TTA since CJK8

14
CJK9 , Zhangjiajie, China TTA since CJK8 CJK-PLE09-XXX Zhangjiajia, China 8-10 April 2009 Won-Sik Kim TTA President [email protected]

description

TTA since CJK8. Won-Sik Kim TTA President [email protected]. CJK-PLE09-XXX Zhangjiajia, China 8-10 April 2009. Contents. TTA Standardization Committees & Fora. Highlights of Current Activities. Future Direction. 1. Organizational Status – Standardization Committee. - PowerPoint PPT Presentation

Transcript of TTA since CJK8

Page 1: TTA since CJK8

1 CJK9 , Zhangjiajie, China

TTA since CJK8

CJK-PLE09-XXX

Zhangjiajia, China

8-10 April 2009

Won-Sik Kim

TTA President

[email protected]

Page 2: TTA since CJK8

2 CJK9 , Zhangjiajie, China

TTA Standardization Committees & Fora

Highlights of Current Activities

Future Direction

Page 3: TTA since CJK8

3 CJK9 , Zhangjiajie, China

1. Organizational Status – Standardization Committee

Technical Committees (TC)Technical Committees (TC)Technical Committees (TC)Technical Committees (TC) 59 Project Groups (PG)59 Project Groups (PG)59 Project Groups (PG)59 Project Groups (PG)

Technical Assembly (TA)Technical Assembly (TA)Technical Assembly (TA)Technical Assembly (TA)Coordination Coordination

Committee (CC)Committee (CC)Coordination Coordination

Committee (CC)Committee (CC)

Future Internet*Future Internet*, NGN, Active Internet, IPTV, etc., NGN, Active Internet, IPTV, etc.Telecommunication (TC2)Telecommunication (TC2)

65 WGs65 WGs65 WGs65 WGs

NGN Evolution, NGN Evolution, etc.etc.

Telematics/ITS, LBS, WPAN, RFID/USN, etc.Telematics/ITS, LBS, WPAN, RFID/USN, etc.Radio Communication (TC3)Radio Communication (TC3) ZigBee/WPAN, ZigBee/WPAN, etc.etc.

u-Health, Multimedia, etc.u-Health, Multimedia, etc.IT Application (TC4)IT Application (TC4) Grid Accounting, etc.Grid Accounting, etc.

Cyber Security, Biometrics, DRM, etc.Cyber Security, Biometrics, DRM, etc.Information Security (TC5)Information Security (TC5) DRM Interworking, etc.DRM Interworking, etc.

Open S/W, WEB, MetaData, etc.Open S/W, WEB, MetaData, etc.Infra Software (TC6)Infra Software (TC6) Mobile Web, etc. Mobile Web, etc.

IMT-2000 and systems beyond IMT-2000, etc.IMT-2000 and systems beyond IMT-2000, etc.Mobile Communication (TC7)Mobile Communication (TC7) Radio Access, etc Radio Access, etc ..

DMB, Digital TV, etc.DMB, Digital TV, etc.Broadcasting (TC8)Broadcasting (TC8) DMB, DMB, etc .etc .

2222

1313

1111

33

22

1111

33

1717

77

1212

66

55

77

55

Strategy PlanningStrategy PlanningCommittee (SPC)Committee (SPC)Strategy PlanningStrategy PlanningCommittee (SPC)Committee (SPC)

ICT & CC*ICT & CC*, etc, etc 22

(as of March 2009)(as of March 2009)* Newly Established in 2008 & 2009* Newly Established in 2008 & 2009

Page 4: TTA since CJK8

4 CJK9 , Zhangjiajie, China

• Newly Established Fora(6)─ Cloud Computing Forum─ Embedded SW Forum─ Data Quality Management Forum─ Data Center Technology Forum─ Game Technology Forum─ Cognitive Radio/Software Defined

Radio Forum

• Abolished Fora(2)─ LBS Forum─ Future of Numbering Forum

• Merged Fora(2)─ Grid Forum Korea

& Open Cyber Collaboration Forum

Cloud Computing➥

1. Organizational Status – IT Standardization Fora

Page 5: TTA since CJK8

5 CJK9 , Zhangjiajie, China

2. Highlights of Current Activities - 4G (IMT-Advanced)

• 4G (IMT-Advanced)

– Standardization activities within TTA• WiBro FemtoCell• Interworking between WiBro and UMTS (Universal Mobile Telecommunications System)

• Media Independent Handover Framework• Implementation of IMT-Advanced channel model

– TTA’s future direction• International standardization through standardization cooperation with 3GPP,

IEEE802.16, and CJKB3G• WiBro Femtocell standardization• Development of IMT-Advanced evaluation tool & Evaluation Activities

Page 6: TTA since CJK8

6 CJK9 , Zhangjiajie, China

2. Highlights of Current Activities - IPTV

• IPTV– Standardization activities within TTA

• Phase 2 in progress for adopting ITU-T IPTV standard in consideration of NGN network (by December 2010) ※ Phase 1 completed in April 2008 : Supports IPTV based on legacy IP network

• Standardization for interoperability of IPTV service and contents among IPTV service providers ➣ DCAS, Middleware API, SI(Service Information)

• Standard research and development for Mobile IPTV to evolve to next generation IPTV

– Industry activities on IPTV• Launched the first IPTV real-time terrestrial television broadcasting service by KT in

Nov. 2008 SK Broadband & LG Dacom(Jan. 2009)

– TTA’s future direction• Completion of domestic IPTV standardization by December 2009

DCAS, SI, Middleware API• Implementation of DCAS by fourth quarter of 2010

Page 7: TTA since CJK8

7 CJK9 , Zhangjiajie, China

2. Highlights of Current Activities – Advanced T-DMB

• Advanced T-DMB– Standardization activities within TTA

• Developed to increase the data rate(double) of traditional T-DMB• Backward compatible with the T-DMB service• Completion of lab test and field test of Advanced T-DMB

– TTA’s future direction• Completion of TTA Advanced T-DMB Domestic Standard by June 2009• International standardization of domestic AT-DMB technology through ITU-R SG6

by 2011

T-DMB AT-DMB MediaFLO (Europe)

DVB-H (North America)

Bandwidth 1.536MHz 1.536MHz 5/6/7/8MHz 5/6/7/8MHz

Frequency VHF/L VHF/L VHF/UHF/L VHF/UHF/L

Modulation Pi/4 DQPSK Pi/4 DQPSK(BL)QPSK, BPSK(EL)

Hierarchical modulation

QPSK16QAM

Hierarchical modulation

QPSK16QAM64QAM

Maximum SFN size

73.8km(GI=246us)

73.8km(GI=246us)

55.4km (4k, GI=1/4) 44.8km(4k, GI=1/4)

Payload 0.8~1.728Mbps(@1.5MHz)

1.088~2.304Mbps(B mode)

1.376~2.88Mbps(Q mode)

2.1~8.4Mbps(@6MHz)

2.8~7.5Mbps(@6MHz, MPE-FEC=3/4)

Comparison of Mobile Broadcasting SystemsComparison of Mobile Broadcasting Systems

Page 8: TTA since CJK8

8 CJK9 , Zhangjiajie, China

• ICT & Climate Change– Joint standardization effort initiated within Korea (Nov. 2008)

• TTA : Establishing the standards/Technical Report for ICT&CC Coordinating the relevant standardization activities on ICT&CC in Korea

• RRA: Corresponding activity to ITU • ICT&CC Forum: Gathering opinions of ICT industries

– TTA’s future direction• To develop a methodology to describe and estimate present and future CO2 emissions of

ICTs

Hosting of ITU Climate Change Symposium in Korea

2. Highlights of Current Activities – ICT and Climate Change

Camera 1

(On-site Speaker)

Camera 2(Overall View)

Internet

ITU / KCC or TTA Web-site Link

(Live Web Casting)

On-Site

Translation booth

LCD Projector

ITU CC Symposium Diagram

Oversea

Speaker

Internet

DeleveryControl

System

PresentationMaterial

SpeakerV iew

On-siteV iew

• Date : 23 September 2009• Venue : Seoul, Korea • Organized by KCC (Korea

Communications Commission) and ITU• Hosted by TTA • On-site & Video Conference (with Live

Casting on Internet)

Page 9: TTA since CJK8

9 CJK9 , Zhangjiajie, China

TV Out CableTV Out Cable

EarphoneEarphone

++20 pin20 pin

New & New & IntegratedIntegrated

USB Data CableUSB Data Cable

Battery ChargerBattery Charger

24 pin24 pin(Since 2001)(Since 2001)

IncumbentIncumbent

• New Standard on Integrated 20pin I/O Connection Interface for Mobile Phones (Revised in Nov. 2007)

– Meet slimming & miniaturizing trend• Smaller plug (10.6mmX2.6mm)

– Maximize Consumer Benefits• Multiple functions from a single plug

TV-OUT, MP3 fast wind and rewind, Universal Asynchronous I/O

– Minimize waste and cost• Estimated cost saving : USD 10mil. per year

2. Highlights of Current Activities – Integrated 20pin I/O Connection

(Since 2008)(Since 2008)

Page 10: TTA since CJK8

10 CJK9 , Zhangjiajie, China

2. Highlights of Current Activities – IT Testing and Certification

TTA Certified TTA verified GOOD Software Data Broadcasting DMB

Mobile Phone Charger Mobile Phone

Digital BroadcastingEquipment

Software

Network

• IT Testing and Certification

– Test and evaluate IT products to verify whether standards and certification requirements are met

– Provide various certification services

• TTA Testing & Certification Service for domestic market

– Increase in reliability and sales of domestic IT products

– Support for product purchase of IT products (BMT)

Page 11: TTA since CJK8

11 CJK9 , Zhangjiajie, China

2. Highlights of Current Activities – IT Testing and Certification

• Bluetooth – Acquired qualification as Testing & Certification personnel

• Recognized as BQE (Bluetooth Qualification Expert) by Bluetooth SIG (May 2008), the 2nd BQE in TTA• Accredited as CATL (CTIA Authorized Testing Laboratory) by CTIA according to BCCP (Bluetooth Compatibility Certification Program), the 5th in the world (Feb. 2009) and 1st in Asia

– Developed Bluetooth VDP(Video Distribution Profile) Tester (June 2008) in collaboration with Bluetooth SIG(Special Interest Group)

• USB – Acquired qualification as Testing & Certification personnel

• Qualified as Test Lab on Hi-Speed USB by USB-IF (Implementers Forum) (Oct. 2008)

Product : Peripheral, Host Add-In Cards, Hubs, Systems, etc.• Qualified as Test Lab on Wireless USB by USB-IF the 5th in the world (Mar. 2009)

Product : Native Devices, Device Wire Adapter, Host Adapters – Plan to expand the testing area to USB 3.0 in 2010

Page 12: TTA since CJK8

12 CJK9 , Zhangjiajie, China

2. Highlights of Current Activities – IT Testing and Certification

• WiBro (Mobile WiMAX) – Acquired qualification as Testing & Certification Personnel

• Selected as WCB (WiMAX Certification Body) by WiMAX Forum (May 2008), the 2nd WCB in the world • Accredited as an International recognized testing laboratory by KOLAS, the national accreditation body (Mar. 2009)

– Provided Testing & Certification Services• Completed the world's first Mobile WiMAX certification testing (Mar. 2008) • Issued Korea's first official WiMAX Forum Certification (Sep. 2008)

• CC (Common Criteria) – IT Security Products– Prepare to be qualified as a licensed laboratory by NIS, the national

certification body, under CCRA(Common Criteria Recognition Agreement) by Sep. 2009

< International Certification Personnel >• BQE_AST

(Auditor, Surveillance, Trainer)Auditor, Surveillance, Trainer)

(Bluetooth)

Kanghae Lee Jeongku Lee

• WCB(WiMAX)

Dujeong Choi

• USB-IF Certified Administrator(USB)

Dongho Kim

• BQE(Bluetooth)

Page 13: TTA since CJK8

13 CJK9 , Zhangjiajie, China

3. Future Direction

• Focused standardization activities in the areas of 4G, Mobile IPTV, and Green-IT

• Standardization activities in IT convergence– u-Transportation

• Vehicle-to-Vehicle Communication System PHY/MAC/Routing, Open Access Protocol between In-Vehicle Network

and Telematics Terminal– u-Health

• Biometrics Monitoring, u-Health network platform– e-Navigation

• Satellite Communication, Global Maritime Distress and Safety System

• Strengthen the cooperation between Fora & TTA Standard Committee– In 2009, TTA supports 45 Fora in IT areas– 1,529 Forum standards have been directly forwarded to TTA committees

Page 14: TTA since CJK8

14 CJK9 , Zhangjiajie, China

www.tta.or.krwww.tta.or.kr