TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella...

98
GWA-CO-TMP-0004 General Report Template Version 2.0 Effective Date: 08/02/2018 GWA- CO-TMP-0004 Report Template Version 2.0 Page 1 of 31 UNCONTROLLED WHEN PRINTED. TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL

Transcript of TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella...

Page 1: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

GWA-CO-TMP-0004 General Report

Template Version 2.0 Effective Date: 08/02/2018

GWA- CO-TMP-0004 Report Template Version 2.0 Page 1 of 31

UNCONTROLLED WHEN PRINTED.

TRAFFIC MANAGEMENT PLAN

Coppabella Wind Farm

29 May, 2020

FINAL

Page 2: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

GWA- CO-TMP-0004 Report Template Version 2.0 Page 2 of 31

UNCONTROLLED WHEN PRINTED.

Alexander Smith – Project Manager

Document History

Revision Date Comment

0.1 28/6/19 Draft submission to RMS, Yass Valley Council and Hilltop Council

0.2 4/10/19 Final Draft to RMS, incorporating agency comments

0.3 1/11/19 Final – submitted to DPIE for endorsement

1.0 16/12/19 Final – incorporation of DPIE comments

1.1 6/5/20 Final – incorporation of 2nd set of DPIE comments

1.2 29/5/20 Final – incorporation of 3rd set of DPIE comments

Document Control

Document No: CB-PM-PLN-002

Document Name: Coppabella Wind Farm Traffic Management Plan

Current Revision No: 1.2

Original Created on: 28 June 2019

Last Updated: 29 May 2020

Status: Final

Author/s: Medard Boutry – Senior Environmental Advisor

Reviewer/s: Tom Nielson – Development Manager

Page 3: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

GWA- CO-TMP-0004 Report Template Version 2.0 Page 3 of 31

UNCONTROLLED WHEN PRINTED.

Contents

1. Introduction ...................................................................................................................................... 4

1.1 Introduction .............................................................................................................................. 4

2. Objectives and Targets .................................................................................................................... 4

3. Legal and Other Requirements ........................................................................................................ 5

3.1 Legislation, Policies, Standards and Guidelines ..................................................................... 5

3.2 Minister’s Conditions of Consent............................................................................................. 6

4. Project Context ................................................................................................................................ 9

4.1 Location ................................................................................................................................... 9

4.2 Surrounding Road Network and Site Access .......................................................................... 9

4.3 Transport Route .................................................................................................................... 12

Major Component Haulage Route ................................................................................................. 12

Rest and Fatigue Breaks ............................................................................................................... 13

Communication Protocol ................................................................................................................ 13

“Pull over” Activation ...................................................................................................................... 13

OSOM Emergency Procedures ..................................................................................................... 14

Local Traffic Routes ....................................................................................................................... 14

4.4 Traffic Generation ................................................................................................................. 14

5. Management Strategy.................................................................................................................... 17

5.1 Communication Strategies .................................................................................................... 17

Notification Strategy ....................................................................................................................... 17

Advertising / Radio Announcements .............................................................................................. 17

5.2 Mitigation Measures .............................................................................................................. 17

6. Roles and Responsibilities ............................................................................................................. 22

7. Training and Awareness ................................................................................................................ 23

8. Inspections and Monitoring ............................................................................................................ 23

9. Reporting, Incident Management and Review ............................................................................... 24

9.1 Reporting ............................................................................................................................... 24

9.2 Corrective Actions ................................................................................................................. 24

9.3 TMP Review .......................................................................................................................... 24

Annex A – Driver Code of Conduct ....................................................................................................... 25

Annex B – Dilapidation Survey and Road Repair Protocol ................................................................... 28

Annex C – Whitefields Road Upgrade Design ...................................................................................... 29

Annex D - Hume Hwy / Whitefields Rd Intersection Design ................................................................. 30

Annex E – Over-dimensional Haulage Route from Port Kembla .......................................................... 31

Page 4: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

GWA- CO-TMP-0004 Report Template Version 2.0 Page 4 of 31

UNCONTROLLED WHEN PRINTED.

1. Introduction

1.1 Introduction

This Traffic Management Plan (TMP) for Coppabella Wind Farm (CWF) is required by Schedule 3,

Condition 32 of the Conditions of Consent (SSD-6698). The TMP forms a sub-plan of the CWF

Environmental Management Strategy (EMS). It has been prepared by Goldwind Australia Pty Ltd on

behalf of Coppabella Wind Farm Pty Ltd (CWFPL).

This TMP provides a reference document to maximise safety of all road users and Project personnel

by consideration of issues arising from access to and from the WRWF site and identifying most

appropriate management practices. It presents a set of mitigation measures, monitoring procedures

and protocols that:

• describe how CWFPL will manage and control risks associated with traffic management during

construction activities of the Project;

• address the requirements of applicable legislation and the Minister’s Conditions of Consent

• have been prepared in consultation with Roads and Maritime Services (RMS) and relevant local

Councils (Yass Valley Council and Hilltops Council).

The TMP covers both the construction and the operation phases of the project, with most emphasis on

construction as this is the phase that generates the greatest volume of traffic. Traffic management for

decommissioning would be addressed closer to that time and the TMP updated accordingly.

2. Objectives and Targets Objectives for traffic management of the CWF include:

• to minimise disruption to local traffic and maximise safety of all road users

• identify all relevant obligations and legislative requirements to be addressed during the

construction phase of the Project

• to define key roles and responsibilities.

• to describe the specific traffic management requirements and identify the best practice methods

to be implemented

• to identify all relevant stakeholders and fulfil consultation requirements

• to outline record keeping and monitoring requirements

Targets for traffic and access management issues associated with the Project comprise:

• 100% compliance with all applicable legislation, regulations, standards, codes and licenses that

relate to the Project

• 100% compliance with this TMP

• no significant degradation to the environment or existing roadways as a result of project traffic

movements

• no significant safety incidents for construction vehicles

• maximise the safety of all road users and construction staff

• no significant unreasonable traffic delays caused by the Project activities

• standard industry environmental management practices implemented for traffic management.

Page 5: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

GWA- CO-TMP-0004 Report Template Version 2.0 Page 5 of 31

UNCONTROLLED WHEN PRINTED.

3. Legal and Other Requirements

3.1 Legislation, Policies, Standards and Guidelines

The applicable legislation, policies, standards and guidelines related to traffic management for the

Project are outlined in Table 1.

Table 1. Applicable Legislation, Policies, Standards and Guidelines

Type Title

Commonwealth Legislation Environment Protection and Biodiversity Conservation Act 1999

State Legislation Environmental Planning and Assessment Act 1979

Protection of the Environment and Operations Act 1997

Work Health and Safety Act 2011

Work Health and Safety Regulations 2017

Roads Act 1993

Roads Transport Act 2013

Road Transport (General) Regulation 2013

Australian Standard AS 1742 - Manual of Uniform Traffic Control Devices

AS 1743 – Road Signs – Specifications

AS 2890 – Parking Facilities

AUSTROADS Guidelines Guide to Traffic Management

Guide to Road Design

Guide to Road Safety

Guide to traffic Engineering Practice. Part 2 – Roadway Capacity 1999

RMS Guidance Traffic Control at Worksites (TCAWS) 2018

Guide to Traffic Control at Worksites

Supplements for Australian Standards

Supplements for Guide to Road Design

Supplements for Guide to Road Safety

Page 6: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

GWA- CO-TMP-0004 Report Template Version 2.0 Page 6 of 31

UNCONTROLLED WHEN PRINTED.

3.2 Minister’s Conditions of Consent

Project Approval was initially granted for CWF by the Minister for Planning on 30 March 2016.

Modification 1 was approved by the Independent Planning Commission on 10 December 2018. The

Minister’s Conditions of Consent include Conditions 27-33 of Schedule C relating to transport and

access as presented in Table 2.

Table 2. Ministers’ Conditions of Consent from Schedule C relating to Transport

Cond. Requirement Where addressed?

27 Whitefields Road Upgrade

Prior to the construction of the proposed upgrade to Whitefields Road, the

Applicant shall prepare detailed plans for the upgrade in consultation with the

relevant Council, and to the satisfaction of the Secretary. In preparing these

plans, the Applicant must seek to avoid and/or minimise the clearing of mature

vegetation adjacent to the road. Further, the detailed plans must include a

landscaping plan for replacing the removal of any existing vegetation and/or

augmenting the existing vegetation adjacent to the upgraded road with

species that are endemic to the locality.

Separate Roadside

Vegetation

Management and

Landscape Plan

(RVMLP) has been

approved. The

Whitefields Road

upgrade design is

provided at Annex C

of this TMP.

28 Road Upgrades

Prior to the commencement of construction (other than pre-construction minor

works), the Applicant shall:

(a) upgrade the existing intersection at the Hume Highway and Whitefields

Road in accordance with Austroads Guide to Road Design (as amended by

RMS supplements);

(b) upgrade the section of Whitefields Road to be used as a primary access

route (and shown in the figure in Appendix 6) including widening and sealing

to a minimum width of 5 m, with 0.5 m gravel shoulders;

(c) upgrade the section of Coppabella Road to be used as a secondary access

route (and shown in the figure in Appendix 6), including applying an all-

weather gravel surface seal;

to the satisfaction of the relevant roads authority

Section 4.2

The designs meet

the criteria of (a)

and (b) evidenced

at Annex C and

Annex D. The

designs have been

endorsed by the

relevant roads

authorities (RMS,

Hilltop Council and

Yass Valley Council,

as relevant) and

must be completed

to their satisfaction.

Coppabella Rd no

longer requires to

be used and will not

be upgraded.

Hilltops Council

supports this

approach and the

development has

been staged

accordingly.

Page 7: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

GWA- CO-TMP-0004 Report Template Version 2.0 Page 7 of 31

UNCONTROLLED WHEN PRINTED.

29 Road Maintenance

The Applicant shall:

(a) prepare a dilapidation survey in accordance with the guidelines and

standards established by Austroads of the designated vehicle route on

Whitefields Road and Coppabella Road, as identified in the figure in Appendix

6:

• prior to the commencement of any construction and/or decommissioning

works; and

• within 1 month of the completion of any construction and/or

decommissioning works;

(b) rehabilitate and/or make good any development-related damage:

• identified during the carrying out of the relevant construction and/or

decommissioning works if it could endanger road safety, as soon as possible

after the damage is identified, but within 7 days at the latest; and

• identified during any dilapidation survey carried out following the completion

of the relevant construction and/or decommissioning works within 2 months of

the completion of the survey, unless the relevant roads authority agrees

otherwise,

to the satisfaction of the relevant roads authority.

If the construction and/or decommissioning of the development is to be

staged, the obligations in this condition apply to each stage of construction

and/or decommissioning.

If there is a dispute about the scope of any remedial works or the

implementation of the works, then either party may refer the matter to the

Secretary for resolution.

Annex B

30 Unformed Crown Roads

The Applicant shall ensure any unformed Crown road reserves affected by the

development are maintained for future use, unless otherwise agreed with the

NSW Department of Industry – Lands and Water.

Section 4.1

31 Restriction on Transport Routes

The Applicant shall ensure that all over-dimension and heavy vehicle access

to and from the site is via the primary access routes identified in the EA (and

shown in the figure in Appendix 6) unless the applicable roads authority

approves otherwise.

Note: The Applicant is required to obtain relevant permits under the Heavy Vehicle

National Law (NSW) for the use of over-dimension vehicles on the road network.

Section 5, Table 5

32 Traffic Management

Prior to the commencement of construction, the Applicant shall prepare a

Traffic Management Plan for the development to the satisfaction of the

Secretary. This plan must be prepared in consultation with RMS and the

Councils, and include:

(a) details of all transport routes and traffic types to be used for development-

related traffic;

(b) a protocol for undertaking dilapidation surveys to assess the:

• existing condition of the transport route/s prior to construction or

decommissioning works; and

• condition of the transport route/s following construction or

decommissioning works;

(c) a protocol for the repair of any roads identified in the dilapidation surveys to

have been damaged during construction or decommissioning works;

This Plan

Section 4.2 & 4.3.

Annex E

Annex B

Annex B

Page 8: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

GWA- CO-TMP-0004 Report Template Version 2.0 Page 8 of 31

UNCONTROLLED WHEN PRINTED.

(d) details of the measures that would be implemented to minimise traffic

safety issues and disruption to local road users during construction or

decommissioning works, including:

• temporary traffic controls, including detours and signage;

• notifying the local community about project-related traffic impacts;

• minimising potential for conflict with school buses and rail services;

• responding to any emergency repair requirements or maintenance

during construction and/or decommissioning; and

• a traffic management system for managing over-dimensional

vehicles; and

(e) a drivers code of conduct that addresses:

• travelling speeds;

• procedures to ensure that drivers adhere to the designated transport

routes; and

• procedures to ensure that drivers implement safe driving practices.

If the construction and/or decommissioning of the development is to be

staged, the obligations in this condition apply to each stage of construction

and/or decommissioning.

Section 5

Annex B

Annex A

33 Following approval, the Applicant must implement the measures described in

the Traffic Management Plan. Section 5.2

Page 9: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

GWA- CO-TMP-0004 Report Template Version 2.0 Page 9 of 31

UNCONTROLLED WHEN PRINTED.

4. Project Context

4.1 Location

The CWF lies approximately 16km west of Yass along Hume Highway, located within Hilltops and Yass

Valley LGA’s. The project consent allows for up to 75 turbines to be constructed, however, only 69

turbines will be developed for the project.

The Project is mostly located on private land however certain access roads and electrical collections

circuits traverse unformed Crown road reserves. Agreement of the Crown Lands Office has been

obtained for the use of the land for the CWF purpose by way of a Crown Land Licence (Lic 571188).

These crown road reserves under licence shall be maintained for future use.

4.2 Surrounding Road Network and Site Access

Details of the surrounding road network are provided at Table 3.

Table 3. Details of existing road network surrounding CWF

An overview of the CWF access points is provided at Figure 4-1 and further described in the following

section.

Road Name Number of

Lanes

Speed Limit Sealed

(Y/N)

Controlling

Authority

Road used

for Project

Hume Highway 4 (median

divided)

110 km/hr

Posted

Y Roads &

Maritime

Service

Yes

Whitefields Road 1 (to be

upgraded to 2)

100km/hr

Unposted.

CWF traffic

will have

40km/hr limit

N Yass Valley

Council

Yes

Coppabella Road 2 100km/hr

Unposted

N Hilltops Council Minimal

Bouyeo Road 2 100km/hr

Unposted

Y Hilltops No

Berremangra Road 2 100km/hr

Unposted

Y Hilltops No

Illalong Road 2 100km/hr

Unposted

Y Yass Valley

Council

No

Page 10: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

Coppabella Wind FarmPrimary access routeSecondary access route

")A Primary site accessProposed wind turbineProposed access trackProposed underground reticulation (up to33kv)Proposed powerline (up to 132kV)Existing 132kV Transmission Line

"/ Substation%2 Potential switchyard locations

Permanent Construction Compound andO&MTemporary Construction CompoundLocal Government AreaExisting road%2

%2

"/

")A

YASS VALLEY LGA

HILLTOPS LGA

1

23

45

6

78

910

11

12 1314

15

16

1718

19

2529

3031

32

33

3435

3738

39

4041

42

43

4445

46

47

4849

5051

5253

54

55 56

5758

59

6061

62

63

6465

66

6768

69

7071

72

7374

7879

80

8182

126127 128

129

130

HUME HIGHWAY

B erremangra Road Whitefields Road

CoppabellaRoa d

PROJECTCoppabella Wind Farm

TITLE

DRAWING No. REVDRAFT

16/08/2018STATUS

CWF_OVR_012_1D Route 01D

1:52,000DATE @A3: SCALE

C.McArleinPRODUCED

I.MackeyCHECKED

J.BembrickAPPROVED

¯

Disclaimer:Goldwind Australia gives no warranty in relation to the data (including accuracy, reliability, completeness or suitability) and accepts noliability for any loss, damage or costs (including consequential damage) relating to any use of the data in this map.Datasets: OpenStreetMapProjection: GDA94 MGA55

LEGEND

Site Access Route

medard.boutry
Text Box
Figure 4-1 Overview of CWF location and site access points
Page 11: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

GWA- CO-TMP-0004 Report Template Version 2.0 Page 11 of 31

UNCONTROLLED WHEN PRINTED.

Hume Highway and Whitefields Road

Primary site access to CWF, including all over dimensional vehicles carrying turbine components and

heavy vehicles, is from Whitefields Road. The primary access route is illustrated on Figure 4-2. The

Hume Hwy is controlled by RMS and the relevant portion of Whitefields Road is controlled by Yass

Valley Council.

Whitefields Road is currently an unsealed road that intersects with Hume Highway at a priority controlled

T-intersection. The access point to the CWF is located approximately 1.2km from the Hume Highway /

Whitefields Road intersection. The 1.2km of Whitefields Road will be upgraded prior to commencement

of major construction activities. The road upgrade design and accompanying Roadside Vegetation

Management and Landscaping Plan (RVMLP) has been developed (and approved) in consultation with

Yass Valley Council and the Commonwealth Department of Environment and Energy (DoEE). The

design plans for the Whitefields Road upgrade are provided at Annex C.

The Hume Highway / Whitefields Road intersection will also be upgraded prior to commencement of

construction (other than pre-construction minor works). The intersection upgrade will include:

• widening of the intersection to allow over-dimensional vehicle access

• extension of the turning lane into Whitefields Road from Yass (southbound)

• extension of the merging lane onto Hume Hwy heading towards Yass (northbound)

• removal of planted vegetation in medium to improve driver visibility and safety.

The intersection upgrade has been designed by RMS and will be completed by RMS.

An overview of the design of the Hume Highway / Whitefields Road intersection upgrade is provided at

Annex D. It is expected that the majority of construction traffic will arrive to the Whitefields Road

intersection from the Yass direction, and leave site in towards Yass (northbound) also.

Figure 4-2. Primary Site Access to CWF (source: Cardno, 2017)

Page 12: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

GWA- CO-TMP-0004 Report Template Version 2.0 Page 12 of 31

UNCONTROLLED WHEN PRINTED.

Coppabella Road

Emergency site access / evacuation from the north of the project area is possible via Coppabella Road

as shown at Figure 4-1. This road forms the emergency evacuation exit route for the project in the event

of an emergency where the primary access point cannot be used (e.g. bushfire). Secondary access

from Coppabella Road is envisaged to include vehicles associated with the establishment of the 132kV

transmission line (by TransGrid). No other construction traffic is currently proposed for Coppabella Road

although workers and limited materials originating from local areas to the north of the project area could

be transported via Coppabella Road in latter stages of construction, subject to agreement with Hilltops

Council. Coppabella Road will not be used by over dimensional vehicles carrying turbine components,

except where the wind farm access tracks cross Coppabella Road. The section of Coppabella Road

between the two wind farm legs (see Figure 4-1) is not currently proposed to be used during construction

and therefore does not require upgrading. Management measures to prevent wind farm vehicles from

using that section of Coppabella Road will include:

• information within the mandatory project induction

• reminders to staff during weekly toolbox talks

• signage

• inspections as part of the weekly routine inspections.

Should this change, appropriate arrangements would be made with the Hilltops Council to satisfy

Schedule 3, Condition 28(c) of the Conditions of Consent. Hilltops Council has confirmed that this

arrangement is acceptable and DPIE has also been notified accordingly.

4.3 Transport Route

Major Component Haulage Route

Over-dimensional turbine components from overseas will be delivered by ship to Port Kembla Port. The

haulage route from Port Kembla to site covers a distance of approximately 276km and is shown at

Figure 4-3. Key roads utilized include the Princes Highway, Picton Road, Hume Highway and then

Whitefields Road into site (refer to Figure 4-3). The detailed haulage report is provided at Annex E. It is

expected that at least two pilot vehicles will accompany each OSOM vehicle to guide the OSOM vehicle

and manage traffic under the direction of police where required. The requirements for police escorts

and / or police traffic management will be confirmed once the logistics contractor has been engaged.

Suitable arrangements and permits with the relevant road authorities must be in place prior to the

commencement of turbine component haulage (e.g. any modifications to road furniture, etc). These

arrangements will be confirmed by the successful transport Contractor (yet to be engaged). It is noted

that several other wind farms have commenced construction in the Goulburn / Yass region. These other

projects are also hauling turbine components from Port Kembla therefore it is expected that most

amendments to road furniture will already be completed by the time CWF haulage commences. It is

also anticipated that the haulage from the other projects will have largely been completed by the time

CWF plans to commence turbine component haulage (i.e. mid 2020).

Page 13: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

GWA- CO-TMP-0004 Report Template Version 2.0 Page 13 of 31

UNCONTROLLED WHEN PRINTED.

Figure 4-3 Over-dimensional transport access route from Port Kembla

Rest and Fatigue Breaks

The appointed haulage contractor will confirm the departure times from Port Kembla in consultation with relevant authorities and to confirm fatigue stop locations.

Potential pullover locations have been identified at:

• Stopping bay at Mount Ousley Road (approximately 10.7km from origin)Parking bay on Picton

Road (approximately 40.9km from origin)

• Parking bay on Hume Motorway (approximately 67.2km from origin)

• Parking bay on Hume Motorway (approximately 104.4km from origin)

• Parking bay on Hume Motorway (approximately 124.6km from origin)

• Governers Hill Truck Parking Area on Hume Motorway (approximately 153km from

origin)Parking bay on Hume Motorway (approximately 167km from origin)Parking bay on Hume

Motorway (approximately 177km from origin)

• Parking bay at Cullerin on Hume Motorway (approximately 191km from origin)Emergency

Pullover Bay on Hume Motorway (approximately 198km from origin)

• Parking bay at Conroys Gap on Hume Motorway (approximately 258km from origin)

Communication Protocol

A pre-departure meeting will be held at least 15 minutes prior to the commencement of any OSOM

movement. Communication between the parties involved in the movements will occur on a UJF radio

channel chosen for the trip. All parties will be informed of the chosen UHF channel in the pre-departure

meeting along with all relevant procedures and schedules required for the OSOM movement.

“Pull over” Activation

It is expected that there will be two typical instances where a ‘pull over’ may be activated: These are:

• When queuing behind the convoy requires clearing. This is expected to be very limited

considering that the majority of the haulage route is along the Hume Motorway.

• Approaching a pinch point and awaiting advice from police that temporary closures have been

implemented and the OSOM vehicle is safe to proceed.

When a ‘pull over’ is activated the lead pilot vehicle for each OSOM vehicle is to determine a safe

location for the OSOM load to stop, preferably at one of the locations identified at Section XX., or using

the left lane and/or road shoulder to at least allow one lane of traffic to pass.

Page 14: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

GWA- CO-TMP-0004 Report Template Version 2.0 Page 14 of 31

UNCONTROLLED WHEN PRINTED.

OSOM Emergency Procedures

In the event of an emergency such as a breakdown, the OSOM vehicle will be moved to the left lane /

or shoulder to ensure that traffic flow adjacent can be maintained with minimal disruption. Police and

pilot vehicles will manage traffic around the OSOM as necessary. Pilot vehicles accompanying the

movements will be required to follow police direction at all times In such instances, the Traffic

Management Centre will be promptly advised so that necessary warnings can be provided to the

surrounding traffic.

In the event of a communications failure between any of the vehicles within the convoy, the OSOM

movement is to cease at a suitable location until communications can be re-established.

Local Traffic Routes

Construction traffic will enter site through the primary access point at Whitefields Road (via Hume

Highway). The Hume Highway / Whitefields Road intersection and the relevant portion of Whitefields

Road will be upgraded prior to commencement of construction activities (other than pre-construction

minor works) – refer to Section 4.2.

4.4 Traffic Generation

Estimated traffic generation during the construction is shown at Table 4. Construction is anticipated to

commence during Q1 2020 and have a total duration of 12-16 months.

During operations the volume will reduce significantly and be mainly limited to the operational site team

(~10 people), occasional contractors, visitors and site deliveries. This is expected to average

approximately 15 loads (30 movements) per day, with peaks during periods of deep maintenance.

The project is anticipated to have a minimum 25 year life after which it would be upgraded or

decommissioned. For decommissioning or upgrading, similar general measures would be necessary

as those detailed in this report for construction works. This TMP would be revised to address traffic

operation and volume changes in the future years during the decommissioning or upgrading phase.

Page 15: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

GWA-CO-TMP-0004 General Report

Template Version 2.0 Effective Date: 08/02/2018

GWA- CO-TMP-0004 Report Template Version 2.0 Page 15 of 31

UNCONTROLLED WHEN PRINTED.

Table 4 Estimated traffic volumes during construction

Item (total

movements)

Detail Total

Quantum

Quantum

Delivered

per load

Loads Typical Vehicle Total

Movements

Assumptions

Access Track Construction

790 Delivery of Plant 20 1 20 Low Loader 40 Nominal allowance

Road Base (t) 12,000 32 375 32t truck and dog 750 Only gate to substation likely imported as rest site won. ~12,000t for 6.5km of access track (6.5m wide)

Fuel - - 50 30t tanker 100 Fuel pod established on site. Assumes weekly refilling during bulk earthworks.

Water - - - - - Water for dust suppression and soil conditioning to be sourced on site (bores and farm dams)

Foundation Preparation and Turbine Construction

Turbine Parts Tower sections (5 per turbine) 345 1 345 OD trailer 690 Four sections per turbine

2027 Generators (1 per turbine) 69 1 69 6-axle articulated 138 One per turbine

Hubs (1 per turbine) 69 1 69 6-axle articulated 138 One per turbine

Nacelles (1 per turbine) 69 1 69 6-axle articulated 138 One per turbine

Blades (3 per turbine) 69 1 207 OD trailer 414 Three per turbine

Cables / controllers (1 per turbine) 69 1 69 6-axle articulated 138 One per turbine

Tools, misc. goods for erection (2 per turbine) 138 1 138 6-axle articulated 276 Two 40 foot containers per turbine

Kiosk transformers (1 per turbine) 69 2 35 6-axle articulated 70 One load per two turbines

Turbine cooler units (2 per turbine) 138 4 35 6-axle articulated 70 One load per two turbines

Plant & Equipment Delivery of plant for civil work 80 1 80 Low Loader 160

270 Cranes – Mobile (3) 3 1 3 Crane 6 Three mobile cranes

Cranes – Tower (2) 20 1 20 6-axle articulated 40 Two tower cranes. Allowance of 10 loads per tower crane. Remain on site until installations completed

Cranes - assist 12 1 12 Body + 6-axle articulated 24 Two 750t assist cranes. Consist of body plus 5 semis of counterweights and other equipment

Miscellaneous equipment 40 1 40 6-axle articulated 40 Nominal allowance

Concrete Batching Delivery of Batching Plant 2 1 20 6-axle articulated 40 Two batch plants. Each plant comprises 10 loads.

6716 Cement (t) - - 350 6-axle articulated 700 125Te per turbine. Allow 5 loads per foundation..70 foundations (including substation footing and incidentals).

Sand and aggregate (t) - - 2100 32T truck & dog 4200 ~1000Te per turbine. Allow 30 loads per foundation. Allow 70 foundations.

Water (t) - - 500 6-axle articulated 1000 40Te per turbine. Allow 2 loads town water per foundation. Allow 70 foundations

Transport of batched concrete 568 Agitator truck 1136 Allow 8 Agitators arriving to site each concrete pour day (71 pour days allowed)

Site & Foundation Walls / formwork - - 13 6-axle articulated 26 Nominal allowance

516 Fencing - - 3 6-axle articulated 6 Nominal allowance

Concrete - - - Agitator truck - Sourced internally from batch plant

Reinforcing Steel 207 1 207 6-axle articulated 414 65T per turbine. Three loads per turbine

Hold down bolts 35 1 35 6-axle articulated 70 Half a load per turbine.

Support Delivery of temporary construction site offices - - 30 6-axle articulated 60 Allow 15 loads for mobilisation and demobilisation

Page 16: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

GWA- CO-TMP-0004 Report Template Version 2.0 Page 16 of 31

UNCONTROLLED WHEN PRINTED.

1158 Delivery of O&M Facility - - 30 6-axle articulated 60 Allow 15 loads for modular O&M facility; Allow 15 loads for storage/maintenance shed.

Waste disposal - - 519 6-axle articulated 1038 One load every second day from compound; 2 skips each turbine; 1 skip per week at substation; sewage pump

out twice per week; 1 container of recyclables / reusables at each turbine; 12 month duration;

Site Rehabilitation Delivery of plant for civil work - - - Low loader - Use same plant as for construction

70 Rehabilitation equipment and deliveries - - 35 Heavy rigid 70 Includes hydro mulchers. Two loads per turbine

Electricity Transmission Infrastructure

Substation Transformer 33/132kV - - 1 OD Trailer 2 One load

62 Switchyard and control equipment - - 20 6-axle articulated 40

Fencing - - 10 6-axle articulated 20

Electrical reticulation Transmission line conduit (132kV) 80 6 14 6-axle articulated 28 8km, nominal 10 lines, 3km rolls, 2 rolls per load

264 Underground cable (33kV) 90 2 45 6-axle articulated 90 45km, 500m rolls, 2 rolls per load

Poles (3-piece) 120 2 60 6-axle articulated 120 3-piece poles; spaced at 200m intervals; 2 pole pieces per load

Pole fittings, insulators, etc - - 8 6-axle articulated 16 Allow 1 load per km

Construction and Operations Workforce

32448 Construction Workforce (average daily) 104 2 16224 Light/medium vehicles 32448 Based in Yass & surrounds. Two people per vehicle; 6 days p/w; 12 months

195000 Operations Workforce (25 years) 15 1 97500 Light/medium vehicles 195,000 Based in Yass & surrounds. 1 person per vehicle. Average 15 per day; 5 days p/w; 25 years.

44321 Total Construction (12 months)

Page 17: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

GWA-CO-TMP-0004 General Report

Template Version 2.0 Effective Date: 08/02/2018

GWA- CO-TMP-0004 Report Template Version 2.0 Page 17 of 31

UNCONTROLLED WHEN PRINTED.

5. Management Strategy

5.1 Communication Strategies

Notification Strategy

A number of activities have been devised in order to keep interested parties informed during the construction

of the project. The strategy and associated activities are detailed in the Stakeholder and Community

Engagement Plan for the project, including:

• establishment of dedicated project website

• establishment of a project information centre in the local area to allow visitors to learn more about

the project and keep up to date on project details and construction activities

• establishment of a Community Consultative Committee that operates in accordance with NSW DPE

guidelines.

• periodic project newsletters delivered via the post to residents within 10km of the project and other

stakeholders that have opted to receive copies. Additionally available on the project website and in

the project information centre

• Meetings with near neighbours and other stakeholders

Advertising / Radio Announcements

The local radio and newspaper will be used to communicate key project details such as oversize haulage

vehicle dates and project updates.

To ensure that a Company representative can be contacted at all times on any matter including traffic issues

associated with the related works, the Company’s contact details will be included in all advertising material.

5.2 Mitigation Measures

To achieve the traffic and access targets presented in Section 2, and meet the Ministers Conditions of

Consent and all legal and other requirements presented in Section 3, the mitigation and management

measures as identified in Table 5 will be adopted. For each measure, key project personnel and

accountabilities are provided.

Following approval, the measures described in this TMP shall be implemented and adhered to.

Page 18: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

GWA-CO-TMP-0004 General Report

Template Version 2.0 Effective Date: 08/02/2018

GWA- CO-TMP-0004 Report Template Version 2.0 Page 18 of 31

UNCONTROLLED WHEN PRINTED.

Table 5. Mitigation and management measures for traffic and access

Issue Management or Mitigation Measure Responsibility Timeframe

Permits /

Consent /

Licences

• RMS will undertake the road intersection upgrade works in accordance with its internal system and

processes. An arrangement is in place for this to occur

• Works on public roads undertaken by the BoP Contractor will comply with requirements of Section 138

of the Roads Act 1993 ‘Works and Structures’

• The logistics and Balance of Plant (BoP) contractors will ensure that all requirements for relevant Road

Occupancy Licences are obtained from both local Council and from RMS prior to any work commencing

on the stipulated roads

• Prior to the commencement of turbine component deliveries, further consultation shall occur with RMS

(and NSW Police) to confirm the turning arrangements into Whitefields Rd from Hume Hwy. This may

involve VMS, temporary traffic light system, signage, police and or escort assistance. It is expected that

the delivery schedule will be timed to minimise disruption / delays to local road user (e.g. 1am departure

from Port Kembla would facilitate arrival to site by 5-5:30am, prior to arrival of other construction staff

and prior to increased traffic on the surrounding road network

• All works within the road reserve of a classified road are to be designed and constructed in accordance

with the current Austroads Guidelines, Australian Standards and RMS Supplements

EPC Project

Manager, BoP

Contractor,

Haulage

Contractor.

Pre-construction: Prior to

commencement of road

activities that will be

identified as requiring

licensing.

Haulage

• An appropriately licensed and experienced haulage contractor shall be appointed for haulage of turbine

components to site. The contractor will be responsible for obtaining all required approvals and permits

from RMS or National Heavy Vehicle Regulator (NHVR) and Councils and for complying with conditions

specified in the approvals

• As per RMS requirements all “high risk” oversized and/or overmass vehicle movements will have an

OSOM TMP provided as part of the permit submission requirements. Refer to RMS website

(https://www.rms.nsw.gov.au/business-industry/heavy-vehicles/road-access/restricted-access-

vehicles/oversize-overmass/index.html#TransportManagementPlans(TMPs)) for OSOM TMP

requirements

• The haulage contractor will implement a traffic management system for managing over-dimensional

vehicles and ensure all arrangements with relevant road authorities are in place

• Where required for oversized vehicles, pilot and escort vehicles will be used to facilitate safe transit of

the oversized vehicle in accordance with RMS requirements

• All over-dimensional and heavy vehicle access to and from the site shall be via the primary access route

(Whitefields Road), unless the applicable roads authorities approves otherwise

• All parties in the road transport supply chain have specific obligations under the law to prevent a breach.

It is called the Chain of Responsibility and it requires every responsible person in the supply chain to

take positive steps to prevent mass, load restraint, dimension, and fatigue and speed offences

EPC Project

Manager

Pre-delivery of turbine

components

Page 19: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

GWA- CO-TMP-0004 Report Template Version 2.0 Page 19 of 31

UNCONTROLLED WHEN PRINTED.

Rest and

Fatigue

Breaks

• Staff to complete journey management planning and take necessary breaks (and other precautions) in

a manner consistent with NHVAS Basic Fatigue Management (NHVAS21193). Drivers should stop

immediately and rest if feeling drowsy or fatigued

Respective

Managers All times

Road

Condition and

Dilapidation

• Prepare a pre-dilapidation survey of the transport route prior to the commencement of any construction

or decommissioning works other than pre-construction minor works (see Annex B)

• Consultation with council as to appropriate procedure should emergency road repairs be required due

to construction traffic along Whitefields Road. If works endanger road safety, the damage will be repaired

as soon as possible but within 7 days at the latest

• Prepare a post-dilapidation survey of the transport route within 1 month of the completion of construction

or decommissioning works other than pre-construction minor works, or other timing as may be agreed

by the applicable roads authority (see Annex B)

• Rehabilitate and/or make good any project-related damage identified in the post-dilapidation survey

within 2 months of the completion of survey, or other timing as may be agreed by the applicable roads

authority, to the satisfaction of the relevant roads authority

• A Dilapidation Survey and Road Repair Protocol is provided at Annex B

EPC Project

Manager

Pre-construction (and post

for post-dilapidation survey)

Consultation

• Undertake effective on-going consultation with relevant stakeholders including, road authorities, local

landholders and emergency services. Liaison activities may include:

• Consultation with relevant council/s and RMS once offsite civil material sources have been confirmed

(e.g. gravel, cement, sand)

• Notifications, prior to commencement of any significant works, to local residents, local newspapers, and

on the project website

• Notifications on a case by case basis as construction progresses, including via the project website, shop

front, local councils, local residents, newsletters and the Community Consultative Committee

• Brief the landholders that utilise Whitefields Rd regarding the traffic arrangements and road use protocol

in relation to the wind farm construction traffic

• A dedicated telephone contacts list to enable any issues or concerns to be rapidly identified and

addressed

• All traffic related complaints will be managed in accordance with the Complaints Management System

(see Project EMS).

EPC Project

Manager; Site

Construction

Manager

Pre-construction and during

construction.

Traffic Control

Plans

• Traffic Control Plans (TCPs) will be developed by personnel duly qualified and certified. TCPs will be

based on the AS1742.3 Manual of uniform traffic control devices – Part 3: Traffic control for works on

roads, the Roads and Maritime Traffic Control at Work Sites (2018), the WHS Act 2011 and WHS

Regulation 2017, in consultation with Roads and Maritime and local councils, as required

BoP

Construction

Manager

Pre-construction and as

required during

construction.

Vehicle

Movement

Plans

• Vehicle movement plans will be prepared at relevant work sites and truck turning areas and will detail:

o Entry and exit points

o Turning point locations

o Safety measures for surrounding workers

BoP

Construction

Manager

Construction

Page 20: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

GWA- CO-TMP-0004 Report Template Version 2.0 Page 20 of 31

UNCONTROLLED WHEN PRINTED.

o Vehicle safety requirements

Speed Limits

• Where speed limits are proposed to be changed on public roads, the process to undertake this will be

identified in the TCP

• Consultation with the relevant road authorities, safety authorities and any changes are to be clearly

communicated within the community and with all road users

• Speed limits on site will be limited to 40km/hr

Site

Construction

Manager,

GWA HSE

Manager

Pre-construction and as

required during

construction.

Safety of

Road Users

and

Construction

Staff

• Traffic risks will be further identified, assessed and mitigation measures developed as part of the Safety

in Design (SID) and Hazard Identification (HAZID) workshops to bring the traffic risks to as low as

reasonably practical

• Specific TCP’s will be prepared for all work which involves any form of traffic control or restriction

• Place signs and devices (e.g. VMS boards) before proceeding with relevant works

• Ensure signs are not obscured by vegetation, vehicles, plant or other traffic control signs/devices and

that signs are placed in the correct order

• Where traffic controllers are required, they must be suitably qualified having passed RMS-approved

training courses

• Traffic controllers (or portable traffic signals if directing traffic to cross barrier lines) shall be used if road

users are to be directed to disobey a traffic regulation

• All traffic controllers are to wear high visibility external clothing

• Signs, devices and TCP’s shall be used to warn, inform and guide road users safely around, through or

past work areas

• Signs, devices and TCP’s are to be removed from the site upon completion of the work

• An increased risk of rear end collisions arises in any location where road traffic is stopped for a period

of time. Ensuring that there is sufficient warning to road users before encountering the queue is

essential. Depending on the situation this may require extending the length of a sign posted roadwork

speed zone in the development of the TCP, using oversized signs, flashing light signs and variable

message signs (in consultation with the relevant road authority)

• With the upgrade of the Hume Hwy / Whitefields Rd intersection it is considered unlikely that queueing

of construction trucks will be an issue, however this will be monitored during the construction period to

ensure appropriate action is taken to avoid excessive queuing (e.g. by staggering worker start times)

• Endeavour to utilise shuttle bus/es for workers to nearby towns during the peak construction period to

help minimise the impact on local traffic

Site

Construction

Manager,

Contractors

Construction

Local School

Buses and

Rail Services

• There are no school buses that travel along the relevant sections of Whitefields Rd or Coppabella Rd.

Vehicle operators will be informed on the general timing of school buses along Hume Hwy. Where

relevant, restrictions will be placed on the timing of some deliveries to site to mitigate specific impacts,

e.g. restriction of oversize traffic movements during school bus operating hours to mitigate delays. There

are no rail services in the vicinity of the project

Site

Construction

Manager,

Contractors

All project phases

Page 21: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

GWA- CO-TMP-0004 Report Template Version 2.0 Page 21 of 31

UNCONTROLLED WHEN PRINTED.

Driver Code of

Conduct

• The draft Driver Code of Conduct (Annex A) will be finalised in consultation with the transport contractor

and BOP contractor (once engaged). The Driver Code of Conduct shall apply for all project staff

undertaking and shall be included as part of the mandatory project induction process

EPC

Construction

Manager

Project inductions (prior to

commencing work on site)

Acoustic and

Amenity

Impacts

• Construction activities associated with the Project will generally be undertaken during the following

approved standard hours, unless requested by authorities for safety reasons, inaudible at non-

associated residences, in the event of an emergency, or as otherwise agreed to by the Secretary (DPIE):

o 7am to 6pm Mondays to Fridays

o 8am to 1pm on Saturdays

o no works on Sundays or public holidays

Traffic to and from the site will generally be within one hour of the site hours, except under the

exceptions above

Site

Construction

Manager (EPC

& BoP)

During Construction.

Provisions for

Emergency

Vehicles &

Emergency

Response

• In the event of an emergency incident the following general procedures will be adopted:

o the works crew is to stop work and activate all flashing lights (and contact emergency services if

required)

o immediately begin warning other road users in the safest means possible

o use an appropriate TCP and use traffic controllers and signage where necessary

o if a queue will be generated by the emergency incident, provide warning signs to inform road

users and minimise the potential for end of queue collisions.

• The Contractor will comply with instruction received from the applicable emergency services / authority

controlling the incident

BoP Contractor During Construction.

Environmental

provisions

• On-site access will be restricted to defined tracks to ensure minimal environmental impact

• All loads that have the potential to generate dust shall be covered if leaving the site or actively managed

if remaining on site (e.g. increased watering, use of more appropriate plant, etc)

• Keep vehicles clean, free of weeds or mud and in good mechanical condition

• Appropriate controls will be emplaced at site access points to minimise tracking of sediment onto the

public (sealed) road system by construction vehicles

Principal

contractor

All project phases

Page 22: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

GWA-CO-TMP-0004 General Report

Template Version 2.0 Effective Date: 08/02/2018

GWA- CO-TMP-0004 Report Template Version 2.0 Page 22 of 31

UNCONTROLLED WHEN PRINTED.

6. Roles and Responsibilities All personnel on site will comply with the requirements of this TMP and associated TCPs.

Duties and responsibilities of personnel allocated to manage, implement and monitor the Traffic

Management practices for the project are detailed below:

Contact Name Project Role Contact Number

To be updated once confirmed BoP Construction Manager TBC

To be updated once confirmed BoP Health and Safety Officer TBC

Alexander Smith EPC Construction Manager 0436 631 556

BoP Construction Manager

• Responsible for preparation of TCPs

• Application of ‘Speed Zone Authorisation (SZA)’ to reduce existing posted speed limit on relevant

roads

• Liaise with RMS and Council regarding traffic management and resolve any traffic-related issues

raised by these stakeholders

• Responsible for preparation and submission of ‘Road Occupancy Licence’ application/s

• Ensure appropriate monitoring is undertaken and any traffic issues resolved promptly

BoP Health and Safety Officer

• Responsible for engaging the relevant traffic contractors to install signs and devices as per the TCPs

• Preparation of Vehicle Movement Plans

• Notify the Site Manager and relevant stakeholders of all traffic incidents, near misses and complaints

• Implement and/or supervise emergency response including construction-related traffic incidents

• Ensure Daily Traffic Control – Safety Checks are carried out when operative

EPC Construction Manager

• Responsible for ensuring there is an approved TMP for the project at all times during construction

• Responsible for verifying that the BoP Contractor is fulfilling its traffic-related duties such as road

maintenance, the preparation of TCPs and their implementation

• Responsible for verifying that the logistics contractor has all road permits and necessary

arrangements in place to deliver the over-dimensional turbine components to site.

Page 23: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

GWA- CO-TMP-0004 Report Template Version 2.0 Page 23 of 31

UNCONTROLLED WHEN PRINTED.

7. Training and Awareness CWFPL will ensure that all personnel responsible for the implementing this TMP are competent on the basis

of education, training and experience.

All site personnel (including sub-contractors) will be required to complete a project induction which will

include key information relating to traffic and access. All personnel that drive vehicles, plant or machinery for

the CWF will be required to sign up to the Driver Code of Conduct provided at Annex A and complete the

driver-specific induction.

Ongoing training and updates on traffic/transport arrangements and will be provided throughout the project

appropriate to their scope of activity and level of responsibility, including at toolbox talks, daily pre-starts and

team meetings.

8. Inspections and Monitoring The following inspections must be undertaken by the transportation contractor, BoP Contractor and other

relevant contractors with respect to traffic:

• pre-start and pre-closedown inspections of traffic control devices and signage and the condition of

local access roads

• daily pre-start inspections of vehicles to ensure they are maintained in good working order

• minimum weekly inspections of traffic control devices, signage and road condition.

The procedures to monitor traffic impacts on public and internal access tracks during construction, including

noise, dust and travel times would include:

• monitoring compliance with TCP’s adopted for the work site

• daily visual checks to assess vehicle movement and traffic flows to and from the Project site primarily

in the vicinity of the Hume Hwy/Whitefileds Road intersection, along Whitefields Road and

throughout the project site. It is not currently planned for the section of Coppabella Road (see Figure

4-1 to be used by construction traffic, however the interfaces of where the project access tracks

cross Coppabella Road would need regular (minimum weekly) monitoring once these access tracks

have been established.

• check minimum weekly that all project related signs and devices are satisfactory and in their correct

position and the condition of the road.

• additional traffic monitoring may be undertaken in response to complaints or incidents regarding

traffic

Where new damage to the roads is identified, the BoP Construction Manager will liaise with the relevant

road authority (within the mechanisms of arrangements with each authority) to ensure roads are adequately

maintained.

If unacceptable traffic congestion or issues are identified, then adjustment to site traffic arrangements will be

made to rectify the issue. This may include staggering site arrival / start times for different groups of workers,

additional use of buses for workers and safety information provided at pre-start meetings and toolbox talks.

Page 24: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

GWA- CO-TMP-0004 Report Template Version 2.0 Page 24 of 31

UNCONTROLLED WHEN PRINTED.

9. Reporting, Incident Management and Review

9.1 Reporting

Inspection and monitoring records will be documented in the respective inspection and monitoring forms.

All traffic and access related incident reporting on the Project will be managed in accordance with the incident

response process described in the EMS. This includes internal and external notification, recording,

reporting and response processes.

9.2 Corrective Actions

Where planning, checks or monitoring identify that a traffic or access issue has occurred or a validated

complaint was received, an incident report and set of corrective actions will be raised by the construction

contractor (e.g. in their Health, Safety and Environmental Management System) and immediately reported

to the Site HSE Representative.

Measures already implemented, additional measures to be implemented as a result and any corrective

actions will be identified, implemented and documented in the incident report. Actions will be implemented

to the satisfaction of the EPC Construction Manager and their effectiveness confirmed to demonstrate

appropriate measures have been implemented to prevent reoccurrence of impacts, as far as practical.

9.3 TMP Review

The TMP is a working document that requires review and amendment during the life of the Project. The

Development Compliance Manager shall undertake a review of the TMP where:

• an audit makes findings or recommendations identifying a need

• there is a significant change to the construction schedule, the site layout or a change in the

construction methodology that will have traffic or access implications

• site based conditions require a change to the environmental controls and procedures identified

within the TMP

• an incident occurs that requires corrective actions to be incorporated in the TMP

• directed to do so by the Secretary, NSW Department of Planning and Environment.

Changes to the TMP will be communicated through toolbox talks to existing onsite personnel and be

incorporated into the project induction material.

Page 25: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

GWA- CO-TMP-0004 Report Template Version 2.0 Page 25 of 31

UNCONTROLLED WHEN PRINTED.

Annex A – Driver Code of Conduct This Code of Conduct will be applied to all traffic and transport construction activities associated with the

CWF Project, with particular emphasis placed on the transport of oversize/overmass wind turbine

components and delivery vehicles during the construction phase. This draft will form the basis for the Driver

Code of Conduct to be finalised prior to construction. The final Code of Conduct will be reviewed and

endorsed prior to implementation.

A.1 Haulage Routes and Timing of Transport

All large vehicles associated with the Project will follow the designated haulage route and main roads near

the Project area to minimise impact to local roadways and road users. Timing of transport will be scheduled

to minimise disruption to local traffic or result in safety risks.

Consultation with relevant stakeholders will occur regarding to deliveries, traffic and construction works,

including notifications, to local residents, local newspapers, at the project shopfront, newsletters and on the

project website. A dedicated telephone contact will be available to enable any issues or concerns to be

rapidly identified and addressed.

A.2 Behavioural Requirements

The operators of all vehicles associated with the Project will maintain a high level of conduct and respect for

other road users. All operators will undergo the project induction prior to undertaking any transport to site

and regular toolbox meetings will be held to maintain awareness of required controls.

Details of the traffic and access training and induction will focus on:

• objectives and performance goals of the TMP;

• mitigation measures required to be implemented;

• traffic and access monitoring and reporting requirements; and

• incident investigation and response.

Training is to be provided prior to start-up of any traffic and access related management tasks and updated

if task, equipment or procedures are expected to, or have changed.

The following requirements would be exercised at all times:

• obey all the laws and regulations;

• not drive whilst under the influence of alcohol, drugs, nor any medication which may affect their

ability to drive;

• be medically fit to drive at all times and personnel must inform their manager and site HSE

Representative if they have any medical condition which may affect their ability to drive;

• implement fatigue management practices and journey management planning. Take regular rest

stops when driving long distances. Have a rest or change drivers if feeling fatigued when driving.

Stop immediately and rest if feeling drowsy or fatigued.

• drive in a considerate manner at all times and respect the rights of others to use and share the road

space;

• avoid compression braking near sensitive receivers and in built up areas;

• take extra precaution during school periods and school holidays;

• do not queue or idle on public roads or adjacent to sensitive receivers;

• stick to the identified access tracks onsite;

• follow all on-site signage (directional and speed);

• report all vehicle defects to their employer. Serious defects must be corrected immediately or an

alternative vehicle supplied;

• report any vehicle accident resulting in injury/or damage to property;

• report any near misses;

Page 26: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

GWA- CO-TMP-0004 Report Template Version 2.0 Page 26 of 31

UNCONTROLLED WHEN PRINTED.

• only drive in the construction hours when conducting Project works (unless permission to conduct

Project works has been provided);

• securely fasten and cover loads, as appropriate; and

• keep vehicles clean and in good mechanical condition to reduce the environmental impact.

The transport contractor is to develop and implement

• safety initiatives for haulage through residential areas and/or school zones (as relevant); and

• a maintenance program for the heavy transport vehicles that is consistent with these safety

requirements.

A.3 Maintenance Requirements

The operators of all vehicles associated with the Project would maintain a high level of maintenance. The

following requirements would be exercised at all times:

• ensure their vehicle complies with relevant State legislation in relation to roadworthiness and

modifications;

• undergo regular vehicle checks and maintenance; and

• ensure their vehicles have correctly fitted mufflers to minimise noise disturbance.

A.4 Speed Limits

All vehicles associated with the Project are required to travel within the posted speed limits on public roads.

Project vehicles may be required to adhere to reduced speed limits on certain public roads as posted by

VMS boards during construction. In situations where drivers’ visibility and traffic safety on public roads is

affected by weather related conditions such as heavy rainfall or fog, construction vehicles should reduce

their speed limit until visibility and traffic safety has improved. Appropriate speed limits (40 km/h or less)

on site should be implemented, providing for a safe workplace.

A.5 Heavy Vehicle Driver Fatigue

Fatigue is one of the biggest causes of crashes for heavy vehicle drivers. The Heavy Vehicle Driver

Fatigue Reform was developed by the National Transport Commission and approved by Ministers from all

States and Territories in February 2007. The heavy vehicle driver fatigue law commenced in NSW on 28

September 2008 and applies to trucks and truck combinations over 12 tonne gross vehicle mass (however

there are Ministerial Exemption Notices that can apply). Under the law, industry has the choice of operating

under three fatigue management schemes:

• Standard hours of operation

• Basic fatigue management

• Advanced fatigue management.

CWFPL is responsible to ensure all heavy vehicle drivers operating out of the CWF site are aware of and

understand the adopted fatigue management scheme and operate within its requirements.

A.6 Inspections, Monitoring and Continual Improvement

Regular monitoring and inspections on- and-off site will occur to ensure that:

• travelling speeds are adhered to, including the use of monitoring systems within the project site.

• drivers adhere to the designated transport routes

• drivers implement safe driving practices

Page 27: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

GWA- CO-TMP-0004 Report Template Version 2.0 Page 27 of 31

UNCONTROLLED WHEN PRINTED.

• traffic controls are in place and maintained

• road surface conditions are maintained and repaired in a timely manner.

Local residents will also be informed of the transport code of conduct and turbine component delivery

arrangements (e.g. radio protocol) and encouraged to report to the EPC Contractor any instances where

construction traffic is observed not following the code of conduct.

Traffic management measures will be regularly reviewed and identified improvements implemented and

communicated to project personnel.

A.7 Complaint Resolution and Disciplinary Process

All traffic related complaints will be managed in accordance with the CWFPL Complaints Management

System described in the EMS. Complaints will be investigated and a report prepared on the circumstances

of the complaints, risks arising and any non-compliance with project procedures. Failure to comply with

any procedures for safe transport may result in dismissal of specific operator(s) from the project.

Page 28: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

GWA- CO-TMP-0004 Report Template Version 2.0 Page 28 of 31

UNCONTROLLED WHEN PRINTED.

Annex B – Dilapidation Survey and Road Repair

Protocol Prior to the commencement of construction (or decommissioning) of the Project and in accordance with

Schedule 3, Condition 32(b) of the Development Consent Conditions, a dilapidation survey will be prepared

in accordance with the guidelines and standards established by Austroads of the designated vehicle route

on Whitefields Road and relevant sections of Coppabella Road, as identified in the figure in Appendix 6 of

the Conditions of Consent (and replicated at Figure 4-1 of this TMP). This will be prepared in consultation

and agreement with Hilltops Council and Yass Valley Council.

The 1.2km section of Whitefields Rd (including the intersection with the Hume Hwy) will be upgraded and

sealed prior to significant construction works commencing. The section of Coppabella Road shown in

Appendix 6 of the consent is not proposed to be used by the Construction Contractor and therefore does not

require to be upgraded.

As a minimum, the following investigations will be undertaken to determine the pre-construction road

pavement condition:

• digital imaging of road pavement/carriageway (with report); and

• assessment of rutting, roughness and macro texture of pavement.

The proponent will enter into agreement with Hilltops Council and Yass Valley Council for emergency road

repairs, and the restoration of these roads based on the pre-construction dilapidation report details and their

proposed use by the project. If works endanger road safety, the damage will be repaired as soon as possible

but within 7 days at the latest.

The proponent will ensure that all pre-construction upgrade measures identified in the report are

implemented to the satisfaction of Council and RMS, prior to the commencement of the wind farm

construction (other than pre-construction minor works).

A post-construction Dilapidation Report will be undertaken within 1 month of the completion of the

construction work to assess the damage attributable to the project over and above the normal road wear

and tear for the time frame of the works. Measures to restore or reinstate roads affected by the project shall

be undertaken within two months’ of the survey, in accordance with the reasonable requirements of the

relevant road authority and at the expense of the proponent as per agreement between the proponent and

Council (or other relevant road authority, as required).

During the construction period, weekly visual checks will be undertaken of the access roads and

intersections to identify any material deterioration of these roads early. Where new damage to the road is

identified (e.g. pothole), the BoP Construction Manager will liaise with the relevant road authority (within the

mechanisms of arrangements with each authority) to ensure roads are adequately maintained. It is generally

expected that road damage by vehicles will be avoided as the project transport routes will predominantly be

on State Highways and on a newly upgraded a sealed section of Whitefields Road with reduced speed limits.

The dilapidation surveys and the repair/rehabilitation of development-related damage shall be completed

to the satisfaction of the relevant roads authority. If there is a dispute about the scope of any remedial

works or the implementation of the works, the parties will first seek to resolve the dispute internally. If a

resolution cannot be agreed then either party may refer the matter to the Secretary for resolution.

Page 29: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

GWA- CO-TMP-0004 Report Template Version 2.0 Page 29 of 31

UNCONTROLLED WHEN PRINTED.

Annex C – Whitefields Road Upgrade Design

Page 30: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

Drawing Number Revision

DATE

PLO

TTED

: 25 J

une 2

019 1

0:04 A

M BY

: MEH

UL V

AIDY

ACA

D Fil

e: N:

\Pro

jects\

505\F

Y17\0

19_Y

ASS

VALL

EY W

IND

FARM

\Dra

wing

s\Buil

d\505

1701

9-C0

0-CS

.dwg

© Cardno Limited All Rights Reserved. This document is produced by Cardno Limited solelyfor the benefit of and use by the client in accordance with the terms of the retainer. CardnoLimited does not and shall not assume any responsibility or liability whatsoever to any third

party arising out of any use or reliance by third party on the content of this document.

GOLDWIND AUSTRALIA

YASS VALLEY WIND FARMACCESS ROAD IMPROVEMENTS AT WHITEFIELDS ROAD AND HUME HIGHWAY, BERREMANGRA - CIVIL WORKS

COVER SHEET AND LOCALITY PLAN

DETAIL DESIGN

50517019 - C00 4

®

Cardno (NSW/ACT) Pty Ltd | ABN 95 001 145 035Level 2, 14 Wormald StreetSymonston ACT 2609Tel: 02 6112 4500 Fax: 02 6112 4599Web: www.cardno.com.au

NORTH

SITE OFWORKS

WHITEFIELDSROAD

BERREMANGRAROAD

ILLALONGROAD

AutoCAD SHX Text
%%ULOCALITY PLAN
AutoCAD SHX Text
NTS
Page 31: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

© Cardno Limited All Rights Reserved.This document is produced by Cardno Limited solely for the

benefit of and use by the client in accordance with theterms of the retainer. Cardno Limited does not and shall notassume any responsibility or liability whatsoever to any thirdparty arising out of any use or reliance by third party on the

content of this document.

®

Cardno (NSW/ACT) Pty Ltd | ABN 95 001 145 035Level 2, 14 Wormald Street

Symonston ACT 2609Tel: 02 6112 4500 Fax: 02 6112 4599

Web: www.cardno.com.auDateRev. Verif. Appd.

Scale

Status

Client

XREF

's:

Drawing Number Revision

DATE

PLO

TTED

: 25 J

une 2

019 1

0:04 A

M BY

: MEH

UL V

AIDY

A

Des.

Size

Project

Title

Drawn Date

Checked

Date

Date

DateVerified

Approved

Description

A1

CAD

File:

N:\P

rojec

ts\50

5\FY1

7\019

_YAS

S VA

LLEY

WIN

D FA

RM\D

rawi

ngs\B

uild\5

0517

019-

C01-

DL.dw

g

0 302010

SCALE 1:500

40 50m

@A1

GOLDWIND AUSTRALIAYASS VALLEY WIND FARMACCESS ROAD IMPROVEMENTS AT WHITEFIELDS ROAD AND HUME HIGHWAY, BERREMANGRA - CIVIL WORKS

DRAWING LIST

DATUMAS SHOWN

50517019 - C01 5

G.J. 23/12/2016

J.H. 23/12/2016

RIC 23/12/2016

J.H. 23/12/2016

M.P. 23/12/2016

Designed

1 23/12/2016 90% DOCUMENTATION G.J. RIC J.H.2 17/03/2017 FINAL SUBMISSION G.J. RIC J.H.3 17/05/2017 DRAWING LIST AMENDED CROSS SECTION 8 OF 8 G.J. RIC J.H.4 25/10/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.5 6/11/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.

FOR APPROVALNOT TO BE USED FOR CONSTRUCTION PURPOSES

SCHEDULE OF DRAWINGS

DRAWING No. DESCRIPTION REV.

50517019 - C00 COVER SHEET AND LOCALITY PLAN DETAIL DESIGN 4

50517019 - C01 DRAWING LIST 5

50517019 - C02 NOTES AND LEGEND 4

50517019 - C03 SITE PLAN 4

50517019 - C04 TYPICAL SECTIONS AND PAVEMENT DETAILS 4

50517019 - C10 GENERAL ARRANGEMENT - SHEET 1 OF 7 4

50517019 - C11 GENERAL ARRANGEMENT - SHEET 2 OF 7 4

50517019 - C12 GENERAL ARRANGEMENT - SHEET 3 OF 7 4

50517019 - C13 GENERAL ARRANGEMENT - SHEET 4 OF 7 4

50517019 - C14 GENERAL ARRANGEMENT - SHEET 5 OF 7 4

50517019 - C15 GENERAL ARRANGEMENT - SHEET 6 OF 7 4

50517019 - C16 GENERAL ARRANGEMENT - SHEET 7 OF 7 4

50517019 - C20 PLAN AND LONG SECTION (MC10) - SHEET 1 OF 4 4

50517019 - C21 PLAN AND LONG SECTION (MC10) - SHEET 2 OF 4 4

50517019 - C22 PLAN AND LONG SECTION (MC10) - SHEET 3 OF 4 4

50517019 - C23 PLAN AND LONG SECTION (MC10) - SHEET 4 OF 4 4

50517019 - C24 INTERSECTION PLAN AND LONG SECTION (MC20) SHEET 1 OF 2 2

50517019 - C25 INTERSECTION PLAN AND LONG SECTION (MC30) SHEET 2 OF 2 2

50517019 - C30 CROSS SECTIONS WHITEFIELDS RD (MC10) - SHEET 1 OF 10 4

50517019 - C31 CROSS SECTIONS WHITEFIELDS RD (MC10) - SHEET 2 OF 10 4

50517019 - C32 CROSS SECTIONS WHITEFIELDS RD (MC10) - SHEET 3 OF 10 4

50517019 - C33 CROSS SECTIONS WHITEFIELDS RD (MC10) - SHEET 4 OF 10 4

SCHEDULE OF DRAWINGS

DRAWING No. DESCRIPTION REV.

50517019 - C34 CROSS SECTIONS WHITEFIELDS RD (MC10) - SHEET 5 OF 10 4

50517019 - C35 CROSS SECTIONS WHITEFIELDS RD (MC10) - SHEET 6 OF 10 4

50517019 - C36 CROSS SECTIONS WHITEFIELDS RD (MC10) - SHEET 7 OF 10 3

50517019 - C37 CROSS SECTIONS WHITEFIELDS RD (MC10) - SHEET 8 OF 10 3

50517019 - C38 CROSS SECTIONS WHITEFIELDS RD (MC10) - SHEET 9 OF 10 2

50517019 - C39 CROSS SECTIONS WHITEFIELDS RD (MC10) - SHEET 10 OF 10 2

50517019 - C45 PAVEMENT PLAN AND TRAFFIC CONTROL DEVICES SHEET 1 OF 4 1

50517019 - C46 PAVEMENT PLAN AND TRAFFIC CONTROL DEVICES SHEET 1 OF 4 1

50517019 - C47 PAVEMENT PLAN AND TRAFFIC CONTROL DEVICES SHEET 1 OF 4 1

50517019 - C48 PAVEMENT PLAN AND TRAFFIC CONTROL DEVICES SHEET 1 OF 4 1

50517019 - C50 SETOUT TABLES 4

Page 32: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

EROSION & SEDIMENT CONTROL NOTES1. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO DESIGN, INSTALL AND

MAINTAIN EROSION AND SEDIMENT CONTROL MEASURES IN ACCORDANCEWITH ALL ENVIRONMENTAL ACTS AND COUNCIL REQUIREMENTS.

2. ALL EROSION AND SEDIMENT MEASURES SHALL BE REMOVED AT THECOMPLETION OF THE PROJECT.

3. THE CONTRACTOR SHALL PROVIDE DRAWING AND DETAILS OF PROPOSEDEROSION AND SEDIMENT CONTROL MEASURES TO THE SUPERINTENDENTFOR APPROVAL PRIOR TO COMMENCING WORKS.

4. PROVIDE FILTER ROLLS TO ALL NEW SUMPS AND CULVERTS WHENCOMPLETED DURING CONSTRUCTION.

ORIGINAL SURVEY1. SURVEY BY DPS (DIVERSE PROJECT SOLUTIONS, YASS NSW.

JOB REFERENCE : 2604 (25 OCTOBER 2016)COMPUTER REFERENCE : 2604_DT1.dwg

2. VERTICAL DATUMDATUM : AHDBM : PM54492 RL518.439 (LC)

2. ORIGIN OF LEVELSSSM5002 - RL499.220SSM30840 - RL498.289

STORMWATER STRUCTURE NOTATIONHW DENOTES STANDARD PRECAST CONCRETE HEADWALL

EXISTING

LEGEND

SEWER

DESCRIPTIONNEW

STORMWATER

WATER

FENCES

EXISTING TO BEREMOVED

ACCESS ROAD PAVEMENT

ELECTRICITY OVERHEAD

PAVEMENT NOTES1. ALL DESIGN SUBGRADE VALUES MUST BE CONFIRMED BY THE

CONTRACTOR PRIOR TO COMMENCING CONSTRUCTION.

2. THE COMPACTION REQUIREMENTS FOR EARTHWORKS, SUBGRADES, ANDPAVEMENT LAYERS ARE NOMINATED ON THE PAVEMENT DETAILDRAWINGS.

3. SUBGRADES ARE INITIALLY TO BE PREPARED TO BOTTOM OF SUB-BASELEVEL AND CBR TESTS TAKEN AT THIS LEVEL. FOLLOWING RECEIPT OFCBR RESULTS. THE SUPERINTENDENT WILL IDENTIFY IF ADDITIONALSELECT FILL NEEDS TO BE PLACED IN SUBGRADE.

4. SUBGRADE PREPARATION :

a) REMOVE TOPSOIL, LARGE ROOTS AND UPPER LEACHED SOILS FROMALL AREAS TO BE DISTURBED.

b) ANY HOLES CREATED BY REMOVAL OF ROOTS SHALL BE BACKFILLED.

c) PROOF ROLL ALL SUBGRADES IN THE PRESENCE OF THESUPERINTENDENT AND THE CONTRACTOR'S GEOTECHNICAL ENGINEER.THE GEOTECHNICAL ENGINEER WILL ASSESS SUITABILITY OF SUBGRADE.ANY AREAS OF UNSUITABLE SUBGRADE SHALL BE REMEDIATED AS PERTHE GEOTECHNICAL ENGINEER INSTRUCTIONS AND SUPERINTENDENT'SAPPROVAL.

d)PROOF ROLL WEATHERED BEDROCK SUBGRADES.

GENERAL NOTES1. ALL CONSTRUCTION WORK SHALL BE CARRIED OUT IN ACCORDANCE WITH

CURRENT HILLTOPS COUNCIL'S REQUIREMENTS, COUNCIL DESIGN ANDCONSTRUCTION SPECIFICATION - AUSSPEC#1, AUSTRALIAN STANDARDS,AUSTROADS.

2. ALL CONSTRUCTION WORK SHALL COMPLY WITH THE HARDEN LOCALENVIRONMENTAL PLANS.

3. ANY EXISTING SERVICES ARE SHOWN IN THEIR APPROXIMATE LOCATION ONLY.PRIOR TO ANY DEMOLITION, EXCAVATION, OR CONSTRUCTION ON SITE, THECONTRACTOR SHALL CONTACT THE RELEVANT AUTHORITIES AND VERIFY THELOCATION OF ALL UNDERGROUND SERVICES ON THE SITE AND OBTAINNECESSARY CLEARANCES.

4. SURFACES WHICH LIE OUTSIDE THE GENERAL LIMITS OF LANDSCAPING ANDRESTORATION WHICH ARE DISTURBED DURING THE CONSTRUCTION OF THEWORKS SHALL BE RESTORED BY THE CONTRACTOR, AT CONTRACTOR'SEXPENSE, TO AT LEAST THEIR PRE-CONSTRUCTION CONDITION. THESESURFACES INCLUDE, BUT ARE NOT NECESSARILY LIMITED TO, PAVEMENTS,PAVING, GRASSING, LANDSCAPING ETC.

5. ANY WORKS THAT ALTER OR DISTURB GRASSED FLOODWAYS, ROAD RESERVEAREAS, MEDIANS OR OTHER OPEN AREAS MUST BE REINSTATED TO EXISTINGCONDITION BY THE PERSON(S) RESPONSIBLE FOR THE DISTURBANCE INACCORDANCE WITH HILLTOPS COUNCIL AND RMS REQUIREMENTS.

6. ALL LEVELS SHOWN ARE FINISHED LEVELS PROVIDED IN THIS CONTRACT.THE CONTRACTOR SHALL ALLOW FOR THE THICKNESS OF ALL FINISHEDSURFACES AND BULK EARTHWORKS REDUCTIONS AS DESCRIBED ON THEDRAWINGS.

7. THE CONTRACTOR SHALL COMPLY WITH THE REQUIREMENTS OF THEOCCUPATIONAL HEALTH AND SAFETY ACT 2000, WHICH REQUIRES EMPLOYERS TOENSURE THE HEALTH, SAFETY AND WELFARE OF EMPLOYEES.

8. THE CONTRACTOR SHALL AT ALL TIMES EXERCISE ALL NECESSARY PRECAUTIONSAPPROPRIATE TO ENSURE THE SAFETY OF ALL PERSONS ON THE WORK SITE ORIN THE VICINITY OF THE WORK SITE.

9. TO LIMIT THE IMPACT OF THE CONSTRUCTION ON ADJACENT LANDOWNERS, ALLWORKS SHALL BE RESTRICTED TO THE HOURS OF 7am-6pm MONDAY TO FRIDAYAND 8am-1pm SATURDAY. NO WORK SHALL TAKE PLACE ON SUNDAYS OR PUBLICHOLIDAYS.

10. ALL WORK IS TO BE SET OUT BY A COMPETENT SURVEYOR APPROVED BY THESUPERINTENDENT.

11. THE CONTRACTOR SHALL NOT DISTURB ANY SURVEY CONTROL MARKS. SHOULDANY SURVEY CONTROL MARK BE DISTURBED OR OBLITERATED, THECONTRACTOR SHALL NOTIFY THE SUPERINTENDENT IMMEDIATELY. THECONTRACTOR SHALL HAVE THE MARKS REPLACED AT THEIR EXPENSE.

12. ALL GREEN WASTE IS TO BE MULCHED, STOCKPILED AND USED (WHEREPOSSIBLE) ON SITE. ALL EXCESS MULCH IS TO BE REMOVED OFF SITE.

13. ALL DISTURBED AREAS INCLUDING BATTERS, TABLE DRAINS AND FOOTPATHAREAS ARE TO BE TOP SOILED, FERTILIZED AND SEEDED TO THE SATISFACTIONOF THE SUPERINTENDENT.THE TYPE OF SEED (NATIVE MIX) IS TO BE APPROVED BY THE SUPERINTENDENT.

14. IF ROCK IS ENCOUNTERED THE SUPERINTENDENT SHALL BE NOTIFIEDIMMEDIATELY SO MEASUREMENTS OF VOLUMES CAN BE MADE. NO VARIATIONSFOR ROCK WILL BE CONSIDERED UNLESS THE SUPERINTENDENT HAS VERIFIEDTHE AMOUNTS PRIOR TO BACKFILLING.

15. THERE SHALL BE NO PARKING, SITE SHEDS, SITE AMENITIES, BILLBOARDS ORSTORAGE OF MATERIALS ON THE ACTIVE ROAD RESERVE, OVERLAND FLOWPATHS OR OPEN SPACE UNDER ANY CIRCUMSTANCES. PROTECT ALLGRASSLAND, TREES AND SHRUBS OUTSIDE THE WORKS AREA FROM DAMAGE.

TRAFFIC AND PEDESTRIAN MANAGEMENT1. THE CONTRACTOR SHALL PROVIDE SAFE AND UNRESTRICTED ACCESS

THROUGHOUT THE CONSTRUCTION PERIOD FOR PEDESTRIANS, CYCLISTS ANDVEHICLES ON HUME HIGHWAY.

2. CLOSURE OF WHITEFIELDS RD IS ALLOWED DURING CONSTRUCTIONPROCEEDINGS WITH ACCESS TO LANDHOLDERS' ACCESS POINT BEINGFACILITATED.

3. THE CONTRACTOR SHALL ENSURE TRAFFIC AND PEDESTRIANS ARE PROTECTEDFROM CONSTRUCTION VEHICLES, DUST, WATER AND OTHER NUISANCE BYMEANS OF TEMPORARY SCREENS, BARRIERS, SIGNAGE AND FENCING.

4. THE CONTRACTOR SHALL PREPARE AND GAIN APPROVAL FOR A TEMPORARYTRAFFIC MANAGEMENT PLAN, FOLLOWING ENDORSEMENT FROM HILLTOPSCOUNCIL AND THE RMS.

5. THE CONTRACTOR IS RESPONSIBLE FOR THE SITE OF WORKS AND THE TRAFFICMANAGEMENT WITHIN THE SITE AND SHALL KEEP ALL REQUIRED RECORDS ANDUNDERTAKE ALL NECESSARY MAINTENANCE.

6. ALL TEMPORARY TRAFFIC MANAGEMENT (TTM) DEVICES SHALL BE INACCORDANCE WITH AS 1742.3 AND QA G10 TRAFFIC MANAGEMENT (ACTMODIFIED).

7. ALL EMPLOYEES ARE TO WEAR APPROPRIATE SAFETY PPE AS DETAILED INAS1742.3 AND QA G10 TRAFFIC MANAGEMENT (ACT MODIFIED).

8. ALL EMPLOYEES INVOLVED IN TTM TRAFFIC CONTROL, SETUP, MINORMODIFICATIONS AND INSPECTIONS SHALL HAVE THE RELEVANT QUALIFICATIONSIN ACCORDANCE WITH CLAUSE 1.5.3 OF QA G10 TRAFFIC MANAGEMENT(ACTMODIFIED)

9. ALL TRAFFIC CONTROL SIGNS AND DEVICES SHALL BE ERECTED AS PER THISTTM AND IN CLEAR LINE OF SIGHT TO ALL ROAD USERS AND PEDESTRIANS. THEYSHALL NOT BE OBSCURED BY ANY VEGETATION, WORK PLANT OR PARKEDVEHICLES. THEY SHALL NOT BE PLACED IN A MANNER THAT THEY WILL BECOMEA HAZARD TO VEHICULAR TRAFFIC OR PEDESTRIANS.

10. THE CONTRACTOR SHALL LIAISE WITH ADJACENT LANDOWNERS AND NOT PLACEANY CONFLICTING TTM. THE CONTRACTOR SHALL NOTIFY THE SUPERINTENDENTOF ANY CONFLICTS.

11. SPOTTERS AND / OR TRAFFIC CONTROL PERSONNEL SHALL BE USED AT ALLTIMES WHEN CONSTRUCTION TRAFFIC CROSSING OCCURS ON WHITEFIELDSROAD.

12. NO CONSTRUCTION OR CONTRACTOR / SUB-CONSTRACTOR VEHICLES AREPERMITTED TO PARK ON HUME HIGHWAY.

13. CONSTRUCTION ACCESS ONLY SIGNS SHALL BE PLACED ON THE ENTRY /EGRESS POINT.

CAUTION:OVERHEAD POWERLINES

THE CONTRACTOR SHALL UNDERTAKE ALLREQUIREMENTS OF WORKCOVER NSW FOR

WORKING UNDER POWERLINES

TREE AND VEGETATION MANAGEMENT NOTES1. THE CONTRACTOR SHALL RECOGNISE THE CLIENT'S INTENTION IS TO

PRESERVE TREES, EXISTING VEGETATION / BRUSHES AND GROUNDCOVER IN ALL AREAS OF THE SITE WHERE POSSIBLE.

2. THE CONTRACTOR SHALL REFER TO THE NGH ENVIRONMENTALLANDSCAPE MANAGEMENT PLANS FOR TREE PROTECTIONREQUIREMENTS.

DEAD TREE

STUMP

EDGE OF GROUP OF TREES / BUSHES

TREE

TELECOMMUNICATIONS

TYPE 1 TYPE 2

CATTLE GRID RESTORATION

VERGE RESTORATION

INDICATES TREE THAT REQUIRES REMOVAL

INDICATES TREE THAT REQUIRES TRIMMING

DateRev. Verif. Appd.

Scale

Status

Client

XREF

's:

Drawing Number Revision

DATE

PLO

TTED

: 25 J

une 2

019 1

0:04 A

M BY

: MEH

UL V

AIDY

A

Des.

Size

Project

Title

Drawn Date

Checked

Date

Date

DateVerified

Approved

Description

A1

CAD

File:

N:\P

rojec

ts\50

5\FY1

7\019

_YAS

S VA

LLEY

WIN

D FA

RM\D

rawi

ngs\B

uild\5

0517

019-

C02-

GNL.d

wg

GOLDWIND AUSTRALIAYASS VALLEY WIND FARMACCESS ROAD IMPROVEMENTS AT WHITEFIELDS ROAD AND HUME HIGHWAY, BERREMANGRA - CIVIL WORKS

NOTES AND LEGEND

DATUMAHD AS SHOWN

50517019 - C02 5

G.J. 23/12/2016

J.H. 23/12/2016

RIC 23/12/2016

J.H. 23/12/2016

M.P. 23/12/2016

Designed

1 23/12/2016 90% DOCUMENTATION G.J. RIC J.H.2 17/03/2017 FINAL SUBMISSION G.J. RIC J.H.3 25/10/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.4 6/11/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.5 25/06/2019 TREE AMENDED P.D.J. RIC S.A.S.

FOR APPROVALNOT TO BE USED FOR CONSTRUCTION PURPOSES

© Cardno Limited All Rights Reserved.This document is produced by Cardno Limited solely for the

benefit of and use by the client in accordance with theterms of the retainer. Cardno Limited does not and shall notassume any responsibility or liability whatsoever to any thirdparty arising out of any use or reliance by third party on the

content of this document.

®

Cardno (NSW/ACT) Pty Ltd | ABN 95 001 145 035Level 2, 14 Wormald Street

Symonston ACT 2609Tel: 02 6112 4500 Fax: 02 6112 4599

Web: www.cardno.com.au

Page 33: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

344DP753595

3DP253853

1DP1211587 2

DP1211587

PROPERTY BOUNDARY

PROPERTY BOUNDARY

7306DP1153126HUME HIGHWAY

HUME HIGHWAY

WHITEFIELDS ROAD

5km TO BOOKHAM

3DP1211587

DRG No 50517019 - C11DRG No 50517019 - C12

DRG No 50517019 - C13 DRG No 50517019 - C14 DRG No 50517019 - C15

24km TO JU

GIONG

FOR HUME HIGHWAY INTERSECTION DRAWINGSREFER TO RMS DRAWINGSREGISTRATION No. DS2018/001026

DRG No 50517019 - C16

DRG No 50517019 - C10

PROPERTY BOUNDARY

PROPERTY BOUNDARY

PROPERTY BOUNDARY

PROPERTY BOUNDARY

0.000

L=37.752

TC 37.752

R=119.675L=48.126

CT 85.878

L=3.775

89.653

40.000

60.000

80.000

0.000L=9.904L=13.113 23.017

20.000

CREST 1162.884

20.000 40.000

60.000

80.000

100.000

120.000

140.000

160.000

180.000

200.000

220.000

240.000

260.000

280.000

300.000

320.000

340.000

360.000

380.000

400.000

420.000

440.000

460.000

480.000

500.000

520.000

540.000

560.000

580.000

600.000

620.000

640.000

660.000

680.000

700.000

720.000

740.000

760.000

780.000

800.000

820.000

840.000

860.000

880.000

900.000

920.000

940.000

960.000

980.000

1000.000

1020.000

1040.000

1060.000

1080.000

1100.000

1120.000

1140.000

1160.000

1180.000

1200.000

1220.000 1240.000 1260.000

LIMIT

OF W

ORKS

LIMIT OF WORKS

LIMITOF

WORKS

PROPERTY BOUNDARY

LIMIT OF WORKS

LIMIT OF WORKS

N

O

R

T

H

DateRev. Verif. Appd.

Scale

Status

Client

XREF

's: X

-YAS

S-BA

SE; X

-S D

ESIG

N BD

Y; X

-CVT

-260

4_DT

1; X-

DESI

GN; X

RF C

ONTR

OL M

AIN

2000

Drawing Number Revision

DATE

PLO

TTED

: 25 J

une 2

019 1

0:04 A

M BY

: MEH

UL V

AIDY

A

Des.

Size

Project

Title

Drawn Date

Checked

Date

Date

DateVerified

Approved

Description

A1

CAD

File:

N:\P

rojec

ts\50

5\FY1

7\019

_YAS

S VA

LLEY

WIN

D FA

RM\D

rawi

ngs\B

uild\5

0517

019-

C03-

SP.dw

g

GOLDWIND AUSTRALIAYASS VALLEY WIND FARMACCESS ROAD IMPROVEMENTS AT WHITEFIELDS ROAD AND HUME HIGHWAY, BERREMANGRA - CIVIL WORKS

SITE PLAN

DATUMAHD 1:2000@A1

50517019 - C03 6

G.J. 23/12/2016

J.H. 23/12/2016

RIC 23/12/2016

J.H. 23/12/2016

M.P. 23/12/2016

Designed

1 23/12/2016 90% DOCUMENTATION G.J. RIC J.H.2 17/03/2017 FINAL SUBMISSION G.J. RIC J.H.3 25/10/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.4 6/11/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.6 21/05/2019 ROAD RE-ALIGNMENT RIC P.D.J. S.A.S.

FOR APPROVALNOT TO BE USED FOR CONSTRUCTION PURPOSES

© Cardno Limited All Rights Reserved.This document is produced by Cardno Limited solely for the

benefit of and use by the client in accordance with theterms of the retainer. Cardno Limited does not and shall notassume any responsibility or liability whatsoever to any thirdparty arising out of any use or reliance by third party on the

content of this document.

®

Cardno (NSW/ACT) Pty Ltd | ABN 95 001 145 035Level 2, 14 Wormald Street

Symonston ACT 2609Tel: 02 6112 4500 Fax: 02 6112 4599

Web: www.cardno.com.au

0 50 150100

SCALE 1:2000

200m

@A1

AutoCAD SHX Text
3 DP253853
AutoCAD SHX Text
3 DP253853
AutoCAD SHX Text
344 DP753595
AutoCAD SHX Text
3 DP1211587
AutoCAD SHX Text
2 DP1211587
AutoCAD SHX Text
1 DP1211587
AutoCAD SHX Text
1 DP1211587
AutoCAD SHX Text
7306 DP1153126
AutoCAD SHX Text
1 DP253853
AutoCAD SHX Text
2 DP253853
AutoCAD SHX Text
(30.175 WIDE & VAR)
AutoCAD SHX Text
(30.175 WIDE & VAR)
AutoCAD SHX Text
HUMEHIGHWAYHIGHWAY
Page 34: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

-3% EDGE

OF

GRAV

EL

DESIGN RL

CONT

ROL L

INE

-3%

EXISTINGSURFACE

2500 2500500

SHOULDER500

SHOULDER

TYPICAL SECTION - CHAINAGE 300SCALE 1:50

EDGE

OF

GRAV

EL

EDGE

OF

SEAL

EDGE

OF

SEAL

MC10

DW10

ES10

CE10

CE1I

ES1I

-3.3:1

1 IN 3 1 IN 2-3% ED

GE O

F GR

AVEL

DESIGN RL

CONT

ROL L

INE

-3%EDGE

OF

GRAV

EL

TYPICAL SECTION - CHAINAGE 680.0SCALE 1:50

PERMEABLE MATERIAL TOALLOW WATER EGRESSTO SWALE DRAIN

SWALE DRAINDRYLAND GRASS AND BITUMENSTRAW MULCH TO SWALES ANDBATTERS. REFER DETAIL

EXISTINGSURFACE

2500 2500500

SHOULDER500

SHOULDER

900 1306

EDGE

OF

SEAL

EDGE

OF

SEAL

ES1I

DW1I

MC10

ES10

CE10

CE1I

TYPICAL SECTION - CHAINAGE 780.0SCALE 1:50

(ROADSIDE PULL OVER AREA)

ES10

CE1I

EXISTINGSURFACE

ES1I

MC10

CE10

DW1I SWALE DRAIN

DRYLAND GRASS AND BITUMENSTRAW MULCH TO SWALES ANDBATTERS. REFER DETAILPERMEABLE MATERIAL TO

ALLOW WATER EGRESSTO SWALE DRAIN

CONT

ROL L

INE

EDGE

OF

GRAV

EL

2500 2500500

SHOULDER500

SHOULDER

EDGE

OF

SEAL

EDGE

OF

SEAL

1 IN 31 IN 2-3%-3%

2000PULL OVER AREA 900 2102

DateRev. Verif. Appd.

Scale

Status

Client

XREF

's:

Drawing Number Revision

DATE

PLO

TTED

: 25 J

une 2

019 1

0:04 A

M BY

: MEH

UL V

AIDY

A

Des.

Size

Project

Title

Drawn Date

Checked

Date

Date

DateVerified

Approved

Description

A1

CAD

File:

N:\P

rojec

ts\50

5\FY1

7\019

_YAS

S VA

LLEY

WIN

D FA

RM\D

rawi

ngs\B

uild\5

0517

019-

C04-

TS-P

D.dw

g

GOLDWIND AUSTRALIAYASS VALLEY WIND FARMACCESS ROAD IMPROVEMENTS AT WHITEFIELDS ROAD AND HUME HIGHWAY, BERREMANGRA - CIVIL WORKS

TYPICAL SECTIONS AND PAVEMENT DETAILS

DATUMAHD AS SHOWN

50517019 - C04 4

G.J. 23/12/2016

J.H. 23/12/2016

RIC 23/12/2016

J.H. 23/12/2016

M.P. 23/12/2016

Designed

1 23/12/2016 90% DOCUMENTATION G.J. RIC J.H.2 17/03/2017 FINAL SUBMISSION G.J. RIC J.H.3 25/10/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.4 6/11/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.

FOR APPROVALNOT TO BE USED FOR CONSTRUCTION PURPOSES

© Cardno Limited All Rights Reserved.This document is produced by Cardno Limited solely for the

benefit of and use by the client in accordance with theterms of the retainer. Cardno Limited does not and shall notassume any responsibility or liability whatsoever to any thirdparty arising out of any use or reliance by third party on the

content of this document.

®

Cardno (NSW/ACT) Pty Ltd | ABN 95 001 145 035Level 2, 14 Wormald Street

Symonston ACT 2609Tel: 02 6112 4500 Fax: 02 6112 4599

Web: www.cardno.com.au

240

PAVEMENT TYPE 1 AND 2

SCALE 1:10

SUBGRADE CBR = 10%COMPACTED TO 95% MMDD

BASE - DGS 20COMPACTED TO 98% MMDDSUBBASE - DGB 20COMPACTED TO 95% MMDD

120

120

0 1000mm

SCALE 1:10

200 400 600 800

@A1

0 5000mm

SCALE 1:50

1000 2000 3000 4000

@A1

ONSITE TOPSOIL100

MIN.

DRYLAND GRASS AND BITUMEN STRAW MULCH(GRASS SPECIES TO BE APPROVED BY SUPERINTENDENT)

SUBGRADE

GRASS SURFACE RESTORATION

SCALE 1:10SWALE BATTERS AND AREAS OF RESTORATION

7 / 14 2 COAT SPRAY SEAL(PAVEMENT TYPE 1 ONLY)

ACCESS ROAD(DESA 3.98 x 105)

VARI

ES

CATTLE GRID RESTORATIONSCALE 1:10

SUBGRADE CBR = 10%COMPACTED TO 95% MMDD

BASE - DGS 20COMPACTED TO 98% MMDDSUBBASE - DGB 20COMPACTED TO 95% MMDD

120

120

SELECTED MATERIALCOMPACTED TO 95% MMDDVA

RIES

7 / 14 2 COAT SPRAY SEAL

TYPE 1 TYPE 2

Page 35: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>>

>>

>>

>>

>

>

>

>>

>>

>>

>>

>>

>>

>>

>>

>>

>>

>

>

>

>

>

>>

>>

>>

>>

>

>

>

>>

>

>>>>>>>>>>>>>>>>>>>>>>

>>

>>

>

>

>

>

>

>

>

>

>>

>>

>>

>

>

>>>>>>>>>>>

>>

>>

>>

494.5

495.0

495.0

495.0

495.5

495.5

495.5 495.5

496.0

496.0

496.0

496.0

496.0

496.5

496.5

496.5

496.5496.5

496.5

496.5

496.5

497.0

497.0

497.0

497.0

497.0497.0

497.0

497.0

497.0

497.0

497.0

497.0

497.0

497.0

497.0

497.5497.5

497.5

497.5

497.5

497.5

497.5

497.5

497.5

497.5

497.5497.5

497.5

497.5

497.5

497.5

497.5

497.5

497.5

497.5

497.5

497.5

497.5

497.5

497.5

497.5

497.5

497.5

497.5

497.5

497.5

497.5

498.0

498.0

498.0

498.0

498.0

498.0

498.0

498.0

498.0

498.0

498.0

498.0

498.0

498.0

498.0

498.0

498.0

498.0498.0

498.0

498.0

498.0

498.0

498.0

498.0

498.0

498.0

498.0

498.0

498.0

498.0

498.0498.0

498.5

498.5

498.5

498.5

498.5

498.5

498.5

498.5498.5

498.5

498.5

498.5

498.5

498.5

498.5

498.5

498.5

498.5

499.0

499.0

499.0

499.0

497.5

498.0498.5

HUME HIGHWAY

HUME HIGHWAY

WHITEFIELDS ROAD

MC10

REMOVE EXISTINGCATTLE GRID ANDMATCH SMOOTHLY TOWORKS UNDERTAKENBY THE RMS

3DP253853

7306DP1153126

WHITEFIELDS ROAD CONSTRUCTION NOTES:1. LANDSCAPING NOTES:· THE ROAD CONSTRUCTION CONTRACTOR SHALL LIAISE WITH THE OWNER'S

ECOLOGIST MANAGING THE REMOVAL (BY OTHERS) OF HOLLOW BEARINGTREES (HBT'S) AND OTHER TREES AND FOLIAGE BEING REMOVED ORPRUNED IN ACCORDANCE WITH THE NGH ENVIRONMENTAL LANDSCAPEMANAGEMENT PLAN (LMP).

· THE LMP WILL IDENTIFY ALL REMOVAL OF TREES (BY OTHERS) AND THESUBSEQUENT OFFSET PLANTING OF NEW TREES AND FOLIAGE WITHIN THEROAD RESERVE. THE CONTRACTOR SHALL LIAISE AND ACCOMMODATE THELANDSCAPING CONTRACTOR DURING THE DEFECTS LIABILITY PERIOD.

· FOLLOWING THE PRACTICAL COMPLETION OF THE ROAD CONSTRUCTION,THE LANDSCAPING CONTRACTOR WILL BE RESPONSIBLE FOR THE PLANTINGAND ESTABLISHMENT OF ALL NEW TREES, FOLIAGE AND GRASSING.

2. WHERE EXISTING TAIL-OUT DRAINS ARE IMPACTED BY THE NEW ROADALIGNMENT LOCALLY CONNECT TO THE EXISTING TAIL-OUT DRAINS

INTERSECTION UPGARDE WORKSTO BE UNDERTAKEN BY THE RMS

REGRADE TAIL-OUT DRAIN ANDCONSTRUCT 1m3 OF D50 Ø300ROCK RIPRAP AT OUTLET

STATE SURVEY MARKSS30840DO NOT DISTURB

ROADSIDE PULL OVER AREAS

40.000

60.000

80.000

100.000

SAG 43.130

20.000

0.000

L=10.845

TC 10.845

R=-40.000L=16.410

CT 27.255

L=8.931

TC 36.186 R=-150.000L=63.385

CT 99.570

REFE

R DR

G No

5051

7019

- C1

1

KEY PLANNTS

50517019-C1650517019-C15

50517019-C1450517019-C12

50517019-C10

50517019-C13

50517019-C110 15105

SCALE 1:250

20 25m

@A1

DateRev. Verif. Appd.

Scale

Status

Client

XREF

's: X

-DES

CONT

250;

XRF

CONT

ROL M

AIN

250;

X-CV

T-26

04_D

T1; X

-SW

-ROU

GH A

S GU

TS; X

-DES

IGN;

X-Y

ASS-

BASE

; X-S

URVC

ONT2

50; X

-S D

ESIG

N BD

Y; X

ref-t

rees

; X-T

REE

FOR

GOLD

WIN

D

Drawing Number Revision

DATE

PLO

TTED

: 26 J

une 2

019 4

:05 P

M BY

: MEH

UL V

AIDY

A

Des.

Size

Project

Title

Drawn Date

Checked

Date

Date

DateVerified

Approved

Description

A1

CAD

File:

N:\P

rojec

ts\50

5\FY1

7\019

_YAS

S VA

LLEY

WIN

D FA

RM\D

rawi

ngs\B

uild\5

0517

019-

C10-

C16-

GA.dw

g

GOLDWIND AUSTRALIAYASS VALLEY WIND FARMACCESS ROAD IMPROVEMENTS AT WHITEFIELDS ROAD AND HUME HIGHWAY, BERREMANGRA - CIVIL WORKS

GENERAL ARRANGEMENT - SHEET 1 OF 7

DATUMAHD 1:250@A1

50517019 - C10 6

G.J. 23/12/2016

J.H. 23/12/2016

RIC 23/12/2016

J.H. 23/12/2016

M.P. 23/12/2016

Designed

© Cardno Limited All Rights Reserved.This document is produced by Cardno Limited solely for the

benefit of and use by the client in accordance with theterms of the retainer. Cardno Limited does not and shall notassume any responsibility or liability whatsoever to any thirdparty arising out of any use or reliance by third party on the

content of this document.

®

Cardno (NSW/ACT) Pty Ltd | ABN 95 001 145 035Level 2, 14 Wormald Street

Symonston ACT 2609Tel: 02 6112 4500 Fax: 02 6112 4599

Web: www.cardno.com.au1 23/12/2016 90% DOCUMENTATION G.J. RIC J.H.2 17/03/2017 FINAL SUBMISSION G.J. RIC J.H.3 25/10/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.4 6/11/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.5 20/05/2019 ROAD RE-ALIGNMENT RIC P.D.J. S.A.S.6 25/06/2019 TREE AMENDED P.D.J. RIC S.A.S. FOR APPROVAL

NOT TO BE USED FOR CONSTRUCTION PURPOSES

NORTH

Page 36: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

>>>>>>

>>>>>>>>>>>>>>>>>>>>>>>

>>

>>

>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>

>

>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>

>>>>>>>>>>>>>>>

>>

>>>>>>>

>>

>

>

>>

>>>>>>>>>>

>>>

>

>>>>

>>>>>>>>

>

>>

>

>

497.5

497.5 498.0

498.0

498.5

498.5

498.5

498.5

498.5

499.0

499.0

499.0

499.0

499.0

499.0

499.0

499.0

499.0

499.0

499.0

499.0

499.0

499.5

499.5 499.5

499.5

499.5

499.5

499.5

499.5

499.5

499.5

500.0

500.0

500.0

500.0

500.0

500.5

500.5

500.5

500.5

501.0

501.0

501.0

501.0

501.5

501.5

501.5

501.5 502.0

502.0

502.0

502.0

502.5

502.5

498.5499.0 499.5

500.0

500.5

501.0

501.5

502.0

MC10

PROPERTY BOUNDARY

PROPERTY BOUNDARY

7306DP1153126

PROPERTY BOUNDARY

PROPERTY BOUNDARY

3DP253853

1DP1211587

MAINTAIN EXISTING TAIL-OUTDRAINS WHERE POSSIBLE(TYPICAL)

REGRADE TAIL-OUT DRAIN ANDCONSTRUCT 2m3 OF D50 Ø300ROCK RIPRAP AT OUTLET

REGRADE LOCALLY AROUNDHEADWALL AND CONSTRUCT 0.5m3

OF D50 Ø300 ROCK RIPRAP AT INLET

REGRADE TAIL-OUT DRAIN ANDCONSTRUCT 1m3 OF D50 Ø300ROCK RIPRAP AT OUTLET

EXHUME EXISTING Ø375STORMWATER PIPE CAREFULLYFOR POSSIBLE REUSE.

EXHUME EXISTING Ø525STORMWATER PIPE CAREFULLYFOR POSSIBLE REUSE.

PROPERTY BOUNDARY

ROADSIDE PULLOVER AREA

120.000

140.000

160.000

180.000

200.000

220.000

240.000

260.000

280.000

L=67.641

TC 167.211

R=-660.000L=51.624

CT 218.835

L=161.887

Ø525

(3x)Ø375

B.01

B.02A.02

A.01

PIT SCHEDULEPit INLET OUTLET PITName TYPE EASTING NORTHING DIA INV LEV DIA INV LEV SETOUT RL REMARKSA.01 HW525INLET 644667.574 6147376.334 525 497.810 498.600

A.02 HW525 644664.327 6147367.130 525 497.690 498.204setout level to pit sumplevel

B.01 HW375INLET 644646.219 6147403.729 (3x)375 498.500 498.578

B.02 HW375 644640.702 6147397.210 (3x)375 498.400 499.150setout level to pit sumplevel

C.01 HW375INLET 644394.946 6147668.179 (2x)375 504.997 505.295

C.02 HW375 644389.976 6147661.234 (2x)375 504.970 504.598setout level to pit sumplevel

D.01 HW375INLET 644130.326 6148008.038 (2x)375 520.559 520.995

D.02 HW375 644122.747 6148004.104 (2x)375 520.517 520.517setout level to pit sumplevel

WHITEFIELDS ROADHBT127

37

REFE

R DR

G No

5051

7019

- C1

2

REFE

R DR

G No

5051

7019

- C1

0

KEY PLANNTS

50517019-C1650517019-C15

50517019-C1450517019-C12

50517019-C10

50517019-C13

50517019-C110 15105

SCALE 1:250

20 25m

@A1

DateRev. Verif. Appd.

Scale

Status

Client

XREF

's: X

-DES

CONT

250;

XRF

CONT

ROL M

AIN

250;

X-CV

T-26

04_D

T1; X

-SW

-ROU

GH A

S GU

TS; X

-DES

IGN;

X-Y

ASS-

BASE

; X-S

URVC

ONT2

50; X

-S D

ESIG

N BD

Y; X

ref-t

rees

; X-T

REE

FOR

GOLD

WIN

D

Drawing Number Revision

DATE

PLO

TTED

: 26 J

une 2

019 4

:05 P

M BY

: MEH

UL V

AIDY

A

Des.

Size

Project

Title

Drawn Date

Checked

Date

Date

DateVerified

Approved

Description

A1

CAD

File:

N:\P

rojec

ts\50

5\FY1

7\019

_YAS

S VA

LLEY

WIN

D FA

RM\D

rawi

ngs\B

uild\5

0517

019-

C10-

C16-

GA.dw

g

GOLDWIND AUSTRALIAYASS VALLEY WIND FARMACCESS ROAD IMPROVEMENTS AT WHITEFIELDS ROAD AND HUME HIGHWAY, BERREMANGRA - CIVIL WORKS

GENERAL ARRANGEMENT - SHEET 2 OF 7

DATUMAHD 1:250@A1

50517019 - C11 6

G.J. 23/12/2016

J.H. 23/12/2016

RIC 23/12/2016

J.H. 23/12/2016

M.P. 23/12/2016

Designed

© Cardno Limited All Rights Reserved.This document is produced by Cardno Limited solely for the

benefit of and use by the client in accordance with theterms of the retainer. Cardno Limited does not and shall notassume any responsibility or liability whatsoever to any thirdparty arising out of any use or reliance by third party on the

content of this document.

®

Cardno (NSW/ACT) Pty Ltd | ABN 95 001 145 035Level 2, 14 Wormald Street

Symonston ACT 2609Tel: 02 6112 4500 Fax: 02 6112 4599

Web: www.cardno.com.au1 23/12/2016 90% DOCUMENTATION G.J. RIC J.H.2 17/03/2017 FINAL SUBMISSION G.J. RIC J.H.3 25/10/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.4 6/11/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.5 20/05/2019 ROAD RE-ALIGNMENT RIC P.D.J. S.A.S.6 25/06/2019 TREE AMENDED P.D.J. RIC S.A.S. FOR APPROVAL

NOT TO BE USED FOR CONSTRUCTION PURPOSES

NORTH

Page 37: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

>>>

>>>>>>>

>

>

>>

>>>>>>>

>>

>

>>>>>>

>>

>

>>>>>>>>>>>>>>>>>>>>>>>>>>

>>

>

>>

>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>

>>>>>>>>>>>>>>>>>>>

>>

>>>>>>>>>>>>>>>>>>>>>

>>>>>>>>

>>

>

502.0

502.0

502.5

502.5

502.5

502.5503.0

503.0

503.0

503.0

503.5

503.5

503.5

503.5

504.0

504.0

504.0

504.5

504.5

504.5

504.5

504.5

504.5

504.5

504.5

504.5

505.0

505.0

505.0

505.0

505.0

505.0

505.0

505.0

505.0

505.0

505.0

505.0

505.0

505.0

505.0

505.0

505.0

505.0

505.0

505.0 505.0

505.0

505.0

505.5

502.5

503.0

503.5

504.0

504.5

505.0

MC10

1DP1211587

PROPERTY BOUNDARY

PROPERTY BOUNDARY

3DP253853

PROPERTY BOUNDARY

PROPERTY BOUNDARY

LOCALLY REGRADE TO MAINTAINPROPERTY ACCESS

LOCALLY REGRADE TO MAINTAINPROPERTY ACCESS

MAINTAIN EXISTING TAIL-OUTDRAINS WHERE POSSIBLE(TYPICAL)

REGRADE TAIL-OUT DRAIN ANDCONSTRUCT 2m3 OF D50 Ø300ROCK RIPRAP AT OUTLET

ROADSIDE PULL OVER AREAC

S

300.000

320.000

340.000

360.000

380.000

400.000

420.000

440.000

460.000

480.000

CREST 418.326

SAG 437.238

L=161.887 TC 380.722

R=-400.000L=44.944

CT 425.666

L=39.732

TC 465.398

R=-400.000

L=26.094

WHITEFIELDS ROAD

65

69

164

HBT131

REFE

R DR

G No

5051

7019

- C1

3

REFE

R DR

G No

5051

7019

- C1

1

KEY PLANNTS

50517019-C1650517019-C15

50517019-C1450517019-C12

50517019-C10

50517019-C13

50517019-C110 15105

SCALE 1:250

20 25m

@A1

DateRev. Verif. Appd.

Scale

Status

Client

XREF

's: X

-DES

CONT

250;

XRF

CONT

ROL M

AIN

250;

X-CV

T-26

04_D

T1; X

-SW

-ROU

GH A

S GU

TS; X

-DES

IGN;

X-Y

ASS-

BASE

; X-S

URVC

ONT2

50; X

-S D

ESIG

N BD

Y; X

ref-t

rees

; X-T

REE

FOR

GOLD

WIN

D

Drawing Number Revision

DATE

PLO

TTED

: 26 J

une 2

019 4

:05 P

M BY

: MEH

UL V

AIDY

A

Des.

Size

Project

Title

Drawn Date

Checked

Date

Date

DateVerified

Approved

Description

A1

CAD

File:

N:\P

rojec

ts\50

5\FY1

7\019

_YAS

S VA

LLEY

WIN

D FA

RM\D

rawi

ngs\B

uild\5

0517

019-

C10-

C16-

GA.dw

g

GOLDWIND AUSTRALIAYASS VALLEY WIND FARMACCESS ROAD IMPROVEMENTS AT WHITEFIELDS ROAD AND HUME HIGHWAY, BERREMANGRA - CIVIL WORKS

GENERAL ARRANGEMENT - SHEET 3 OF 7

DATUMAHD 1:250@A1

50517019 - C12 6

G.J. 23/12/2016

J.H. 23/12/2016

RIC 23/12/2016

J.H. 23/12/2016

M.P. 23/12/2016

Designed

© Cardno Limited All Rights Reserved.This document is produced by Cardno Limited solely for the

benefit of and use by the client in accordance with theterms of the retainer. Cardno Limited does not and shall notassume any responsibility or liability whatsoever to any thirdparty arising out of any use or reliance by third party on the

content of this document.

®

Cardno (NSW/ACT) Pty Ltd | ABN 95 001 145 035Level 2, 14 Wormald Street

Symonston ACT 2609Tel: 02 6112 4500 Fax: 02 6112 4599

Web: www.cardno.com.au1 23/12/2016 90% DOCUMENTATION G.J. RIC J.H.2 17/03/2017 FINAL SUBMISSION G.J. RIC J.H.3 25/10/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.4 6/11/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.5 20/05/2019 ROAD RE-ALIGNMENT RIC P.D.J. S.A.S.6 25/06/2019 TREE AMENDED P.D.J. RIC S.A.S. FOR APPROVAL

NOT TO BE USED FOR CONSTRUCTION PURPOSES

NORTH

Page 38: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

>>>>>>>>>>>>>

>>

>

>

>>>>>>>>>>>>>

>>

>>

>>>>

>

>>>>

>>>

>

>

>>> >>>>>>>>>>>>>>>>>>>>>>>>>>>>

>

>

>>>>>>>>>>>>>>>

>>

>>

>>

>>>>>>>>>>>>>>>>>>>>>>

>>

>>

>>

>>>>>>>>>

>>

>

>>>

>>

>>>>

>

> >>

>>>

>>

>>

505.0

505.0

505.0

505.5

505.5

505.5

505.5 505.5

505.5

505.5

505.5

505.5

505.5

505.5

506.0

506.0

506.0

506.0

506.0

506.0

506.5

506.5

506.5

506.5

506.5

506.5

506.5

506.5

507.0

507.0

507.0

507.0

507.0

507.0

507.5

507.5

507.5507.5

507.5

507.5

508.0

508.0

508.0

508.5

508.5

508.5 509.0

509.0

509.0

509.5

509.5

509.5

505.5

506.0

506.5 507.0 507.5

508.0

508.5

509.0

509.5

MC10

PROPERTY BOUNDARY

PROPERTY BOUNDARY

PROPERTY BOUNDARY

PROPERTY BOUNDARY

3DP253853

1DP1211587

MAINTAIN EXISTING TAIL-OUTDRAINS WHERE POSSIBLE(TYPICAL)

REGRADE LOCALLY AROUNDHEADWALL AND CONSTRUCT 1m3 OFD50 Ø300 ROCK RIPRAP AT INLETEXHUME EXISTING Ø450

STORMWATER PIPE CAREFULLYFOR POSSIBLE REUSE.

ROADSIDE PULL OVER AREA

480.000

500.000

520.000

540.000

560.000

580.000

600.000

620.000

640.000

660.000

680.000

CT 491.492

L=45.724 TC 537.216

R=280.000L=74.503

CT 611.719(2x)Ø375

C.01

C.02

PIT SCHEDULEPit INLET OUTLET PITName TYPE EASTING NORTHING DIA INV LEV DIA INV LEV SETOUT RL REMARKSA.01 HW525INLET 644667.574 6147376.334 525 497.810 498.600

A.02 HW525 644664.327 6147367.130 525 497.690 498.204setout level to pit sumplevel

B.01 HW375INLET 644646.219 6147403.729 (3x)375 498.500 498.578

B.02 HW375 644640.702 6147397.210 (3x)375 498.400 499.150setout level to pit sumplevel

C.01 HW375INLET 644394.946 6147668.179 (2x)375 504.997 505.295

C.02 HW375 644389.976 6147661.234 (2x)375 504.970 504.598setout level to pit sumplevel

D.01 HW375INLET 644130.326 6148008.038 (2x)375 520.559 520.995

D.02 HW375 644122.747 6148004.104 (2x)375 520.517 520.517setout level to pit sumplevel

WHITEFIELDS ROAD

86

106HBT110

REFE

R DR

G No

5051

7019

- C1

4

REFE

R DR

G No

5051

7019

- C1

2

KEY PLANNTS

50517019-C1650517019-C15

50517019-C1450517019-C12

50517019-C10

50517019-C13

50517019-C11 0 15105

SCALE 1:250

20 25m

@A1

DateRev. Verif. Appd.

Scale

Status

Client

XREF

's: X

-DES

CONT

250;

XRF

CONT

ROL M

AIN

250;

X-CV

T-26

04_D

T1; X

-SW

-ROU

GH A

S GU

TS; X

-DES

IGN;

X-Y

ASS-

BASE

; X-S

URVC

ONT2

50; X

-S D

ESIG

N BD

Y; X

ref-t

rees

; X-T

REE

FOR

GOLD

WIN

D

Drawing Number Revision

DATE

PLO

TTED

: 26 J

une 2

019 4

:05 P

M BY

: MEH

UL V

AIDY

A

Des.

Size

Project

Title

Drawn Date

Checked

Date

Date

DateVerified

Approved

Description

A1

CAD

File:

N:\P

rojec

ts\50

5\FY1

7\019

_YAS

S VA

LLEY

WIN

D FA

RM\D

rawi

ngs\B

uild\5

0517

019-

C10-

C16-

GA.dw

g

GOLDWIND AUSTRALIAYASS VALLEY WIND FARMACCESS ROAD IMPROVEMENTS AT WHITEFIELDS ROAD AND HUME HIGHWAY, BERREMANGRA - CIVIL WORKS

GENERAL ARRANGEMENT - SHEET 4 OF 7

DATUMAHD 1:250@A1

50517019 - C13 6

G.J. 23/12/2016

J.H. 23/12/2016

RIC 23/12/2016

J.H. 23/12/2016

M.P. 23/12/2016

Designed

© Cardno Limited All Rights Reserved.This document is produced by Cardno Limited solely for the

benefit of and use by the client in accordance with theterms of the retainer. Cardno Limited does not and shall notassume any responsibility or liability whatsoever to any thirdparty arising out of any use or reliance by third party on the

content of this document.

®

Cardno (NSW/ACT) Pty Ltd | ABN 95 001 145 035Level 2, 14 Wormald Street

Symonston ACT 2609Tel: 02 6112 4500 Fax: 02 6112 4599

Web: www.cardno.com.au1 23/12/2016 90% DOCUMENTATION G.J. RIC J.H.2 17/03/2017 FINAL SUBMISSION G.J. RIC J.H.3 25/10/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.4 6/11/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.5 20/05/2019 ROAD RE-ALIGNMENT RIC P.D.J. S.A.S.6 25/06/2019 TREE AMENDED P.D.J. RIC S.A.S. FOR APPROVAL

NOT TO BE USED FOR CONSTRUCTION PURPOSES

NORTH

Page 39: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>

>>

>

>>>>>>>>>>>

>>

>>>>>>>>>>

>>

>>

>>>>>>>>>>>>>>>

>>

>

>

>>>>>>>>>>>>

>

>

>>>>>>>>

>>>>>>>>>>>>>>>>>>>>>>

509.5

509.5

509.5

510.0

510.0

510.0

510.5

510.5

510.5

510.5

511.0

511.0

511.0511.5

511.5

511.5

512.0

512.0

512.0

512.5

512.5

512.5

512.5

513.0

513.0

513.0

513.0

513.5513.5

513.5

514.0

514.0

514.0

514.5

514.5

514.5

514.5

515.0

515.0

515.0

515.5

515.5

515.5

515.5

515.5

516.0

516.0

516.0

516.0

516.5

516.5

516.5

517.0

517.0

509.5

510.0

510.5

511.0

511.5

512.0

512.5

513.0

513.5

514.0

514.5

515.0

515.5

516.0

516.5

517.0

MC10

3DP253853

1DP1211587

PROPERTY BOUNDARY

PROPERTY BOUNDARY

PROPERTY BOUNDARY

MAINTAIN EXISTING TAIL-OUTDRAINS WHERE POSSIBLE(TYPICAL)

PROPERTY BOUNDARY

ROADSIDE PULL OVER AREA

ROADSIDE PULL OVER AREA

680.000

700.000

720.000

740.000

760.000

780.000

800.000

820.000

840.000

860.000

L=289.242WHITEFIELDS ROAD

HBT

HBT110

REFE

R DR

G No

5051

7019

- C1

5

REFE

R DR

G No

5051

7019

- C1

3

KEY PLANNTS

50517019-C1650517019-C15

50517019-C1450517019-C12

50517019-C10

50517019-C13

50517019-C110 15105

SCALE 1:250

20 25m

@A1

DateRev. Verif. Appd.

Scale

Status

Client

XREF

's: X

-DES

CONT

250;

XRF

CONT

ROL M

AIN

250;

X-CV

T-26

04_D

T1; X

-SW

-ROU

GH A

S GU

TS; X

-DES

IGN;

X-Y

ASS-

BASE

; X-S

URVC

ONT2

50; X

-S D

ESIG

N BD

Y; X

ref-t

rees

; X-T

REE

FOR

GOLD

WIN

D

Drawing Number Revision

DATE

PLO

TTED

: 26 J

une 2

019 4

:05 P

M BY

: MEH

UL V

AIDY

A

Des.

Size

Project

Title

Drawn Date

Checked

Date

Date

DateVerified

Approved

Description

A1

CAD

File:

N:\P

rojec

ts\50

5\FY1

7\019

_YAS

S VA

LLEY

WIN

D FA

RM\D

rawi

ngs\B

uild\5

0517

019-

C10-

C16-

GA.dw

g

GOLDWIND AUSTRALIAYASS VALLEY WIND FARMACCESS ROAD IMPROVEMENTS AT WHITEFIELDS ROAD AND HUME HIGHWAY, BERREMANGRA - CIVIL WORKS

GENERAL ARRANGEMENT - SHEET 5 OF 7

DATUMAHD 1:250@A1

50517019 - C14 6

G.J. 23/12/2016

J.H. 23/12/2016

RIC 23/12/2016

J.H. 23/12/2016

M.P. 23/12/2016

Designed

© Cardno Limited All Rights Reserved.This document is produced by Cardno Limited solely for the

benefit of and use by the client in accordance with theterms of the retainer. Cardno Limited does not and shall notassume any responsibility or liability whatsoever to any thirdparty arising out of any use or reliance by third party on the

content of this document.

®

Cardno (NSW/ACT) Pty Ltd | ABN 95 001 145 035Level 2, 14 Wormald Street

Symonston ACT 2609Tel: 02 6112 4500 Fax: 02 6112 4599

Web: www.cardno.com.au1 23/12/2016 90% DOCUMENTATION G.J. RIC J.H.2 17/03/2017 FINAL SUBMISSION G.J. RIC J.H.3 25/10/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.4 6/11/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.5 20/05/2019 ROAD RE-ALIGNMENT RIC P.D.J. S.A.S.6 25/06/2019 TREE AMENDED P.D.J. RIC S.A.S. FOR APPROVAL

NOT TO BE USED FOR CONSTRUCTION PURPOSES

NORTH

Page 40: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

>

>

>>>>>>

>

>>

>>

>>

>>

>>

>>

>>>>>

>>>>>>>

>>

>>

>

>>>>>>>>>>>>>>>>>>>>>

>>

>

>>

>

>>>

>>

>>

>

>>

>>>

>>

>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>

>>>>>>>>>

>>>>>>>>>

>

>

>

517.0

517.5

517.5

517.5

518.0

518.0 518.0

518.0518.5

518.5

518.5

519.0

519.0

519.0

519.0

519.5

519.5

519.5

520.0

520.0

520.5

520.5

520.5

521.0

521.0

521.0 521.5

521.5

521.5

522.0

522.0

522.0

522.0

522.5

522.5

522.5

522.5

523.0

523.0

523.0

523.0

523.0

523.0

523.5

523.5

523.5

523.5

524.0

524.0

524.0

524.0

524.0

524.0

524.5

524.5

524.5

524.5

525.0

525.0 525.5

525.5

526.0

526.0

526.5527.0

517.5

518.0

518.5

519.0 519.5 520.0 520.5 521.0 521.5

522.0

523.5

525.0

525.5

522.5

523.0

524.0

524.5

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

MC10

MC50

PROPERTY BOUNDARY

PROPERTY BOUNDARY

1DP1211587

344DP753595

3DP253853

PROPERTY BOUNDARY

PROPERTY BOUNDARY

MAINTAIN EXISTING TAIL-OUTDRAINS WHERE POSSIBLE(TYPICAL)

REMOVE EXISTING FENCEAND CONSTRUCT NEWALIGNMENT AS SHOWN

PROPERTY BOUNDARY

LIMIT OF WORKS.MATCH SMOOTHLY TO EXISTING

880.000

900.000

920.000

940.000 960.000

980.000

1000.000

1020.000

1040.000

1060.000

0.000

L=3.682

TC 3.682

R=12.000L=7.504

CT 11.186

L=26.939

38.125

20.000

TC 900.961

R=310.000L=81.701

CT 982.662

L=160.672

(2x)Ø375

D.01

D.02

INSTALL STOCK GATE IN EXISTINGFENCE LINE. LOCALLY REGRADETO PROVIDE PROPERTY ACCESS

INSTALL STOCK GATE IN EXISTINGFENCE LINE. LOCALLY REGRADETO PROVIDE PROPERTY ACCESS

WHITEFIELDS ROAD

WIND FARM ACCESS

WHITEFIELDS ROAD

115

REFE

R DR

G No

5051

7019

- C1

6

REFE

R DR

G No

5051

7019

- C1

4

KEY PLANNTS

50517019-C1650517019-C15

50517019-C1450517019-C12

50517019-C10

50517019-C13

50517019-C11 0 15105

SCALE 1:250

20 25m

@A1

DateRev. Verif. Appd.

Scale

Status

Client

XREF

's: X

-DES

CONT

250;

XRF

CONT

ROL M

AIN

250;

X-CV

T-26

04_D

T1; X

-SW

-ROU

GH A

S GU

TS; X

-DES

IGN;

X-Y

ASS-

BASE

; X-S

URVC

ONT2

50; X

-S D

ESIG

N BD

Y; X

ref-t

rees

; X-T

REE

FOR

GOLD

WIN

D

Drawing Number Revision

DATE

PLO

TTED

: 26 J

une 2

019 4

:05 P

M BY

: MEH

UL V

AIDY

A

Des.

Size

Project

Title

Drawn Date

Checked

Date

Date

DateVerified

Approved

Description

A1

CAD

File:

N:\P

rojec

ts\50

5\FY1

7\019

_YAS

S VA

LLEY

WIN

D FA

RM\D

rawi

ngs\B

uild\5

0517

019-

C10-

C16-

GA.dw

g

GOLDWIND AUSTRALIAYASS VALLEY WIND FARMACCESS ROAD IMPROVEMENTS AT WHITEFIELDS ROAD AND HUME HIGHWAY, BERREMANGRA - CIVIL WORKS

GENERAL ARRANGEMENT - SHEET 6 OF 7

DATUMAHD 1:250@A1

50517019 - C15 6

G.J. 23/12/2016

J.H. 23/12/2016

RIC 23/12/2016

J.H. 23/12/2016

M.P. 23/12/2016

Designed

© Cardno Limited All Rights Reserved.This document is produced by Cardno Limited solely for the

benefit of and use by the client in accordance with theterms of the retainer. Cardno Limited does not and shall notassume any responsibility or liability whatsoever to any thirdparty arising out of any use or reliance by third party on the

content of this document.

®

Cardno (NSW/ACT) Pty Ltd | ABN 95 001 145 035Level 2, 14 Wormald Street

Symonston ACT 2609Tel: 02 6112 4500 Fax: 02 6112 4599

Web: www.cardno.com.au1 23/12/2016 90% DOCUMENTATION G.J. RIC J.H.2 17/03/2017 FINAL SUBMISSION G.J. RIC J.H.3 25/10/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.4 6/11/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.5 22/03/2019 2 STOCK GATES ADDED AT CH 940 RIC RIC S.A.S.6 20/05/2019 ROAD RE-ALIGNMENT RIC P.D.J. S.A.S.6 25/06/2019 TREE AMENDED P.D.J. RIC S.A.S. FOR APPROVAL

NOT TO BE USED FOR CONSTRUCTION PURPOSES

NORTH

6

Page 41: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

> > > > > > >

> > >

>>>>>>>>>>

>>

>>

>>>>>>>

>>

>

>

>

>

>>>>>

>>

> > > > > >

>>

>>>>>>>>>>>

>>>>>>>>>

>>

>>>>>>>>>>>>>>>>>>>

524.5525.0

525.0

525.0

525.0

525.5

525.5525.5

526.0

526.0

526.0

526.0

526.0

526.0

526.5

526.5

526.5

526.5

526.5

526.5

527.0

527.0

527.0

527.0

527.0

527.0

527.0

527.0

527.0

527.0

527.5

527.5

527.5

527.5

527.5

527.5

527.5

527.5

527.5

527.5

528.0

528.0

528.0

528.0

528.0

528.0

528.0

528.0

528.0

528.0

528.0

528.5

528.5

528.5

528.5

528.5

528.5

528.5

528.5

528.5

528.5

528.5

529.0

529.0

529.0

529.0

529.0

529.0

529.0

529.0

529.0

529.0529.5

529.5

529.5

529.5

529.5

529.5

529.5

529.5

530.0

530.0

530.0

530.0

530.0

530.0

530.0

530.5

530.5

530.5

530.5

530.5

530.5531.0

531.0

531.0531.0

531.0

531.5

531.5

531.5

531.5

532.0

532.0

532.0

532.5

532.5

533.0

530.0

525.5

526.0

526.5

527.0

527.5

528.0

528.5

529.0

529.5

529.5

530.0

XX

XX

XX

XX

XX

XX

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

WHITEFIELDS ROAD

MC10

HBTS

HBT

HBT

HBT

HBT

MC20

X

XX

XX

XX

XX

XX

XX

XX

344DP753595

2DP1211587

2DP1211587

PROPERTY BOUNDARY

ACCESS ROAD TO WINDFARM WITHIN PROPERTYBOUNDARY (BY OTHERS)

CONNECT TOEXISTING FENCE

PROPERTY BOUNDARY

PROPERTY BOUNDARY

PROPERTY BOUNDARY

LIMIT OF WORKSINSTALL CATTLE GRIDAND GATE. FINAL LOCATION TO BECONFIRMED BY PROPERTY OWNER

PROPERTY BOUNDARY

REMOVE EXISTING FENCEAND CONSTRUCT NEWALIGNMENT AS SHOWN

REMOVE EXISTING FENCEAND CONSTRUCT NEWALIGNMENT AS SHOWN

RELOCATE EXISTING CATTLE GRID AND GATE.RECONSTRUCT ACCESS TRACKAFTER REMOVAL REFER PAVEMENT PLAN FORDETAILS

INSTALL CORNER POST ANDCONNECT NEW FENCE

MC40

INSTALL NEW FENCE POST

INSTALL NEW FENCE POST

MATCH TO EXISTING PROPERTYENTRTY ROAD

MATCH TO EXISTING PROPERTYENTRTY ROAD

C

0.000

L=37.752

TC 37.752

R=119.675L=48.126

20.000

40.000

60.000

0.000L=9.904

L=13.113

23.017

20.000

1060.000

1080.000

1100.000

1120.000

1140.000

1160.000

1180.000

1200.000

1220.000

1240.000

1260.000

CREST 1162.884

L=160.672

TC 1143.334

R=300.000L=120.174

CT 1263.509

L=7.311

1270.819

PIT SCHEDULEPit INLET OUTLET PITName TYPE EASTING NORTHING DIA INV LEV DIA INV LEV SETOUT RL REMARKSA.01 HW525INLET 644667.574 6147376.334 525 497.810 498.600

A.02 HW525 644664.327 6147367.130 525 497.690 498.204setout level to pit sumplevel

B.01 HW375INLET 644646.219 6147403.729 (3x)375 498.500 498.578

B.02 HW375 644640.702 6147397.210 (3x)375 498.400 499.150setout level to pit sumplevel

C.01 HW375INLET 644394.946 6147668.179 (2x)375 504.997 505.295

C.02 HW375 644389.976 6147661.234 (2x)375 504.970 504.598setout level to pit sumplevel

D.01 HW375INLET 644130.326 6148008.038 (2x)375 520.559 520.995

D.02 HW375 644122.747 6148004.104 (2x)375 520.517 520.517setout level to pit sumplevel

WHITEFIELDS ROAD

REFE

R DR

G No

5051

7019

- C1

5

KEY PLANNTS

50517019-C1650517019-C15

50517019-C1450517019-C12

50517019-C10

50517019-C13

50517019-C11

0 15105

SCALE 1:250

20 25m

@A1

DateRev. Verif. Appd.

Scale

Status

Client

XREF

's: X

-DES

CONT

250;

XRF

CONT

ROL M

AIN

250;

X-CV

T-26

04_D

T1; X

-SW

-ROU

GH A

S GU

TS; X

-DES

IGN;

X-Y

ASS-

BASE

; X-S

URVC

ONT2

50; X

-S D

ESIG

N BD

Y; X

ref-t

rees

; X-T

REE

FOR

GOLD

WIN

D

Drawing Number Revision

DATE

PLO

TTED

: 26 J

une 2

019 4

:05 P

M BY

: MEH

UL V

AIDY

A

Des.

Size

Project

Title

Drawn Date

Checked

Date

Date

DateVerified

Approved

Description

A1

CAD

File:

N:\P

rojec

ts\50

5\FY1

7\019

_YAS

S VA

LLEY

WIN

D FA

RM\D

rawi

ngs\B

uild\5

0517

019-

C10-

C16-

GA.dw

g

GOLDWIND AUSTRALIAYASS VALLEY WIND FARMACCESS ROAD IMPROVEMENTS AT WHITEFIELDS ROAD AND HUME HIGHWAY, BERREMANGRA - CIVIL WORKS

GENERAL ARRANGEMENT - SHEET 7 OF 7

DATUMAHD 1:250@A1

50517019 - C16 5

G.J. 23/12/2016

J.H. 23/12/2016

RIC 23/12/2016

J.H. 23/12/2016

M.P. 23/12/2016

Designed

© Cardno Limited All Rights Reserved.This document is produced by Cardno Limited solely for the

benefit of and use by the client in accordance with theterms of the retainer. Cardno Limited does not and shall notassume any responsibility or liability whatsoever to any thirdparty arising out of any use or reliance by third party on the

content of this document.

®

Cardno (NSW/ACT) Pty Ltd | ABN 95 001 145 035Level 2, 14 Wormald Street

Symonston ACT 2609Tel: 02 6112 4500 Fax: 02 6112 4599

Web: www.cardno.com.au1 23/12/2016 90% DOCUMENTATION G.J. RIC J.H.2 17/03/2017 FINAL SUBMISSION G.J. RIC J.H.3 25/10/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.4 6/11/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.5 20/05/2019 ROAD RE-ALIGNMENT RIC P.D.J. S.A.S.

FOR APPROVALNOT TO BE USED FOR CONSTRUCTION PURPOSES

NORTH

6

Page 42: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

CH. 5

.000

CH. 1

0.000

CH. 1

0.845

CH. 1

5.000

CH. 2

0.000

CH. 2

5.000

CH. 2

7.255

CH. 3

0.000

CH. 3

5.000

CH. 3

6.186

CH. 6

9.708

CH. 1

29.87

8

CH. 2

09.47

6

RL. 4

98.24

6m

RL. 4

98.07

6mRL

. 498

.037m

RL. 4

97.79

1m

RL. 4

97.64

1m

RL. 4

97.51

4mRL

. 497

.459m

RL. 4

97.40

5m

RL. 4

97.38

8mRL

. 497

.384m

RL. 4

97.31

8m

RL. 4

99.17

7m

RL. 4

99.57

5m

SAG

CH.43

.130

RL. 4

97.37

4m

L=60.339 L=60.000 L=80.000VERT. ALIGNMENTG=-1.98%

G=-3.41%

G=-4.60%

G=-5.93%

G=-2.99%

G=-2.54%

G=-2.45%

G=-1.96%

G=-0.34%

G=-0.33%

G=-0.20%

G=3.09%

G=0.50%

G=3.18%L=5.00 L=5.00L=0.84L=4.16L=5.00 L=5.00L=2.25L=2.75L=5.00L=1.19L=3.35 L=9.60 L=112.40K=18.4 K=23.2 K=29.9

R=-40.000 R=-150.000 R=-660.000HORIZ. ALIGNMENT T=10.845 T=8.931 T=67.641 T=161.887

0.000

498.3

4649

8.346

5.000

498.2

4649

8.246

10.00

049

8.076

498.0

7610

.845

498.0

3749

8.037

15.00

049

7.791

497.7

91

20.00

049

7.641

497.6

41

25.00

049

7.514

497.5

1427

.255

497.4

5949

7.459

30.00

049

7.405

497.4

05

35.00

049

7.388

497.3

8836

.186

497.3

8449

7.384

39.53

849

7.377

497.3

7740

.000

497.3

7749

7.377

43.13

049

7.374

497.3

74

60.00

049

7.538

497.4

51

69.70

849

7.680

497.5

66

80.00

049

7.837

497.7

44

99.57

049

8.320

498.2

4199

.878

498.3

2949

8.250

100.0

0049

8.333

498.2

54

120.0

0049

8.895

498.7

84

129.8

7849

8.918

498.9

83

140.0

0049

8.947

499.1

42

159.8

7849

9.107

499.3

2716

0.000

499.1

0749

9.327

167.2

1149

9.111

499.3

6316

9.476

499.1

1449

9.375

180.0

0049

9.169

499.4

46

200.0

0049

9.464

499.6

83

209.4

7649

9.621

499.8

42

218.8

3549

9.760

500.0

2922

0.000

499.7

7950

0.054

240.0

0050

0.153

500.5

59

249.4

7650

0.401

500.8

45

260.0

0050

0.721

501.1

79

280.0

0050

1.453

501.8

14

300.0

0050

2.126

502.4

50

320.0

0050

2.754

503.0

85

CHAINAGE

EXISTING LEVELS

DESIGN LEVELS

DATUM R.L. 494.000

LONGITUDINAL SECTION CONTROL MC10H 1:500V 1:100

496.0

496.0

497.0

497.0

497.0

497.0

497.0

497.0

497.0

497.0

497.0

498.0

498.0 498.0

498.0

498.0

498.0

498.0

498.0

498.0

498.0

498.0

498.0 498.0

498.0

498.0

498.0

498.0

499.0 499.0

499.0

499.0

499.0

499.0499.0

499.0

499.0

500.0

500.0

500.0

500.0

501.0

501.0

501.0

502.0

502.0

502.0

503.0

503.0

503.0PROPERTY

BOUNDARY

PROPERTY BOUNDARY

MATCH SMOOTHLY TORMS DESIGN

HUME HIGHWAY

HUME HIGHWAY

PROPERTY BOUNDARY

3DP253853

7306DP1153126

PROPERTY BOUNDARY

PROPERTY BOUNDARY

WHITEFIELDS ROAD

STORMWATER CULVERTREFER DRG C11 FOR DETAILS

STORMWATER CULVERTREFER DRG C11 FOR DETAILS

MC10

40.000

60.000 80.000

100.000

120.000

140.000

160.000

180.000

200.000

220.000

240.000

260.000

280.000

300.000

320.000

340.000

20.000

PLANSCALE 1:500

REFE

R DR

G No

5051

7019

- C2

1

JOIN LINE REFER

DRG No 50517019-C23

30

6

40

8

50m

10m

H:

V:SCALE: H:1:500 V:1:100

100

0 2

20

4@A1

DateRev. Verif. Appd.

Scale

Status

Client

XREF

's: X

-YAS

S-BA

SE; X

-CHA

IN50

0; X-

DESI

GN; X

-DES

CONT

250;

X-SW

-ROU

GH A

S GU

TS; L

S-MC

10-0

1; X-

CVT-

2604

_DT1

; X-S

URVC

ONT5

00; X

-S D

ESIG

N BD

Y

Drawing Number Revision

DATE

PLO

TTED

: 25 J

une 2

019 1

0:06 A

M BY

: MEH

UL V

AIDY

A

Des.

Size

Project

Title

Drawn Date

Checked

Date

Date

DateVerified

Approved

Description

A1

CAD

File:

N:\P

rojec

ts\50

5\FY1

7\019

_YAS

S VA

LLEY

WIN

D FA

RM\D

rawi

ngs\B

uild\5

0517

019-

C20-

C23-

SO-L

S.dw

g

GOLDWIND AUSTRALIAYASS VALLEY WIND FARMACCESS ROAD IMPROVEMENTS AT WHITEFIELDS ROAD AND HUME HIGHWAY, BERREMANGRA - CIVIL WORKS

PLAN AND LONG SECTION (MC10) - SHEET 1 OF 4

DATUMAHD AS SHOWN

50517019 - C20 5

G.J. 23/12/2016

J.H. 23/12/2016

RIC 23/12/2016

J.H. 23/12/2016

M.P. 23/12/2016

Designed

© Cardno Limited All Rights Reserved.This document is produced by Cardno Limited solely for the

benefit of and use by the client in accordance with theterms of the retainer. Cardno Limited does not and shall notassume any responsibility or liability whatsoever to any thirdparty arising out of any use or reliance by third party on the

content of this document.

®

Cardno (NSW/ACT) Pty Ltd | ABN 95 001 145 035Level 2, 14 Wormald Street

Symonston ACT 2609Tel: 02 6112 4500 Fax: 02 6112 4599

Web: www.cardno.com.au1 23/12/2016 90% DOCUMENTATION G.J. RIC J.H.2 17/03/2017 FINAL SUBMISSION G.J. RIC J.H.3 25/10/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.4 6/11/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.5 21/05/2019 ROAD RE-ALIGNMENT RIC P.D.J. S.A.S.

FOR APPROVALNOT TO BE USED FOR CONSTRUCTION PURPOSES

NORTH

Page 43: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

CH. 3

91.88

0

CH. 5

07.26

0

RL. 5

05.36

8m

RL. 5

05.13

7m

CRES

T CH

. 418

.326

RL. 5

05.31

1m

SAG

CH.43

7.238

RL.

505.2

92m

L=60.000 L=170.000 L=114.117VERT. ALIGNMENT G=3.18%

G=-0.20%

G=2.07%L=112.40 L=0.38K=17.8 K=74.9 K=44.0

R=-400.000 R=-400.000 R=280.000HORIZ. ALIGNMENT T=161.887 T=39.732 T=45.724 T=289.242

320.0

0050

2.754

503.0

85

340.0

0050

3.309

503.7

20

360.0

0050

3.868

504.3

5536

1.880

503.9

5350

4.415

380.0

0050

4.714

504.8

9838

0.722

504.7

3850

4.913

391.8

8050

4.972

505.1

15

400.0

0050

5.037

505.2

17

418.3

2650

5.060

505.3

1142

0.000

505.0

6450

5.311

421.8

8050

5.068

505.3

0842

2.260

505.0

6950

5.307

425.6

6650

5.078

505.3

01

437.2

3850

5.057

505.2

9244

0.000

505.0

4850

5.293

460.0

0050

5.041

505.3

27

465.3

9850

5.068

505.3

45

480.0

0050

5.246

505.4

14

491.4

9250

5.474

505.4

89

500.0

0050

5.528

505.5

55

507.2

6050

5.428

505.6

19

520.0

0050

5.287

505.7

49

537.2

1650

5.545

505.9

5954

0.000

505.5

6250

5.997

560.0

0050

5.851

506.2

98

580.0

0050

6.240

506.6

53

592.2

6050

6.508

506.8

96

600.0

0050

6.644

507.0

64

611.7

1950

6.968

507.3

42

620.0

0050

7.144

507.5

58

640.0

0050

7.646

508.1

44

CHAINAGE

EXISTING LEVELS

DESIGN LEVELS

DATUM R.L. 500.000

LONGITUDINAL SECTION CONTROL MC10H 1:500V 1:100

503.0

503.0

503.0

504.0

504.0 505.0

505.0

505.0

505.0

505.0

505.0

505.0

505.0

505.0

505.0

505.0505.0

505.0 505.0

505.0

506.0

506.0

506.0

506.0

507.0

507.0

507.0

507.0

507.0

508.0

508.0

1DP1211587

PROPERTY BOUNDARY

WHITEFIELDS ROAD

3

PROPERTY BOUNDARY

STORMWATER CULVERT REFERDRG C13 FOR DETAILS

MC10

PROPERTY BOUNDARY

300.000

320.000

340.000

360.000

380.000

400.000

420.000

440.000

460.000

480.000

500.000

520.000

540.000

560.000

580.000

600.000

620.000

640.000

660.000

REFE

R DR

G No

5051

7019

- C2

0

JOIN LINE REFER

DRG No 50517019-C22

PLANSCALE 1:500

REFE

R DR

G No

5051

7019

- C2

2

JOIN LINE REFER

DRG No 50517019-C23

30

6

40

8

50m

10m

H:

V:SCALE: H:1:500 V:1:100

100

0 2

20

4@A1

DateRev. Verif. Appd.

Scale

Status

Client

XREF

's: X

-YAS

S-BA

SE; X

-CHA

IN50

0; X-

DESI

GN; X

-DES

CONT

250;

X-SW

-ROU

GH A

S GU

TS; L

S-MC

10-0

1; X-

CVT-

2604

_DT1

; X-S

URVC

ONT5

00; X

-S D

ESIG

N BD

Y

Drawing Number Revision

DATE

PLO

TTED

: 25 J

une 2

019 1

0:06 A

M BY

: MEH

UL V

AIDY

A

Des.

Size

Project

Title

Drawn Date

Checked

Date

Date

DateVerified

Approved

Description

A1

CAD

File:

N:\P

rojec

ts\50

5\FY1

7\019

_YAS

S VA

LLEY

WIN

D FA

RM\D

rawi

ngs\B

uild\5

0517

019-

C20-

C23-

SO-L

S.dw

g

GOLDWIND AUSTRALIAYASS VALLEY WIND FARMACCESS ROAD IMPROVEMENTS AT WHITEFIELDS ROAD AND HUME HIGHWAY, BERREMANGRA - CIVIL WORKS

PLAN AND LONG SECTION (MC10) - SHEET 2 OF 4

DATUMAHD AS SHOWN

50517019 - C21 5

G.J. 23/12/2016

J.H. 23/12/2016

RIC 23/12/2016

J.H. 23/12/2016

M.P. 23/12/2016

Designed

© Cardno Limited All Rights Reserved.This document is produced by Cardno Limited solely for the

benefit of and use by the client in accordance with theterms of the retainer. Cardno Limited does not and shall notassume any responsibility or liability whatsoever to any thirdparty arising out of any use or reliance by third party on the

content of this document.

®

Cardno (NSW/ACT) Pty Ltd | ABN 95 001 145 035Level 2, 14 Wormald Street

Symonston ACT 2609Tel: 02 6112 4500 Fax: 02 6112 4599

Web: www.cardno.com.au1 23/12/2016 90% DOCUMENTATION G.J. RIC J.H.2 17/03/2017 FINAL SUBMISSION G.J. RIC J.H.3 25/10/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.4 6/11/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.5 21/05/2019 ROAD RE-ALIGNMENT RIC P.D.J. S.A.S.

FOR APPROVALNOT TO BE USED FOR CONSTRUCTION PURPOSES

NORTH

Page 44: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

CH. 6

49.31

9

CH. 7

70.33

2

CH. 8

74.56

8

RL. 5

08.07

8m

RL. 5

13.72

4m

RL. 5

17.32

8m

L=114.117 L=60.000 L=140.000VERT. ALIGNMENTG=4.67%

G=3.46%

G=5.00%

L=33.95 L=4.24 L=19.80K=44.0 K=49.7 K=90.8

R=310.000HORIZ. ALIGNMENT T=289.242

640.0

0050

7.646

508.1

44

649.3

1950

8.314

508.4

48

660.0

0050

8.898

508.8

21

680.0

0050

9.926

509.5

88

700.0

0051

0.765

510.4

47

706.3

7751

1.006

510.7

40

720.0

0051

1.620

511.3

76

740.0

0051

2.227

512.3

0974

0.332

512.2

3551

2.324

760.0

0051

2.831

513.2

03

770.3

3251

3.219

513.6

33

780.0

0051

3.771

514.0

17

800.0

0051

4.601

514.7

5080

0.332

514.6

1351

4.761

804.5

6851

4.751

514.9

08

820.0

0051

5.308

515.4

54

840.0

0051

6.020

516.2

02

860.0

0051

6.631

516.9

94

874.5

6851

7.257

517.5

98

880.0

0051

7.471

517.8

29

900.0

0051

8.515

518.7

0990

0.961

518.5

5451

8.752

920.0

0051

9.399

519.6

33

940.0

0052

0.566

520.6

01

944.5

6852

0.854

520.8

28

960.0

0052

1.654

521.6

00

CHAINAGE

EXISTING LEVELS

DESIGN LEVELS

DATUM R.L. 504.000

LONGITUDINAL SECTION CONTROL MC10H 1:500V 1:100

507.0

507.0

508.0

508.0 509.0

509.0

510.0

510.0

511.0

511.0

512.0

512.0513.0

513.0

513.0514.0

514.0

515.0

515.0

516.0

516.0 517.0

517.0

518.0

518.0

518.0

519.0

519.0

519.0

520.0

520.0 521.0

521.0

522.0

522.0

522.0

523.0

1DP1211587

PROPERTY BOUNDARYWHITEFIELDS LANE

MC10

PROPERTY BOUNDARY

PROPERTY BOUNDARY

620.000

640.000

660.000

680.000

700.000

720.000

740.000

760.000

780.000

800.000

820.000

840.000

860.000

880.000

900.000

920.000

940.000

960.000 980.000 1000.000

STORMWATERCULVERT REFER DRGC15 FOR DETAILS

REFE

R DR

G No

5051

7019

- C2

1

JOIN

LINE

REF

ER

DRG

No 50

5170

19-C

22JOIN LINE REFER

DRG No 50517019-C21

PLANSCALE 1:500

REFE

R DR

G No

5051

7019

- C2

3

30

6

40

8

50m

10m

H:

V:SCALE: H:1:500 V:1:100

100

0 2

20

4@A1

DateRev. Verif. Appd.

Scale

Status

Client

XREF

's: X

-YAS

S-BA

SE; X

-CHA

IN50

0; X-

DESI

GN; X

-DES

CONT

250;

X-SW

-ROU

GH A

S GU

TS; L

S-MC

10-0

1; X-

CVT-

2604

_DT1

; X-S

URVC

ONT5

00; X

-S D

ESIG

N BD

Y

Drawing Number Revision

DATE

PLO

TTED

: 25 J

une 2

019 1

0:07 A

M BY

: MEH

UL V

AIDY

A

Des.

Size

Project

Title

Drawn Date

Checked

Date

Date

DateVerified

Approved

Description

A1

CAD

File:

N:\P

rojec

ts\50

5\FY1

7\019

_YAS

S VA

LLEY

WIN

D FA

RM\D

rawi

ngs\B

uild\5

0517

019-

C20-

C23-

SO-L

S.dw

g

GOLDWIND AUSTRALIAYASS VALLEY WIND FARMACCESS ROAD IMPROVEMENTS AT WHITEFIELDS ROAD AND HUME HIGHWAY, BERREMANGRA - CIVIL WORKS

PLAN AND LONG SECTION (MC10) - SHEET 3 OF 4

DATUMAHD AS SHOWN

50517019 - C22 5

G.J. 23/12/2016

J.H. 23/12/2016

RIC 23/12/2016

J.H. 23/12/2016

M.P. 23/12/2016

Designed

© Cardno Limited All Rights Reserved.This document is produced by Cardno Limited solely for the

benefit of and use by the client in accordance with theterms of the retainer. Cardno Limited does not and shall notassume any responsibility or liability whatsoever to any thirdparty arising out of any use or reliance by third party on the

content of this document.

®

Cardno (NSW/ACT) Pty Ltd | ABN 95 001 145 035Level 2, 14 Wormald Street

Symonston ACT 2609Tel: 02 6112 4500 Fax: 02 6112 4599

Web: www.cardno.com.au1 23/12/2016 90% DOCUMENTATION G.J. RIC J.H.2 17/03/2017 FINAL SUBMISSION G.J. RIC J.H.3 25/10/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.4 6/11/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.5 21/05/2019 ROAD RE-ALIGNMENT RIC P.D.J. S.A.S.

FOR APPROVALNOT TO BE USED FOR CONSTRUCTION PURPOSES

NORTH

Page 45: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

CH11

77.52

7RL

530.1

45MC

20CH

1174

.434

RL53

0.202

MC40

CH10

16RL

523.9

95MC

50

CH. 9

94.36

6

CH. 1

060.1

22

CH. 1

152.8

10

RL. 5

23.31

8m

RL. 5

25.40

7m

RL. 5

30.96

9m

CRES

T CH

. 116

2.884

RL.

530.2

96m

L=60.000 L=60.000 L=65.000VERT. ALIGNMENTG=5.00%

G=3.18%

G=6.00%

G=-3.16%L=19.80 L=5.76 L=30.19 L=85.51K=32.9 K=21.3 K=7.1

R=310.000 R=300.000HORIZ. ALIGNMENT T=160.672 T=7.311

960.0

0052

1.654

521.6

00

964.3

6652

1.869

521.8

18

980.0

0052

2.197

522.5

6298

2.662

522.4

8252

2.682

994.3

6652

2.723

523.1

81

1000

.000

522.6

8152

3.407

1020

.000

523.8

3552

4.130

1024

.366

524.0

0652

4.271

1030

.122

524.2

2252

4.454

1040

.000

524.5

9052

4.791

1060

.000

525.3

8652

5.613

1060

.122

525.3

9152

5.619

1080

.000

526.4

5352

6.624

1090

.122

527.0

4552

7.207

1100

.000

527.6

4252

7.800

1120

.000

528.9

0552

9.000

1120

.310

528.9

2552

9.019

1140

.000

529.8

7452

9.927

1143

.334

530.0

0653

0.027

1152

.810

530.2

0853

0.224

1160

.000

530.2

4653

0.290

1162

.884

530.2

4053

0.296

1180

.000

529.9

4653

0.089

1185

.310

529.7

2052

9.941

1200

.000

529.2

1552

9.477

1220

.000

528.5

5852

8.845

1240

.000

527.9

3552

8.213

1260

.000

527.4

0852

7.581

1263

.509

527.2

9752

7.470

1270

.819

527.1

2852

7.239

CHAINAGE

EXISTING LEVELS

DESIGN LEVELS

DATUM R.L. 518.000

LONGITUDINAL SECTION CONTROL MC10H 1:500V 1:100

520.0 521.0

521.0522.0

522.0

522.0

523.0

523.0523.0

523.0

524.0

524.0

524.0

524.0

525.0

525.0

525.0

525.0

525.0

525.0

526.0

526.0

526.0

526.0

526.0

526.0527.0

527.0

527.0

527.0

527.0

527.0

527.0

528.0

528.0

528.0

528.0

528.0

528.0

528.0

528.0

529.0

529.0

529.0

529.0

529.0

529.0

529.0

530.0

530.0

530.0

530.0

530.0

531.0

531.0

531.0

532.0

532.0

533.0

344DP753595

2DP1211587

WHITEFIELDS RD

2DP1211587

PROPERTY BOUNDARY

PROPERTY BOUNDARY

PROPERTY BOUNDARY

PROPERTY BOUNDARYMC10

MC20

WHITEFIELDS ROAD

LIMIT OF WORKSFUTURE GRAVELROAD BY OTHERS

MATCH TOEXISTING

MC50

20.000

40.000

60.000

80.000

20.000

940.000

960.000

980.000

1000.000

1020.000

1040.000

1060.000

1080.000

1100.000

1120.000

1140.000

1160.000

1180.000 1200.000 1220.000

1240.000

1260.000

0.000

L=3.682

TC 3.682

R=12.000

L=7.504

CT 11.186

L=26.939

38.125

20.000

MC40

STORMWATERCULVERT REFER DRGC15 FOR DETAILS

MATCH TOEXISTING

REFE

R DR

G No

5051

7019

- C2

2

JOIN

LINE

REF

ER

DRG

No 50

5170

19-C

22

PLANSCALE 1:500

30

6

40

8

50m

10m

H:

V:SCALE: H:1:500 V:1:100

100

0 2

20

4@A1

DateRev. Verif. Appd.

Scale

Status

Client

XREF

's: X

-YAS

S-BA

SE; X

-CHA

IN50

0; X-

DESI

GN; X

-DES

CONT

250;

X-SW

-ROU

GH A

S GU

TS; L

S-MC

10-0

1; X-

CVT-

2604

_DT1

; X-S

URVC

ONT5

00; X

-S D

ESIG

N BD

Y

Drawing Number Revision

DATE

PLO

TTED

: 25 J

une 2

019 1

0:07 A

M BY

: MEH

UL V

AIDY

A

Des.

Size

Project

Title

Drawn Date

Checked

Date

Date

DateVerified

Approved

Description

A1

CAD

File:

N:\P

rojec

ts\50

5\FY1

7\019

_YAS

S VA

LLEY

WIN

D FA

RM\D

rawi

ngs\B

uild\5

0517

019-

C20-

C23-

SO-L

S.dw

g

GOLDWIND AUSTRALIAYASS VALLEY WIND FARMACCESS ROAD IMPROVEMENTS AT WHITEFIELDS ROAD AND HUME HIGHWAY, BERREMANGRA - CIVIL WORKS

PLAN AND LONG SECTION (MC10) - SHEET 4 OF 4

DATUMAHD AS SHOWN

50517019 - C23 5

G.J. 23/12/2016

J.H. 23/12/2016

RIC 23/12/2016

J.H. 23/12/2016

M.P. 23/12/2016

Designed

© Cardno Limited All Rights Reserved.This document is produced by Cardno Limited solely for the

benefit of and use by the client in accordance with theterms of the retainer. Cardno Limited does not and shall notassume any responsibility or liability whatsoever to any thirdparty arising out of any use or reliance by third party on the

content of this document.

®

Cardno (NSW/ACT) Pty Ltd | ABN 95 001 145 035Level 2, 14 Wormald Street

Symonston ACT 2609Tel: 02 6112 4500 Fax: 02 6112 4599

Web: www.cardno.com.au1 23/12/2016 90% DOCUMENTATION G.J. RIC J.H.2 17/03/2017 FINAL SUBMISSION G.J. RIC J.H.3 25/10/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.4 6/11/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.5 21/05/2019 ROAD RE-ALIGNMENT RIC P.D.J. S.A.S.

FOR APPROVALNOT TO BE USED FOR CONSTRUCTION PURPOSES

NORTH

Page 46: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

CH. 3

.922

CH. 1

1.717

RL. 5

30.23

1m

RL. 5

30.09

4m

CRES

T CH

. 1.59

2 RL

. 530

.217m

L=7.844 L=7.744VERT. ALIGNMENTG=0.45%

G=-1.76%

G=-1.80%

L=0.10K=3.5 K=236.1

R=-8.000HORIZ. ALIGNMENT

0.000

530.1

6153

0.214

1.592

530.1

5253

0.217

3.922

530.1

2053

0.210

7.844

530.0

2053

0.162

11.71

752

9.879

530.0

93

15.58

952

9.945

530.0

2415

.689

529.9

4653

0.022

CHAINAGE

EXISTING LEVELS

DESIGN LEVELS

DATUM R.L. 527.000

LONGITUDINAL SECTION CONTROL MK01H 1:250V 1:50

530.0

529.5

530.0

MC20

MATCH TOEXISTING

MC10

MATCH TOEXISTING

MK04

MK03MK02

MK01

MC40

0.000

R=-8.000

15.689

3.0006.000

9.000

12.000

15.000

C

CREST 1.592

0.000R=-1

0.000

11.65

9

3.0006.0009.0

00

S

SAG 7.075

0.000

R=-7.500

14.010

3.000

6.000

9.000

12.000

0.000

R=-8.000

10.343

3.0006.000 9.000C

CREST 5.568

0.000

R=-1.000

2.947C

CREST 0.148

MK07

MATCH TOEXISTING

C

0.000

L=37.752

TC 37.752

20.000

40.000

0.000

L=9.904L=13.113

23.017

20.000

1160.000

1180.000

1200.000

1220.000

CREST 1162.884 R=300.000L=120.174

CH. 2

.915

CH. 8

.744

RL. 5

30.35

1m

RL. 5

30.34

1m

SAG

CH.7.

075

RL. 5

30.34

5m

L=5.8

29

L=5.8

29VERT. ALIGNMENTG=-2.52%

G=-0.16%

G=0.60%

K=2.5 K=7.7

R=-10.000HORIZ. ALIGNMENT

0.000

530.4

2453

0.424

2.915

530.3

6153

0.368

5.829

530.2

9453

0.346

7.075

530.2

8953

0.345

8.744

530.2

8853

0.347

11.65

953

0.326

530.3

59

CHAINAGE

EXISTING LEVELS

DESIGN LEVELS

DATUM R.L. 527.000

LONGITUDINAL SECTION CONTROL MK02H 1:250V 1:50

CH. 3

.503

CH. 1

0.508

RL. 5

29.97

6m

RL. 5

30.36

3m

L=7.005 L=7.005VERT. ALIGNMENTG=3.16%

G=5.53%

G=3.13%

K=3.0 K=2.9

R=-7.500HORIZ. ALIGNMENT

0.000

529.6

4352

9.865

3.503

529.7

8852

9.996

7.005

529.9

7953

0.169

10.50

853

0.250

530.3

42

14.01

053

0.443

530.4

72

CHAINAGE

EXISTING LEVELS

DESIGN LEVELS

DATUM R.L. 527.000

LONGITUDINAL SECTION CONTROL MK03H 1:250V 1:50

CH. 2

.586

CH. 7

.757

RL. 5

29.96

3m

RL. 5

29.97

6m

CRES

T CH

. 5.56

8 RL

. 529

.970m

L=5.1

72

L=5.1

72VERT. ALIGNMENTG=5.15%

G=0.25%

G=-3.02%

K=1.1 K=1.6

R=-8.000HORIZ. ALIGNMENT

0.000

529.6

7952

9.829

2.586

529.7

6852

9.931

5.172

529.7

6652

9.969

5.568

529.7

5152

9.970

7.757

529.7

1552

9.954

10.34

352

9.665

529.8

97

CHAINAGE

EXISTING LEVELS

DESIGN LEVELS

DATUM R.L. 527.000

LONGITUDINAL SECTION CONTROL MK04H 1:250V 1:50

CH18

.593

RL53

0.145

MC10

CH. 4

.348

CH. 1

2.045

CH. 1

8.593

CH. 2

2.970

CH. 2

6.323

CH. 3

0.000

CH. 3

2.000

CH. 3

8.000

CH. 4

0.000

RL. 5

29.51

7m

RL. 5

29.99

1m

RL. 5

30.14

5m

RL. 5

30.24

6m

RL. 5

30.37

3mRL

. 530

.473m

RL. 5

30.53

6m

RL. 5

30.72

7mRL

. 530

.811m

L=7.5

00

L=7.5

00

L=3.3

53

L=3.3

53VERT. ALIGNMENTG=1.45%

G=6.16%

G=2.35%

G=2.32%

G=3.79%

G=2.71%

G=3.13%

G=3.20%

G=4.19%

G=4.63%G=4.62%

L=0.60 L=0.20 L=2.80L=2.70 L=2.00L=2.00L=6.00L=2.00L=2.00L=2.00K=1.6 K=2.0 K=2.3K=3.1

R=119.675HORIZ. ALIGNMENT T=37.752 T=3.775

0.000

529.4

5352

9.453

0.598

529.4

6252

9.462

4.348

529.5

1052

9.561

8.098

529.6

3752

9.748

8.295

529.6

4552

9.760

12.04

552

9.776

529.9

5515

.795

529.8

7053

0.079

18.59

352

9.990

530.1

4520

.000

530.0

6753

0.177

21.29

353

0.137

530.2

0722

.970

530.2

2753

0.253

24.64

753

0.303

530.3

1026

.323

530.3

7253

0.369

28.00

053

0.419

530.4

1930

.000

530.4

7353

0.473

32.00

053

0.536

530.5

3637

.752

530.7

1953

0.719

38.00

053

0.727

530.7

2740

.000

530.8

1153

0.811

42.00

053

0.904

530.9

0444

.000

530.9

9653

0.996

46.00

053

1.088

531.0

8848

.000

531.1

8053

1.180

50.00

053

1.271

531.2

7152

.000

531.3

7453

1.374

54.00

053

1.476

531.4

7656

.000

531.5

7553

1.575

58.00

053

1.689

531.6

8960

.000

531.8

1253

1.812

62.00

053

1.926

531.9

2664

.000

532.0

4853

2.048

66.00

053

2.179

532.1

7968

.000

532.3

1453

2.314

70.00

053

2.459

532.4

5972

.000

532.6

0653

2.606

74.00

053

2.752

532.7

5276

.000

532.8

9953

2.899

78.00

053

3.045

533.0

4580

.000

533.2

0053

3.200

82.00

053

3.364

533.3

6484

.000

533.5

2853

3.528

85.87

853

3.679

533.6

7989

.653

533.9

81

CHAINAGE

EXISTING LEVELS

DESIGN LEVELS

DATUM R.L. 526.000

LONGITUDINAL SECTION CONTROL MC20H 1:500V 1:100

MATCH EXISTING

CH23

.017

RL53

0.202

MC10

CH. 1

.000

CH. 2

.000

CH. 5

.328

CH. 2

0.262

RL. 5

29.74

5mRL

. 529

.808m

RL. 5

29.95

8m

RL. 5

30.13

0m

L=6.6

57

VERT. ALIGNMENT G=6.96%G=6.37%

G=4.51%

G=1.15%

G=2.61%

L=1.00L=1.00 L=11.61 L=2.76K=2.0

HORIZ. ALIGNMENT T=9.904 T=13.113

0.000

529.6

7552

9.675

1.000

529.7

4552

9.745

2.000

529.8

0852

9.808

5.328

529.9

5752

9.930

8.657

529.9

2252

9.997

20.00

053

0.077

530.1

2720

.262

530.0

8253

0.130

23.01

753

0.130

530.2

02

CHAINAGE

EXISTING LEVELS

DESIGN LEVELS

DATUM R.L. 526.000

LONGITUDINAL SECTION CONTROL MC40H 1:500V 1:100

PLANSCALE 1:200

30

6

40

8

50m

10m

H:

V:SCALE: H:1:500 V:1:100

100

0 2

20

4@A1

DateRev. Verif. Appd.

Scale

Status

Client

XREF

's: X

-SW

-ROU

GH A

S GU

TS; L

S-MK

01-0

1; LS

-MK0

2-01

; LS-

MK03

-01;

LS-M

K04-

01; L

S-MC

20-0

1; X-

YASS

-BAS

E; X

-CVT

-260

4_DT

1; XR

F CO

NTRO

L KR

250;

X-DE

SCON

T250

; LS-

MC40

-01;

X-DE

SIGN

; XRF

CON

TROL

MAI

N 25

0; LS

-MC5

0-01

; LS-

MK50

-01;

LS-M

K51-

01

Drawing Number Revision

DATE

PLO

TTED

: 25 J

une 2

019 1

0:09 A

M BY

: MEH

UL V

AIDY

A

Des.

Size

Project

Title

Drawn Date

Checked

Date

Date

DateVerified

Approved

Description

A1

CAD

File:

N:\P

rojec

ts\50

5\FY1

7\019

_YAS

S VA

LLEY

WIN

D FA

RM\D

rawi

ngs\B

uild\5

0517

019-

C24-

SO-L

S.dw

g

GOLDWIND AUSTRALIAYASS VALLEY WIND FARMACCESS ROAD IMPROVEMENTS AT WHITEFIELDS ROAD AND HUME HIGHWAY, BERREMANGRA - CIVIL WORKS

INTERSECTION PLAN AND LONG SECTION (MC20)SHEET 1 OF 2

DATUMAHD AS SHOWN

50517019 - C24 3

G.J. 23/12/2016

J.H. 23/12/2016

RIC 23/12/2016

J.H. 23/12/2016

M.P. 23/12/2016

Designed

© Cardno Limited All Rights Reserved.This document is produced by Cardno Limited solely for the

benefit of and use by the client in accordance with theterms of the retainer. Cardno Limited does not and shall notassume any responsibility or liability whatsoever to any thirdparty arising out of any use or reliance by third party on the

content of this document.

®

Cardno (NSW/ACT) Pty Ltd | ABN 95 001 145 035Level 2, 14 Wormald Street

Symonston ACT 2609Tel: 02 6112 4500 Fax: 02 6112 4599

Web: www.cardno.com.au1 25/10/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.2 6/11/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.3 21/05/2019 ROAD RE-ALIGNMENT RIC P.D.J. S.A.S.

FOR APPROVALNOT TO BE USED FOR CONSTRUCTION PURPOSES

NORTH

5m

SCALE 1:50

1 2 3 40

@A1

5000

SCALE 1:200

10000 15000 20000mm0

@A1

0 15105

SCALE 1:250

20 25m

@A1

AutoCAD SHX Text
529
Page 47: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

523.5

525.0

525.5

522.5

523.0

524.0

524.5

MC10

MATCH TOEXISTING

R=-460.000

55.434

3.000

6.000

9.000

12.000

15.000

18.000

21.000

24.000

27.000

30.000

33.000

36.000

39.000

42.000

45.000

48.000

51.000

54.000

0.000

R=-1.500

4.472 3.000S

C

SAG

0.357

CREST 4.379

MC50

980.000

1000.000 1020.000 1040.000 1060.000

0.000

L=3.682

TC 3.682

R=12.000L=7.504

CT 11.186

L=26.939

38.125

20.000

CT 982.662

L=160.672

MK51

MK50

CH. 2

.016

CH. 4

.033

CH. 6

.050

CH. 8

.069

CH. 1

0.089

CH. 1

2.110

CH. 1

4.118

CH. 1

6.123

CH. 1

8.129

CH. 2

0.135

CH. 2

2.143

CH. 2

4.125

CH. 2

4.151

CH. 2

6.160

CH. 2

8.169

CH. 3

0.180

CH. 3

2.192

CH. 3

4.204

CH. 3

6.218

CH. 3

8.232

CH. 4

8.495

CH. 5

5.024

RL. 5

22.13

4m

RL. 5

22.22

8m

RL. 5

22.31

9m

RL. 5

22.40

9m

RL. 5

22.49

7m

RL. 5

22.58

3m

RL. 5

22.66

7m

RL. 5

22.75

0m

RL. 5

22.83

2m

RL. 5

22.91

2m

RL. 5

22.99

0m

RL. 5

23.06

6mRL

. 523

.067m

RL. 5

23.14

2m

RL. 5

23.21

6m

RL. 5

23.28

9m

RL. 5

23.36

0m

RL. 5

23.43

0m

RL. 5

23.49

8m

RL. 5

23.56

4m

RL. 5

23.89

6m

RL. 5

24.06

9m

L=13.058VERT. ALIGNMENTG=4.73%

G=4.64%

G=4.54%

G=4.45%

G=4.35%

G=4.26%

G=4.20%

G=4.20%

G=4.13%

G=4.06%

G=3.98%

G=3.91%

G=3.83%

G=3.80%

G=3.76%

G=3.68%

G=3.61%

G=3.53%

G=3.46%

G=3.38%

G=3.31%

G=3.24%

G=2.64%

G=2.66%L=2.02L=2.02L=2.02L=2.02L=2.02L=2.02L=0.27L=1.73L=2.01L=2.01L=2.01L=2.01L=1.98L=0.03L=2.01L=2.01L=2.01L=2.01L=2.01L=2.01L=2.01 L=3.73 L=0.41K=22.0

R=-460.000HORIZ. ALIGNMENT

0.000

521.4

9152

2.039

2.016

521.6

1252

2.134

4.033

521.7

0252

2.228

6.050

521.7

8152

2.319

8.069

521.8

2852

2.409

10.08

952

1.863

522.4

9712

.110

521.8

8452

2.583

12.38

452

1.887

522.5

9514

.118

521.9

1252

2.667

16.12

352

1.996

522.7

5018

.129

522.0

9052

2.832

20.00

052

2.179

522.9

0620

.135

522.1

8552

2.912

22.14

352

2.280

522.9

9024

.125

522.3

7552

3.066

24.15

152

2.376

523.0

6726

.160

522.4

7352

3.142

28.16

952

2.572

523.2

1630

.180

522.6

7252

3.289

32.19

252

2.773

523.3

6034

.204

522.8

6052

3.430

36.21

852

2.946

523.4

9838

.232

523.0

2852

3.564

40.00

052

3.097

523.6

2141

.966

523.1

7252

3.685

48.49

552

3.371

523.8

87

55.02

452

3.511

524.0

6955

.434

523.5

2352

4.080

CHAINAGE

EXISTING LEVELS

DESIGN LEVELS

DATUM R.L. 519.000

LONGITUDINAL SECTION CONTROL MK50H 1:250V 1:50

CH. 1

.193

CH. 3

.379

RL. 5

24.30

6m

RL. 5

24.48

6mCR

EST

CH. 4

.379

RL. 5

24.48

6m

SAG

CH.0.

357

RL. 5

24.31

3mL=

2.000

L=2.0

00

VERT. ALIGNMENTG=-0.73%

G=8.20%

G=0.00%

L=0.19L=0.19L=0.09K=0.2 K=0.2

R=-1.500HORIZ. ALIGNMENT

0.000

523.7

0152

4.315

0.193

523.6

9152

4.314

0.357

523.6

8052

4.313

1.193

523.6

5052

4.329

2.193

523.9

5952

4.388

2.379

524.0

2552

4.404

3.379

524.3

6952

4.465

4.379

524.3

8752

4.486

4.472

524.3

8552

4.486

CHAINAGE

EXISTING LEVELS

DESIGN LEVELS

DATUM R.L. 521.000

LONGITUDINAL SECTION CONTROL MK51H 1:250V 1:50

CH0

RL52

3.995

MC10

CH. 7

.306

CH. 1

6.165

CH. 3

3.957

RL. 5

24.01

5m

RL. 5

24.25

0m

RL. 5

24.33

9m

L=8.0

00

L=8.0

00

L=8.0

00VERT. ALIGNMENTG=0.28%

G=2.66%

G=0.50%

G=3.09%L=3.31 L=0.86 L=9.79 L=0.17K=3.4 K=3.7 K=3.1

R=12.000HORIZ. ALIGNMENT T=3.682 T=26.939

0.000

523.6

7952

3.995

3.306

523.6

2352

4.004

3.682

523.5

3852

4.005

7.306

523.3

1852

4.039

11.18

652

3.546

524.1

1811

.306

523.5

5152

4.121

12.16

552

3.590

524.1

4416

.165

523.7

6952

4.229

20.00

052

3.896

524.2

6920

.165

523.9

0252

4.270

29.95

752

4.216

524.3

1933

.957

524.3

3952

4.365

37.95

752

4.463

524.4

6338

.125

524.4

6852

4.468

CHAINAGE

EXISTING LEVELS

DESIGN LEVELS

DATUM R.L. 520.000

LONGITUDINAL SECTION CONTROL MC50H 1:500V 1:100PLAN

SCALE 1:500

DateRev. Verif. Appd.

Scale

Status

Client

XREF

's: X

-SW

-ROU

GH A

S GU

TS; L

S-MK

01-0

1; LS

-MK0

2-01

; LS-

MK03

-01;

LS-M

K04-

01; L

S-MC

20-0

1; X-

YASS

-BAS

E; X

-CVT

-260

4_DT

1; XR

F CO

NTRO

L KR

250;

X-DE

SCON

T250

; LS-

MC40

-01;

X-DE

SIGN

; XRF

CON

TROL

MAI

N 25

0; LS

-MC5

0-01

; LS-

MK50

-01;

LS-M

K51-

01

Drawing Number Revision

DATE

PLO

TTED

: 25 J

une 2

019 1

0:10 A

M BY

: MEH

UL V

AIDY

A

Des.

Size

Project

Title

Drawn Date

Checked

Date

Date

DateVerified

Approved

Description

A1

CAD

File:

N:\P

rojec

ts\50

5\FY1

7\019

_YAS

S VA

LLEY

WIN

D FA

RM\D

rawi

ngs\B

uild\5

0517

019-

C24-

SO-L

S.dw

g

GOLDWIND AUSTRALIAYASS VALLEY WIND FARMACCESS ROAD IMPROVEMENTS AT WHITEFIELDS ROAD AND HUME HIGHWAY, BERREMANGRA - CIVIL WORKS

INTERSECTION PLAN AND LONG SECTION (MC30)SHEET 2 OF 2

DATUMAHD AS SHOWN

50517019 - C25 3

G.J. 23/12/2016

J.H. 23/12/2016

RIC 23/12/2016

J.H. 23/12/2016

M.P. 23/12/2016

Designed

© Cardno Limited All Rights Reserved.This document is produced by Cardno Limited solely for the

benefit of and use by the client in accordance with theterms of the retainer. Cardno Limited does not and shall notassume any responsibility or liability whatsoever to any thirdparty arising out of any use or reliance by third party on the

content of this document.

®

Cardno (NSW/ACT) Pty Ltd | ABN 95 001 145 035Level 2, 14 Wormald Street

Symonston ACT 2609Tel: 02 6112 4500 Fax: 02 6112 4599

Web: www.cardno.com.au1 25/10/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.2 6/11/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.3 21/05/2019 ROAD RE-ALIGNMENT RIC P.D.J. S.A.S.

FOR APPROVALNOT TO BE USED FOR CONSTRUCTION PURPOSES

NORTH

30

6

40

8

50m

10m

H:

V:SCALE: H:1:500 V:1:100

100

0 2

20

4@A1

5m

SCALE 1:50

1 2 3 40

@A1

5000

SCALE 1:200

10000 15000 20000mm0

@A1

0 15105

SCALE 1:250

20 25m

@A1

Page 48: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

MC10

CE10

MC10 44.397

0.5%

-3.75

749

7.401

049

7.401

-3.74

249

7.401

0.007

497.3

94

0.000

497.3

73-0

.002

497.3

74

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 496.0

MC10

ES10

CE10

CE1I

ES1I

MC10 60

2:1 -3% -0.2%

-3.44

949

7.586

049

7.586

-3.00

049

7.554

0.193

497.3

61-2

.500

497.4

970.1

2149

7.376

0.000

497.5

380.0

8649

7.451

2.500

497.4

39-0

.007

497.4

462.7

0849

7.446

049

7.446

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 496.0

MC10

ES10

CE10

CE1I

ES1I

MC10 80

2:1 -3% 1.4%

-5.36

349

7.775

049

7.775

-5.00

049

7.773

0.179

497.5

94

-2.50

049

7.753

0.084

497.6

69

0.000

497.8

370.0

9349

7.744

2.500

497.6

35-0

.144

497.7

792.8

8349

7.784

049

7.784

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 496.0

MC10

ES10

CE10

CE1I

ES1I

MC10 99.57

2:1 -3% 3%

-3.40

449

8.353

049

8.353

-3.00

049

8.318

0.168

498.1

51-2

.500

498.1

890.0

2349

8.166

0.000

498.3

20.0

7949

8.241

2.500

498.1

61-0

.155

498.3

162.9

5649

8.329

049

8.329

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 496.0

MC10

ES10

CE10

CE1I

ES1I

MC10 99.878

2:1 -3% 2.9%

-3.41

049

8.365

049

8.365

-3.00

049

8.326

0.166

498.1

60-2

.500

498.1

970.0

2249

8.175

0.000

498.3

290.0

7949

8.250

2.500

498.1

65-0

.158

498.3

232.9

6849

8.337

049

8.337

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 496.0

MC10

A

ES10

CE10

CE1I

ES1I

MC10 120

-3% -3%

-3.19

149

8.689

-049

8.689

-2.50

049

8.927

0.218

498.7

09

0.000

498.8

950.1

149

8.784

2.500

498.9

060.1

9649

8.709

3.000

498.4

77-0

.218

498.6

94

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 497.0

MC10

ES10

CE10

CE1I

ES1I

MC10 140

-4:1 -3% -3%

-4.29

449

8.729

049

8.729

-3.00

049

8.948

-0.10

449

9.052

-2.50

049

8.844

-0.22

349

9.067

0.000

498.9

47-0

.195

499.1

42

2.500

499.0

4-0

.027

499.0

673.0

0049

9.094

0.042

499.0

523.1

0849

9.106

049

9.106

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 497.0

MC10

ES10

CE10

CE1I

ES1I

MC10 159.878

-4:1 -3% -3% -4:1

-4.01

949

8.982

049

8.982

-3.00

049

8.788

-0.44

949

9.237

-2.50

049

8.984

-0.26

849

9.252

0.000

499.1

07-0

.2249

9.327

2.500

498.9

12-0

.339

499.2

523.0

0049

9.017

-0.22

499.2

373.4

1449

9.133

049

9.133

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 497.0

MC10

ES10

CE10

CE1I

ES1I

MC10 167.211

-4:1 -3% -3%

-3.94

849

9.036

049

9.036

-3.00

049

8.971

-0.30

349

9.273

-2.50

049

9.054

-0.23

549

9.288

0.000

499.1

11-0

.252

499.3

63

2.500

499.1

8-0

.108

499.2

883.0

0049

9.261

-0.01

349

9.273

3.028

499.2

660

499.2

66

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 497.0

© Cardno Limited All Rights Reserved.This document is produced by Cardno Limited solely for the

benefit of and use by the client in accordance with theterms of the retainer. Cardno Limited does not and shall notassume any responsibility or liability whatsoever to any thirdparty arising out of any use or reliance by third party on the

content of this document.

®

Cardno (NSW/ACT) Pty Ltd | ABN 95 001 145 035Level 2, 14 Wormald Street

Symonston ACT 2609Tel: 02 6112 4500 Fax: 02 6112 4599

Web: www.cardno.com.au1 23/12/2016 90% DOCUMENTATION G.J. RIC J.H.2 17/03/2017 FINAL SUBMISSION G.J. RIC J.H.3 17/05/2017 AMENDED DRAWING CROSS-SECTION 1 OF 8 G.J. RIC J.H.4 25/10/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.4 6/11/2018 ROAD RE-ALIGNMENT P.D.J. RIC5 22/05/2019 ROAD RE-ALIGNMENT RIC P.D.J. S.A.S.

DateRev. Verif. Appd.

Scale

Status

Client

XREF

's: X

S-MC

10

Drawing Number Revision

DATE

PLO

TTED

: 25 J

une 2

019 1

0:10 A

M BY

: MEH

UL V

AIDY

A

Des.

Size

Project

Title

Drawn Date

Checked

Date

Date

DateVerified

Approved

Description

A1

CAD

File:

N:\P

rojec

ts\50

5\FY1

7\019

_YAS

S VA

LLEY

WIN

D FA

RM\D

rawi

ngs\B

uild\5

0517

019-

C30-

C37-

XS.dw

g

GOLDWIND AUSTRALIAYASS VALLEY WIND FARMACCESS ROAD IMPROVEMENTS AT WHITEFIELDS ROAD AND HUME HIGHWAY, BERREMANGRA - CIVIL WORKS

CROSS SECTIONSWHITEFIELDS RD (MC10) - SHEET 1 OF 10

DATUMAHD 1:100@A1

50517019 - C30 5

G.J. 23/12/2016

J.H. 23/12/2016

RIC 23/12/2016

J.H. 23/12/2016

M.P. 23/12/2016

Designed FOR APPROVALNOT TO BE USED FOR CONSTRUCTION PURPOSES

2 4 6 8 10m0

SCALE: 1:100 @A1

Page 49: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

MC10

ES10

CE10

CE1I

ES1I

MC10 169.476

-4:1 -3% -3%

-3.48

249

9.164

049

9.164

-3.00

049

9.018

-0.26

749

9.285

-2.50

049

9.009

-0.29

149

9.300

0.000

499.1

14-0

.2649

9.375

2.500

499.2

02-0

.097

499.3

003.0

0049

9.322

0.037

499.2

853.1

0549

9.337

049

9.337

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 497.0

MC10

ES10

CE10

CE1I

ES1I

MC10 180

-3% -3%

-3.13

049

9.339

049

9.339

-3.07

149

9.202

-0.15

249

9.354

-2.50

049

9.127

-0.24

449

9.371

0.000

499.1

69-0

.277

499.4

46

2.500

499.2

34-0

.137

499.3

713.0

0049

9.358

0.002

499.3

563.0

1149

9.362

049

9.362

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 498.0

MC10

ES10

CE10

CE1I

ES1I

MC10 200

-3% -3% 2:1

-3.48

849

9.579

049

9.579

-2.50

049

9.454

-0.15

449

9.608

0.000

499.4

64-0

.219

499.6

83

2.500

499.6

330.0

2449

9.608

3.000

499.7

110.1

1849

9.593

3.350

499.7

680

499.7

68

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 498.0

MC10

DW10

ES10

CE10

CE1I

ES1I

MC10 218.835

-4:1 -3% -3%

-3.68

949

9.766

049

9.766

-3.00

049

9.801

-0.13

849

9.939

-2.50

049

9.819

-0.13

549

9.954

0.000

499.7

6-0

.268

500.0

29

2.500

500.0

60.1

0649

9.954

3.000

500.0

530.1

1449

9.939

3.170

500.0

240

500.0

24

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 498.0

MC10

DW10

ES10

CE10

CE1I

ES1I

MC10 240

-6.8:1 -3% -3%

-4.54

250

0.241

050

0.241

-3.00

050

0.268

-0.20

150

0.469

-2.50

050

0.28

-0.20

450

0.484

0.000

500.1

53-0

.406

500.5

59

2.500

500.6

630.1

7950

0.484

3.000

500.5

80.1

1150

0.469

3.166

500.5

520

500.5

52

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 499.0

MC10

DW10

ES10

CE10

CE1I

ES1I

MC10 249.476

-7.2:1 -3% -3% 2:1

-4.80

350

0.503

050

0.503

-3.00

050

0.541

-0.21

450

0.755

-2.50

050

0.554

-0.21

650

0.770

0.000

500.4

01-0

.444

500.8

45

2.500

500.9

930.2

2350

0.770

4.095

500.8

540.1

3250

0.722

4.360

500.8

540

500.8

54

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 499.0

MC10

DW10

ES10

CE10

CE1I

ES1I

MC10 260

-6.5:1 -3% -3% 2:1

-4.79

350

0.812

050

0.812

-3.00

050

0.875

-0.21

450

1.089

-2.50

050

0.889

-0.21

550

1.104

0.000

500.7

21-0

.459

501.1

79

2.500

501.3

60.2

5650

1.104

5.000

501.1

920.1

6250

1.029

5.329

501.1

940

501.1

94

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 499.0

MC10

DW10

ES10

CE10

CE1I

ES1I

MC10 280

-4.7:1 -3% -3% 2:1

-4.15

350

1.479

050

1.479

-3.00

050

1.513

-0.21

250

1.724

-2.50

050

1.531

-0.20

850

1.739

0.000

501.4

53-0

.361

501.8

14

2.500

502.0

160.2

7650

1.739

3.000

502.1

340.4

150

1.724

3.526

501.9

870

501.9

87

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 500.0

MC10

DW10

ES10

CE10

CE1I

ES1I

MC10 300

-3.3:1 -3% -3% 2:1

-3.67

450

2.153

050

2.153

-3.00

050

2.16

-0.2

502.3

60-2

.500

502.1

75-0

.250

2.375

0.000

502.1

26-0

.323

502.4

50

2.500

502.5

170.1

4250

2.375

3.000

502.6

780.3

1850

2.360

3.512

502.6

150

502.6

15

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 500.0

© Cardno Limited All Rights Reserved.This document is produced by Cardno Limited solely for the

benefit of and use by the client in accordance with theterms of the retainer. Cardno Limited does not and shall notassume any responsibility or liability whatsoever to any thirdparty arising out of any use or reliance by third party on the

content of this document.

®

Cardno (NSW/ACT) Pty Ltd | ABN 95 001 145 035Level 2, 14 Wormald Street

Symonston ACT 2609Tel: 02 6112 4500 Fax: 02 6112 4599

Web: www.cardno.com.au1 23/12/2016 90% DOCUMENTATION G.J. RIC J.H.2 17/03/2017 FINAL SUBMISSION G.J. RIC J.H.3 17/05/2017 AMENDED DRAWING CROSS-SECTION 2 OF 8 G.J. RIC J.H.4 25/10/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.4 6/11/2018 ROAD RE-ALIGNMENT P.D.J. RIC5 22/05/2019 ROAD RE-ALIGNMENT RIC P.D.J. S.A.S.

DateRev. Verif. Appd.

Scale

Status

Client

XREF

's: X

S-MC

10

Drawing Number Revision

DATE

PLO

TTED

: 25 J

une 2

019 1

0:10 A

M BY

: MEH

UL V

AIDY

A

Des.

Size

Project

Title

Drawn Date

Checked

Date

Date

DateVerified

Approved

Description

A1

CAD

File:

N:\P

rojec

ts\50

5\FY1

7\019

_YAS

S VA

LLEY

WIN

D FA

RM\D

rawi

ngs\B

uild\5

0517

019-

C30-

C37-

XS.dw

g

GOLDWIND AUSTRALIAYASS VALLEY WIND FARMACCESS ROAD IMPROVEMENTS AT WHITEFIELDS ROAD AND HUME HIGHWAY, BERREMANGRA - CIVIL WORKS

CROSS SECTIONSWHITEFIELDS RD (MC10) - SHEET 2 OF 10

DATUMAHD 1:100@A1

50517019 - C31 5

G.J. 23/12/2016

J.H. 23/12/2016

RIC 23/12/2016

J.H. 23/12/2016

M.P. 23/12/2016

Designed FOR APPROVALNOT TO BE USED FOR CONSTRUCTION PURPOSES

2 4 6 8 10m0

SCALE: 1:100 @A1

Page 50: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

MC10

DW10

ES10

CE10

CE1I

ES1I

MC10 320

-3.3:1 -3% -3% 2:1

-3.83

950

2.738

050

2.738

-3.00

050

2.795

-0.2

502.9

95-2

.500

502.8

15-0

.195

503.0

10

0.000

502.7

54-0

.331

503.0

85

2.500

503.0

960.0

8650

3.010

3.000

503.1

960.2

0250

2.995

3.401

503.1

950

503.1

95

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 501.0

MC10

DW10

ES10

CE10

CE1I

ES1I

MC10 340

2:1 -3:1 -3% -3% 2:1

-7.03

450

3.837

050

3.837

-5.90

050

3.879

0.609

503.2

70

-5.00

050

3.735

0.165

503.5

70

-2.50

050

3.333

-0.31

250

3.645

0.000

503.3

09-0

.411

503.7

20

2.500

503.7

340.0

8950

3.645

3.000

503.8

520.2

2250

3.630

3.417

503.8

390

503.8

39

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 502.0

MC10

ES10

CE10

CE1I

ES1I

MC10 361.88

-3% -3% -4:1

-4.12

850

4.291

050

4.291

-2.50

050

4.015

-0.32

550

4.340

0.000

503.9

53-0

.462

504.4

15

2.500

504.2

95-0

.045

504.3

403.0

0050

4.239

-0.08

650

4.325

3.512

504.1

970

504.1

97

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 502.0

MC10

ES10

CE10

CE1I

ES1I

MC10 380.722

-3% -3% 2:1-3

.514

504.8

080

504.8

08

-2.50

050

4.639

-0.2

504.8

38

0.000

504.7

38-0

.175

504.9

13

2.500

504.9

990.1

650

4.838

3.000

505.1

260.3

0250

4.823

3.620

505.1

330

505.1

33

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 503.0

MC10

ES10

CE10

CE1I

ES1I

MC10 400

-3% -3%

-3.00

050

4.939

-0.18

750

5.127

-2.50

050

4.96

-0.18

250

5.142

0.000

505.0

37-0

.1850

5.217

2.500

505.1

06-0

.036

505.1

423.0

0050

5.177

0.05

505.1

273.1

3950

5.196

050

5.196

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 503.0

MC10

ES10

CE10

CE1I

ES1I

MC10 418.326

-3% -3%

-3.00

050

4.929

-0.29

250

5.221

-2.50

050

4.956

-0.28

505.2

36

0.000

505.0

6-0

.251

505.3

11

2.500

505.0

32-0

.205

505.2

363.0

0050

5.217

-0.00

450

5.221

3.009

505.2

190

505.2

19

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 503.0

MC10

ES10

CE10

CE1I

ES1I

MC10 421.88

-3% -3%

-3.00

050

4.89

-0.32

750

5.218

-2.50

050

4.927

-0.30

650

5.233

0.000

505.0

68-0

.2450

5.308

2.500

505.0

2-0

.212

505.2

333.0

0050

5.242

0.024

505.2

183.0

4650

5.241

050

5.241

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 503.0

MC10

ES10

CE10

CE1I

ES1I

MC10 422.26

-3% -3%

-3.00

050

4.892

-0.32

550

5.217

-2.50

050

4.926

-0.30

650

5.232

0.000

505.0

69-0

.238

505.3

07

2.500

505.0

13-0

.218

505.2

323.0

0050

5.247

0.03

505.2

173.0

5850

5.246

050

5.246

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 503.0

MC10

ES10

CE10

CE1I

ES1I

MC10 425.666

-3% -3%

-3.00

050

4.91

-0.30

150

5.211

-2.50

050

4.918

-0.30

850

5.226

0.000

505.0

78-0

.223

505.3

01

2.500

504.9

6-0

.266

505.2

263.0

0050

5.269

0.058

505.2

113.1

1250

5.267

050

5.267

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 503.0

© Cardno Limited All Rights Reserved.This document is produced by Cardno Limited solely for the

benefit of and use by the client in accordance with theterms of the retainer. Cardno Limited does not and shall notassume any responsibility or liability whatsoever to any thirdparty arising out of any use or reliance by third party on the

content of this document.

®

Cardno (NSW/ACT) Pty Ltd | ABN 95 001 145 035Level 2, 14 Wormald Street

Symonston ACT 2609Tel: 02 6112 4500 Fax: 02 6112 4599

Web: www.cardno.com.au1 23/12/2016 90% DOCUMENTATION G.J. RIC J.H.2 17/03/2017 FINAL SUBMISSION G.J. RIC J.H.3 17/05/2017 AMENDED DRAWING CROSS-SECTION 3 OF 8 G.J. RIC J.H.4 25/10/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.4 6/11/2018 ROAD RE-ALIGNMENT P.D.J. RIC5 22/05/2019 ROAD RE-ALIGNMENT RIC P.D.J. S.A.S.

DateRev. Verif. Appd.

Scale

Status

Client

XREF

's: X

S-MC

10

Drawing Number Revision

DATE

PLO

TTED

: 25 J

une 2

019 1

0:10 A

M BY

: MEH

UL V

AIDY

A

Des.

Size

Project

Title

Drawn Date

Checked

Date

Date

DateVerified

Approved

Description

A1

CAD

File:

N:\P

rojec

ts\50

5\FY1

7\019

_YAS

S VA

LLEY

WIN

D FA

RM\D

rawi

ngs\B

uild\5

0517

019-

C30-

C37-

XS.dw

g

GOLDWIND AUSTRALIAYASS VALLEY WIND FARMACCESS ROAD IMPROVEMENTS AT WHITEFIELDS ROAD AND HUME HIGHWAY, BERREMANGRA - CIVIL WORKS

CROSS SECTIONSWHITEFIELDS RD (MC10) - SHEET 3 OF 10

DATUMAHD 1:100@A1

50517019 - C32 5

G.J. 23/12/2016

J.H. 23/12/2016

RIC 23/12/2016

J.H. 23/12/2016

M.P. 23/12/2016

Designed FOR APPROVALNOT TO BE USED FOR CONSTRUCTION PURPOSES

2 4 6 8 10m0

SCALE: 1:100 @A1

Page 51: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

MC10

ES10

CE10

CE1I

ES1I

MC10 437.238

-3% -3%

-3.00

050

5.138

-0.06

450

5.202

-2.50

050

4.914

-0.30

350

5.217

0.000

505.0

57-0

.235

505.2

92

2.500

504.9

87-0

.2350

5.217

3.000

505.1

83-0

.019

505.2

023.0

4950

5.19

050

5.190

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 503.0

MC10

ES10

CE10

CE1I

ES1I

MC10 440

-3% -3%

-3.00

050

4.988

-0.21

550

5.203

-2.50

050

4.942

-0.27

650

5.218

0.000

505.0

48-0

.244

505.2

93

2.500

504.9

81-0

.237

505.2

183.0

0050

5.16

-0.04

350

5.203

3.117

505.1

730

505.1

73

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 503.0

MC10

ES10

CE10

CE1I

ES1I

MC10 460

-3% -3% -4:1

-3.00

050

5.07

-0.16

650

5.237

-2.50

050

5.071

-0.18

150

5.252

0.000

505.0

41-0

.286

505.3

27

2.500

504.9

91-0

.2650

5.252

3.000

505.0

03-0

.234

505.2

373.5

7550

5.093

050

5.093

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 503.0

MC10

ES10

CE10

CE1I

ES1I

MC10 465.398

-3% -3% -4:1

-3.00

050

5.017

-0.23

850

5.255

-2.50

050

5.048

-0.22

250

5.270

0.000

505.0

68-0

.277

505.3

45

2.500

505.0

42-0

.228

505.2

703.0

0050

5.02

-0.23

550

5.255

3.596

505.1

060

505.1

06

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 503.0

MC10

ES10

CE10

CE1I

ES1I

MC10 480

-3% -3% -4:1

-3.00

050

5.18

-0.14

450

5.324

-2.50

050

5.247

-0.09

250

5.339

0.000

505.2

46-0

.169

505.4

14

2.500

505.2

74-0

.065

505.3

393.0

0050

5.257

-0.06

750

5.324

3.307

505.2

470

505.2

47

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 503.0

MC10

ES10

CE10

CE1I

ES1I

MC10 491.492

-3% -3%

-3.00

050

5.338

-0.06

505.3

99-2

.500

505.4

170.0

0350

5.414

0.000

505.4

74-0

.015

505.4

89

2.500

505.4

460.0

3350

5.414

3.000

505.4

250.0

2750

5.399

3.050

505.4

230

505.4

23

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 503.0

MC10

ES10

CE10

CE1I

ES1I

MC10 500

-3% -3% -4:1

-3.00

050

5.459

-0.00

650

5.465

-2.50

050

5.483

0.003

505.4

80

0.000

505.5

28-0

.027

505.5

55

2.500

505.4

880.0

0850

5.480

3.000

505.3

93-0

.072

505.4

65

4.805

505.0

140

505.0

14

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 503.0

MC10

ES10

CE10

CE1I

ES1I

DW1I

MC10 520

-4:1 -3% -3%-3:1 2:1

-3.80

450

5.458

050

5.458

-3.00

050

5.473

-0.18

650

5.659

-2.50

050

5.484

-0.19

150

5.674

0.000

505.2

87-0

.462

505.7

49

2.500

505.7

310.0

5750

5.674

3.000

505.7

010.0

4250

5.659

4.988

505.6

190.6

2350

4.997

6.329

505.6

670

505.6

67

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 503.0

MC10

ES10

CE10

CE1I

ES1I

DW1I

MC10 537.216

-4:1 -3% -3% -3:1 2:1

-4.09

250

5.596

050

5.596

-3.00

050

5.605

-0.26

550

5.869

-2.50

050

5.566

-0.31

950

5.884

0.000

505.5

45-0

.414

505.9

59

2.500

505.9

520.0

6850

5.884

3.643

505.8

41-0

.009

505.8

50

4.543

505.7

880.2

3750

5.550

5.050

505.8

030

505.8

03

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 504.0

© Cardno Limited All Rights Reserved.This document is produced by Cardno Limited solely for the

benefit of and use by the client in accordance with theterms of the retainer. Cardno Limited does not and shall notassume any responsibility or liability whatsoever to any thirdparty arising out of any use or reliance by third party on the

content of this document.

®

Cardno (NSW/ACT) Pty Ltd | ABN 95 001 145 035Level 2, 14 Wormald Street

Symonston ACT 2609Tel: 02 6112 4500 Fax: 02 6112 4599

Web: www.cardno.com.au1 23/12/2016 90% DOCUMENTATION G.J. RIC J.H.2 17/03/2017 FINAL SUBMISSION G.J. RIC J.H.3 17/05/2017 AMENDED DRAWING CROSS-SECTION 4 OF 8 G.J. RIC J.H.4 25/10/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.4 6/11/2018 ROAD RE-ALIGNMENT P.D.J. RIC5 22/05/2019 ROAD RE-ALIGNMENT RIC P.D.J. S.A.S.

DateRev. Verif. Appd.

Scale

Status

Client

XREF

's: X

S-MC

10

Drawing Number Revision

DATE

PLO

TTED

: 25 J

une 2

019 1

0:10 A

M BY

: MEH

UL V

AIDY

A

Des.

Size

Project

Title

Drawn Date

Checked

Date

Date

DateVerified

Approved

Description

A1

CAD

File:

N:\P

rojec

ts\50

5\FY1

7\019

_YAS

S VA

LLEY

WIN

D FA

RM\D

rawi

ngs\B

uild\5

0517

019-

C30-

C37-

XS.dw

g

GOLDWIND AUSTRALIAYASS VALLEY WIND FARMACCESS ROAD IMPROVEMENTS AT WHITEFIELDS ROAD AND HUME HIGHWAY, BERREMANGRA - CIVIL WORKS

CROSS SECTIONSWHITEFIELDS RD (MC10) - SHEET 4 OF 10

DATUMAHD 1:100@A1

50517019 - C33 5

G.J. 23/12/2016

J.H. 23/12/2016

RIC 23/12/2016

J.H. 23/12/2016

M.P. 23/12/2016

Designed FOR APPROVALNOT TO BE USED FOR CONSTRUCTION PURPOSES

2 4 6 8 10m0

SCALE: 1:100 @A1

Page 52: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

MC10

ES10

CE10

CE1I

ES1I

DW1I

MC10 540

-4:1 -3% -3% -3:1 2:1

-4.13

150

5.624

050

5.624

-3.00

050

5.634

-0.27

350

5.907

-2.50

050

5.595

-0.32

750

5.922

0.000

505.5

62-0

.435

505.9

97

2.500

505.9

620.0

450

5.922

4.200

505.7

84-0

.087

505.8

71

5.100

505.8

110.2

450

5.571

5.613

505.8

270

505.8

27

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 504.0

MC10

ES10

CE10

CE1I

ES1I

DW1I

MC10 560

-4:1 -3% -3% -3:1 2:1

-3.96

250

5.968

050

5.968

-3.00

050

5.973

-0.23

550

6.208

-2.50

050

5.912

-0.31

150

6.223

0.000

505.8

51-0

.447

506.2

98

2.500

506.0

62-0

.161

506.2

23

5.000

505.9

64-0

.184

506.1

48

5.900

506.1

650.3

1750

5.848

6.778

506.2

870

506.2

87

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 504.0

MC10

ES10

CE10

CE1I

ES1I

DW1I

MC10 580

-4:1 -3% -3% -3:1 -6.8%

-3.89

350

6.339

050

6.339

-3.00

050

6.388

-0.17

550

6.563

-2.50

050

6.409

-0.16

850

6.578

0.000

506.2

4-0

.412

506.6

53

2.500

506.7

070.1

350

6.578

3.000

506.6

880.1

2650

6.563

3.900

506.6

540.3

9150

6.263

5.470

506.1

550

506.1

55

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 505.0

MC10

ES10

CE10

CE1I

ES1I

DW1I

MC10 592.26

-4:1 -3% -3% -3:1 2.9%

-3.94

850

6.569

050

6.569

-3.00

050

6.426

-0.38

506.8

06-2

.500

506.4

72-0

.3550

6.821

0.000

506.5

08-0

.388

506.8

96

2.500

506.8

15-0

.006

506.8

213.0

0050

7.033

0.226

506.8

06

3.900

506.9

560.4

550

6.506

5.399

506.5

50

506.5

50OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 505.0

MC10

ES10

CE10

CE1I

ES1I

DW1I

MC10 600

-3% -3% -3:1 9.2%

-3.05

550

6.96

050

6.960

-3.00

050

6.925

-0.04

850

6.974

-2.50

050

6.557

-0.43

250

6.989

0.000

506.6

44-0

.419

507.0

64

2.500

506.8

9-0

.099

506.9

893.0

0050

7.075

0.101

506.9

74

3.900

506.9

150.2

4250

6.674

4.754

506.7

520

506.7

52

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 505.0

MC10

ES10

CE10

CE1I

ES1I

DW1I

MC10 611.719

-4:1 -3% -3% -3:1 2:1

-3.28

150

7.182

050

7.182

-3.00

050

6.901

-0.35

150

7.252

-2.50

050

6.871

-0.39

750

7.267

0.000

506.9

68-0

.374

507.3

42

2.500

506.9

02-0

.365

507.2

673.0

0050

7.001

-0.25

150

7.252

3.900

507.1

330.1

8150

6.952

4.393

507.1

990

507.1

99

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 505.0

MC10

ES10

CE10

CE1I

ES1I

DW1I

MC10 620

-4:1 -3% -3% -3:1 2:1

-3.64

350

7.308

050

7.308

-3.00

050

7.105

-0.36

350

7.468

-2.50

050

7.113

-0.37

507.4

83

0.000

507.1

44-0

.415

507.5

58

2.500

507.2

47-0

.236

507.4

833.0

0050

7.348

-0.12

150

7.468

3.900

507.4

820.3

1450

7.168

4.532

507.4

840

507.4

84

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 506.0

MC10

ES10

CE10

CE1I

ES1I

DW1I

MC10 640

-4:1-3% -3% -3:1 2:1

-5.31

050

7.476

050

7.476

-3.00

050

7.654

-0.4

508.0

54-2

.500

507.6

31-0

.438

508.0

69

0.000

507.6

46-0

.498

508.1

44

2.500

507.9

65-0

.104

508.0

693.0

0050

7.964

-0.09

508.0

54

3.900

507.9

630.2

0950

7.754

4.317

507.9

630

507.9

63

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 506.0

MC10

ES10

CE10

CE1I

ES1I

DW1I

MC10 660

-4:1 -3% -3% -3:1 2:1

-4.37

050

8.388

050

8.388

-3.00

050

8.253

-0.47

850

8.731

-2.50

050

8.203

-0.54

350

8.746

0.000

508.8

980.0

7750

8.821

2.500

508.8

730.1

2750

8.746

3.000

508.8

580.1

2750

8.731

3.900

508.8

30.3

9950

8.431

4.651

508.8

060

508.8

06

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 507.0

© Cardno Limited All Rights Reserved.This document is produced by Cardno Limited solely for the

benefit of and use by the client in accordance with theterms of the retainer. Cardno Limited does not and shall notassume any responsibility or liability whatsoever to any thirdparty arising out of any use or reliance by third party on the

content of this document.

®

Cardno (NSW/ACT) Pty Ltd | ABN 95 001 145 035Level 2, 14 Wormald Street

Symonston ACT 2609Tel: 02 6112 4500 Fax: 02 6112 4599

Web: www.cardno.com.au1 23/12/2016 90% DOCUMENTATION G.J. RIC J.H.2 17/03/2017 FINAL SUBMISSION G.J. RIC J.H.3 17/05/2017 AMENDED DRAWING CROSS-SECTION 5 OF 8 G.J. RIC J.H.4 25/10/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.4 6/11/2018 ROAD RE-ALIGNMENT P.D.J. RIC5 22/05/2019 ROAD RE-ALIGNMENT RIC P.D.J. S.A.S.

DateRev. Verif. Appd.

Scale

Status

Client

XREF

's: X

S-MC

10

Drawing Number Revision

DATE

PLO

TTED

: 25 J

une 2

019 1

0:10 A

M BY

: MEH

UL V

AIDY

A

Des.

Size

Project

Title

Drawn Date

Checked

Date

Date

DateVerified

Approved

Description

A1

CAD

File:

N:\P

rojec

ts\50

5\FY1

7\019

_YAS

S VA

LLEY

WIN

D FA

RM\D

rawi

ngs\B

uild\5

0517

019-

C30-

C37-

XS.dw

g

GOLDWIND AUSTRALIAYASS VALLEY WIND FARMACCESS ROAD IMPROVEMENTS AT WHITEFIELDS ROAD AND HUME HIGHWAY, BERREMANGRA - CIVIL WORKS

CROSS SECTIONSWHITEFIELDS RD (MC10) - SHEET 5 OF 10

DATUMAHD 1:100@A1

50517019 - C34 5

G.J. 23/12/2016

J.H. 23/12/2016

RIC 23/12/2016

J.H. 23/12/2016

M.P. 23/12/2016

Designed FOR APPROVALNOT TO BE USED FOR CONSTRUCTION PURPOSES

2 4 6 8 10m0

SCALE: 1:100 @A1

Page 53: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

MC10

ES10

CE10

CE1I

ES1I

DW1I

MC10 680

-3% -3% -3:1 2:1

-3.67

050

9.478

-050

9.478

-2.50

050

9.796

0.283

509.5

13

0.000

509.9

260.3

3850

9.588

2.500

509.8

990.3

8650

9.513

3.000

509.8

940.3

9650

9.498

3.900

509.8

830.6

8550

9.198

5.206

509.8

510

509.8

51

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 508.0

MC10

ES10

CE10

CE1I

ES1I

DW1I

MC10 700

-3% -3% -3:1 2:1

-5.16

151

0.377

051

0.377

-5.00

051

0.365

0.068

510.2

97

-2.50

051

0.587

0.215

510.3

72

0.000

510.7

650.3

1851

0.447

2.500

510.7

620.3

951

0.372

3.000

510.7

690.4

1251

0.357

3.900

510.7

810.7

2451

0.057

5.391

510.8

020

510.8

02

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 509.0

MC10

ES10

CE10

CE1I

ES1I

DW1I

MC10 706.377

-3% -3% -3:1 2:1

-5.03

151

0.645

051

0.645

-4.92

551

0.637

0.045

510.5

92

-2.50

051

0.768

0.103

510.6

65

0.000

511.0

060.2

6651

0.740

2.500

511.0

420.3

7751

0.665

3.000

511.0

490.3

9951

0.650

3.900

511.0

610.7

1151

0.350

5.374

511.0

870

511.0

87

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 509.0

MC10

ES10

CE10

CE1I

ES1I

DW1I

MC10 720

-4:1 -3% -3% -3:1 2:1-3

.626

511.1

290

511.1

29-3

.000

511.0

85-0

.201

511.2

86-2

.500

511.0

38-0

.262

511.3

01

0.000

511.6

20.2

4551

1.376

2.500

511.6

660.3

6551

1.301

3.000

511.6

750.3

8951

1.286

3.900

511.6

910.7

0551

0.986

5.364

511.7

170

511.7

17OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 509.0

MC10

ES10

CE10

CE1I

ES1I

DW1I

MC10 740.332

-4:1 -3% -3% -3:1 2:1

-4.06

051

1.969

051

1.969

-3.00

051

1.94

-0.29

451

2.234

-2.50

051

1.917

-0.33

251

2.249

0.000

512.2

35-0

.089

512.3

24

2.500

512.6

110.3

6251

2.249

3.000

512.7

110.4

7751

2.234

3.900

512.6

790.7

4551

1.934

5.154

512.5

610

512.5

61

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 510.0

MC10

ES10

CE10

CE1I

ES1I

DW1I

MC10 760

-4:1 -3% -3% -3:1 2:1

-3.92

751

2.881

051

2.881

-3.00

051

2.93

-0.18

351

3.113

-2.50

051

2.944

-0.18

451

3.128

0.000

512.8

31-0

.372

513.2

03

2.500

513.4

70.3

4251

3.128

3.000

513.4

970.3

8451

3.113

3.900

513.5

440.7

3151

2.813

5.533

513.6

290

513.6

29

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 511.0

MC10

ES10

CE10

CE1I

ES1I

DW1I

MC10 780

-3% -3% -3:12:1

-3.14

951

3.889

051

3.889

-3.00

051

3.894

-0.03

351

3.927

-2.50

051

3.91

-0.03

251

3.942

0.000

513.7

71-0

.246

514.0

17

2.500

514.3

990.4

5851

3.942

5.000

514.5

090.6

4251

3.867

5.900

514.5

380.9

7251

3.567

8.002

514.6

180

514.6

18

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 512.0

MC10

ES10

CE10

CE1I

ES1I

DW1I

MC10 800.332

-3% -3% -3:12:1

-3.01

451

4.678

051

4.678

-3.00

051

4.679

0.008

514.6

71-2

.500

514.7

0.014

514.6

86

0.000

514.6

13-0

.149

514.7

61

2.500

515.2

340.5

4851

4.686

3.000

515.2

530.5

8251

4.671

3.900

515.2

870.9

1651

4.371

5.864

515.3

530

515.3

53

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 513.0

MC10

ES10

CE10

CE1I

ES1I

DW1I

MC10 804.568

-3% -3% -3:12:1

-3.00

051

4.819

0.001

514.8

18-2

.500

514.8

360.0

0351

4.833

0.000

514.7

51-0

.157

514.9

08

2.500

515.3

920.5

651

4.833

3.000

515.4

110.5

9351

4.818

3.900

515.4

370.9

251

4.518

5.855

515.4

950

515.4

95

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 513.0

© Cardno Limited All Rights Reserved.This document is produced by Cardno Limited solely for the

benefit of and use by the client in accordance with theterms of the retainer. Cardno Limited does not and shall notassume any responsibility or liability whatsoever to any thirdparty arising out of any use or reliance by third party on the

content of this document.

®

Cardno (NSW/ACT) Pty Ltd | ABN 95 001 145 035Level 2, 14 Wormald Street

Symonston ACT 2609Tel: 02 6112 4500 Fax: 02 6112 4599

Web: www.cardno.com.au1 23/12/2016 90% DOCUMENTATION G.J. RIC J.H.2 17/03/2017 FINAL SUBMISSION G.J. RIC J.H.3 17/05/2017 AMENDED DRAWING CROSS-SECTION 6 OF 8 G.J. RIC J.H.4 25/10/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.4 6/11/2018 ROAD RE-ALIGNMENT P.D.J. RIC5 22/05/2019 ROAD RE-ALIGNMENT RIC P.D.J. S.A.S.

DateRev. Verif. Appd.

Scale

Status

Client

XREF

's: X

S-MC

10

Drawing Number Revision

DATE

PLO

TTED

: 25 J

une 2

019 1

0:11 A

M BY

: MEH

UL V

AIDY

A

Des.

Size

Project

Title

Drawn Date

Checked

Date

Date

DateVerified

Approved

Description

A1

CAD

File:

N:\P

rojec

ts\50

5\FY1

7\019

_YAS

S VA

LLEY

WIN

D FA

RM\D

rawi

ngs\B

uild\5

0517

019-

C30-

C37-

XS.dw

g

GOLDWIND AUSTRALIAYASS VALLEY WIND FARMACCESS ROAD IMPROVEMENTS AT WHITEFIELDS ROAD AND HUME HIGHWAY, BERREMANGRA - CIVIL WORKS

CROSS SECTIONSWHITEFIELDS RD (MC10) - SHEET 6 OF 10

DATUMAHD 1:100@A1

50517019 - C35 5

G.J. 23/12/2016

J.H. 23/12/2016

RIC 23/12/2016

J.H. 23/12/2016

M.P. 23/12/2016

Designed FOR APPROVALNOT TO BE USED FOR CONSTRUCTION PURPOSES

2 4 6 8 10m0

SCALE: 1:100 @A1

Page 54: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

MC10

ES10

CE10

CE1I

ES1I

DW1I

MC10 820

-3% -3% -3:12:1

-3.19

551

5.316

051

5.316

-3.00

051

5.324

-0.04

151

5.364

-2.50

051

5.344

-0.03

551

5.379

0.000

515.3

08-0

.146

515.4

54

2.500

515.4

960.1

1751

5.379

3.000

515.6

20.2

5551

5.364

3.900

515.8

690.8

0451

5.064

5.686

515.9

580

515.9

58

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 514.0

MC10

ES10

CE10

CE1I

ES1I

DW1I

MC10 840

-4:1 -3% -3% -3:1 2:1

-3.54

351

5.976

051

5.976

-3.00

051

5.866

-0.24

651

6.112

-2.50

051

5.933

-0.19

451

6.127

0.000

516.0

2-0

.182

516.2

02

2.500

515.7

62-0

.365

516.1

273.0

0051

5.896

-0.21

651

6.112

3.900

516.1

380.3

2651

5.812

5.089

516.4

060

516.4

06

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 514.0

MC10

ES10

CE10

CE1I

ES1I

DW1I

MC10 860

-4:1 -3% -3% -3:1 2:1

-3.90

451

6.677

051

6.677

-3.00

051

6.621

-0.28

351

6.904

-2.50

051

6.664

-0.25

451

6.919

0.000

516.6

31-0

.363

516.9

94

2.500

516.9

04-0

.014

516.9

193.0

0051

7.023

0.119

516.9

04

3.900

517.0

270.4

2451

6.604

4.753

517.0

30

517.0

30

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 515.0

MC10

ES10

CE10

CE1I

ES1I

DW1I

MC10 880

-4:1 -3% -3% -3:12:1

-3.50

851

7.612

051

7.612

-3.00

051

7.528

-0.21

251

7.739

-2.50

051

7.541

-0.21

351

7.754

0.000

517.4

71-0

.358

517.8

29

2.500

517.8

180.0

6351

7.754

3.000

517.8

680.1

2951

7.739

3.372

517.8

780.2

6351

7.615

3.958

517.9

080

517.9

08

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 516.0MC

10

ES10

CE10

CE1I

ES1I

MC10 900.961

-4:1 -3% -3% 2:1

-3.70

151

8.487

051

8.487

-3.00

051

8.497

-0.16

551

8.662

-2.50

051

8.487

-0.19

518.6

77

0.000

518.5

54-0

.198

518.7

52

2.500

519.2

380.5

6151

8.677

3.000

519.2

550.5

9351

8.662

4.280

519.3

030

519.3

03

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 517.0

MC10

ES10

CE10

CE1I

ES1I

MC10 920

-4:1 -3% -3% 2:1

-3.38

051

9.448

051

9.448

-3.00

051

9.441

-0.10

251

9.543

-2.50

051

9.39

-0.16

751

9.558

0.000

519.3

99-0

.234

519.6

33

2.500

520.0

040.4

4651

9.558

3.000

520.0

140.4

7151

9.543

3.985

520.0

350

520.0

35

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 518.0

MC10

ES10

CE10

CE1I

ES1I

MC10 940

-4:1 -3% -3% 2:1

-3.78

052

0.316

052

0.316

-3.00

052

0.243

-0.26

852

0.511

-2.50

052

0.198

-0.32

852

0.526

0.000

520.5

66-0

.034

520.6

01

2.500

520.8

380.3

1252

0.526

3.000

520.8

680.3

5752

0.511

3.803

520.9

120

520.9

12

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 519.0

MC10

ES10

CE10

CE1I

ES1I

MC10 944.568

-4:1 -3% -3% 2:1

-3.96

752

0.496

052

0.496

-3.00

052

0.387

-0.35

152

0.738

-2.50

052

0.33

-0.42

352

0.753

0.000

520.8

540.0

2652

0.828

2.500

521.0

490.2

9652

0.753

3.000

521.0

750.3

3752

0.738

3.753

521.1

140

521.1

14

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 519.0

MC10

ES10

CE10

CE1I

ES1I

DW1I

MC10 960

-4:1 -3% -3% -3:1 2:1

-4.24

752

1.198

052

1.198

-3.00

052

1.073

-0.43

752

1.510

-2.50

052

1.014

-0.51

521.5

25

0.000

521.6

540.0

5452

1.600

2.500

521.7

760.2

5152

1.525

3.000

521.7

950.2

8552

1.510

3.900

521.8

290.6

1952

1.210

5.241

521.8

80

521.8

80

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 519.0

© Cardno Limited All Rights Reserved.This document is produced by Cardno Limited solely for the

benefit of and use by the client in accordance with theterms of the retainer. Cardno Limited does not and shall notassume any responsibility or liability whatsoever to any thirdparty arising out of any use or reliance by third party on the

content of this document.

®

Cardno (NSW/ACT) Pty Ltd | ABN 95 001 145 035Level 2, 14 Wormald Street

Symonston ACT 2609Tel: 02 6112 4500 Fax: 02 6112 4599

Web: www.cardno.com.au1 17/05/2017 NEW DRAWING CROSS-SECTION 8 OF 8 G.J. RIC J.H.2 25/10/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.3 6/11/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.4 22/05/2019 ROAD RE-ALIGNMENT RIC P.D.J. S.A.S.

DateRev. Verif. Appd.

Scale

Status

Client

XREF

's: X

S-MC

10

Drawing Number Revision

DATE

PLO

TTED

: 25 J

une 2

019 1

0:11 A

M BY

: MEH

UL V

AIDY

A

Des.

Size

Project

Title

Drawn Date

Checked

Date

Date

DateVerified

Approved

Description

A1

CAD

File:

N:\P

rojec

ts\50

5\FY1

7\019

_YAS

S VA

LLEY

WIN

D FA

RM\D

rawi

ngs\B

uild\5

0517

019-

C30-

C37-

XS.dw

g

GOLDWIND AUSTRALIAYASS VALLEY WIND FARMACCESS ROAD IMPROVEMENTS AT WHITEFIELDS ROAD AND HUME HIGHWAY, BERREMANGRA - CIVIL WORKS

CROSS SECTIONSWHITEFIELDS RD (MC10) - SHEET 7 OF 10

DATUMAHD 1:100@A1

50517019 - C36 4

G.J. 17/05/2017

J.H. 17/05/2017

RIC 17/05/2017

J.H. 17/05/2017

M.P. 17/05/2017

Designed FOR APPROVALNOT TO BE USED FOR CONSTRUCTION PURPOSES

2 4 6 8 10m0

SCALE: 1:100 @A1

Page 55: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

MC10

ES10

CE10

CE1I

ES1I

DW1I

MC10 964.366

-4:1 -3% -3% -3:1 2:1

-4.45

052

1.365

052

1.365

-3.00

052

1.237

-0.49

152

1.728

-2.50

052

1.186

-0.55

752

1.743

0.000

521.8

690.0

5152

1.818

2.500

521.9

680.2

2552

1.743

3.000

521.9

860.2

5952

1.728

3.900

522.0

20.5

9252

1.428

5.180

522.0

680

522.0

68

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 520.0

MC10

CE1I

ES1I

DW1I

MC10 980

-3% -3% -3:1 2:1

0.000

522.1

97-0

.365

522.5

62

2.500

522.2

21-0

.266

522.4

873.0

0052

2.21

-0.26

352

2.472

3.900

522.2

870.1

1452

2.172

4.522

522.4

840

522.4

84

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 520.0

MC10

CE1I

ES1I

DW1I

MC10 982.662

-3% -3% -3:1 2:1

0.000

522.4

82-0

.252

2.682

2.500

522.3

69-0

.238

522.6

073.0

0052

2.347

-0.24

552

2.592

3.900

522.4

50.1

5852

2.292

4.510

522.5

970

522.5

97

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 520.0

MC10

CE1I

ES1I

DW1I

MC10 1000

-3% -3% -3:1 2:1

0.000

522.6

81-0

.726

523.4

07

2.500

523.2

48-0

.084

523.3

323.0

0052

3.259

-0.05

852

3.317

3.900

523.2

930.2

7752

3.017

4.477

523.3

050

523.3

05

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 521.0

MC10

MC50

CE1I

ES1I

DW1I

MC10 1020

-3% -3% -3:1 2:1

0.000

523.8

35-0

.294

524.1

30

2.500

523.9

88-0

.066

524.0

553.0

0052

4.002

-0.03

752

4.040

3.900

524.0

270.2

8852

3.740

4.520

524.0

490

524.0

49

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 522.0

MC10

MC50

CE1I

ES1I

DW1I

MC10 1024.366

-3% -2.6% -3:1 2:1

0.000

524.0

06-0

.265

524.2

71

2.500

524.1

39-0

.068

524.2

073.0

0052

4.16

-0.03

452

4.194

3.900

524.1

910.2

9752

3.894

4.542

524.2

150

524.2

15

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 522.0

MC10

MC50 CE1I

ES1I

DW1I

MC10 1030.122

-3% -2% -3:1 2:1

0.000

524.2

22-0

.232

524.4

54

2.500

524.3

26-0

.078

524.4

043.0

0052

4.349

-0.04

552

4.394

3.900

524.3

950.3

0152

4.094

4.571

524.4

30

524.4

30

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 522.0

MC10

MC50

DW10

ES10

CE10

CE1I

ES1I

DW1I

MC10 1040

2:1 -3:1 -3% -1% -3:1 2:1

-4.19

252

4.547

052

4.547

-3.90

052

4.589

0.189

524.4

01-3

.000

524.4

66-0

.235

524.7

01-2

.500

524.3

49-0

.367

524.7

16

0.000

524.5

9-0

.252

4.791

2.500

524.6

88-0

.078

524.7

663.0

0052

4.712

-0.04

952

4.761

3.900

524.7

550.2

9452

4.461

4.551

524.7

860

524.7

86

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 522.0

MC10

DW10

ES10

CE10

CE1I

ES1I

DW1I

MC10 1060

-3:1 -3% 1% -3:1 2:1

-3.92

252

5.234

052

5.234

-3.90

052

5.238

0.015

525.2

23-3

.000

525.3

06-0

.217

525.5

23-2

.500

525.3

19-0

.2252

5.538

0.000

525.3

86-0

.227

525.6

13

2.500

525.5

21-0

.117

525.6

383.0

0052

5.549

-0.09

552

5.643

3.900

525.5

980.2

5552

5.343

4.472

525.6

30

525.6

30

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 523.0

© Cardno Limited All Rights Reserved.This document is produced by Cardno Limited solely for the

benefit of and use by the client in accordance with theterms of the retainer. Cardno Limited does not and shall notassume any responsibility or liability whatsoever to any thirdparty arising out of any use or reliance by third party on the

content of this document.

®

Cardno (NSW/ACT) Pty Ltd | ABN 95 001 145 035Level 2, 14 Wormald Street

Symonston ACT 2609Tel: 02 6112 4500 Fax: 02 6112 4599

Web: www.cardno.com.au1 17/05/2017 NEW DRAWING CROSS-SECTION 8 OF 8 G.J. RIC J.H.2 25/10/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.3 6/11/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.4 22/05/2019 ROAD RE-ALIGNMENT RIC P.D.J. S.A.S.

DateRev. Verif. Appd.

Scale

Status

Client

XREF

's: X

S-MC

10

Drawing Number Revision

DATE

PLO

TTED

: 25 J

une 2

019 1

0:11 A

M BY

: MEH

UL V

AIDY

A

Des.

Size

Project

Title

Drawn Date

Checked

Date

Date

DateVerified

Approved

Description

A1

CAD

File:

N:\P

rojec

ts\50

5\FY1

7\019

_YAS

S VA

LLEY

WIN

D FA

RM\D

rawi

ngs\B

uild\5

0517

019-

C30-

C37-

XS.dw

g

GOLDWIND AUSTRALIAYASS VALLEY WIND FARMACCESS ROAD IMPROVEMENTS AT WHITEFIELDS ROAD AND HUME HIGHWAY, BERREMANGRA - CIVIL WORKS

CROSS SECTIONSWHITEFIELDS RD (MC10) - SHEET 8 OF 10

DATUMAHD 1:100@A1

50517019 - C37 4

G.J. 17/05/2017

J.H. 17/05/2017

RIC 17/05/2017

J.H. 17/05/2017

M.P. 17/05/2017

Designed FOR APPROVALNOT TO BE USED FOR CONSTRUCTION PURPOSES

2 4 6 8 10m0

SCALE: 1:100 @A1

5

Page 56: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

MC10

DW10

ES10

CE10

CE1I

ES1I

DW1I

MC10 1080

-3:1 -3% 3% -3:1 2:1

-3.96

052

6.264

052

6.264

-3.90

052

6.267

0.033

526.2

34-3

.000

526.3

14-0

.2252

6.534

-2.50

052

6.338

-0.21

152

6.549

0.000

526.4

53-0

.172

526.6

24

2.500

526.5

67-0

.132

526.6

993.0

0052

6.59

-0.12

452

6.714

3.900

526.6

310.2

1752

6.414

4.378

526.6

530

526.6

53

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 524.0

MC10

DW10

ES10

CE10

CE1I

ES1I

DW1I

MC10 1090.122

-3:1 -3% 3% -3:1 2:1

-3.95

852

6.846

052

6.846

-3.90

052

6.849

0.032

526.8

17-3

.000

526.8

95-0

.223

527.1

17-2

.500

526.9

2-0

.213

527.1

32

0.000

527.0

45-0

.162

527.2

07

2.500

527.1

65-0

.117

527.2

823.0

0052

7.189

-0.10

852

7.297

3.900

527.2

320.2

3552

6.997

4.418

527.2

570

527.2

57

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 525.0

MC10

DW10

ES10

CE10

CE1I

ES1I

DW1I

MC10 1100

-3:1 -3% 3% -3:1 2:1

-3.97

352

7.446

052

7.446

-3.90

052

7.45

0.04

527.4

10-3

.000

527.4

93-0

.217

527.7

10-2

.500

527.5

18-0

.207

527.7

25

0.000

527.6

42-0

.158

527.8

00

2.500

527.7

67-0

.108

527.8

753.0

0052

7.792

-0.09

852

7.890

3.900

527.8

360.2

4652

7.590

4.447

527.8

640

527.8

64

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 526.0

MC10

DW10

ES10

CE10

CE1I

ES1I

DW1I

MC10 1120.31

2:1 -3:1 -3% 3% -3:1 2:1

-4.13

952

8.748

052

8.748

-3.90

052

8.758

0.13

528.6

29-3

.000

528.7

97-0

.132

528.9

29-2

.500

528.8

18-0

.126

528.9

44

0.000

528.9

25-0

.094

529.0

19

2.500

529.0

31-0

.062

529.0

943.0

0052

9.053

-0.05

652

9.109

3.900

529.0

960.2

8752

8.809

4.542

529.1

30

529.1

30

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 527.0MC

10

DW10

ES10

CE10

CE1I

ES1I

DW1I

MC10 1140

2:1 -3:1 -3% 3% -3:1 2:1

-4.24

652

9.71

052

9.710

-3.90

052

9.723

0.187

529.5

37-3

.000

529.7

58-0

.079

529.8

37-2

.500

529.7

78-0

.074

529.8

52

0.000

529.8

74-0

.053

529.9

27

2.500

529.9

82-0

.0253

0.002

3.000

530.0

08-0

.009

530.0

17

3.900

530.0

540.3

3752

9.717

4.651

530.0

920

530.0

92

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 528.0

MC10

DW10

ES10

CE10

CE1I

ES1I

DW1I

MC10 1143.334

2:1 -3:1 -3% 3% -3:1 2:1

-4.30

352

9.838

052

9.838

-3.90

052

9.855

0.218

529.6

37-3

.000

529.8

9-0

.046

529.9

37-2

.500

529.9

1-0

.042

529.9

52

0.000

530.0

06-0

.0253

0.027

2.500

530.1

150.0

1453

0.102

3.000

530.1

360.0

253

0.117

3.900

530.1

740.3

5852

9.817

4.681

530.2

070

530.2

07

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 528.0

MC10

CE1I

ES1I

DW1I

MC10 1160

3% -3:1 2:1

0.000

530.2

46-0

.044

530.2

90

2.500

530.3

62-0

.003

530.3

653.0

0053

0.386

0.006

530.3

80

3.900

530.4

290.3

4953

0.080

4.671

530.4

650

530.4

65

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 528.0

MC10

CE1I

ES1I

DW1I

MC10 1162.884

3% -3:1 2:1

0.000

530.2

4-0

.056

530.2

96

2.500

530.3

51-0

.0253

0.371

3.000

530.3

75-0

.011

530.3

86

3.900

530.4

180.3

3253

0.086

4.633

530.4

530

530.4

53

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 528.0

© Cardno Limited All Rights Reserved.This document is produced by Cardno Limited solely for the

benefit of and use by the client in accordance with theterms of the retainer. Cardno Limited does not and shall notassume any responsibility or liability whatsoever to any thirdparty arising out of any use or reliance by third party on the

content of this document.

®

Cardno (NSW/ACT) Pty Ltd | ABN 95 001 145 035Level 2, 14 Wormald Street

Symonston ACT 2609Tel: 02 6112 4500 Fax: 02 6112 4599

Web: www.cardno.com.au1 25/10/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.2 6/11/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.3 22/05/2019 ROAD RE-ALIGNMENT RIC P.D.J. S.A.S.

DateRev. Verif. Appd.

Scale

Status

Client

XREF

's: X

S-MC

10

Drawing Number Revision

DATE

PLO

TTED

: 25 J

une 2

019 1

0:11 A

M BY

: MEH

UL V

AIDY

A

Des.

Size

Project

Title

Drawn Date

Checked

Date

Date

DateVerified

Approved

Description

A1

CAD

File:

N:\P

rojec

ts\50

5\FY1

7\019

_YAS

S VA

LLEY

WIN

D FA

RM\D

rawi

ngs\B

uild\5

0517

019-

C30-

C37-

XS.dw

g

GOLDWIND AUSTRALIAYASS VALLEY WIND FARMACCESS ROAD IMPROVEMENTS AT WHITEFIELDS ROAD AND HUME HIGHWAY, BERREMANGRA - CIVIL WORKS

CROSS SECTIONSWHITEFIELDS RD (MC10) - SHEET 9 OF 10

DATUMAHD 1:100@A1

50517019 - C38 3

G.J. 17/05/2017

J.H. 17/05/2017

RIC 17/05/2017

J.H. 17/05/2017

M.P. 17/05/2017

Designed FOR APPROVALNOT TO BE USED FOR CONSTRUCTION PURPOSES

2 4 6 8 10m0

SCALE: 1:100 @A1

Page 57: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

MC10

ES10

CE10

MC10 1185.31

-4:1 -3%

-4.09

652

9.577

052

9.577

-3.00

052

9.619

-0.23

252

9.851

-2.50

052

9.636

-0.23

529.8

66

0.000

529.7

2-0

.221

529.9

41

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 528.0

MC10

ES10

CE10

CE1I

ES1I

DW1I

MC10 1200

-4:1 -3% 3% -3:1

-4.30

752

9.06

052

9.060

-3.00

052

9.111

-0.27

652

9.387

-2.50

052

9.13

-0.27

252

9.402

0.000

529.2

15-0

.263

529.4

77

2.500

529.3

05-0

.247

529.5

523.0

0052

9.323

-0.24

452

9.567

3.900

529.3

550.0

8852

9.267

4.090

529.3

620

529.3

62

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 527.0

MC10

ES10

CE10

CE1I

ES1I

DW1I

MC10 1220

-4:1-3% 3% -3:1 2:1

-4.81

452

8.302

052

8.302

-3.00

052

8.399

-0.35

652

8.755

-2.50

052

8.425

-0.34

552

8.770

0.000

528.5

58-0

.287

528.8

45

2.500

528.6

89-0

.231

528.9

203.0

0052

8.708

-0.22

752

8.935

3.900

528.7

460.1

1152

8.635

4.142

528.7

560

528.7

56

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 527.0

MC10

ES10

CE10

CE1I

ES1I

DW1I

MC10 1240

-4:1-3% 3% -3:1 2:1

-5.05

952

7.608

052

7.608

-3.00

052

7.743

-0.38

528.1

23-2

.500

527.7

75-0

.363

528.1

38

0.000

527.9

35-0

.278

528.2

13

2.500

528.0

95-0

.193

528.2

883.0

0052

8.127

-0.17

652

8.303

3.900

528.1

850.1

8252

8.003

4.317

528.2

120

528.2

12

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 526.0MC

10

ES10

CE10

CE1I

ES1I

DW1I

MC10 1260

-4:1-3% 3% -3:1 2:1

-4.75

552

7.052

052

7.052

-3.00

052

7.183

-0.30

752

7.491

-2.50

052

7.221

-0.28

552

7.506

0.000

527.4

08-0

.173

527.5

81

2.500

527.5

79-0

.077

527.6

563.0

0052

7.611

-0.05

952

7.671

3.900

527.6

70.2

9952

7.371

4.586

527.7

140

527.7

14

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 526.0

MC10

ES10

CE10

CE1I

ES1I

DW1I

MC10 1263.509

-4:1 -3% 3% -3:1 2:1

-4.56

852

6.988

052

6.988

-3.00

052

7.102

-0.27

852

7.380

-2.50

052

7.134

-0.26

152

7.395

0.000

527.2

97-0

.173

527.4

70

2.500

527.4

59-0

.086

527.5

453.0

0052

7.492

-0.06

852

7.560

3.900

527.5

50.2

952

7.260

4.568

527.5

940

527.5

94

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 525.0

MC10

DW10

ES10

CE10

CE1I

ES1I

DW1I

MC10 1270.819

-3:1 -3% 3% -3:1 2:1

-3.91

652

6.857

052

6.857

-3.90

052

6.858

0.009

526.8

49-3

.000

526.9

2-0

.228

527.1

49-2

.500

526.9

55-0

.209

527.1

64

0.000

527.1

28-0

.111

527.2

39

2.500

527.2

86-0

.028

527.3

143.0

0052

7.317

-0.01

152

7.329

3.900

527.3

780.3

4952

7.029

4.712

527.4

350

527.4

35

OFFSET

EXISTINGLEVELS

LEVELDIFF

DESIGNLEVELS

DATUM 525.0

© Cardno Limited All Rights Reserved.This document is produced by Cardno Limited solely for the

benefit of and use by the client in accordance with theterms of the retainer. Cardno Limited does not and shall notassume any responsibility or liability whatsoever to any thirdparty arising out of any use or reliance by third party on the

content of this document.

®

Cardno (NSW/ACT) Pty Ltd | ABN 95 001 145 035Level 2, 14 Wormald Street

Symonston ACT 2609Tel: 02 6112 4500 Fax: 02 6112 4599

Web: www.cardno.com.au1 25/10/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.2 6/11/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.3 22/05/2019 ROAD RE-ALIGNMENT RIC P.D.J. S.A.S.

DateRev. Verif. Appd.

Scale

Status

Client

XREF

's: X

S-MC

10

Drawing Number Revision

DATE

PLO

TTED

: 25 J

une 2

019 1

0:11 A

M BY

: MEH

UL V

AIDY

A

Des.

Size

Project

Title

Drawn Date

Checked

Date

Date

DateVerified

Approved

Description

A1

CAD

File:

N:\P

rojec

ts\50

5\FY1

7\019

_YAS

S VA

LLEY

WIN

D FA

RM\D

rawi

ngs\B

uild\5

0517

019-

C30-

C37-

XS.dw

g

GOLDWIND AUSTRALIAYASS VALLEY WIND FARMACCESS ROAD IMPROVEMENTS AT WHITEFIELDS ROAD AND HUME HIGHWAY, BERREMANGRA - CIVIL WORKS

CROSS SECTIONSWHITEFIELDS RD (MC10) - SHEET 10 OF 10

DATUMAHD 1:100@A1

50517019 - C39 3

G.J. 17/05/2017

J.H. 17/05/2017

RIC 17/05/2017

J.H. 17/05/2017

M.P. 17/05/2017

Designed FOR APPROVALNOT TO BE USED FOR CONSTRUCTION PURPOSES

2 4 6 8 10m0

SCALE: 1:100 @A1

Page 58: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

WHITEFIELDS ROAD

120.000

140.000

160.000

180.000

200.000

220.000

240.000

260.000

280.000

PROPERTY BOUNDARY

PROPERTY BOUNDARY

PROPERTY BOUNDARY

PROPERTY BOUNDARY

ROADSIDE PULLOVER AREA

GUIDEPOST IN ACCORDANCE WITHRMS DELINATION GUIDELINESSECTION 16 (TYPICAL)

WHITEFIELDS ROAD

120.000

140.000

160.000

180.000

200.000

220.000

240.000

260.000

280.000HUME HIGHWAY WHITEFIELDS ROAD

MC10

40.000

60.000

80.000

100.000

20.000

REMOVE EXISTINGCATTLE GRID ANDMATCH SMOOTHLY TOWORKS UNDERTAKENBY THE RMS

3DP253853

STATE SURVEY MARKSS30840DO NOT DISTURB

ROADSIDE PULL OVER AREA

NEW TRAFFIC SIGNCODE: W1-5A

GUIDEPOST IN ACCORDANCE WITHRMS DELINATION GUIDELINESSECTION 16 (TYPICAL)

40.000

60.000

80.000

100.000

20.000

REFE

R BE

LOW

KEY PLANNTS

50517019-C4750517019-C45 50517019-C48

50517019-C46

0 15105

SCALE 1:250

20 25m

@A1

DateRev. Verif. Appd.

Scale

Status

Client

XREF

's: X

RF C

ONTR

OL M

AIN

250;

X-CV

T-26

04_D

T1; X

-SW

-ROU

GH A

S GU

TS; X

-DES

IGN;

X-Y

ASS-

BASE

; X-S

DES

IGN

BDY;

X-P

AVE

HATC

H

Drawing Number Revision

DATE

PLO

TTED

: 25 J

une 2

019 1

0:12 A

M BY

: MEH

UL V

AIDY

A

Des.

Size

Project

Title

Drawn Date

Checked

Date

Date

DateVerified

Approved

Description

A1

CAD

File:

N:\P

rojec

ts\50

5\FY1

7\019

_YAS

S VA

LLEY

WIN

D FA

RM\D

rawi

ngs\B

uild\5

0517

019-

C45-

PPTC

D.dw

g

GOLDWIND AUSTRALIAYASS VALLEY WIND FARMACCESS ROAD IMPROVEMENTS AT WHITEFIELDS ROAD AND HUME HIGHWAY, BERREMANGRA - CIVIL WORKS

PAVEMENT PLAN AND TRAFFIC CONTROL DEVICESSHEET 1 OF 4

DATUMAHD 1:100@A1

50517019 - C45 3

P.D.J. 25/10/2018

S.A.S 25/10/2018

RIC 25/10/2018

S.A.S. 25/10/2018

M.P. 25/10/2018

Designed

© Cardno Limited All Rights Reserved.This document is produced by Cardno Limited solely for the

benefit of and use by the client in accordance with theterms of the retainer. Cardno Limited does not and shall notassume any responsibility or liability whatsoever to any thirdparty arising out of any use or reliance by third party on the

content of this document.

®

Cardno (NSW/ACT) Pty Ltd | ABN 95 001 145 035Level 2, 14 Wormald Street

Symonston ACT 2609Tel: 02 6112 4500 Fax: 02 6112 4599

Web: www.cardno.com.au1 6/11/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.2 20/03/2019 ROAD RE-ALIGNMENT RIC P.D.J. S.A.S.3 22/05/2019 ROAD RE-ALIGNMENT RIC P.D.J. S.A.S.

FOR APPROVALNOT TO BE USED FOR CONSTRUCTION PURPOSES

NORTH

NORTH

REFE

R DR

G No

5051

7019

- C4

6

REFE

R AB

OVE

Page 59: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

MC10

480.000

500.000

520.000

540.000

560.000

580.000

600.000

620.000

640.000

660.000

680.000

PROPERTY BOUNDARY

PROPERTY BOUNDARY

PROPERTY BOUNDARY

PROPERTY BOUNDARY

GUIDEPOST IN ACCORDANCE WITHRMS DELINATION GUIDELINESSECTION 16 (TYPICAL)

ROADSIDE PULLOVER AREA

WHITEFIELDS ROAD

480.000

500.000

520.000

540.000

560.000

580.000

600.000

620.000

640.000

660.000

680.000

WHITEFIELDS ROAD

MC10

300.000

320.000

340.000

360.000

380.000

400.000

420.000

440.000

460.000

480.000PROPERTY BOUNDARY

PROPERTY BOUNDARY

PROPERTY BOUNDARY

GUIDEPOST IN ACCORDANCE WITHRMS DELINATION GUIDELINESSECTION 16 (TYPICAL)

ROADSIDE PULLOVER AREA

WHITEFIELDS ROAD

300.000

320.000

340.000

360.000

380.000

400.000

420.000

440.000

460.000

480.000

0 15105

SCALE 1:250

20 25m

@A1

DateRev. Verif. Appd.

Scale

Status

Client

XREF

's: X

RF C

ONTR

OL M

AIN

250;

X-CV

T-26

04_D

T1; X

-SW

-ROU

GH A

S GU

TS; X

-DES

IGN;

X-Y

ASS-

BASE

; X-S

DES

IGN

BDY;

X-P

AVE

HATC

H

Drawing Number Revision

DATE

PLO

TTED

: 25 J

une 2

019 1

0:12 A

M BY

: MEH

UL V

AIDY

A

Des.

Size

Project

Title

Drawn Date

Checked

Date

Date

DateVerified

Approved

Description

A1

CAD

File:

N:\P

rojec

ts\50

5\FY1

7\019

_YAS

S VA

LLEY

WIN

D FA

RM\D

rawi

ngs\B

uild\5

0517

019-

C45-

PPTC

D.dw

g

GOLDWIND AUSTRALIAYASS VALLEY WIND FARMACCESS ROAD IMPROVEMENTS AT WHITEFIELDS ROAD AND HUME HIGHWAY, BERREMANGRA - CIVIL WORKS

PAVEMENT PLAN AND TRAFFIC CONTROL DEVICESSHEET 1 OF 4

DATUMAHD 1:100@A1

50517019 - C46 3

P.D.J. 25/10/2018

S.A.S 25/10/2018

RIC 25/10/2018

S.A.S. 25/10/2018

M.P. 25/10/2018

Designed

© Cardno Limited All Rights Reserved.This document is produced by Cardno Limited solely for the

benefit of and use by the client in accordance with theterms of the retainer. Cardno Limited does not and shall notassume any responsibility or liability whatsoever to any thirdparty arising out of any use or reliance by third party on the

content of this document.

®

Cardno (NSW/ACT) Pty Ltd | ABN 95 001 145 035Level 2, 14 Wormald Street

Symonston ACT 2609Tel: 02 6112 4500 Fax: 02 6112 4599

Web: www.cardno.com.au1 6/11/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.2 20/03/2019 ROAD RE-ALIGNMENT RIC P.D.J. S.A.S.3 22/05/2019 ROAD RE-ALIGNMENT RIC P.D.J. S.A.S.

FOR APPROVALNOT TO BE USED FOR CONSTRUCTION PURPOSES

NORTH

REFE

R BE

LOW

REFE

R DR

G No

5051

7019

- C4

7

REFE

R AB

OVE

REFE

R DR

G No

5051

7019

- C4

5

KEY PLANNTS

50517019-C4750517019-C45

50517019-C4850517019-C46

NORTH

Page 60: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

WHITEFIELDS ROAD

MC10

MC50880.000

900.000

920.000

940.000 960.000

980.000

1000.000

1020.000

1040.000

1060.000

0.000

L=3.682

TC 3.682

R=12.000L=7.504

CT 11.186

L=26.939

38.125

20.000

PROPERTY BOUNDARY

3DP253853

PROPERTY BOUNDARY

PROPERTY BOUNDARY

NEW TRAFFIC SIGNCODE: R1-1

NEW TRAFFIC SIGNSCODE: R1-2 & W2-3

NEW TRAFFIC SIGNCODE: W2-3

GUIDEPOST IN ACCORDANCE WITHRMS DELINATION GUIDELINESSECTION 16 (TYPICAL)

NEW TB LINEMARKING

NEW TB1 LINEMARKINGNEW BB (10m) LINEMARKING

880.000

900.000

920.000

940.000 960.000

980.000

1000.000

1020.000

1040.000

1060.000

0.000

L=3.682

TC 3.682

R=12.000L=7.504

CT 11.186

L=26.939

38.125

20.000

PROPOSED PRIORITY CONTROLLEDINTERSECTION LINEMARKING

AND SIGNAGE

WIND FARM ACCESS

WHITEFIELDS ROAD

WHITEFIELDS ROAD

MC10

680.000

700.000

720.000

740.000

760.000

780.000

800.000

820.000

840.000

860.000

3DP253853

PROPERTY BOUNDARY

PROPERTY BOUNDARY

PROPERTY BOUNDARY

PROPERTY BOUNDARY

GUIDEPOST IN ACCORDANCE WITHRMS DELINATION GUIDELINESSECTION 16 (TYPICAL)

ROADSIDE PULLOVER AREA

ROADSIDE PULLOVER AREA

WHITEFIELDS ROAD

680.000

700.000

720.000

740.000

760.000

780.000

800.000

820.000

840.000

860.000

0 15105

SCALE 1:250

20 25m

@A1

DateRev. Verif. Appd.

Scale

Status

Client

XREF

's: X

RF C

ONTR

OL M

AIN

250;

X-CV

T-26

04_D

T1; X

-SW

-ROU

GH A

S GU

TS; X

-DES

IGN;

X-Y

ASS-

BASE

; X-S

DES

IGN

BDY;

X-P

AVE

HATC

H

Drawing Number Revision

DATE

PLO

TTED

: 25 J

une 2

019 1

0:12 A

M BY

: MEH

UL V

AIDY

A

Des.

Size

Project

Title

Drawn Date

Checked

Date

Date

DateVerified

Approved

Description

A1

CAD

File:

N:\P

rojec

ts\50

5\FY1

7\019

_YAS

S VA

LLEY

WIN

D FA

RM\D

rawi

ngs\B

uild\5

0517

019-

C45-

PPTC

D.dw

g

GOLDWIND AUSTRALIAYASS VALLEY WIND FARMACCESS ROAD IMPROVEMENTS AT WHITEFIELDS ROAD AND HUME HIGHWAY, BERREMANGRA - CIVIL WORKS

PAVEMENT PLAN AND TRAFFIC CONTROL DEVICESSHEET 1 OF 4

DATUMAHD 1:100@A1

50517019 - C47 3

P.D.J. 25/10/2018

S.A.S 25/10/2018

RIC 25/10/2018

S.A.S. 25/10/2018

M.P. 25/10/2018

Designed

© Cardno Limited All Rights Reserved.This document is produced by Cardno Limited solely for the

benefit of and use by the client in accordance with theterms of the retainer. Cardno Limited does not and shall notassume any responsibility or liability whatsoever to any thirdparty arising out of any use or reliance by third party on the

content of this document.

®

Cardno (NSW/ACT) Pty Ltd | ABN 95 001 145 035Level 2, 14 Wormald Street

Symonston ACT 2609Tel: 02 6112 4500 Fax: 02 6112 4599

Web: www.cardno.com.au1 6/11/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.2 20/03/2019 ROAD RE-ALIGNMENT RIC P.D.J. S.A.S.3 22/05/2019 ROAD RE-ALIGNMENT RIC P.D.J. S.A.S.

FOR APPROVALNOT TO BE USED FOR CONSTRUCTION PURPOSES

NORTH

REFE

R BE

LOW

REFE

R DR

G No

5051

7019

- C4

8

REFE

R AB

OVE

REFE

R DR

G No

5051

7019

- C4

6

KEY PLANNTS

50517019-C4750517019-C45

50517019-C4850517019-C46

Page 61: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

WHITEFIELDS ROAD

MC10

MC20

20.000

40.000

60.000

20.000

1060.000

1080.000

1100.000

1120.000

1140.000

1160.000

1180.000

1200.000

1220.000

1240.000

1260.000

344DP753595

2DP1211587

2DP1211587

PROPERTY BOUNDARY

ACCESS ROAD TO WINDFARM WITHIN PROPERTYBOUNDARY (BY OTHERS)

PROPERTY BOUNDARY

PROPERTY BOUNDARY

PROPERTY BOUNDARY

GUIDEPOST IN ACCORDANCE WITHRMS DELINATION GUIDELINESSECTION 16 (TYPICAL)

MC40

INSTALL "PRIVATEPROPERTY SIGN"

INSTALL "PRIVATEPROPERTY SIGN"

NEW TB1 LINEMARKING20.000

40.000

60.000

20.000

1060.000

1080.000

1100.000

1120.000

1140.000

1160.000

1180.000

1200.000

1220.000

1240.000

1260.000

WIND FARM ACCESS

0 15105

SCALE 1:250

20 25m

@A1

DateRev. Verif. Appd.

Scale

Status

Client

XREF

's: X

RF C

ONTR

OL M

AIN

250;

X-CV

T-26

04_D

T1; X

-SW

-ROU

GH A

S GU

TS; X

-DES

IGN;

X-Y

ASS-

BASE

; X-S

DES

IGN

BDY;

X-P

AVE

HATC

H

Drawing Number Revision

DATE

PLO

TTED

: 25 J

une 2

019 1

0:12 A

M BY

: MEH

UL V

AIDY

A

Des.

Size

Project

Title

Drawn Date

Checked

Date

Date

DateVerified

Approved

Description

A1

CAD

File:

N:\P

rojec

ts\50

5\FY1

7\019

_YAS

S VA

LLEY

WIN

D FA

RM\D

rawi

ngs\B

uild\5

0517

019-

C45-

PPTC

D.dw

g

GOLDWIND AUSTRALIAYASS VALLEY WIND FARMACCESS ROAD IMPROVEMENTS AT WHITEFIELDS ROAD AND HUME HIGHWAY, BERREMANGRA - CIVIL WORKS

PAVEMENT PLAN AND TRAFFIC CONTROL DEVICESSHEET 1 OF 4

DATUMAHD 1:100@A1

50517019 - C48 3

P.D.J. 25/10/2018

S.A.S 25/10/2018

RIC 25/10/2018

S.A.S. 25/10/2018

M.P. 25/10/2018

Designed

© Cardno Limited All Rights Reserved.This document is produced by Cardno Limited solely for the

benefit of and use by the client in accordance with theterms of the retainer. Cardno Limited does not and shall notassume any responsibility or liability whatsoever to any thirdparty arising out of any use or reliance by third party on the

content of this document.

®

Cardno (NSW/ACT) Pty Ltd | ABN 95 001 145 035Level 2, 14 Wormald Street

Symonston ACT 2609Tel: 02 6112 4500 Fax: 02 6112 4599

Web: www.cardno.com.au1 6/11/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.2 20/03/2019 ROAD RE-ALIGNMENT RIC P.D.J. S.A.S.3 22/05/2019 ROAD RE-ALIGNMENT RIC P.D.J. S.A.S.

FOR APPROVALNOT TO BE USED FOR CONSTRUCTION PURPOSES

NORTH

REFE

R DR

G No

5051

7019

- C4

7

KEY PLANNTS

50517019-C4750517019-C45 50517019-C48

50517019-C46

Page 62: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

ALIGNMENT->MC30 HORIZONTAL SEGMENTS

PT CHAINAGE EASTING NORTHING HEIGHT BEARING DEP.SEG DEP.RAD DEP.LEN

S 0.000 644077.302 6148129.831 527.029 269°18'55.59" LINE 9.466

TC 9.466 644067.837 6148129.718 526.953 269°18'55.59" ARC 15.000 16.739

CT 26.205 644054.263 6148137.966 526.798 333°15'13.27" LINE 12.776

E 38.981 644048.513 6148149.375 333°15'13.27"

ALIGNMENT KERB RETURN->MK05 HORIZONTAL SEGMENTS

PT CHAINAGE EASTING NORTHING HEIGHT BEARING DEP.SEG DEP.RAD DEP.LEN

S 0.000 644078.397 6148120.197 526.426 271°45'57.04" ARC -12.500 14.575

E 14.575 644067.147 6148128.124 526.897 271°45'57.04"

ALIGNMENT KERB RETURN->MK06 HORIZONTAL SEGMENTS

PT CHAINAGE EASTING NORTHING HEIGHT BEARING DEP.SEG DEP.RAD DEP.LEN

S 0.000 644053.243 6148143.322 526.934 338°34'24.60" ARC -7.500 22.866

E 22.866 644066.923 6148149.437 528.274 338°34'24.60"

ALIGNMENT->MC10 HORIZONTAL SEGMENTS

PT CHAINAGE EASTING NORTHING HEIGHT BEARING DEP.SEG DEP.RAD DEP.LEN

S 0.000 644703.848 6147264.490 498.346 10°36'03.77" LINE 10.845

TC 10.845 644705.843 6147275.150 498.037 10°36'03.77" ARC -40.000 16.410

CT 27.255 644705.515 6147291.441 497.459 347°05'44.85" LINE 8.931

TC 36.186 644703.521 6147300.147 497.384 347°05'44.85" ARC -150.000 63.385

CT 99.570 644676.922 6147357.162 498.241 322°53'04.86" LINE 67.641

TC 167.211 644636.106 6147411.100 499.363 322°53'04.86" ARC -660.000 51.624

CT 218.835 644603.378 6147451.007 500.029 318°24'11.31" LINE 161.887

TC 380.722 644495.904 6147572.071 504.913 318°24'11.31" ARC -400.000 44.944

CT 425.666 644464.243 6147603.937 505.301 311°57'55.52" LINE 39.732

TC 465.398 644434.700 6147630.504 505.345 311°57'55.52" ARC -400.000 26.094

CT 491.492 644414.743 6147647.308 505.489 308°13'39.60" LINE 45.724

TC 537.216 644378.824 6147675.602 505.959 308°13'39.60" ARC 280.000 74.503

CT 611.719 644327.082 6147728.902 507.342 323°28'23.11" LINE 289.242

TC 900.961 644154.926 6147961.330 518.752 323°28'23.11" ARC 310.000 81.701

CT 982.662 644115.460 6148032.597 522.682 338°34'24.60" LINE 160.672

TC 1143.334 644056.765 6148182.164 530.027 338°34'24.60" ARC 300.000 120.174

CT 1263.509 644036.137 6148299.741 527.470 1°31'30.45" LINE 7.311

E 1270.819 644036.332 6148307.049 527.239 1°31'30.45"

ALIGNMENT->MC20 HORIZONTAL SEGMENTS

PT CHAINAGE EASTING NORTHING HEIGHT BEARING DEP.SEG DEP.RAD DEP.LEN

S 0.000 644029.934 6148205.474 529.453 60°28'34.07" LINE 37.752

TC 37.752 644062.784 6148224.077 530.719 60°28'34.07" ARC 119.675 48.126

CT 85.878 644108.246 6148238.852 533.679 83°31'01.82" LINE 3.775

E 89.653 644111.997 6148239.278 533.981 83°31'01.82"

ALIGNMENT->MC40 HORIZONTAL SEGMENTS

PT CHAINAGE EASTING NORTHING HEIGHT BEARING DEP.SEG DEP.LEN

S 0.000 644029.465 6148196.652 529.675 49°19'57.02" LINE 9.904

TT 9.904 644036.977 6148203.106 530.011 49°19'57.02" LINE 13.113

E 23.017 644046.924 6148211.652 530.202 49°19'57.02"

ALIGNMENT KERB RETURN->MK01 HORIZONTAL SEGMENTS

PT CHAINAGE EASTING NORTHING HEIGHT BEARING DEP.SEG DEP.RAD DEP.LEN

S 0.000 644048.836 6148196.757 530.214 229°19'57.02" ARC -8.000 15.689

E 15.689 644036.027 6148200.312 530.022 229°19'57.02"

ALIGNMENT KERB RETURN->MK02 HORIZONTAL SEGMENTS

PT CHAINAGE EASTING NORTHING HEIGHT BEARING DEP.SEG DEP.RAD DEP.LEN

S 0.000 644054.504 6148215.837 530.424 163°06'05.81" ARC -10.000 11.659

E 11.659 644051.377 6148205.281 530.359 163°06'05.81"

ALIGNMENT KERB RETURN->MK03 HORIZONTAL SEGMENTS

PT CHAINAGE EASTING NORTHING HEIGHT BEARING DEP.SEG DEP.RAD DEP.LEN

S 0.000 644045.576 6148227.398 529.865 60°28'34.07" ARC -7.500 14.010

E 14.010 644056.594 6148222.494 530.472 60°28'34.07"

ALIGNMENT KERB RETURN->MK04 HORIZONTAL SEGMENTS

PT CHAINAGE EASTING NORTHING HEIGHT BEARING DEP.SEG DEP.RAD DEP.LEN

S 0.000 644038.181 6148211.776 529.829 346°23'54.68" ARC -8.000 10.343

E 10.343 644042.015 6148220.619 529.897 346°23'54.68"

ALIGNMENT KERB RETURN->MK07 HORIZONTAL SEGMENTS

PT CHAINAGE EASTING NORTHING HEIGHT BEARING DEP.SEG DEP.RAD DEP.LEN

S 0.000 644039.405 6148207.170 530.018 240°28'34.07" ARC -1.000 2.947

E 2.947 644038.261 6148208.798 529.831 240°28'34.07"

ALIGNMENT KERB RETURN->MK50 HORIZONTAL SEGMENTS

PT CHAINAGE EASTING NORTHING HEIGHT BEARING DEP.SEG DEP.RAD DEP.LEN

S 0.000 644117.878 6148020.262 522.039 329°24'03.45" ARC -460.000 55.434

E 55.434 644092.600 6148069.560 524.080 329°24'03.45"

ALIGNMENT KERB RETURN->MK51 HORIZONTAL SEGMENTS

PT CHAINAGE EASTING NORTHING HEIGHT BEARING DEP.SEG DEP.RAD DEP.LEN

S 0.000 644091.912 6148077.600 524.315 338°34'24.60" ARC -1.500 4.472

E 4.472 644094.599 6148078.911 524.486 338°34'24.60"

ALIGNMENT->MC50 HORIZONTAL SEGMENTS

PT CHAINAGE EASTING NORTHING HEIGHT BEARING DEP.SEG DEP.RAD DEP.LEN

S 0.000 644103.281 6148063.631 523.995 293°34'24.60" LINE 3.682

TC 3.682 644099.907 6148065.103 524.005 293°34'24.60" ARC 12.000 7.504

CT 11.186 644094.377 6148069.993 524.118 329°24'03.45" LINE 26.939

E 38.125 644080.664 6148093.181 524.468 329°24'03.45"

© Cardno Limited All Rights Reserved.This document is produced by Cardno Limited solely for the

benefit of and use by the client in accordance with theterms of the retainer. Cardno Limited does not and shall notassume any responsibility or liability whatsoever to any thirdparty arising out of any use or reliance by third party on the

content of this document.

®

Cardno (NSW/ACT) Pty Ltd | ABN 95 001 145 035Level 2, 14 Wormald Street

Symonston ACT 2609Tel: 02 6112 4500 Fax: 02 6112 4599

Web: www.cardno.com.auDateRev. Verif. Appd.

Scale

Status

Client

XREF

's: X

-SET

OUT

TABL

E

Drawing Number Revision

DATE

PLO

TTED

: 25 J

une 2

019 1

0:12 A

M BY

: MEH

UL V

AIDY

A

Des.

Size

Project

Title

Drawn Date

Checked

Date

Date

DateVerified

Approved

Description

A1

CAD

File:

N:\P

rojec

ts\50

5\FY1

7\019

_YAS

S VA

LLEY

WIN

D FA

RM\D

rawi

ngs\B

uild\5

0517

019-

C50-

SO.dw

g

GOLDWIND AUSTRALIAYASS VALLEY WIND FARMACCESS ROAD IMPROVEMENTS AT WHITEFIELDS ROAD AND HUME HIGHWAY, BERREMANGRA - CIVIL WORKS

SETOUT TABLES

DATUMAHD NTS

50517019 - C50 5

G.J. 23/12/2016

J.H. 23/12/2016

RIC 23/12/2016

J.H. 23/12/2016

M.P. 23/12/2016

Designed

1 23/12/2016 90% DOCUMENTATION G.J. RIC J.H.2 17/03/2017 FINAL SUBMISSION G.J. RIC J.H.3 25/10/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.4 6/11/2018 ROAD RE-ALIGNMENT P.D.J. RIC S.A.S.5 21/05/2019 ROAD RE-ALIGNMENT RIC P.D.J. S.A.S.

FOR APPROVALNOT TO BE USED FOR CONSTRUCTION PURPOSES

Page 63: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

150m

HUME HIGHWAYTO GUNDAGAI

1

HUME HIGHWAYFROM YASS

WHITEFEILDS LANE

REFER NOTE 10 FOR TRAFFIC CONTROL ON WHITEFEILDS LANE

150m 150m

150m

1

WHITEFEILDS LANE

REFER NOTE 10 FOR TRAFFIC CONTROL ON WHITEFEILDS LANE

DateRev. Verif. Appd.

Scale

Status

Client

XREF

's: X

-YAS

S-BA

SE; X

-SW

Drawing Number Revision

DATE

PLO

TTED

: 25 J

une 2

019 1

0:13 A

M BY

: MEH

UL V

AIDY

A

Des.

Size

Project

Title

Drawn Date

Checked

Date

Date

DateVerified

Approved

Description

A1

CAD

File:

N:\P

rojec

ts\50

5\FY1

7\019

_YAS

S VA

LLEY

WIN

D FA

RM\D

rawi

ngs\B

uild\5

0517

019-

C100

-TTM

.dwg

GOLDWIND AUSTRALIAYASS VALLEY WIND FARMACCESS ROAD IMPROVEMENTS AT WHITEFIELDS ROAD AND HUME HIGHWAY, BERREMANGRA - CIVIL WORKS

TEMPORARY TRAFFIC MANAGEMENT PLANBARTON HIGHWAY

DATUMAHD NTS

50517019 - C100 1

P.D.J. 10/09/2018

P.D.J. 10/09/2018

RIC 10/09/2018

S.A.S. 10/09/2018

M.P. 10/09/2018

Designed

1 10/09/2018 FOR APPROVAL P.D.J. S.A.S. M.P.

FOR APPROVALNOT TO BE USED FOR CONSTRUCTION PURPOSES

© Cardno Limited All Rights Reserved.This document is produced by Cardno Limited solely for the

benefit of and use by the client in accordance with theterms of the retainer. Cardno Limited does not and shall notassume any responsibility or liability whatsoever to any thirdparty arising out of any use or reliance by third party on the

content of this document.

®

Cardno (NSW/ACT) Pty Ltd | ABN 95 001 145 035Level 2, 14 Wormald Street

Symonston ACT 2609Tel: 02 6112 4500 Fax: 02 6112 4599

Web: www.cardno.com.au

0 4020

SCALE 1:1000

60 80 100m

@A1

1. THE CONTRACTOR IS RESPONSIBLE FOR THE SITE OF WORKS AND THE TRAFFIC MANAGEMENT WITHIN THE SITE AND SHALL KEEP ALLREQUIRED RECORDS AND UNDERTAKE ALL NECESSARY MAINTENANCE.

2. ALL TEMPORARY TRAFFIC MANAGEMENT SHALL BE IN ACCORDANCE WITH AS 1743 AND QA G10 TRAFFIC MANAGEMENT3. ALL EMPLOYEES ARE TO WEAR APPROPRIATE SAFETY EQUIPMENT AS DETAILED IN THE RELEVANT AUSTRALIAN STANDARD AND QA G10

TRAFFIC MANAGEMENT.4. ALL SIGNS CONFLICTING WITH THIS THE TTM PLAN SHALL BE COVERED OR REMOVED DURING THE HOURS OF OPERATION.5. ALL SIGNS ERECTED IN RELATION TO THIS TTM THAT ARE NOT REQUIRED OUTSIDE THE HOURS OF OPERATION SHALL BE COVERED.6. ALL EMPLOYEES INVOLVED IN TTM TRAFFIC CONTROL, SETUP, MINOR MODIFICATIONS AND INSPECTIONS SHALL HAVE THE RELEVANT

QUALIFICATIONS IN ACCORDANCE WITH CLAUSE 1.5.3 OF QA G10 TRAFFIC MANAGEMENT.7. ALL TRAFFIC CONTROL SIGNS AND DEVICES SHALL BE ERECTED AS PER THIS TCP AND IN CLEAR LINE OF SIGHT TO ALL ROAD USERS AND

PEDESTRIANS. THEY SHALL NOT BE OBSCURED BY ANY VEGETATION, WORK PLANT OR PARKED VEHICLES. THEY SHALL NOT BE PLACED IN AMANOR THAT THEY WILL BECOME A HAZARD TO VEHICULAR TRAFFIC OR PEDESTRIANS.

8. ALL TRAFFIC LANES SHALL BE 3.0m MINIMUM.9. ALL BOLLARDS SHALL BE PLACED AT 1.8m MINIMUM SPACING AND PLACED ALONG THE EDGE OF BITUMENT TO FORM THE WORK SAFETY

ZONE.10. BOREHOLES ALONG WHITEFIELDS LANE WILL UNDERTAKEN WITHIN THE SHOULDER AREA OF THE LANE. A T1-5 SHALL BE ALSO PLACED

BEHIND AND IN FRONT OF THE TEST LOCATION MIN 50m EITHER SIDE. WORK VEHICLE SHALL BE PLACE BEHIND THE TEST LOCATION WITHFLASHING WARNING LIGHTS

NOTES:NUMBER & HAND

SIGNNUMBER DESCRIPTION

RL D N

T2-16 END OF ROADWORK

SIGNS TO BE ERECTED

- 2- -

- 2- -

T1-5 - 3- -WORKMAN AHEADT1-1 ROADWORK AHEAD

-- -R4-1 SPEED (80) 2

SIGN SCHEDULE

-- -R4-1 SPEED (100) 2

RMS LICENSEDESIGNERLICENCE NUMBER: 39624635LICENCE EXPIRY: 12/07/2021NAME: PHILLIP JEWELL

APPROVEDLICENCE NUMBER: 39279354LICENCE EXPIRY: 10/03/2020NAME: PANKAJ PATOLE

LEGEND

WORK ZONE

BOLLARDS

FOR

CONI

TUNA

TION

REF

ER IN

SET

A

INSET A

E:\Signatures\PHIL TRANS BG.png

TEST PIT LOCATIONS

NORTH

- 3- -T1-25 ROADWORK ON SIDE ROAD

Page 64: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

GWA- CO-TMP-0004 Report Template Version 2.0 Page 30 of 31

UNCONTROLLED WHEN PRINTED.

Annex D - Hume Hwy / Whitefields Rd Intersection

Design

Page 65: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

ISSUE STATUS SHEET No. ISSUE

RMS REGISTRATION No.

EDMS No.

DRAWING FILE LOCATION / NAMEA3

CLIENT

05

10

15

20

25

30

35

40

45

50m

m O

N A

3 SIZ

E O

RIGIN

AL

THIS D

RA

WIN

G M

AY B

E P

REP

AR

ED IN C

OLO

UR A

ND M

AY B

E IN

CO

MPLETE IF C

OPIE

D

PREPARED FOR

© Roads and Maritime Services

NOT FOR CONSTRUCTION

PLOT DATE / TIME PLOT BY

ROAD DESIGN

LOCALITY PLAN

OF WORK

SITE

LINEAR REFERENCING

DESIGNED REVIEWED VERIFIED RMS PROJECT MANAGER

SEPARATE PROCESS

THEREON IS TO BE CARRIED OUT UNDER

DRAWINGS AND THE DESIGN SHOWN

VALIDATION AND ACCEPTANCE OF THESE

TITLE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

NAME . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

SIGNED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

NAME . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

TITLE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

DATE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

SIGNED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

NAME . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

DATE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

NAME . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

TITLE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

DATE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

PREPARED BY

RMS PROJECT No. DESIGN PROJECT No.

HasanM

@google

M.HASAN

ROAD DESIGNER

PROJECT/CONTRACT MANAGER

ROAD DESIGN SOUTH WEST

TECHNICAL OPERATIONS AND SUPPORT

ENGINEERING SERVICES

TECHNICAL & PROJECT SERVICES

ROADS AND MARITIME SERVICES

DETAIL DESIGN

DETAIL DESIGN 0101GE-

A.LEAD ROAD DESIGN MANAGER

PART

SIGNED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

K:\Design\0002\SF2018-231209-HW2_Intersection upgrade with Whitefields Rd\3-Microstation\03 Detail\DS2018-001026-01-GE.dgn

HW2 - HUME HIGHWAY

INTERSECTION UPGRADE WITH WHITEFIELDS RD

37.560km TO 37.935km SOUTH OF YASS

DS2018/001026

SF2018/231209

PROJECT MANAGEMENT SOUTH WEST

SOUTH WEST REGION

REGIONAL & FREIGHT

J.GOODEN

TITLE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .LEAD ROAD DESIGNER

30/11/18 30/11/1830/11/18

YASS VALLEY COUNCIL

P.JOHNSON

FINISH : 0002, 1723, B1, 5.921(E 644658.126, N 6147273.101, MGA55)

START: 0002, 1723, B1, 5.546 (E 645026.686, N 6147203.909, MGA55) YASS VALLEY COUNCIL

HW2 - HUME HIGHWAY

INTERSECTION UPGRADE WITH WHITEFIELDS RD

37.560km TO 37.935km SOUTH OF YASS

P.0015534

SF2018/231209

L.CROKER

27/11/2018 2:56:39 PM

Page 66: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

ISSUE STATUS SHEET No. ISSUE

RMS REGISTRATION No. VOL

EDMS No.

EXTERNAL REFERENCE FILES REV DATE AMENDMENT / REVISION DESCRIPTION WVR No. APPROVAL

DRAWING FILE LOCATION / NAMEA3

SCALES ON A3 SIZE DRAWING

CO-ORDINATE SYSTEM HEIGHT DATUM

AHDMGA ZONE 55

CLIENT

05

10

15

20

25

30

35

40

45

50m

m O

N A

3 SIZ

E O

RIGIN

AL

THIS D

RA

WIN

G M

AY B

E P

REP

AR

ED IN C

OLO

UR A

ND M

AY B

E IN

CO

MPLETE IF C

OPIE

D

PREPARED FOR

DESIGN MODEL FILE(S) USED FOR DOCUMENTATION OF THIS DRAWING

DRAWINGS / DESIGN PREPARED BY TITLE NAME

© Roads and Maritime Services

DESIGN

DESIGN CHECK

PLOT DATE / TIME PLOT BY

DRAWN

DRG CHECK

PROJECT MNGR

DATE

DESIGN LOT CODE

DESIGN SOUTH WEST

ENGINEERING SERVICES

TECHNICAL AND PROJECT SERVICES

ROADS AND MARITIME SERVICES

NOT FOR CONSTRUCTION

30.11.18

P.JOHNSON

DS2018/001026

DETAIL DESIGN SF2018/231209

YASS VALLEY COUNCIL

HW2 - HUME HIGHWAY

INTERSECTION UPGRADE WITH WHITEFIELDS RD

37.560km TO 37.935km FROM YASSM.HASAN

M.HASAN

A. DESIGN MNGR L.CROKER

J.GOODEN

J.GOODEN

30.11.18

30.11.18

30.11.18

30.11.18

30.11.18

PROJECT MANAGEMENT SOUTH WEST

REGIONAL MAINTENANCE

REGIONAL & FREIGHT

LEGEND

THE VICINITY OF ALL UTILITY SERVICES.

BEFORE YOU DIG). CAUTION SHOULD BE EXERCISED WHEN WORKING IN

UTILITY PLANS OBTAINED BY DIALLING PH 1100 OR FAX 1300 652 077 (DIAL

PRIOR TO THE COMMENCEMENT OF ROADWORKS AND THE RELEVANT

SIZE AND LOCATION SHOULD BE CONFIRMED BY FIELD INSPECTION,

DOCUMENTARY EVIDENCE. THE PRESENCE OF A UTILITY SERVICE, ITS

MORE THAN THE PRESENCE OF A SERVICE, BASED ON AVAILABLE

UTILITY INFORMATION SHOWN ON THE PLANS DOES NOT DEPICT ANY

NOTES

EXISTING PROPERTY FENCE

PM PERMANENT SURVEY MARK - DO NOT DISTURB

STATE SURVEY MARK - DO NOT DISTURB

TELSTRA CABLE MARKER

BATTER TO BE TOP SOILED AND HYDROMULCHED

NEW PAVEMENT TO BE CONSTRUCTED

DP MICELLANEOUS SURVEY MARK

DP MICELLANEOUS SURVEY MARK TO BE REMOVED

EXISTING PAVEMENT TO BE RETAINED

TREES/DENSE VEGETATION TO BE CLEAREDX X

EXISTING CULVERT TO BE RETAINED

CULVERT TO BE CONSTRUCTED

EXISTING TELSTRA CABLET

SS

37 560

37 580

37 600

37 620

37 640

37 660

37 680

37 700

37 720

37 740

37 760

37 780

37 571.533

37 571.857

37 619.779

37 620.222

37 687.894

37 688.865

37 708.958

37 708.967

37 754.429

37 755.384

37 781.778

TC

CT TC

CT

TC

CT

TC

CT

TC

CT

TC

R=-100.000m R=-200.000m

R=200.000mR=200.000m

R=-200.000m

37 660

37 680

37 700

37 720

37 740

37 760

37 652.000

37 759.978

37 760.022

TC

CT

R=200.000m

DPDP

DP

SS31096

DP9000

LIMIT O

F W

OR

KS

SCALE 1:1000m

0 10 20 30 40 DETAIL PLAN

FROM YASS TO GUNDAGAI

HW2 - HUME HIGHWAY NB

HW2 - HUME HIGHWAY SB

FROM YASS TO GUNDAGAI

HasanM

0201-RD

27/11/2018 2:56:45 PM

DETAIL PLAN - HW2 - HUME HIGHWAY NB - MCA0 - 37560 TO 37750

K:\Design\0002\SF2018-231209-HW2_Intersection upgrade with Whitefields Rd\3-Microstation\03 Detail\DS2018-001026-03-RD.dgn

0202

-R

DA

DJOIN

S S

HEET

CONTROL STRING LABEL

IN ACCORDANCE WITH LPI STANDARDS - FINES APPLY

DISTURBED UNLESS ASSESSED BY ROADS AND MARITIME SURVEY

PERMANENT AND STATE SURVEY CONTROL MARKS ARE NOT TO BE1.

FOR SURVEY METADATA0205-RDREFER TO SHEET 4.

FOR ROAD ALIGNMENT SCHEDULE0204REFER TO SHEET RD-2.

& GE-0104 FOR TYPICAL PAVEMENT DETAILS0103REFER TO SHEET GE-3.

FOR PAVEMENT DESIGN0104-GEREFER TO SHEET 5.

MCA0

MCA0

MCB0

Page 67: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

499.379498.487497.730

496.362

497.227

497.016

497.407

497.459

XXXX

XXXXX XX

ISSUE STATUS SHEET No. ISSUE

RMS REGISTRATION No. VOL

EDMS No.

EXTERNAL REFERENCE FILES REV DATE AMENDMENT / REVISION DESCRIPTION WVR No. APPROVAL

DRAWING FILE LOCATION / NAMEA3

SCALES ON A3 SIZE DRAWING

CO-ORDINATE SYSTEM HEIGHT DATUM

AHDMGA ZONE 55

CLIENT

05

10

15

20

25

30

35

40

45

50m

m O

N A

3 SIZ

E O

RIGIN

AL

THIS D

RA

WIN

G M

AY B

E P

REP

AR

ED IN C

OLO

UR A

ND M

AY B

E IN

CO

MPLETE IF C

OPIE

D

PREPARED FOR

DESIGN MODEL FILE(S) USED FOR DOCUMENTATION OF THIS DRAWING

DRAWINGS / DESIGN PREPARED BY TITLE NAME

© Roads and Maritime Services

DESIGN

DESIGN CHECK

PLOT DATE / TIME PLOT BY

DRAWN

DRG CHECK

PROJECT MNGR

DATE

DESIGN LOT CODE

DESIGN SOUTH WEST

ENGINEERING SERVICES

TECHNICAL AND PROJECT SERVICES

ROADS AND MARITIME SERVICES

NOT FOR CONSTRUCTION

30.11.18

P.JOHNSON

DS2018/001026

DETAIL DESIGN SF2018/231209

YASS VALLEY COUNCIL

HW2 - HUME HIGHWAY

INTERSECTION UPGRADE WITH WHITEFIELDS RD

37.560km TO 37.935km FROM YASSM.HASAN

M.HASAN

A. DESIGN MNGR L.CROKER

J.GOODEN

J.GOODEN

30.11.18

30.11.18

30.11.18

30.11.18

30.11.18

PROJECT MANAGEMENT SOUTH WEST

REGIONAL MAINTENANCE

REGIONAL & FREIGHT

LEGEND

THE VICINITY OF ALL UTILITY SERVICES.

BEFORE YOU DIG). CAUTION SHOULD BE EXERCISED WHEN WORKING IN

UTILITY PLANS OBTAINED BY DIALLING PH 1100 OR FAX 1300 652 077 (DIAL

PRIOR TO THE COMMENCEMENT OF ROADWORKS AND THE RELEVANT

SIZE AND LOCATION SHOULD BE CONFIRMED BY FIELD INSPECTION,

DOCUMENTARY EVIDENCE. THE PRESENCE OF A UTILITY SERVICE, ITS

MORE THAN THE PRESENCE OF A SERVICE, BASED ON AVAILABLE

UTILITY INFORMATION SHOWN ON THE PLANS DOES NOT DEPICT ANY

NOTES

EXISTING PROPERTY FENCE

PM PERMANENT SURVEY MARK - DO NOT DISTURB

STATE SURVEY MARK - DO NOT DISTURB

TELSTRA CABLE MARKER

BATTER TO BE TOP SOILED AND HYDROMULCHED

NEW PAVEMENT TO BE CONSTRUCTED

DP MICELLANEOUS SURVEY MARK

DP MICELLANEOUS SURVEY MARK TO BE REMOVED

EXISTING PAVEMENT TO BE RETAINED

TREES/DENSE VEGETATION TO BE CLEAREDX X

EXISTING CULVERT TO BE RETAINED

CULVERT TO BE CONSTRUCTED

EXISTING TELSTRA CABLET

SS

37 720

37 740

37 760

37 780

37 800

37 820

37 840

37 860

37 880

37 900

37 754.429

37 755.384

37 781.778

37 782.669

37 820.293

37 820.800

37 887.312

37 887.528

37 920.000

TC

CT

TC

CT

TC

CT

TC

CT

R=200.000m

R=-200.000m

R=200.000m

R=-200.000m

R=200.000m

37 935.000

37 720

37 740

37 760

37 780

37 800

37 820

37 840

37 860

37 880

37 759.978

37 760.022

37 859.436

37 860.564

TC

CT

TC

CT

R=200.000m

R=-1000.000m

20

40

0.000

10.991

30.590

44.528

TC

CT

R=-45.000m

0.00

0

15.315

0.000

20.223

0.000

11.698

0.000

9.420

0.000

24.688

31.364

35.036

0.000

38.661

DP

SS30840

SS5002

DP9000

DP9001

LIMIT O

F W

OR

KS

SCALE 1:1000m

0 10 20 30 40

FROM YASS

DETAIL PLAN

FROM YASS TO GUNDAGAI

TO GUNDAGAI

HW2 - HUME HIGHWAY NB

HW2 - HUME HIGHWAY SB

10.5m

35.0m

3.7m

100.0m

LIMIT

OF W

ORKS

HasanM

0202-RD

27/11/2018 2:56:46 PM

DETAIL PLAN - HW2 - HUME HIGHWAY NB - MCA0 - 37750 TO 37935.000

K:\Design\0002\SF2018-231209-HW2_Intersection upgrade with Whitefields Rd\3-Microstation\03 Detail\DS2018-001026-03-RD.dgn

0201

-R

DA

DJOIN

S S

HEET

HW2 - HUME HIGHWAY NB

CONTROL STRING LABEL

IN ACCORDANCE WITH LPI STANDARDS - FINES APPLY

DISTURBED UNLESS ASSESSED BY ROADS AND MARITIME SURVEY

PERMANENT AND STATE SURVEY CONTROL MARKS ARE NOT TO BE1.

FOR SURVEY METADATA0205-RDREFER TO SHEET 4.

FOR ROAD ALIGNMENT SCHEDULE0204REFER TO SHEET RD-2.

& GE-0104 FOR TYPICAL PAVEMENT DETAILS0103REFER TO SHEET GE-3.

FOR PAVEMENT DESIGN0104-GEREFER TO SHEET 5.

37 890.603

MCA0

MCB0

MCA0 MCC0

MRC0

MRCI

MRCJ

MRCK

PRIOR TO CONSTRUCTION

CONFIRM DEPTH ON SITE

CAUTION: TELSTRA CABLE.

PRIOR TO CONSTRUCTION

CONFIRM DEPTH ON SITE

CAUTION: TELSTRA CABLE.

MD10

WHITEFILEDS RD

Page 68: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

GWA- CO-TMP-0004 Report Template Version 2.0 Page 31 of 31

UNCONTROLLED WHEN PRINTED.

Annex E – Over-dimensional Haulage Route from Port

Kembla

Page 69: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

1

DZH: XYZ123

ROUTE STUDY: GOLDWIND AUSTRALIA COPPABELLA WIND FARM: EX PORT KEMBLA. 04/07/2018 REV 01

Rev. Date Change Responsible Checked

00 02/07/18 Route Assessed W Andrews ✓

00 02/07/18 Report compiled W Andrews ✓

00 02/07/18 Report completed W Andrews ✓

01 04/07/18 Route edited W Andrews ✓

Page 70: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

1

DZH: XYZ123

Index:

INDEX: ............................................................................................................... 2INDEX:.....................................................................................................................................................................2

1.0 INTRODUCTION............................................................................................................................................32.0 EVALUATION................................................................................................................................................43.0 PROJECTDATA.............................................................................................................................................54.0 TRANSPORTCOMBINATIONS3.4MW...............................................................................................................65.0 SITELOCATION.............................................................................................................................................76.0 TRANSPORTDRAWINGS(EXAMPLES)................................................................................................................87.0 PORTOFIMPORT........................................................................................................................................138.0 ROUTESTUDY:PORTKEMBLATOCOPPABELLA.................................................................................................149.0 CONCLUSION:............................................................................................................................................2810.0 REFERENCES:...........................................................................................................................................30

Page 71: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

ROUTE STUDY Pt Kembla to Coppabella

3

1.0 Introduction This document describes observations and previous experience on sections of this route and explains the Transport of Wind turbine equipment from Port Kembla to Coppabella wind farm. This Route survey took place on 02-07-18.

Page 72: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

ROUTE STUDY Pt Kembla to Coppabella

4

2.0 Evaluation

1 No work required

2 Some Work required

3 Moderate amount of works required

4 Large amount of works required

(Mark below boxes with an X)

1 2 3 4 A Harbour X B Road Modification X C Road Furnishings X D Trees X E Site Entrance X F Bridge Calculations X G Traffic Control X

Page 73: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

ROUTE STUDY Pt Kembla to Coppabella

5

3.0 Project data. Date of latest Route Assessment. 04/08/2017 Survey undertaken by. (Rex J Andrews P/L) Project name. Coppabella Windfarm Location. Port Kembla (NSW) to Bookham (NSW) Turbine type. 69 x GW136, 100 metre H/H

Page 74: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

ROUTE STUDY Pt Kembla to Coppabella

6

4.0 Transport combinations 3.4MW. Nacelle bodies (10.1l x 5.1w x 4.4h x 38T) Possible transport configuration. Prime mover with 2x4 dolly 4x4 Low loader. Overall length: 25.0l x 5.1w x 5.3h x 54.5T. Generators (5.2 x 5.2 x 2.3h x 82T) Possible transport configuration. Prime mover with 6x8 Platform trailer. Overall length: 25.0l x 5.2w x 5.2h x 114.5T. Hubs (5.4l x 4.7w x 4.0h x 41.0T) Possible transport configuration. Prime mover with 4x4 Low Loader. Overall length: 19.0l x 4.0w x 4.9h x 54.5T. Blades (68.7l x 4.1w x 3.4h x 22T) Possible transport configuration. Prime mover with 1x4- 4x4 -Blade trailer. Overall length: 75.0l x 4.1w x 5.2h x 52.5T. Bottom section (16.2l x 4.6 x 4.3 x 109T) Possible transport configuration. Prime mover with 9x8 Platform trailer. Overall length: 30.0l x 4.8w x 5.6h x 108.5T. Mid lower section (14.0l x 4.3 x 4.3 x 68.5T) Possible transport configuration. Prime mover with 6x8 Platform trailer. Overall length: 25.0l x 4.3w x 5.3h x 105.5T. Mid section (18.0l x 4.3 x 4.3 x 64T) Possible transport configuration. Prime mover with 6x8 Platform trailer. Overall length: 29.0l x 4.3w x 5.3h x 102.5T. Mid upper section (24.4l x 4.3 x 4.3 x 63.2T) Possible transport configuration. Prime mover with 2x8 3x8 dolly-jinker. Overall length: 35.0l x 4.3w x 5.3h x 103.5T. Top section (25.0l x 4.3 x 3.4h x 52.7T) Possible transport configuration. Prime mover with 2x8 2x8 dolly-jinker. Overall length: 35.0l x 4.3w x 5.3h x 86.5T.

Page 75: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

ROUTE STUDY Pt Kembla to Coppabella

7

5.0 Site Location. The Coppabella Wind farm is located approx. 300 Kilometers south west of Port Kembla, and approx. 20 Kilometers south of Yass.

Page 76: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

ROUTE STUDY Pt Kembla to Coppabella

8

6.0 Transport drawings (Examples). Blade example:

Page 77: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

ROUTE STUDY Pt Kembla to Coppabella

9

Generator example:

Page 78: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

ROUTE STUDY Pt Kembla to Coppabella

10

Hub example:

Page 79: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

ROUTE STUDY Pt Kembla to Coppabella

11

Tower examples:

Page 80: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

ROUTE STUDY Pt Kembla to Coppabella

12

Page 81: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

ROUTE STUDY Pt Kembla to Coppabella

13

7.0 Port of Import. The wind turbine equipment will be imported from various countries, and will arrive on ships into Port Kembla. The client may also source local towers. The ideal berth for these shipments is the AAT terminal. The facility has a hardstand storage area of roughly 40,000 s/q metres.

Page 82: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

ROUTE STUDY Pt Kembla to Coppabella

14

8.0 Route study: Port Kembla to Coppabella. We have based this study on the turbine components, and all imported towers entering Australia via the AAT terminal at Port Kembla. After accessing a number of options, the following was selected as the most likely route. ROUTE: Port Kembla to Bookham 275.0 kilometres: This route took us via Tom Thumb Road, Springhill Road, Masters Road, Southern Freeway, Mt Ousley Road, Picton-Wilton Road, Hume Highway, Whitefields Lane.

Page 83: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

ROUTE STUDY Pt Kembla to Coppabella

15

Route Index

KEY CRITICAL CAUTION

EMERGENCY PARKING

KM index Location Section of road

Critical Measurement

Procedure Notes

Route: Port Kembla to Coppabella wind farm 0.0 Port Kembla Exit port onto Tom Thumb Road 5.5 Metres width Travel directly

ahead No problems with this section of road

0.2 Port Kembla Tom Thumb Road onto Springhill Road

A clearance of 70 metres in length is required Left hand turn

The light pole on the right hand side will need to be relocated to accommodate the tail swing. Some removal and trimming of trees will also be required.

1.4 Port Kembla Springhill Road onto Masters Road

A clearance of 70 metres in length is required Right hand turn Some hardstand will need to be

added on the exit of the corner.

2.6 Figtree Masters Road onto Southern Freeway 70.0 Metres clearance Right hand

sweeping bend No problems with this section of road

2.7 Figtree Southern Freeway under The Avenue 5.4 Metres clearance Travel directly

ahead

Loads that exceed 5.3 metres will not be able to use this section of road.

6.4 Keiraville Southern Freeway onto Mount Ousley Road 5.4 Metres clearance Travel directly

ahead

Loads that exceed 5.3 metres will not be able to use this section of road.

6.5 Keiraville

Mount Ousley Road under the University Bridge

5.0 Metres clearance Travel directly ahead

Loads that exceed 5.0 metres will not be able to use this section of road. Detour for up to 5.3 metres high via the Princes Highway.

13.0 Mount Ousley

Mount Ousley Road onto Picton-Wilton Road

70.0 Metres clearance Tight left hand turn

Care to be taken with this procedure. The guardrail on the left hand side will come close to the trailer. The prime mover will need to mount the existing median strip. Police will need to hold southbound traffic so the overhang can pass over the southbound lanes.

40.0 Wilton

Picton-Wilton Road onto the Hume Highway

70.0 Metres clearance Long Sweeping left Hand Turn

Care to be taken with this procedure. The pole on the inside of the corner will come close to the trailer. The overhang should pass over the signs on the outside of the turn.

104.0 Sutton Forest Hume Highway 150.0 long x 10.0 wide Merge to left Large parking area

153.0 Goulburn Hume Highway 180.0 long x 15.0 wide Merge to left Large parking area

Page 84: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

ROUTE STUDY Pt Kembla to Coppabella

16

KM index Location Section of road

Critical Measurement

Procedure Notes

273.9 Bookham

Hume Highway

200.0 long x 6.0 wide Merge to left

Large parking area to be built to hold windfarm components prior to turning into Whitefields Lane

274.0 Bookham Hume Highway onto Whitefields lane

70.0 Metres clearance

Right hand turn

This corner is planned to be widened in the centre median strip with a turn lane installed. It is recommended that the loads use the parking bay to wait until (Police and or escorts and VMS) have the intersection under traffic control prior to moving.

274.1 Bookham Whitefields lane

Travel directly ahead

Client to provide a suitable road for the swept path of the largest components.

275.0 Bookham Whitefields lane into site

Travel directly ahead

Client to provide a suitable road for the swept path of the largest components.

Page 85: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

ROUTE STUDY Pt Kembla to Coppabella

17

0.0 Km’s: Exiting Port Kembla.

PROCEDURE: Exit port heading north through the security gate. COMMENTS: Straight ahead. Contact must be made with security guard top ensure the boom remains open until the loads have passed through. CONCLUSION: No problems with this section of road. ROAD MODIFICATIONS: No works required.

Page 86: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

ROUTE STUDY Pt Kembla to Coppabella

18

0.2 Km’s: Left turn from Tom Thumb Road onto Springhill Road at Port Kembla.

PROCEDURE: Tight left hand turn from Tom Thumb Road onto Springhill Road. COMMENTS: The blades will need to cross from the incorrect side of Tom Thumb Road onto the incorrect side of Springhill Road, before returning to the correct side approx. 100 metres west of the intersection. CONCLUSION: The light pole on the right hand side will need to be relocated to accommodate the tail swing. Some removal and trimming of trees will also be required. ROAD MODIFICATIONS: Yes large amounts of works are required.

medard.boutry
Text Box
Note: These road modification works have already been completed for another project
Page 87: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

ROUTE STUDY Pt Kembla to Coppabella

19

1.4 Km’s: Springhill Road onto Masters Road at Port Kembla.

PROCEDURE: Sweeping right hand corner. COMMENTS: The blades will need to cross from the far left hand lane while entering the corner, and cross onto the verge while exiting the turn. CONCLUSION: Some hardstand will need to be added to the exit of the corner. ROAD MODIFICATIONS: Small amounts of works are required on this section of road.

Page 88: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

ROUTE STUDY Pt Kembla to Coppabella

20

2.6 Km’s: Masters Road onto the Southern Freeway at Figtree.

PROCEDURE: Gentle right hand merge onto the Southern Freeway. COMMENTS: This is a large turn with very little problems. The overhead bridge is 5.35 metres high at the lowest point. CONCLUSION: No problems with this section of road. ROAD MODIFICATIONS: No works required on this section of road.

Page 89: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

ROUTE STUDY Pt Kembla to Coppabella

21

6.4 Km’s: The Southern Freeway onto Mount Ousley Road at Keiraville.

PROCEDURE: Gentle left hand sweeping bend. COMMENTS: Large section of road with plenty of room. However the lowest structure on route is on this section of road. CONCLUSION: Loads over 5.0 metres high will need to take the high load detour. ROAD MODIFICATIONS: No works required on this section of road.

Page 90: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

ROUTE STUDY Pt Kembla to Coppabella

22

6.5 Km’s: University Overbridge on the Southern Freeway at Keiraville. Image 1:

PROCEDURE: Travel under bridge in the left hand lane. COMMENTS: No loads that exceed 5.0 metres to pass under this structure. CONCLUSION: Loads that exceed 5.0 metres high will need to use the following detour. ROAD MODIFICATIONS: No works required on this section of road.

Page 91: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

ROUTE STUDY Pt Kembla to Coppabella

23

Image 2: (High load detour) VIA: Southern Freeway, Memorial Drive, Princes Highway, Mount Ousley Road.

Page 92: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

ROUTE STUDY Pt Kembla to Coppabella

24

13.1 Km’s: Mt Ousley Road onto Picton-Wilton Road at Mt Ousley.

PROCEDURE: Tight left hand turn from Mt Ousley Road onto Picton-Wilton Road. COMMENTS: The truck will need to stay as far to the right while exiting this turn. CONCLUSION: Care to be taken with this procedure. The guardrail on the left hand side will come close to the trailer. The prime mover will also need to mount the existing median strip. Police may need to hold southbound traffic so the overhang can pass over the southbound lanes. Signs on the median strip will need to be made removable. ROAD MODIFICATIONS: Small amounts of works are required on this section of road.

Page 93: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

ROUTE STUDY Pt Kembla to Coppabella

25

40.2 Km’s: Picton-Wilton Road onto the Hume Highway at Wilton.

PROCEDURE: Tight left hand turn from Picton-Wilton Road onto Hume Highway onramp. COMMENTS: The truck will need to stay as far to the right while exiting this turn. CONCLUSION: Care to be taken with this procedure. The pole on the inside of the corner will come close to the trailer. The overhang should pass over the signs on the outside of the turn. ROAD MODIFICATIONS: No works required on this section of road.

Page 94: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

ROUTE STUDY Pt Kembla to Coppabella

26

274.0 Km’s: Hume Highway onto Whitefields lane at Bookham. Image 1:

Page 95: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

ROUTE STUDY Pt Kembla to Coppabella

27

Image 2:

PROCEDURE: Loads to pull over to the parking area prior to the corner. Once intersection is under traffic control, loads will turn to the right. COMMENTS: The existing intersection will require some hardstand added to the centre median strip, and some widening on Whitefields Lane. CONCLUSION: Once the works are completed the loads will have adequate clearance on the corner. Police and or escorts and VMS will need to control local traffic on the Hume Highway as well as Whitefields Lane. ROAD MODIFICATIONS: Large amounts of works are required.

Page 96: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

ROUTE STUDY Pt Kembla to Coppabella

28

9.0 Conclusion: After studying all options and undertaking a route survey, this route in its current condition will require a large amount of upgrades before it could be deemed suitable for transporting the proposed components. The following are the key points that need to be taken into consideration, if the project moves forward with this route. BRIDGES:

• There are a number of bridges on route that will require bridge assessments. However the route up till Whitefield’s lane has had similar axle weights in the past.

OVERHEAD STRUCTURES: (5.3 Maximum loaded height)

• There are a large number of overhead structures between Port Kembla and Bookham. The lowest of these structures is the University Bridge at Keiraville. This bridge has a maximum safe clearance of 5.0 metres. All loads over 5.0 metres will need to take the high load detour via the Princes Highway. The high load detour will allow loads of up to 5.3 metres in height.

OVERHEAD UTILITIES: • This route will need to be checked by an authorised scoping company. It is

likely that a route of at least 5.3 metres is required for this project.

OVERHEAD TREES: • This route will need to be checked from Whitefields Lane through to site for a

clear passage of at least 5.3 metres for overhead branches. Some trimming is likely on this section route.

PAVEMENT: • The route up until Whitefields Lane is highway grade asphalt and will be

adequate for all loads. The pavement from the Hume Highway through to site is gravel, and would need to be made suitable for all weather conditions.

Page 97: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

ROUTE STUDY Pt Kembla to Coppabella

29

PORT KEMBLA: • The light pole exiting the port and the removal of a number of trees are

required. This is likely to be a large job. We would recommend discussions with the authorities take place at least 6 month prior to the start of transport.

BOOKHAM: • Parking bay to be built on the right hand side of the Hume Highway

southbound prior to the turnoff onto Whitefields Lane. • The centre median strip will need to be widened to suit the swept path of the

largest components. • Whitefields Lane to be made suitable for the swept path of the largest

components. Road to be made suitable for all weather conditions.

Page 98: TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm · 2020-06-26 · TRAFFIC MANAGEMENT PLAN Coppabella Wind Farm 29 May, 2020 FINAL. GWA- CO-TMP-0004 Report Template Version 2.0 Page 2

ROUTE STUDY Pt Kembla to Coppabella

30

10.0 References:

Australian Load Restraint Guide Rex J Andrews P/L Drawings Rex J Andrews route survey # 243 Google Earth/Maps Nearmaps NHVR (OSOM) NHVAS Maintenance Management (NHVAS21193) NHVAS Basic Fatigue Management (NHVAS21193)

Disclaimer: This route study is a guide only; government approvals would be required before these routes could be deemed suitable for transporting the components over the listed routes.

This study was undertaken using data supplied by Rex J Andrews P/L. Equipment and swept paths might vary if using transport methodology other than the data supplied by Rex J Andrews.