/31/2019 PIMS Presentation 2012

    23/27

    Status Reporting

    Merge multiple reports into a single PDF file

    Re-use of report layout

    Standardized report layout

    Supports all PIMS reports

    Import PDF files

    Import Microsoft Word documents

    Executive summary page

    Distribution matrix

    Monthly reports, Bi-weekly reports and/or Weekly Reports

  • 7/31/2019 PIMS Presentation 2012

    24/27

    Project Portfolio Management

    Select projects to be included in a portfolio

    Define and report against an unlimited number of alternative

    structures

    Track and analyze actual, planned, earned, commitment,

    progress and forecast

    Sort your projects in categories, phases and regions

    Monitor, analyze and report actual cash flow

    Cost trending

  • 7/31/2019 PIMS Presentation 2012

    25/27

    Experience Source of quantitative project facts

    Quick access to experience data

    All datasets are SCCS coded, hence possible to compare

    and benchmark different projects

    Comprehensive twist and turn functionality using pivoting

    Built in charts available

    Several chart types supported

    User defined configuration for quick and easy access to

    data

    Extensive grouping and filtering possibilities

  • 7/31/2019 PIMS Presentation 2012

    26/27

    Lesson Learned

    Capture and share contributions and associated files

    Browser based front-end to the application and information

    Customizable design and layout

    Capture Proven Value experiences in addition to Potential Value Impact

    assessments

    Powerful discussion features

    Tools for providing contributor recognition

    Tag contributions, contributors and categories and management of e-

    mail alerts

    Allow anonymous postings

  • 7/31/2019 PIMS Presentation 2012

    27/27

    Timesheet

    User friendly interfaces for users and managers

    Accessible either on Intranet or Internet

    Man hour registration against the project WBS and contracts

    Verification and approval of released man hours

    Integration with other PIMS modules for reporting