TRAFFIC IMPACT STUDY
PROPOSED N14 TOWNSHIP ESTABLISHMENT
ON
FARM PORTIONS
205 & 206 ELANDSKUIL
Rev 0
DEC 2017
REF: 1712 – VNDP
Prepared By: Approval By: MSN Civils 2 Seventh Ave, SYMHURST, 1401 Contacts: 076 965 0150 [email protected]
Dept. Public Works & Roads Provincial Head Office Planning Division Cnr. Carrington & Tillard Str. MMABATHO, 2735 (018) 388 1435/1377
This Traffic Impact Study for was prepared, checked, approved and issued to Department of Public Works & Roads: North West Provincial Govenrment for approval. Site: N14 Township on Farm Ptn’s 205 and 206 Elandskuil Issue No: 1
Prepared by: IM BSc (Hons): Civil Engineering
Checked by: IM BSc (Hons): Civil Engineering
Signaure JM
______________________ Julius M: B-Ing (Civil Eng.)
Table of Contents
Introduction .......................................................................................................................... 1
Background and executive summary .............................................................................. 1
Objectives of this Traffic Impact Assessment report .................................................... 2
Site Description and Characteristics ..................................................................................... 3
Locality ............................................................................................................................. 3
Site area ............................................................................................................................ 3
Methodology ......................................................................................................................... 5
Town Planning Matters: ....................................................................................................... 6
Existing Zoning and Land Use ...................................................................................... 6
Proposed Development Controls ................................................................................... 6
Accessibility to site and Road Classification ........................................................................ 8
Road network master-planning ...................................................................................... 8
Road classification, design speed and design vehicle .................................................... 8
5.2.1. Road Classification ........................................................................................................ 8
5.2.2. Design Speed .............................................................................................................. 8
5.2.3. Design vehicle ............................................................................................................ 8
Capacity Analysis ................................................................................................................. 9
Trip generation, split and assignment ........................................................................... 9
6.1.1. Trip reduction factor, generation and split for Sub-Development A .................................. 9
6.1.2. Trip reduction factor, generation and split for Sub-Development B ............................ 10
6.1.3. Trip reduction factor, generation and split for Sub-Development C ............................. 10
6.1.4. Trip reduction factor, generation and split for Sub-Development D ............................ 11
Capacity analysis standards ........................................................................................... 11
Data collection................................................................................................................ 12
6.3.1. Traffic counts: .......................................................................................................... 12
6.3.2. Peak Hour & Years of analysis ................................................................................... 13
PHF, growth rate and trip distribution ........................................................................ 13
6.4.1. Peak hour factor ......................................................................................................... 13
6.4.2. Growth rate .............................................................................................................. 14
6.4.3. Trip distribution ........................................................................................................ 14
Assessment Scenarios and criteria ................................................................................ 14
Intersections capacity analysis results for scenarios .................................................... 14
Road Access, Intersection Provision and Spacing .............................................................. 19
Access analysis .................................................................................................................... 19
Driveway design ............................................................................................................ 19
Accesses throat lengths .................................................................................................. 19
Sight distance requirements ................................................................................................ 19
Access position ............................................................................................................... 20
9.1.1. Proposed site access position........................................................................................... 20
9.1.2. Impact of site access on adjacent properties ................................................................. 20
Recommended access layout and control from the road .............................................. 20
Road Widening, PWV Network and Servitudes ............................................................... 22
Road widening & PWV Network ................................................................................ 22
Servitudes ....................................................................................................................... 22
Public transport assessment ................................................................................................ 22
Parking requirements .......................................................................................................... 23
Summary and Recommendations ....................................................................................... 23
Conclusion .......................................................................................................................... 26
References: ........................................................................................................................... 26
List of Tables
Table 1: Controls for Sub-Development A ................................................................................ 6
Table 2: Controls for Sub-Development B ................................................................................ 6
Table 3: Controls for Sub-Development C ................................................................................ 6
Table 4: Controls for Sub-Development D ............................................................................... 7
Table 5: Intersections lane configurations ................................................................................ 12
Table 6: Assessment Scenarios ................................................................................................ 14
Table 7: Intersection A- Summary of analysis results ............................................................. 15
Table 8: Intersection C - Summary of analysis results ............................................................ 15
Table 9: Intersection D - Summary of analysis results ........................................................... 16
Table 10: Intersection Entrance - Summary of analysis results ............................................... 18
List of Figures Figure 1 : Locality Plan and Sub-development Portions ............................................................ 4
Figure 2 : Existing Intersections and Proposed access positions .............................................. 21
Annexures Annexure A - Figures for traffic volumes
Annexure B - Trip Generation Rates
Annexure C - Traffic Counts, Peak Hour and Traffic Projections
Annexure D - Auto J Analysis Results
Annexure E - Land Use Application Annexure F - PWV Network
Annexure G - Proposed layout Plan
Vtdp N14 Dev– TIA (V1) 1
Introduction
Background and executive summary
Mosoane Civils (Pty) Ltd (MSN Civils) has appointed by Mamphele Development Planners to undertake the Traffic Impact Study for proposed N14 Township development on Farm Portions 205 and 206 Elandskuil IP. Mamphele Development Planners were appointed by Housing Development Agency(“HDA”) to carry out a detailed Township establishment for the creation of an Integrated and Sustainable Human Settlement on the farms: Elandskuil No. 205 IP and Elandskuil No. 206, IP, North-West Province within the JB Marks Local Municipality in Ventersdorp. This report is prepared to support the Township Establishment Application that is submitted for approval by JB Marks Local Municipality in Ventersdorp area which is one of the four Local Municipalities of Dr. Kenneth Kaunda District Municipality. The development sites are situated adjacent to the intersection of N14 Highway/R30 Road Both 205 and 206 sites are currently zoned “Farm” The proposed township shall comprise of:
→ 2199 x Residential 1 Stand Houses → 6 x Residential 2 Stand Houses → 2 x Municipal/Institutional Stands → 7 x Business stands → 18 x Industrial 1/2 → 2 x Pre-schools → 2 x Primary schools → 1 x Secondary school → 1 x Community health center → 3 x Churches → 1 x Public Garage → 1 x Taxi Rank → 6 x Public Spaces
Vtdp N14 Dev– TIA (V1) 2
Objectives of this Traffic Impact Assessment report
To achieve the acceptable engineering practice standards and municipal standards and policies with reference to safety, security, convenience, effeciency, reliability, accessibility, practicality, economic, affordability, sustainability and enfironmentally friendly.
To support sustainable development by protecting the overall integrity of the transportation system for the benefit of all users.
To minimise all the impacts and at the same time have the greatest overall benefits.
To develop and evaluate alternative options or solutions to determine the most preferred option.
Determine the peak hour trips to be generated by the development and report on the impact thereof onto the existing road network.
Analyze the access requirements for this site in specific and in relation to the adjacent properties.
Vtdp N14 Dev– TIA (V1) 3
Site Description and Characteristics
Locality
Site falls under 3 wards, namely: Ward 2, 4 and 6 in terms of spatial demarcation of JB Marks Local Municipality as approved by 2016 Municipal Demarcation Board. The four-way crossing of N14 Highway/R30 Road is situated approximately at the centre of the site, which divides the site into for portions. N14 and R30 bisects the site which then make all 4 portions to be adjacent to all these roads. The site, Ptn 205 of Farm Elandskuil IP, is situated adjacent and to the: - South-east of the intersection of N14/R30 Road which is under Ward 6, and - South-west of the intersection of N14/R30 Road which is under Ward 4. The site, Ptn 206 of Farm Elandskuil IP, is situated adjacent and to the: - North-east of the intersection of N14/R30 Road which is under Ward 2,
See the locality figure on the next page.
Site area
- Re Extend of Ptn 206 measures 83.0076ha in extend and is held under Title Deed No: T14359/1986.
- Ptn 205 IP measures 174.4764 ha in extend and is held under Title Deed No: T98541/1997.
- Total area of the site area is 257.484 ha
Vtdp N14 Dev– TIA (V1) 4
Figure 1 : Locality Plan and Sub-development Portions
Vtdp N14 Dev– TIA (V1) 5
Methodology
The methodology in the report included:
A site visit to observe current travel patterns, road geometry and to gain an
understanding of the study area,
For the purpose streamlining the contents of this report, the analysis shall of the
site shall be separated into 4 developmental portions linked to the wards, being:
→ North-east portion on Ward 2 to be Sub-Development A
→ South-east portion on Ward 4 to be Sub-Development B
→ South-west portion on Ward 6 to be Sub-Development C
→ North-west portion on Ward 1 to be Sub-Development D
See Figure A – Locality plan for these sub-developments
Trip generation, trip distribution and assignment,
Traffic Counts,
Capacity analysis,
Sites access,
Throat lengths,
Conceptual layouts,
All findings, recommendations and conclusion captured in the report.
Guidelines to be used:
- TMH 16 (Vol 1 & 2) – South African Traffic Impact and Site Traffic Assessment
Standards and requirements manual
- TMH 17 – South African Trip Data Manual
- TRH 26 – Road Classification and Access Management Manual
Vtdp N14 Dev– TIA (V1) 6
Town Planning Matters:
Township establishment in terms of Township Ordinances 1986, Read in conjunction with SPLUMA 2013, Act no 16 of 2013
Existing Zoning and Land Use
- Zone : Farm
Proposed Development Controls
Table 1: Controls for Sub-Development A
Land Use Sub-Development A
Parcels Size Total
Residential 1 Houses 686 Vary 686 units Residential 2 Houses 3 1.15 + 1.01 + 4.71 6.87ha Municipal 1 0.46 + 0.53 0.99ha Business 2 1.25 + 1.71 2.96ha Pre-school (1) 1 0.6ha 0.6ha Primary school (1) 1 3.08ha 3.08ha Public Spaces 4 Vary -
Table 2: Controls for Sub-Development B
Land Use Sub-Development B
Parcels Size Total
Residential 1 Houses 440 Vary 440 units Industrial 7 Vary 7.64ha Business 2 2.36ha + 0.15ha 2.51ha Institutional / College 1 14.79ha 14.79ha Municipal 1 1.14 2.28ha Public Spaces 5 Vary -
Table 3: Controls for Sub-Development C
Land Use Sub-Development C
Parcels Size Total
Residential 1 Houses 1530 Vary 1530 Municipal 4 2.81 + 0.72 + 0.29 4.42ha Business 3 3.87 +0.47 + 1.1 5.44ha Pre-school (1) 1 0.84ha 0.84ha Primary school (1) 1 3.0ha 3.0ha Secondary school (1) 1 5.12ha 5.12ha Taxi Rank/Holding 1 0.6ha 0.6ha Public Spaces 1 0.36ha 0.36ha
Vtdp N14 Dev– TIA (V1) 7
Table 4: Controls for Sub-Development D
Land Use Sub-Development D
Parcels Size Total
Residential 2 Houses 1 6.74ha 6.74ha
See attached Annexure E for the Land use application and Annexure F for Proposed Conceptual Site Development Plan The following controls of ratios and students are used for the development:
→ Apartments and flats Density = 25 du/ha → Business park FAR = 0.5 → Public Primary School no. of kids = 500 → Public Secondary School no. of kids = 500 → Pre-school no. of kids = 200 → Industrial FAR = 0.3 → Institutional/College no. student = 1000 → Medical Clinic FAR = 0.3 → Taxi rank/holding facility = 100 mini-bus
Vtdp N14 Dev– TIA (V1) 8
Accessibility to site and Road Classification
Road network master-planning
The road network adjacent to site are N14 and R30. R30 was previously owned by the provincial road authority but now is taken over by SANRAL. There is no master plan for the area.
Road classification, design speed and design vehicle
5.2.1. Road Classification
For this report, road classification is very important for analysis of the traffic parterns within the vicinity of the site. The roads classification is accorrding to COTO - RCAM a) N14 Highway currently is operating as – Class R2 (Rural major arterial) which will
in future become Class R1 (Principal Arterial). b) R30 is in general classified as Class R2 (Rural minor arterial). R30 to the north of
N14 links Ventersdorp and Rustenburg at approximately 95km, to the south of N14 links Ventersdorp and Klerksdorp at approximately 70km
- It should be noted that R30 to the north from N14 goes into Ventersdorp Town and this 4.5km section of the road shall not have functions of a class 2 road, it shall operate Urban Class 3 and 4a.
- R30 to the south shall be R2 however the first 2km section from the N14 shall be operating as Class U2
5.2.2. Design Speed
N14 = 120 km/h R30 to the south = 80 km/hr first 5km section from N14 R30 to the south = 120 km/hr over 5km section from N14 R30 to the north = 70km/hr
5.2.3. Design vehicle
Sub-development Normal operation Occasional use A Bus WB-15 B WB-15 WB-20 C Bus WB-15 D Bus WB-15
Vtdp N14 Dev– TIA (V1) 9
Capacity Analysis
Trip generation, split and assignment
See trip reduction factors and trip generation rates attached as Annexure B.
6.1.1. Trip reduction factor, generation and split for Sub-Development A
Sub-development A - Calculation of trip reduction factor PC = 1 - (1 - PM) x (1 - PV) x (1 - PT)
Land Use Trips% Mixed-Use
(Max Factor)
% Low
Vehicle
%
Transit
nodes
Combined
factor without
Mixed-use
Trips without
Mixed-use
factor (x)
In Out
Assumption of
Internal circulating
trips for mix-use (y)
% of proposed
Mixed use trips
(y/x)
Pc
Combined
Factor
Residential 1 Houses 686 10 40 15 0,49 336 84 252 20 6 0,520
Residential 2 Houses 129 15 30 15 0,405 52 13 39 5 10 0,462
Business Park 222 15 20 15 0,32 71 60 11 10 14 0,416
Pre-school (1) 425 5 50 15 0,575 244 122 122 10 4 0,592
Primary school (1) 200 30 50 15 0,575 115 58 57 20 17 0,649
Trip Generation
AM Mid PM AM Mid PM AM Mid PM
210 Single dwelling Units No. No. 1,00 - 1,00 686 686 - 686 0,520 329 - 329
232 Multi-level Town Houses No. No. 0,75 - 0,75 172 129 - 129 0,462 69 - 69
770 Business Park sqm 100sqm 1,50 - 1,50 14800 222 - 222 0,416 130 - 130
520 Public Primary School Student Student 0,85 0,35 0,30 500 425 175 150 0,592 173 71 61
565 Pre-School Student Student 1,00 0,35 0,80 200 200 70 160 0,649 70 25 56
Trips with
reduction factorTrip rate
calc per
Trip RateProposed
Trips Trip
Reduction
factor
Code Land Use Unit
Trip Split
Ratio IN OUT
AM 329 - 329 25:75 82 247
PM 329 - 329 70:30 230 99
AM 129 - 129 25:75 32 97
PM 129 - 129 70:30 90 39
AM 130 - 130 85:15 111 20
PM 130 - 130 20:80 26 104
AM 173 0,55 315 50:50 158 157
Midday 71 0,55 129 45:55 58 71
PM 61 0,55 111 50:50 55 55
AM 70 0,85 82 50:50 41 41
Midday 25 0,85 29 50:50 15 15
PM 56 0,85 66 50:50 33 33
Public Primary School
Pre-school
SplitPHF
Peak Hr
pc trips
Single dwelling units
TripsLand-use Peak Period
Multi-level Town
Business Centre Park
Vtdp N14 Dev– TIA (V1) 10
6.1.2. Trip reduction factor, generation and split for Sub-Development B
6.1.3. Trip reduction factor, generation and split for Sub-Development C
Sub-development B - Calculation of trip reduction factors PC = 1 - (1 - PM) x (1 - PV) x (1 - PT)
Land Use Trips% Mixed-Use
(Max Factor)
% Low
Vehicle
%
Transit
nodes
Combined
factor without
Mixed-use
Trips without
Mixed-use
factor (x)
In Out
Assumption of
Internal circulating
trips for mix-use (y)
% of proposed
Mixed use trips
(y/x)
Pc
Combined
Factor
Single dwelling Units 440 10 40 15 0,490 216 54 162 20 9 0,537
Industrial Area (Park) 183 5 30 15 0,405 74 19 56 4 5 0,437
Business Park 288 15 20 15 0,320 92 78 14 10 11 0,394
Institutional - College 200 20 50 15 0,575 115 58 57 8 7 0,605
Trip Generation
AM Mid PM AM Mid PM AM Mid PM
210 Single dwelling Units No. No. 1 - 1 440 440 - 440 0,537 204 - 204
130 Industrial Area (Park) sqm 100sqm 0,8 - 0,8 22900 183 - 183 0,437 103 - 103
770 Business Park sqm 100sqm 1,5 - 1,5 12550 188 - 188 0,394 114 - 114
520 Institutional - College Student Student 0,2 0,25 0,2 1000 200 250 200 0,605 79 99 79
ProposedUnitCode Land Use
Trips with
reduction factorTrip
Reduction
factor
TripsTrip RateTrip rate
calc per
Trip Split
Ratio IN OUT
AM 204 - 204 25:75 51 153
PM 204 - 204 70:30 143 61
AM 103 - 103 75:25 77 26
PM 103 - 103 30:70 31 72
AM 114 - 114 85:15 97 17
PM 114 - 114 20:80 23 91
AM 79 0,55 144 50:50 72 72
Midday 99 0,55 180 50:50 90 90
PM 79 0,55 144 50:50 72 72
SplitLand-use Peak Period Trips PHF
Peak Hr
pc trips
Single dwelling units
Business Centre Park
Industrial Area (Park)
Institution - College
Sub-development C - Calculation of trip reduction factors PC = 1 - (1 - PM) x (1 - PV) x (1 - PT)
Land Use Trips% Mixed-Use
(Max Factor)
% Low
Vehicle
%
Transit
nodes
Combined
factor without
Mixed-use
Trips without
Mixed-use
factor (x)
In Out
Assumption of
Internal circulating
trips for mix-use (y)
% of proposed
Mixed use trips
(y/x)
Pc
Combined
Factor
Residential 1 Houses 1530 10 40 15 0,490 750 187 562 25 3 0,507
Business Park 408 15 20 15 0,320 131 111 20 10 8 0,372
Pre-school (1) 425 5 50 15 0,575 244 122 122 10 4 0,592
Primary school (1) 200 30 50 15 0,575 115 58 57 20 17 0,649
Trip Generation
AM Mid PM AM Mid PM AM Mid PM
210 Single dwelling Units No. No. 1,00 - 1,00 1530 1530 - 1530 0,537 708 - 708
770 Business Park sqm 100sqm 1,50 - 1,50 27200 408 - 408 0,372 256 - 256
520 Public Primary School Student Student 0,85 0,35 0,30 500 425 175 150 0,592 173 71 61
565 Pre-School Student Student 1,00 0,35 0,80 200 200 70 160 0,649 70 25 56
Code Land Use UnitTrip rate
calc per
Trip RateProposed
Trips Trip
Reduction
factor
Trips with
reduction factor
Vtdp N14 Dev– TIA (V1) 11
6.1.4. Trip reduction factor, generation and split for Sub-Development D
Capacity analysis standards
- Assessment hours: Normal Hours. - Right turn movements at signalized intersections may operate at LOS E on
condition that queue length of 95th percentile is provided. - Acceptable LOS is D. - Microscopic simulation software used: Auto J (Developed by Dr. John Sampson).
Sub-development C
Trip Split
Ratio IN OUT
AM 708 - 708 25:75 177 531
PM 708 - 708 70:30 496 212
AM 256 - 256 85:15 218 38
PM 256 - 256 20:80 51 205
AM 173 0,55 315 50:50 158 157
Midday 71 0,55 129 45:55 58 71
PM 61 0,55 111 50:50 56 55
AM 70 0,85 82 50:50 41 41
Midday 25 0,85 29 50:50 15 14
PM 56 0,85 66 50:50 33 33
Single dwelling units
Business Centre Park
Public Primary School
Pre-school
Land-use Peak Period Trips PHFPeak Hr
pc trips
Split
Sub-development D - Calculation of trip reduction factors PC = 1 - (1 - PM) x (1 - PV) x (1 - PT)
Land Use Trips% Mixed-Use
(Max Factor)
% Low
Vehicle
%
Transit
nodes
Combined
factor without
Mixed-use
Trips without
Mixed-use
factor (x)
In Out
Assumption of
Internal circulating
trips for mix-use (y)
% of proposed
Mixed use trips
(y/x)
Pc
Combined
Factor
Residential 2 Houses 129 15 30 15 0,405 52 13 39 0 0 0,405
Trip Generation
AM Mid PM AM Mid PM AM Mid PM
232 Multi-level Town Houses No. No. 0,75 - 0,75 169 127 - 127 0,405 75 - 75
ProposedTrips Trip
Reduction
factor
Trips with
reduction factorCode Land Use UnitTrip rate
calc per
Trip Rate
Trip Split
Ratio IN OUT
AM 75 - 75 25:75 19 56
PM 75 - 75 70:30 53 23Multi-level Town
Peak Period Trips PHFPeak Hr
pc trips
SplitLand-use
Vtdp N14 Dev– TIA (V1) 12
Level of Service Criteria (HCM)
Level of Service
Avg. Delay for Stop Controlled
A <10
B <15
C <25
D <35
E <50
F = 50+
Data collection
6.3.1. Traffic counts:
Manual intersection traffic counts were conducted. - Date : 15 November 2017 (Wednesday) - Period : Morning - 6:00 – 9:00,
Afternoon - 15:00 – 18:00 - Intersections : A. N14/R30
B. Loccatie Str/R30 C. De Beer Str/R30 D. Yssel Rd/Loccatie Str E. Phuthaditshaba Str/Letsibaba Str
- Lane configurations of the intersections is reflected by the layouts on the table of
summary of intersection analysis results below.
Table 5: Intersections lane configurations
A. N14/R30 B. Loccatie Str/R30
Vtdp N14 Dev– TIA (V1) 13
C. De Beer Str/R30 D. Yssel Rd/Loccatie Str
E. Phuthaditshaba Str/Letsibaba Str
6.3.2. Peak Hour & Years of analysis
→ AM : 6H45 – 7H45 → PM : 16H30 – 17H30 → Base year : 2018 → Horizon year : 2023
PHF, growth rate and trip distribution
6.4.1. Peak hour factor
HCM recommends 0.92 PHF for urban areas, it will therefore be applied to calculate the peak hour volumes.
Vtdp N14 Dev– TIA (V1) 14
6.4.2. Growth rate
- The COTO recommends 3-4% growth rates for average growth areas. - The surrounding area is developed with residential units and commercial. - A growth rate of 4.0% shall be applied for analysis. See attached Annexure C for Traffic Counts, Peak hour and projections.
6.4.3. Trip distribution
See the attached Figure 3 of Annexure A.
Assessment Scenarios and criteria
Table 6: Assessment Scenarios
SCENARIO ASSESSMENT YEAR AND
TRAFFIC DEMAND INTERSECTION LAYOUT
1 Status Quo 2018 Existing 2018 road layout.
2 2017 Background + Development Improved 2018 road layout.
3 2023 Horizon Improved 2018 road layout.
4 2023 Horizon + Development Improved 2018 Layout
Intersections capacity analysis results for scenarios
See detailed intersection analysis results attached as Annexure D.
Vtdp N14 Dev– TIA (V1) 15
Table 7: Intersection A- Summary of analysis results
Table 8: Intersection C - Summary of analysis results
Intersection: B &
Scenario 1
v/c
Del
ay
LOS
v/c
Del
ay
LOS
North 0.2 9 A 0.1 9 ASouth - - - - - -West 0.3 1 A 0.1 0 AEast 0.1 0 A 0.3 2 AOverall 0.2 2 A 0.3 2 A
Scenario 2
v/c
Del
ay
LOS
v/c
Del
ay
LOS
North 0.19 9 A 0.1 9 ASouth - - - - - -West 0.26 1 A 0.1 0 AEast 0.12 1 A 0.3 2 AOverall 0.23 2 A 0.3 2 A
Scenario 3
v/c
Del
ay
LOS
v/c
Del
ay
LOS
North 0.25 10 B 0.1 9 ASouth - - - - - -West 0.3 2 A 0.1 0 AEast 0.14 1 A 0.4 2 AOverall 0.26 3 A 0.3 2 A
Scenario 4
v/c
Del
ay
LOS
v/c
Del
ay
LOS
North 0.3 10 B 0.1 9 ASouth - - - - - -West 0.3 2 A 0.1 0 AEast 0.2 1 A 0.4 2 AOverall 0.3 3 A 0.3 2 A
Peter Wessels Street
Intersection Layout
Intersection Layout AM Peak PM Peak
Intersection will still operate at highly acceptablelevel of service with the development trips during
base year.
AM Peak
Eastwood Road
Intersection operates at highly acceptablelevel of service.
PM Peak
level of service during the horizon year.Intersection will still operate at highly acceptable
Intersection Layout AM Peak Friday PM Peak
Intersection will operate at highly acceptable LOS duringthe horizon year with the site traffic.
Intersection Layout AM Peak PM Peak
Vtdp N14 Dev– TIA (V1) 16
Table 9: Intersection D - Summary of analysis results
Intersection: C &
Scenario 1: 2017 Existing
v/c
Del
ay
LOS
v/c
Del
ay
LOS
North - - - - - -
South 0,11 9 A 0,05 9 A
West 0,29 2 A 0,11 0 A
East 0,08 0 0 0,32 2 0Overall 0,23 2 A 0,27 2 A
Scenario 2: 2017 + Dev
v/c
Del
ay
LOS
v/c
Del
ay
LOS
North - - - - - -South 0,12 9 A 0,06 9 AWest 0,31 2 A 0,12 1 AEast 0,08 0 0 0,34 2 0Overall 0,24 2 A 0,29 2 A
Scenario 3: 2022 Horizon
v/c
Del
ay
LOS
v/c
Del
ay
LOS
North - - - - - -South 0,15 9 A 0,08 9 AWest 0,35 2 A 0,13 1 AEast 0,09 0 0 0,38 2 0Overall 0,28 2 A 0,32 2 A
Scenario 4: 2022 + Dev
v/c
Del
ay
LOS
v/c
Del
ay
LOS
North - - - - - -South 0,16 9 A 0,09 9 AWest 0,36 2 A 0,14 1 AEast 0,10 0 0 0,40 3 0Overall 0,29 3 A 0,34 2 A
AM Peak PM Peak
AM Peak PM Peak
Development trips will have negligible effect on the highly
acceptable operating conditions in the horizon year.
The road network operations will still be at highly
acceptable LOS during the horizon year.
President Street
The road network operating conditions will still be at highly
acceptable LOS with the development trips.
AM Peak PM Peak
AM Peak
Eastwood Road
PM Peak
The 2017 background traffic operates at highly acceptable
LOS.
Vtdp N14 Dev– TIA (V1) 17
Intersection: D &
Scenario 1: 2017 Existing
v/c
Del
ay
LOS
v/c
Del
ay
LOS
North - - - - - -
South 0,04 8 A 0,02 8 A
West 0,28 2 A 0,11 0 A
East 0,08 0 0 0,26 1 0Overall 0,23 2 A 0,22 1 A
Scenario 2: 2017 + Dev
v/c
Del
ay
LOS
v/c
Del
ay
LOS
North - - - - - -South 0,04 9 A 0,02 8 AWest 0,30 2 A 0,11 1 AEast 0,09 0 0 0,28 2 0Overall 0,24 2 A 0,23 1 A
Scenario 3: 2022 Horizon
v/c
Del
ay
LOS
v/c
Del
ay
LOS
North - - - - - -South 0,05 9 A 0,02 8 AWest 0,34 2 A 0,13 1 AEast 0,10 0 0 0,31 2 0Overall 0,27 2 A 0,26 2 A
Scenario 4: 2022 + Dev
v/c
Del
ay
LOS
v/c
Del
ay
LOS
North - - - - - -South 0,06 9 A 0,03 8 AWest 0,35 2 A 0,14 1 AEast 0,10 0 0 0,33 2 0Overall 0,28 2 A 0,27 2 A
AM Peak PM Peak
AM Peak PM Peak
Development trips will have negligible effect on the highly
acceptable operating conditions in the horizon year.
The road network operations will still be at highly
acceptable LOS during the horizon year.
Park Street
The road network operating conditions will still be at highly
acceptable LOS with the development trips.
AM Peak PM Peak
AM Peak
Eastwood Road
PM Peak
The 2017 background traffic operates at highly acceptable
LOS.
Vtdp N14 Dev– TIA (V1) 18
Table 10: Intersection Entrance - Summary of analysis results
Intersection: Entr &
Scenario 2a: 2017 + Dev (Alt 1)
v/c
Del
ay
LOS
v/c
Del
ay
LOS
North 0,03 9 A 0,13 9 A
South - - - - - -
West 0,30 2 A 0,09 0 A
East 0,11 1 0 0,34 2 0Overall 0,25 2 0 0,27 2 0
Scenario 4a: 2022 + Dev (Alt 1)
v/c
Del
ay
LOS
v/c
Del
ay
LOS
North 0,04 9 A 0,16 9 ASouth - - - - - -West 0,35 2 A 0,11 0 AEast 0,13 1 A 0,40 3 AOverall 0,30 2 A 0,33 3 A
Site Access
The site access will still not have capacity problems in the
horizon year.
AM Peak PM Peak
AM Peak
Eastwood Road
PM Peak
With the proposed stop from the site merging to Eastwood
Street, the site access will not have any capacity problem
during the base year.
Vtdp N14 Dev– TIA (V1) 19
Road Access, Intersection Provision and Spacing
- Full intersection shall be provided for all sub-developments with R30 being a priority road.
- There is an access position approved at approximately 600m to the north of N14 along R30 which is meant to provide an access to Tshing Village and proposed sub-development D. A symmetrical intersection is therefore proposed to provided an access to the proposed sub-development A. Also a second linkage on the northern part of the sub-development A is proposed. This second linkage shall link with the intersection to Tshing Village.
- A symmetrical intersection to sub-developments B and C is proposed to the south of N14 along R30. Since this intersection is new, it will require a spacing of 800±15% along R30 from N14 intersection.
- Internal Class 4a, 4b and 5b intersections to be spaced at a minimum of 100m, 75m and 50m respectively.
Access analysis
Driveway design
Not required during the Traffic Impact Assessment Stage.
Accesses throat lengths
Not required during the Traffic Impact Assessment Stage.
Sight distance requirements
Sight distance calculations: Sub-development A – Access Y
Movement No. of lanes Left turn 1 Straight through 3
i. Left turn movement ii. Straight through movement
Vtdp N14 Dev– TIA (V1) 20
Access position
9.1.1. Proposed site access position
- Sub-development A: 2 intersections are proposed off R30 to provide access. The
intersections are denoted as Y and Z on figure 2 below.
- Sub-development B and C: intersection is proposed off R30 to provided access to
these two sub-developments. The intersection is denoted as X on figure 2 below.
- Sub-development D: This development shall obtain access of an existing
Letsibaba Street.
9.1.2. Impact of site access on adjacent properties
- All the sites access does not affect the neighbourhood accesses.
Recommended access layout and control from the road
From above summary of intersection analysis results, it is recommended that all-way stop
control be provided to better the operating conditions for the site access.
Vtdp N14 Dev– TIA (V1) 21
Figure 2 : Existing Intersections and Proposed access positions
Vtdp N14 Dev– TIA (V1) 22
Road Widening, PWV Network and Servitudes
Road widening & PWV Network
a. Municipal Roads: No widening required. b. Provincial Roads: Site is not affected. c. SANRAL Roads: Site is not affected. See Annexure F for PWV Road Network.
Servitudes
- Internal road servitudes in accordance of the road classes shall be registered to the
satisfaction of the municipality. - External and internal splays to be registered to the satisfaction of SANRAL and
Municipality respectively. - Servitudes for road connection network to the neighboughing properties shall be
registered to the satisfaction of the Municipality.
Public transport assessment
In terms of the National Land Transport Act (NLTA) (Act No 5 of 2009) Section 35,
assessment of public transport should be included in the traffic impact assessments.
The following comments are relevant in respect to the public transport availability at
the proposed development.
a. Public transport
- R30 Road is a transit road comprising of mini-buses (taxis) and buses.
- It is proposed that the one stand zoned Municipal in Sub-development C shall be
allocated to taxis as a small taxi holding and rank. This taxi rank shall have
dedicated route within Sub-developments B and C.
- The site shall therefore be well serviced by Public Transport.
b. Non-motorized transport
- A 1,5m paved side-walk is therefore proposed to be constructed on the internal roads in accordance with the Municipal standards at the properties frontage to cater for NMT.
Vtdp N14 Dev– TIA (V1) 23
Parking requirements
- There is a conceptual Site Development Plan prepared which is not yet finalized, however, the parking shall be provided internally as per the town-planning scheme.
Summary and Recommendations
In summary:
- This TIA report is prepared to support a Township establishment in Ventersdorp
area, situated at the intersection of N14/R30. - The methodology of approaching this development TIA was sub-dividing
development into four sub-developments i.e A, B, C and D situated at NE, SE, SW and SE of N14/R30 intersection respectively.
- Land use township application is in cicrulation seeking an approval of the following rigths on sub-developments:
Land Use Measure Sub-development
A B C D
Residential 1 Houses No. Units 686 440 1530 - Residential 2 Houses ha 6.87 - - 6.74 Industrial ha - 7.64 - - Municipal ha 0.99 2.28 5.02 - Business ha 2.96 2.51 5.44 - Pre-school ha 0.6 - 0.84 - Primary school ha 3.08 - 3.0 - Secondary school ha - - 5.12 - Institutional (College) ha - 14.79 - - Public Spaces ha Vary Vary Vary -
Land Use Measure for Trips
Sub-development
A B C D
Residential 1 Houses No. Units 686 440 1530 - Residential 2 Houses No. of Units 172 - - 169 Industrial FA (m2) - 22900 - - Municipal To be determined - - - - Business FA (m2) 14800 12550 27200 - Pre-school No. Students 200 - 200 - Primary school No. Students 500 - 500 - Secondary school No. Students - - 500 - Institutional (College) No. Students - 1000 - - Public Spaces N/A - - - -
Peak Hour Trips
Land Use Sub-dev A Sub-dev B Sub-dev C Sub-dev D
AM Midday PM AM Midday PM AM Midday PM AM Midday PM
Residential 1 329 - 329 204 - 204 708 - 708 - - - Residential 2 69 - 69 - - - - - - 75 - 75 Industrial - - - 103 - 103 - - -
Vtdp N14 Dev– TIA (V1) 24
Municipal - - - - - - - - - - - - Business 130 - 130 114 - 114 256 - 256 - - - Pre-school 70 25 56 - - - 70 25 56 - - - Primary school 173 71 61 - - - 173 71 61 - - - Secondary school - - - - - - - - - - - - College - - - 79 99 79 - - - - - - Public Spaces - - - - - - - - - - - -
- Traffic counts were conducted at the following intersections: N14/R30 R30/Yssel Str R30/De Beer Str Locattie Str/Yssel Str Phuthaditshaba Str/Letsibaba
- AM and PM peak hours were determined to be 6:45 – 7:45 and 16:30 – 17:30 respectively.
- PHF of 0.92 and 4% traffic growth rate were applied for analysis of intersections. - Auto J micro-analysis program was used to analyze the intersections. - Intersection analysis results:
Intersection Description 2018 2018+Dev 2023 2023+Dev
A N14/R30 Operates at acceptable LOS
Operates at acceptable LOS
Operates at acceptable LOS
Operates at acceptable LOS
B R30/Loccattie Str
Operates at acceptable LOS
Operates at acceptable LOS
Operates at acceptable LOS
Operates at acceptable LOS
C R30/De Beer Str Operates at acceptable LOS
Operates at acceptable LOS
Operates at acceptable LOS
Operates at acceptable LOS
D Locattie/Yssel Operates at acceptable LOS
Operates at acceptable LOS
Operates at acceptable LOS
Operates at acceptable LOS
E Phuthaditshaba /Letsibaba
Operates at acceptable LOS
Operates at acceptable LOS
Operates at acceptable LOS
Operates at acceptable LOS
X Sub-dev B & C/R30
Operates at acceptable LOS
Operates at acceptable LOS
Operates at acceptable LOS
Operates at acceptable LOS
Y Sub-dev A/R30 Operates at acceptable LOS
Operates at acceptable LOS
Operates at acceptable LOS
Operates at acceptable LOS
Z Sub-dev A/R30 Operates at acceptable LOS
Operates at acceptable LOS
Operates at acceptable LOS
Operates at acceptable LOS
- Public transport is available along R30 Road which is adjacent to the sub-
developments. A taxi holding and rank shall also be provided at one stand zoned Municipal.
- Servitudes to be provided to the satisfaction of the Municipality. - Splays to be provided to the satisfaction of SANRAL and Municipality.
Vtdp N14 Dev– TIA (V1) 25
It is therefore recommented that:
a. Upgrades by the developer
i. Site access
→ Sub-development A to obtain 2 intersections off R30 that will provide access to
site. First to be situated at approximately 600m to the north of the intersection of R30/N14, the second access to be at approximately 700m from the first intersection. Access to be as per the SANRAL speciication.
→ Sub-development B and C to obtain one intersection off R30 that will provide access to both developments. The access to be situated at approximately 800m to the south of the intersection of R30/N14. Access to be as per SANRAL specification.
→ Sub-development D to obtain access off Letsibaba street. ii. Non-motorised transport → A 1,5m paved side-walk to be constructed within the internal property roads on
the properties frontage to cater for NMT.
Vtdp N14 Dev– TIA (V1) 26
Conclusion
Based on the contents and findings contained in this report, it is recommended that the
authority approves the recommendations in this report, pertaining to the Development.
Should there be any further information required, please feel free to contact us as soon as possible.
References:
Principles of Highway Engineering and Traffic Analysis by FL Mannering, WP Kilareski and SS Washburn
Guidelines for Human Settlement Planning and Design by CSIR Guidelines for access to private developments by JC de Vries South African Trip Data Manual - TMH 17, Version 1.01, September 2013 by Committee
of Transport Officials (COTO) South African Traffic Impact and Site Traffic Assessment Standards and Requirements
Manual, August 2012, by COTO Technical Guidelines and Criteria for Enclosed Neighbourhoods, June 2007
National Land Transport Act – Act No 5 of 2009 Section 35
Annexure A - List of Figures (Volumes)
N14
Sub-dev D
R30
Sub-dev A
Sub-dev BSub-dev C
D
Locc
atie
De
Bee
r
Phuthaditshaba
Lets
ibab
a
Yssel
R30BZ C
Y
A
X
E
5%
5% 25% 5%
15%35%
10% 5%
5%
5%
5
5%
5%
5%
3
0%
1
0%
5%
5%
5%
25%35%
5%
5%55%
5%15%30%
5%
5%
5% 10%
5%
15%
5%
20%
5% 20%
5%
15%
5%
5%
15%
15%
N14 Development (Ventersdorp) Figure 3A1
Turning Volumes (vph)
LEGEND
10% - AM & PM Development Assignment
Sub-Development A - Residential Trip Assignment
N14
Sub-dev D
R30
Sub-dev A
Sub-dev BSub-dev C
D
Locc
atie
De
Bee
r
Phuthaditshaba
Lets
ibab
a
Yssel
R30BZ C
Y
A
X
E
10%
5% 20% 5%
25%30%
5% 45%
5%
5%
1
5%
5%
5%
2
5%
5
%
10%
10%
5%
20%30%
5%
45% 15%
45%15%25%
5%
5%
5% 5% 5%
25%
5%
15%
5% 15%
5%
15%
45%
10%
15%
15%
N14 Development (Ventersdorp) Figure 3A2
Turning Volumes (vph)
LEGEND
10% - AM & PM Development Assignment
Sub-Development A - Business Trip Assignment
N14
Sub-dev D
R30
Sub-dev A
Sub-dev BSub-dev C
D
Locc
atie
De
Bee
r
Phuthaditshaba
Lets
ibab
a
Yssel
R30BZ C
Y
A
X
E
10%
0% 20% 0%
25%20%
0% 0%
5%
5%
4
5%
0%
0%
3
5%
5
%
10%
10%
5%
20%20%
5%
0% 45%
20%35%
0%
20%
5% 5% 20%
25%
0%
30%
5% 30%
0%
20%
0%
10%
20%
20%
N14 Development (Ventersdorp) Figure 3A3
Turning Volumes (vph)
LEGEND
10% - AM & PM Development Assignment
Sub-Development A - Schools Trip Assignment
N14
Sub-dev D
R30
Sub-dev A
Sub-dev BSub-dev C
D
Locc
atie
De
Bee
r
Phuthaditshaba
Lets
ibab
a
Yssel
R30BZ C
Y
A
X
E
(16) 6
(7) 17 (34) 86 (7) 17
(21) 52(43) 120(14) 34 (7) 17
(16) 6
(16) 6
(7
6) 1
89
(
16) 6
(
16) 6
(96)
34
(3
2) 1
1
(7
) 17
(7
) 17
(7
) 17
28 (80)40 (112)
6 (16)
6 (16)63 (176)
17 (7)52 (21)103 (41)
5 (16)
6 (16)
17 (7
) 3
4 (1
4) 1
7 (7
)
17
(48)
6 (1
6)
(64
) 23
17
(7)
69
(28)
17
(7)
(48) 17
6 (1
6)
6 (1
6)
(2
1) 5
2
(48) 17
N14 Development (Ventersdorp) Figure 4A1
Sub-Development A - Residential Trips
Turning Volumes (vph)
LEGEND
10 - AM Peak Hour Development Trips(10) - PM Peak Hour Development Trips
N14
Sub-dev D
R30
Sub-dev A
Sub-dev BSub-dev C
D
Locc
atie
De
Bee
r
Phuthaditshaba
Lets
ibab
a
Yssel
R30BZ C
Y
A
X
E
(3) 11
(5) 1 (21) 4 (5) 1
(26) 5(31) 6 (5) 1 (47) 9
(1) 6
(1) 5
(17)
4
1 (5
)
(1) 5
(6) 2
8
(2
) 6
(1
0) 2
(1
0) 2
(
6) 1
22 (5)33 (8)
6 (1)
50 (11) 16 (4)
9 (47) 3 (16) 5 (26)
6 (1)
5 (1)
1 (5
)1
(6)
1 (5
)
28 (7
)
6 (2
)
(4
) 16
1 (5
) 3
(16)
1 (5
)
(4) 16
50
(11)
11 (3
)
(
16) 3
(4) 16
N14 Development (Ventersdorp) Figure 4A2
Sub-Development A - Business Trips
Turning Volumes (vph)
LEGEND
10 - AM Peak Hour Development Trips(10) - PM Peak Hour Development Trips
N14
Sub-dev D
R30
Sub-dev A
Sub-dev BSub-dev C
D
Locc
atie
De
Bee
r
Phuthaditshaba
Lets
ibab
a
Yssel
R30BZ C
Y
A
X
E
(9) 20
0 (18) 40 0
(22) 49 (18) 40 0 0
(4) 9
(4) 10
(40)
89
0
0
(31)
70
(
5) 1
0
(
9) 2
0
(9)
19
(
4) 1
0
40 (18)40 (18)
10 (4)
0 90 (40)
40 (18) 70 (31)
1 (1)
40 (17) 1
0 (4
) 1
0 (4
) 3
9 (1
8)
50
(22)
0
(2
6) 6
0
10 (4
)59
(26)
0
(18) 40
0
20 (9
)
(1
8) 4
0
(18) 40
N14 Development (Ventersdorp) Figure 4A3
Sub-Development A - Schools Trips
Turning Volumes (vph)
LEGEND
10 - AM Peak Hour Development Trips(10) - PM Peak Hour Development Trips
N14
Sub-dev D
R30
Sub-dev A
Sub-dev BSub-dev C
D
Locc
atie
De
Bee
r
Phuthaditshaba
Lets
ibab
a
Yssel
R30BZ C
Y
A
X
E
(28) 37
(12) 18(73) 130(12) 18
(69) 106 (92) 166 (19) 35 (54) 26
(21) 21
(21) 21
(28
2) 1
33
(1
7) 1
1
(1
7) 1
1
(13
3) 1
32
(39)
27
(26
) 39
(26
) 38
(17
) 28
90 (103)113 (138)
22 (21)
56 (27) 169 (220)
26 (54) 95 (55) 178 (98)
12 (18)
51 (34)
28
(16)
45
(24)
57
(30)
95
(77)
12
(18)
(9
4) 9
9
28
(16)
131
(70)
18
(12)
(70) 73
27
(56)
37 (2
8)
(5
5) 6
8
(70) 73
N14 Development (Ventersdorp) Figure 4AO
Sub-Development A - Overall Trips
Turning Volumes (vph)
LEGEND
10 - AM Peak Hour Development Trips(10) - PM Peak Hour Development Trips
Annexure B - Trip Generation Rates
Percentage reduction for developments in areas with
Mixed-use Low vehicle Very Low Transit nodes
Land Use Size Units Development Ownership Ownership or Corridors
100 Industrial
110 Service Industry 100 sqm GLA 5% 20% 30% 15%
120 Heavy industry/manufacturing 100 sqm GLA 5% 20% 30% 15%
121 Mining 1 Employees 5% 20% 30% 15%
130 Industrial Area (Park) 100 sqm GLA 5% 20% 30% 15%
140 Manufacturing 100 sqm GLA 5% 20% 30% 15%
150 Warehousing and Distribution 100 sqm GLA 5% 20% 30% 15%
151 Mini-Warehousing 100 sqm GLA 5% 20% 30% 15%
200 Residential
210 Single Dwelling Units 1 D/Unit 10% 40% 70% 15%
220 Apartments and Flats 1 D/Unit 15% 30% 50% 15%
225 Student Apartments and Flats 1 D/Unit 25% 50% 80% 15%
231 Townhouses (Simplexes and Duplexes) 1 D/Unit 15% 30% 50% 15%
232 Multi-Level Townhouses 1 D/Unit 15% 30% 50% 15%
251 Retirement Village 1 D/Unit 5% 50% 80% 15%
254 Old-Age Home 1 D/Unit 5% 50% 80% 15%
260 Recreational Homes 1 D/Unit 10% 20% 30% 15%
300 Lodging
310 Hotel, Residential 1 Room 20% 20% 30% 15%
330 Hotel, Resort 1 Room 20% 20% 30% 15%
350 Guest House 1 Room 20% 30% 50% 15%
400 Recreational and Sport
430 Golf Course 1 Course 5% 0% 0% 0%
473 Casino 100 sqm GLA 5% 20% 30% 15%
480 Amusement Park 1 ha 5% 30% 50% 15%
488 Sport Stadium 1000 Seat 5% 30% 50% 15%
492 Health and Fitness Centre 100 sqm GLA 15% 20% 30% 15%
500 Institutional
520 Public Primary School 1 Student 30% 50% 80% 15%
530 Public Secondary School 1 Student 30% 50% 80% 15%
536 Private School 1 Student 30% 50% 80% 15%
550 University / College 1 Student 20% 40% 60% 15%
560 Places of Public Worship (Weekend) 1 Seat 10% 50% 80% 15%
561 Places of Public Worship (Weekday) 1 Seat 10% 50% 80% 15%
565 Pre-School (Day Care Centre) 1 Student 5% 50% 80% 15%
566 Cemetery 1 Ha 0% 30% 50% 15%
600 Medical
611 Public Hospital 1 Bed 0% 50% 80% 15%
612 Private Hospital 100 sqm GLA 0% 20% 30% 15%
620 Nursing Home 1 Bed 0% 50% 80% 15%
630 Medical Clinic 100 sqm GLA 0% 50% 80% 15%
700 Office
710 Offices 100 sqm GLA 20% 20% 30% 15%
713 Home offices and undertakings 1 House 10% 20% 30% 15%
720 Medical consulting rooms 100 sqm GLA 10% 30% 50% 15%
770 Business Centre (Park) 100 sqm GLA 15% 20% 30% 15%
780 Conference Centre 1 Seat 10% 20% 30% 10%
Table 3.2: Trip Generation Adjustment Factors
800 Retail
812 Building Materials 100 sqm GLA 10% 30% 50% 15%
816 Hardware and Paint Store 100 sqm GLA 10% 30% 50% 15%
817 Nursery (Garden Centre) 101 sqm GLA 10% 30% 50% 15%
820 Shopping Centre 100 sqm GLA 10% 30% 60% 15%
830 Bulk Trade Centre 100 sqm GLA 10% 30% 60% 15%
841 Motor Dealership 100 sqm GLA 5% 20% 30% 15%
860 Wholesale Market (Fresh produce) 100 sqm GLA 0% 0% 0% 5%
890 Furniture Store 100 sqm GLA 5% 30% 50% 15%
900 Services
931 Restaurant, Quality (Sit-down) 100 sqm GLA 10% 10% 15% 15%
932 Restaurant, Family (Sit-down) 100 sqm GLA 10% 30% 50% 15%
933 Fast Food 100 sqm GLA 10% 40% 60% 15%
946 Filling Station 1 Station 0% 0% 0% 0%
950 Vehicle Fitment Centre 100 sqm GLA 0% 0% 0% 0%
Size Adjustment Factor
1+A/(1+sqm Size/B)
110 Service Industry 100 sqm GLA
Description AM Peak PM Peak Friday PM Midday Evening Saturday Sunday Factor A Factor B
Trip Rate 0.90 0.90 0.90 0.15
% Heavy
In/Out 75:25 25:75 50:50 50:50
PHF Dev
PHF Street
Veh Occupancy
% Pass-by
% Diverted
120 Heavy industry/manufacturing 100 sqm GLA
Description AM Peak PM Peak Friday PM Midday Evening Saturday Sunday Factor A Factor B
Trip Rate 0.50 0.70
% Heavy
In/Out 75:25 25:75
PHF Dev
PHF Street
Veh Occupancy 1.80
% Pass-by
% Diverted
121 Mining 1 Employees
Description AM Peak PM Peak Friday PM Midday Evening Saturday Sunday Factor A Factor B
Trip Rate
% Heavy
In/Out
PHF Dev
PHF Street
Veh Occupancy
% Pass-by
% Diverted
130 Industrial Area (Park) 100 sqm GLA
Description AM Peak PM Peak Friday PM Midday Evening Saturday Sunday Factor A Factor B
Trip Rate 0.80 0.80 0.40
% Heavy
In/Out 70:30 25:75 30:70
PHF Dev
PHF Street
Veh Occupancy 1.80
% Pass-by
% Diverted
140 Manufacturing 100 sqm GLA
Description AM Peak PM Peak Friday PM Midday Evening Saturday Sunday Factor A Factor B
Trip Rate 0.60 0.60 0.30
% Heavy
In/Out 80:20 20:80
PHF Dev
PHF Street
Veh Occupancy 1.50 1.50
% Pass-by
% Diverted
Table 3.3: Peak-hour Trip Generation Rates and Parameters
150 Warehousing and Distribution 100 sqm GLA
Description AM Peak PM Peak Friday PM Midday Evening Saturday Sunday Factor A Factor B
Trip Rate 0.50 0.50 0.15
% Heavy
In/Out 60:40 45:55 65:35
PHF Dev
PHF Street
Veh Occupancy 1.50 1.50
% Pass-by
% Diverted
151 Mini-Warehousing 100 sqm GLA
Description AM Peak PM Peak Friday PM Midday Evening Saturday Sunday Factor A Factor B
Trip Rate 0.15 0.25 0.40 0.30
% Heavy
In/Out 60:40 50:50 50:50 50:50
PHF Dev
PHF Street
Veh Occupancy
% Pass-by
% Diverted
210 Single Dwelling Units 1 D/Unit
Description AM Peak PM Peak Friday PM Midday Evening Saturday Sunday Factor A Factor B
Trip Rate 1.00 1.00 0.50 0.50
% Heavy
In/Out 25:75 70:30 50:50 50:50
PHF Dev
PHF Street
Veh Occupancy
% Pass-by
% Diverted
220 Apartments and Flats 1 D/Unit
Description AM Peak PM Peak Friday PM Midday Evening Saturday Sunday Factor A Factor B
Trip Rate 0.65 0.65 0.35 0.35
% Heavy
In/Out 25:75 70:30 50:50 50:50
PHF Dev
PHF Street
Veh Occupancy
% Pass-by
% Diverted
225 Student Apartments and Flats 1 D/Unit
Description AM Peak PM Peak Friday PM Midday Evening Saturday Sunday Factor A Factor B
Trip Rate 0.20 0.30 0.15 0.15
% Heavy
In/Out 25:75 65:35 50:50 50:50
PHF Dev
PHF Street
Veh Occupancy
% Pass-by
% Diverted
231 Townhouses (Simplexes and Duplexes) 1 D/Unit
Description AM Peak PM Peak Friday PM Midday Evening Saturday Sunday Factor A Factor B
Trip Rate 0.85 0.85 0.45 0.45
% Heavy
In/Out 25:75 70:30 50:50 50:50
PHF Dev
PHF Street
Veh Occupancy
% Pass-by
% Diverted
520 Public Primary School 1 Student
Description AM Peak PM Peak Friday PM Midday Evening Saturday Sunday Factor A Factor B
Trip Rate 0.85 0.30 0.35
% Heavy
In/Out 50:50 50:50 45:55
PHF Dev 0.55 0.55
PHF Street
Veh Occupancy 1.55 1.70
% Pass-by
% Diverted
530 Public Secondary School 1 Student
Description AM Peak PM Peak Friday PM Midday Evening Saturday Sunday Factor A Factor B
Trip Rate 0.75 0.25 0.35
% Heavy
In/Out 50:50 50:50 45:55
PHF Dev 0.55 0.55
PHF Street
Veh Occupancy 1.40 1.70
% Pass-by
% Diverted
536 Private School 1 Student
Description AM Peak PM Peak Friday PM Midday Evening Saturday Sunday Factor A Factor B
Trip Rate 0.80 0.30 0.35
% Heavy
In/Out 50:50 50:50 50:50
PHF Dev 0.55 0.55
PHF Street
Veh Occupancy 1.50 1.70
% Pass-by
% Diverted
550 University / College 1 Student
Description AM Peak PM Peak Friday PM Midday Evening Saturday Sunday Factor A Factor B
Trip Rate 0.20 0.20 0.25
% Heavy
In/Out 80:20 30:70 30:70
PHF Dev 0.65 0.65
PHF Street
Veh Occupancy
% Pass-by
% Diverted
560 Places of Public Worship (Weekend) 1 Seat
Description AM Peak PM Peak Friday PM Midday Evening Saturday Sunday Factor A Factor B
Trip Rate 0.05 0.05 0.65
% Heavy
In/Out 55:45 50:50 55:45
PHF Dev
PHF Street
Veh Occupancy
% Pass-by
% Diverted
561 Places of Public Worship (Weekday) 1 Seat
Description AM Peak PM Peak Friday PM Midday Evening Saturday Sunday Factor A Factor B
Trip Rate 0.05 0.05
% Heavy
In/Out 50:50 50:50
PHF Dev
PHF Street
Veh Occupancy
% Pass-by
% Diverted
710 Offices 100 sqm GLA
Description AM Peak PM Peak Friday PM Midday Evening Saturday Sunday Factor A Factor B
Trip Rate 2.10 2.10 0.45 0.15
% Heavy
In/Out 85:15 20:80 55:45 55:45
PHF Dev
PHF Street
Veh Occupancy
% Pass-by
% Diverted
713 Home offices and undertakings 1 House
Description AM Peak PM Peak Friday PM Midday Evening Saturday Sunday Factor A Factor B
Trip Rate 6.50 6.50 7.00
% Heavy
In/Out 85:15 15:85 50:50
PHF Dev
PHF Street
Veh Occupancy
% Pass-by
% Diverted
720 Medical consulting rooms 100 sqm GLA
Description AM Peak PM Peak Friday PM Midday Evening Saturday Sunday Factor A Factor B
Trip Rate 8.00 8.00 8.00 3.90 0.45
% Heavy
In/Out 55:45 45:55 45:55 60:40 50:50
PHF Dev
PHF Street
Veh Occupancy 1.60 1.50
% Pass-by
% Diverted
770 Business Centre (Park) 100 sqm GLA
Description AM Peak PM Peak Friday PM Midday Evening Saturday Sunday Factor A Factor B
Trip Rate 1.50 1.50
% Heavy
In/Out 85:15 20:80
PHF Dev
PHF Street
Veh Occupancy
% Pass-by
% Diverted
780 Conference Centre 1 Seat
Description AM Peak PM Peak Friday PM Midday Evening Saturday Sunday Factor A Factor B
Trip Rate 0.50
% Heavy
In/Out 90:10
PHF Dev 0.75
PHF Street
Veh Occupancy 1.50
% Pass-by
% Diverted
812 Building Materials 100 sqm GLA
Description AM Peak PM Peak Friday PM Midday Evening Saturday Sunday Factor A Factor B
Trip Rate 2.80 5.50 11.00 5.00
% Heavy
In/Out 65:35 45:55 50:50 50:50
PHF Dev
PHF Street
Veh Occupancy
% Pass-by
% Diverted
Annexure E - Land Use Application
i | P a g e
INCEPTION AND DATA COLLECTION REPORT: PROPOSED
N14 TOWNSHIP ESTABLISHMENT(RFP/NW/2017/007).
DATE: 10 NOVEMBER 2017
ii | P a g e
Table of Contents
1.INTRODUCTION ........................................................................................................................... 1
1.1. National Objectives of Sustainable Human Settlement Developments ............................. 1
2.STUDY AREA IN CONTEXT ........................................................................................................... 2
3.LOCALITY ...................................................................................................................................... 2
4.PROPOSED IMPLEMENTATION PROGRAMME ........................................................................... 5
4.1. Detailed Programme with actual timelines ...................................................................... 7
5.DATA SO FAR COLLECTED .......................................................................................................... 12
5.1. Town Planning Information .......................................................................................... 12
5.1.1.Information Gaps ................................................................................................................. 12
5.2. Site Visit with Municipal Officials ............................................................................... 13
5.3. Environmental Information ...................................................................................... 13
5.3.1.Site Visit Observations ......................................................................................................... 14
5.4. Topographical Survey .................................................................................................. 15
5.5. Engineering Services .................................................................................................... 15
5.5.1.Scope .................................................................................................................................... 15
5.5.2. Topography and Drainage ................................................................................................... 16
5.5.3.Storm Water Management Objectives ................................................................................ 16
5.5.4. Storm water Management Control Measures .................................................................... 18
5.5.5.Geological overview ............................................................................................................. 18
5.6. Bulk Engineering Services ............................................................................................. 18
5.6.1.Water Supply ....................................................................................................................... 19
5.6.2.Sanitation ............................................................................................................................. 19
5.6.3.Electrical supply ................................................................................................................... 19
5.6.4.Road Infrastructure .............................................................................................................. 20
5.6.5.Waste Disposal ..................................................................................................................... 21
5.6.6.Overall Status Quo Assessment ........................................................................................... 21
6. REFERENCES .............................................................................................................................. 22
1 | P a g e
1. INTRODUCTION
The Housing Development Agency(“HDA”) has, on 27 September 2017 appointed
Mamphele Development Planners CC (“MDP”) to carry out a detailed Township
establishment for the creation of an Integrated and Sustainable Human Settlement on the
farms: Elandskuil No. 205 IP and Elandskuil No. 206, IP, North-West Province within the JB
Marks Local Municipality in Ventersdorp.
This report serves as the Inception Plan according to which the contract is to be
implemented. The report is structured in line with the stated project activities and
deliverables as set out in the Terms of Reference and it is not necessary in our view to
repeat them in this paragraph, save to indicate that the sequence of this Inception Report
is a product of the project proposal as submitted to the HDA by MDP.
This appointment has been followed by a Service Level Agreement duly signed on 04
October 2017 by the parties to this agreement.
1.1. National Objectives of Sustainable Human Settlement Developments.
The National goals of Sustainable Human Settlements are generally covered by the Breaking
New Ground Policy call on Human Settlements Developers to:
Accelerate delivery of housing within the context of sustainable human
settlements;
Provide Integrated housing within human settlements’ inclusionary approach;
Provide quality housing to turn homes into assets;
Create a single, efficient formal housing market;
Abolish apartheid spatial planning thereby, restructuring and integrating human
Settlements; and
Incorporating environmental protection as part of the integrated Human
Settlement development;
2 | P a g e
2. STUDY AREA IN CONTEXT
The urban area within the Local Municipality, collectively known as Ventersdorp, comprises
the suburbs Ventersdorp, Tshing and Toevlug. There are six rural villages located within
Ventersdorp Local Municipality, as set out below:
Goedgevonden
Situated 23km north east of Ventersdorp, within ward 5
Welgevonden
Situated 17km north-north east of Ventersdorp, within ward 3
Tsêtsê
Situated 15km north of Ventersdorp, within ward 3
Ga-Mogopa
Situated 23km north-north east of Ventersdorp, within ward 3
Boikhutso
Situated 10km north of Ventersdorp, within ward 3
Boikhutsong
Situated 17km north east of Ventersdorp, within ward 5
The municipality is home to almost 48,981 people of which 60% is urbanized (Ventersdorp)
and 40% rural. Approximately 94% of Ventersdorp Local Municipality is classified as
agricultural land (cultivated and uncultivated) which reflects the rural nature and character
of Ventersdorp Local Municipality
3. LOCALITY
Ventersdorp Local Municipality is situated in the eastern part of the North West Province.
It is one of the four local municipalities in Dr Kenneth Kaunda District Municipality. Situated
towards the north of Dr Kenneth Kaunda District Municipality, Ventersdorp borders onto
Gauteng Province towards the east, Bojanala District Municipality towards the north and
Ngaka Modiri Molema District Municipality towards the west.
The respective farm portions are briefly described below:
3 | P a g e
Remaining Extent of the farm Elandskuil 206 IP
This portion measures 83,0076 Hectares and is held under Title Deed No:
T14359/1986.
This portion is also located on the south-western outskirts of Ventersdorp, north east
of the N14 and R30 intersection.
The portion remains mostly unoccupied with the exception of the north eastern edge
which is occupied by informal dwellers
and the north western edge which is occupied by a quarry.
Unregistered Portion 3 of the farm Elandskuil 205 IP
This portion measures 143,7769 Hectares and is held under Title Deed No:
T98541/1997.
The total area of both portions of land is 257.484 hectares.
4 | P a g e
Figure 1: Locality of Land Portions
Tshing Township
Portion 205 IP
Portion 206 IP
Elandskuil Dam
Township
Skoonspruit River
5 | P a g e
4. PROPOSED IMPLEMENTATION PROGRAMME
In order for the project to be implemented within reasonable time frames, the following
Implementation Programme is proposed for adoption by the Client.
It needs to be noted though while we will take every reasonable effort to ensure that the
Project is delivered within the stipulated timeframe, a greater
proportion of the implementation time will be taken by the respective approving authorities
which too often do not consider these kinds of applications within
the statutory time frames. Our role in this regard will be a continuous persuasion of these
approving authorities for speedy approvals.
6 | P a g e
Road Project Timeline for the proposed Re/Elandskuil 205 and 206-IP Township Establishment:
Activities Month 1-4 Month
5-8
Month 9-
12 Month 13-14
Inception (stage 0)
a).Topographical Survey
b). Environmental Impact Assessment Report &
RoD
c). Civil Engineering Services Reports &
Floodline
d). Geotechnical Report
e). Township Establishment application &
circulation
f). Township approval process
g). GP Generation, pegging & approval
Duration of 6 Months over a 14 Months period
Total Duration of 7 months of the 16 Months period
Duration of 5 weeks over the 4 Months period
Duration of 2 weeks over a 14 months period
Duration of 2 months over a 16 months period
Duration of 4 months over a 14 months period
Duration of 5months over a 14 months period
Duration of 4 Months over a 14 Months period
Duration of 4 Weeks over a 14 Months period
Duration of 7 Weeks over a 14 Months period
Duration of 3 months over a 14 months period
7 | P a g e
h).Opening of Township Register
i). Township Proclamation
j). Project Management
Key milestone dates with reports at end of workstream
4.1. Detailed Programme with actual timelines.
Proposed Township Establishment: Remainder of Elandskuil 206 & Ptn 3/205, IP JB Marks Municipality, North-West Province.
No Items/Activities TIME FRAME( MONTHS): BASE MONTH: OCTOBER 2017
OCT-2017
NOV DEC JAN-,18 FEB MAR APR MAY JUNE JULY AUG SEP OCT NOV
A: INCEPTION REPORT
02-Oct to 13-
Oct/17
1 . Estimated Timeframes,
2 Initial Stakeholder engagement;
3 Site visits;
4 Final determination of the study area and
5 Signing of the Service Level Agreement
Duration of 6 weeks over a 14 months period
Duration of 3 weeks over a 14 months period
Continuous for 14 Months for the rest of the Project duration
8 | P a g e
6 B: TOWN PLANNING
7 1.Stakeholder Management
8 1.1. Client liaison/Mun/Community
9 1.2. attend Project meetings
10 1.3. Prepare &submit progress reports
11 2. Data collection
02-Oct to 13-
Oct/17
12 2.1. Gather cadastral information
13 2.2.Obtain title deed and verify any restrictive conditions
14 2.3.Obtain Land Claims information( if any)
15 2.4.Obtain SDF & IDP Information in relation to the subject property
16 2.5. Site visits
17 3. Prepare detailed Layout Plan
18 3.1.Design layout plan
19 3.2.Digitise layout plan on GIS & Autocad
20 4.Prepare Detailed Township Application
21 4.1.Prepare Motivation Memo
22 4.2.Prepare Conditions of Establishment
23 4.3.Prepare Advert Notices
24 4.4. Lodge & circulate application
25 4.5.Respond to comments
9 | P a g e
26 4.6.follow-up on application
27 4.7.Facilitate approval of appl.
28 4.8.Final Cond of estblishment
29 4.9. Township Approval
27 C: LAND SURVEYING
28 1.1. Base Mapping and Contour Survey generation
09-Oct to 18/Oct/17
29 1.2. Generation of the SG Diagram & digitisation
30 1.3. Pegging of the township Layout after approval of SG Diagram
31 1.4. Approval of the SG Diagram & SG Examination Fees
32 D: ENGINEERING SERVICES
33 1.1. Determine Flood line Frequency on 1:100 year
34 1.2. Prepare and submit Outline Scheme Reports( all eng. services)
35 1.3. Prepare detailed costing for Engineering Services
36 E: ENVIRONMENTAL IMPACT ASSESSMENT
37 1.1. Data collection & Field Survey: Scoping Phase
38 1.2. Registration &
verification of I & Aps
39 1.3. Draft Report writing
40 1.4. Public Participatiuon process
41 1.5. Submission of final
Scoping Report to DEDECT
10 | P a g e
42 1.6. Approval of Scoping
Report by DEDECT
43 1.7. Preparation and
submission of Final EIR report
44 1.8. Approval of EIR ( RoD
obtained from DEDECT)
45 1.9. Conduct all Specialist
Studies required
46 F: CONVEYANCING & LEGAL
47 1.1. Prepare a
Conveyancer's Certificate & Title Conditions
48 1.2. Verify Conditions of
Establishment for legality
49 1.3. Prepare Section 53
Documents for Deeds Office
50 G: TRAFFIC IMPACT STUDY
51 1.1.Existing traffic flows and patterns
52 1.2. Background Traffic Flows
53 1.3. Trip Generation Analysis
54 1.4. Trip distribution analysis
55 1.5. Report writing & presentation
56
H: GEOTECHNICAL INVESTIGATION ( IN LINE WITH NDPG GUIDELINES)
57 1.1.Conduct desktop studies
58 1.2. TLB hire and test pitting
59 1.3. GFSH-2, Phase 1 Fieldwork and excavation of test pits
60 1.4. Data analysis, cartography and interpretation
11 | P a g e
61 1.5. Laboratory testing of soil conditions
62 1.6. Reporting and recommendations
63 I: TOWNSHIP PROCLAMATION
64 1.1. Opening of Township Register
65 1.2. Township Proclamation
12 | P a g e
5. DATA SO FAR COLLECTED
5.1. TOWN PLANNING INFORMATION
The Township Establishment process will start with data collection. The following information
has so far been collected:
Cadastral information on the subject property
Obtained title deeds and will later assess any restrictive conditions (if any) for the
subject property;
Obtain strategic planning and related documents. These documents have so far been obtained
from the Municipality:
The Ventersdorp Municipal Integrated Development Plan (IDP) 2016-2017
Spatial Development Framework (SDF) 2010
Draft Local Economic Development (LED) Strategy 2015
Draft Housing Sector Plan (HSP) 2014
Dr Kenneth Kaunda District Municipality IDP and sector plans
National Spatial Development Plan (NSDP)
Provincial Growth and Development Strategy (PGDS)
These documents are currently being reviewed and analyzed in order to establish the
development vision and planning principles for the Study Area.
The review and analysis of the documents will also assist with both vertical and horizontal
alignment.
5.1.1. INFORMATION GAPS
It is important to indicate that, Ventersdorp Local Municipality was disestablished and merged
with Tlokwe City Council Local Municipality to establish
JB Marks Local Municipality on 3 August 2016. Most of the information available is historical
in nature and relates to the municipality before being disestablished.
As a result of the disestablishment, a number of key strategic documents are in a draft form
and have not yet been approved by council as official documents.
Other documents are outdated and need to be reviewed as per the applicable legislation.
The following information gaps were identified during this initial data collection stage:
13 | P a g e
1. Socio Economic study/ Market assessment will be required as it will inform the housing
product type, affordability and percentage allocations.
2. The municipality has the waiting list which is not used as it is considered unsatisfactory
as a result, the extend of housing demand/ backlog cannot be established.
3. The alternative to establishing demand is use the Provincial Demand Data Base which
must be informed by the municipal waiting lists
4. The Informal Settlements Upgrading Programme (ISUP) report was compiled in 2008,
this report provides an overview of informal settlements identified within Ventersdorp.
Informal settlements have direct bearing on the provision of housing
5. SDF was last approved in 2010, and should have been reviewed after five years as
required by the Municipal Systems Act (No. 32 of 2000) as it forms a significant part of
key strategic documents for the municipality
6. Housing Sector Plan 2014 is still in a draft format, therefore, there appears to be no
approved Housing Sector Plan in place;
7. The LED Strategy is also still in a draft form.
5.2. SITE VISIT WITH MUNICIPAL OFFICIALS
A preliminary meeting with both Municipal and HDA officials took place in Potchefstroom on
the 10th October 2017 in order to introduce our Team to the municipality. After the meeting a
site visit and walk about with the entire project team and municipal officials followed on
Monday, the 16th October 2017 in Ventersdorp.
5.3. ENVIRONMENTAL INFORMATION
The focus of attention for this part of the project will be on the following, namely:
undertake the flora & fauna assessments,
undertake the Wetland/ riparian delineation & functional assessment merged with the
Soils & Agricultural Potential, so as to provide high level input into the Wetland
Sensitivity and Extent w.r.t the project site, with the aim to determine no-go areas and
sensitive landscape elements, and
undertake a heritage impact assessment,
14 | P a g e
lastly, expedite the socio-economic survey, in order to develop the following: Socio-
Economic Profile & the Socio-economic Needs Assessment
5.3.1. SITE VISIT OBSERVATIONS(ENVIRONMENTAL)
The following observations were made during our site visit as at week of 16 to 22 October
2017
It can be noted that we are aware that Venterdorp has been plagued with service delivery
protests, included in there is a cry for housing provision by the community. In order to address
the matter, note Council earmarked land parcels under its auspices for housing development.
It is unfortunate, that council did not provide us with alternative farmland parcels that had
lain as not ploughed for consideration. Nonetheless, from an ecological point of view, it can
be noted that there are site sensitivities flagged hereunder with regards to the earmarked
project sites and the Client is given a heads up that buffering will endeavour to bring resolve,
that goes for heritage as well.
Key environmental features discerned on site:
a watercourse that meanders gently through the middle wherein the two farms meet (see
outline figures on the google image). Another gently winding channel can be seen east of
the Remainder of the farm Elandskuil 206-IP. All sensitive sites will be rehabilitated and
be zoned Public Open Space.
there are graves close to the north-western boundary of the Remainder of the farm
Elandskuil 205-IP. In terms of town planning they will not be disturbed as it has been
planned that they be demarcated & zoned public open space for usage by family members
of those buried (NB: - usage will be limited to allow visits to graves, paying homage &
cleaning thereof). Whereas, to the north of the Remainder of the farm Elandskuil 206-IP,
there is JB Marks Memorial site (consisting of his inscribed granite plate, grave & statue),
after whom the new Vendersdorp municipality name has been officially changed. Thus as
a further consideration from a Heritage point of view they will be buffered accordingly.
Tshing township lies immediately to the north of the development site.
Arterial routes depicted is the N14 to & from Krugersdorp & Lichtenburg bearing in
an east west direction, whereas going from north to south (i.e. from small town Derby
through Ventersdorp town to Klerksdorp is the Provincial road the R30).
15 | P a g e
South, South East of RE/ 205 is Railway Line, Shell Garage & Transnet Freight
Rail Groynes
5.4. TOPOGRAPHICAL SURVEY
A topographical survey on the subject property was conducted during October 2017 with the
following geodetic Survey details:
COORD-REF STATION: TRIG BCN
BASE STATION 254
XY SYSTEM: WG27
Z DATUM: MSL
CONTOUR INTERVAL :0,50m
SCALE 1:1000
5.5. ENGINEERING SERVICES
ASSUMPTIONS
This report is prepared with the understanding that the information provided by the JB Marks
Local Municipality’s technical division is correct.
5.5.1. SCOPE
The scope of work for the bulk engineering services investigations conducted can be
summarised as follows:
Provide a topographical and geological overview of the study area;
Investigate the study area(s) storm water drainage;
Investigate the presence and current operational capacity of bulk engineering
services infrastructure in terms of potable water supply, sanitation, electrical supply;
Investigate road access to the study area;
Investigate the presence of solid waste disposal facilities to service the proposed
development;
16 | P a g e
Conduct a study area slope analysis to determine which portion(s) of the study area
are may be undevelopable;
5.5.2. TOPOGRAPHY AND DRAINAGE
The study area has an average height of 1465 meters above sea level and is dominated by
gentle to fair slopes with average gradients of 1.3% on portion 205 IP and 5% on portion 206
IP draining south towards the Skoonspruit River. Due to the study area being dominated by
gentle to fair gradients, storm water drainage problems and or any developmental constraints
associated topographical gradients are not foreseen. However, storm water management
measures should be incorporated into the study areas development to reduce and or eliminate
any potential risks to life and property that may be posed by storm water runoff.
Storm water management objectives and mitigation measures highlighted below may be used
as a guideline in the planning and design stages of proposed development(s) on the study
area.
5.5.3. STORM WATER MANAGEMENT OBJECTIVES
Any proposed developments in the study area may have an impact on the natural storm water
drainage patterns of the study area. Impacts of developments may include an increase in
hardened areas, reduced infiltration areas, loss of vegetation and reduced evapo-transpiration
potential. There may also be an overall increase in the speed of runoff and peak flow rates in
the receiving streams and rivers in and around the study area.
It is thus important that storm water management system(s) form part of the study area’s
development planning process in order to reduce and manage impacts on the water cycle
during and after development. Storm water management system(s) should be planned and
designed in line with municipal storm water management policies and or engineering best
practices. The study area’s storm water management objectives should seek to address the
following objectives:
Control the quality and quantity of storm water runoff;
To protect local and downstream water courses;
Encourage natural ground water recharge;
17 | P a g e
To prevent soil erosion;
To protect all property and life from damage caused by storm water and flooding.
5.5.4. STORM WATER MANAGEMENT CONTROL MEASURES
The following design and construction measures should be adopted as control and mitigation
strategies to address the above-mentioned objectives:
Storm water runoff patterns should be assessed to determine peak flow rates and 1:100 flood
line boundaries of water courses within close proximity of the study area. Outputs from such
assessments will be used as input data required in the detailed design of culverts, channels
and other storm water infrastructure;
Storm water reticulation design and construction of storm water infrastructure should ensure
that overall development of the study area does not increase the rate of storm water flow
above that which the natural ground can safely accommodate at any point in the sub-
catchments;
Sub-surface disposal of storm water should be avoided;
All natural and unlined channels should be inspected for adequate binding of soil to reduce
erosion;
Steeper watercourses (especially in portion 206 IP) should be protected from erosion through
the use of appropriate channel linings or controlled drops to dissipate flow energy. Stone
pitching should also be used to reinforce channel inverts on such slopes;
Landscaping and or re-vegetation of areas not occupied by buildings or paving should be
constructed immediately after building works have been completed, or have reached a stage
where newly established ground cover to all sub-structures is not at risk from the construction
works.
The above-mentioned control measures will go a long way in ensuring the environmental
sustainability of the development whilst also protecting life and property from storm water
damage.
18 | P a g e
5.5.5. GEOLOGICAL OVERVIEW
According to 1:25 000 geological maps supplied by the Council for Geoscience, the study area
is dominantly underlain by amygdaloidal andesite igneous rock types of the Ventersdorp Super
Group.
A near surface geotechnical investigation is currently being conducted on the study area by
ZwaMavu Consultants to evaluate engineering characteristics of soils underlying the study
area. A detailed geotechnical investigation report will be available after the investigation has
been concluded.
5.6. BULK ENGINEERING SERVICES
5.6.1. Water Supply
The Ventersdorp town receives its potable water supply through river extraction of the
Skoonspruit River via a network of canals. The water is then purified at the Ventersdorp Water
Treatment plant and stored in reservoirs.
Potable water supply to the Ventersdorp town, the Tshing Township which is located north
west of the study area and the Moosa Park suburb is via the town’s bulk water reticulation
network while the surrounding farms are supplied by the towns canal network and bore holes.
Even though the study area currently does not have any water supply infrastructure
constructed in it, bulk service connections to service the study area can be made in the
adjacent Tshing Township.
Challenges associated with water supply within the JB Marks Local Municipality are aging
infrastructure, water losses and lack of maintenance. The Department of Water and Sanitation
in partnership with the then Ventersdorp Local Municipality have however recently completed
an upgrade of the Ventersdorp bulk water supply system which included a new 5.7 Mega liter
reservoir, an upgrade of the water treatment plant from 7 Mega liters a day to 14 Mega liters
a day along with a 2.4-kilometer-long raising main from the water treatment plant to the
reservoir. The upgrade has thus increased the town’s reservoir storage capacity to 10.3 Mega
liters and the water treatment plant’s capacity to 14 Mega liters a day.
19 | P a g e
5.6.2. Sanitation
Sewerage disposal in the Ventersdorp town, Tshing Township and Moosa Park suburb is
provided through a water borne sewerage reticulation network with the sewerage treated at
the Ventersdorp Waste Water Treatment Works (WWTW). Sewerage disposal in the
surrounding arms and informal settlements is provided through a combination of septic tanks
and pit toilets.
The current sewerage volume in the system peaks at 2.7 Mega liters a day. The capacity of
WWTW is 3 Mega liters a day. Even though the study area currently does not have any
sewerage infrastructure constructed in it, bulk service connections to service the study area
can be made in the adjacent Tshing Township.
Risks posed to the waterborne sewerage reticulation system in Ventersdorp are the aging
infrastructure along with the lack of funding to adequately maintain and or upgrade the
system.
5.6.3. Electrical Supply
Eskom is the sole bulk electricity supplier to the JB Marks Local Municipality. Residents in the
Ventersdorp town receive power from the municipality while residents in the surrounding
farms and villages are supplied by Eskom.
The current electrical supply to the municipality from Eskom is a total of 20MVA via a network
of high voltage lines. The current municipal load on the grid is 9MVA leaving 11MVA available
to service future developments and to connect villages not currently connected.
There are multiple overhead electrical power lines running through portion 205 IP and along
the R30 thus electrical connections to any new developments in the study area may be made
with relative ease.
Challenges facing the efficiency of the system include illegal connections, vandalism and aging
infrastructure to list a few.
20 | P a g e
Figure 2: Overhead Power Lines at N14 - R30 Intersection
5.6.4. Road Infrastructure
The study area is easily accessible via the N14 which is the main route linking Ventersdorp
with Colingy to the west and Krugersdorp to the east; and via R30 which is the main north-
south route linking Ventersdorp and Klerksdorp. Both access roads are paved and seem to
be well maintained.
Typical traffic on both access roads includes small vehicles for personal use, busses and trucks
transporting agricultural products between towns.
A traffic impact study is currently being conducted by MDP to assess traffic impact the
proposed development will have on the existing infrastructure and propose suitable access
points from the N14 and R30 respectively. A detailed traffic impact study report will be
available once the study has been concluded.
21 | P a g e
Figure 3: Road Access Along R30
5.6.5. Waste Disposal
The JB Marks Local Municipality provides waste collection services to the Ventersdorp town,
Tshing Township and Moosa Suburb serviced currently by one landfill site. Waste collection
services do not extend to residents the surrounding farms, villages and informal settlements.
Some residents in these un-serviced areas currently dispose of their waste in unoccupied
parcels of land which may pose health hazards.
The close proximity of the study area to the Tshing Township will thus enable waste collection
services to easily be extended to service the proposed development.
5.6.6. OVERALL STATUS QUO ASSESSMENT
The availability of key bulk service infrastructure (bulk water, sanitation, electricity and waste
disposal) within the vicinity of the study area and the lack of any visible geological features
that may negatively affect the overall development render the study area feasible for
development.
22 | P a g e
6. REFERENCES
The following documents were used in the investigations in along with personal meetings with
the JB Marks Local Municipality’s engineering services manager Mr. Fani Zoko based in the
Ventersdorp.
Ventersdorp Local Municipality: 2015/ 2016 Final Integrated Development Plan.
Ventersdorp Local Municipality: 2015/ 2016 Annual Report.
Annexure G - Layout Plan
1
3
m
S
T
R
E
E
T
1
3
m
S
T
R
E
E
T
2
5
m
S
T
R
E
E
T
2
0
m
S
T
R
E
E
T
2
5
m
S
T
R
E
E
T
25m
S
T
R
E
E
T
20m
S
T
R
E
E
T
2
0
m
S
T
R
E
E
T
1
6
m
S
T
R
E
E
T
16m
ST
RE
ET
1
6
m
S
T
R
E
E
T
1
6
m
S
T
R
E
E
T
2
0
m
S
T
R
E
E
T
2
5
m
S
T
R
E
E
T
2
0
m
S
T
R
E
E
T
1
3
m
S
T
R
E
E
T
1
3
m
S
T
R
E
E
T
1
3
m
S
T
R
E
E
T
1
3
m
S
T
R
E
E
T
1
6
m
S
T
R
E
E
T
1
6
m
S
T
R
E
E
T
1
3
m
S
T
R
E
E
T
1
3
m
S
T
R
E
E
T
2
5
m
S
T
R
E
E
T
1
3
m
S
T
R
E
E
T
1
6
m
S
T
R
E
E
T
1
3
m
S
T
R
E
E
T
1
3
m
S
T
R
E
E
T
1
2
3
4
5
6
8
7
9
10
11
12
13
14
15
16
17
18
19
21
20
24
22
23
26
25
27
51
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
79
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
131
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
202
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
203
204
205
206
207
208
209
210
211 212
213
214
215
216
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
371
372373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
415
414
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
484
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476477
478
479
480
481
482
483
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
590
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585
586
587
588
589
591
592
593
594
596
597
598
599
600
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
631
632
633
634
635
636
637
665
666
667
668
669
670
671
672
673
674
675
676
677
678
679
680
681
682
683
684
685
686
255
256
257
284
283
258
282
260
259281
261
280
279
262
278
263
277
264
276
265
275
266
274
267
273
268272
269
271
270
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
338
337
336
335
334
333
332
331
330
329
328
327
217
218
254
219
253
220
252
221
251
222
250
223
249
224
248
225
247
226
245
228
244
229
243
230
242
231
241
232
240
233
239
234
238
235
237
236
285
286
326
287
325
288
324
289
323
290
322
291
321
292
320
319
318
317
316
315
314
313
312
311
310
309
308
307
306
305
304
303
302
301
300
299
298
297
296
295
294
293
1
1
1
1
1
227
246
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656
657
658
659
660
661
662
663
664
370
687
688
689
690
691
692
693
694
695
696
697
698
699
700
701
702
703
704
705
706
707
708
709
710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731
732
733
734
735
736
737
738
739
740
741
742
743
744
745
746
747
748
749
750
751
752
753
754
755
756
757
758
759
760
761
762
763
764
765
766
767
768
769
770
771
772
773
774
775
776
777
778
779
780
781
782
783
784
785
786
787
788
789
790
791
792
793
794
795
796
797
798
799
800
801
802
803
804
805
806
807
808
809
810
811
812
813
814
815
686
816
817
818
819
820
821
822
823
824
825
826
827
828
829
830
860
831
832
833
834
835
836
837
838
839
840
841
842
843
844845
846
847
848
849
850
851
852
853
854
855
856
857
858
859
861
862
863
864
865
866
867
868
869
870
871
872
873
874
875
876
877
878
879
880
881
882
883
884
891
890
889
888
887
886
885
892
893
894
895
896
897
898
899
900
901
902
903
904
905
906
907
908
930
909
929
910
928
911
927
912926
913
925
914
915
916
917
924
923922
919
920
921
918
981
982
983
984
985
978
979
980
977
976
975
988
987
986
989
974
973
990
991
992
993
994
995
996
997
998
999
967
968
969
970
971
972
931
932
966
933
965
934
964
963
962
961
960
935
936
959
958
957
956
955
954
953
952
951
950
949
948
947
946
945
944
943
942
941
940
939
938
937
1000
1001
1002
1003
1004
1005
1006
1007
1008
1009
1010
1011
1012
1013
1014
1121
1120
1119
1118
1117
1116
1115
1114
1113
1112
1111
1061
1062
1060
1063
1064
1059
1058
1065
1057
1066
1067
1068
1069
1070
1071
1072
1073
1074
1075
1076
1047
1048
1049
1050
1051
1052
1053
1054
1055
1056
1110
1109
1108
1107
1106
1105
1104
1103
1102
1101
1100
1099
1098
1097
1096
1095
1094
1093
1092
1091
1090
1089
1088
1087
1086
1085
1084
1083
1082
1081
1080
1079
1078
1077
1015
1016
1017
1018
1019
1020
1021
1022
1023
1024
1025
1026
1027
1028
1029
1030
1031
1032
1033
1034
1035
1036
1037
1038
1039
1040
1041
1042
1043
1044
1045
1046
1122
1123
1124
1125
1127
1126
1128
1129
1130
1131
1132
1133
1134
1135
1136
1137
1138
1139
1140
1141
1142
1143
1144
1145
1146
1183
1184
1186
1185
1187
1188
1189
1190
1191
1192
1193
1194
1195
1196
1197
1170
1147
1148
1149
1150
1151
1152
1153
1154
1155
1156
1157
1158
1159
1160
1161
1162
1163
1164
1165
1166
1167
1168
1169
1182
1181
1180
1179
1178
1177
1176
1175
1174
1173
1172
1171
1245
1246
1247
1248
1249
1250
1251
1252
1253
1262
1261
1260
1259
1258
1257
1256
1255
1254
1198
1199
1200
1201
1202
1203
1204
1205
1206
1207
1208
1209
1210
1211
1212
1213
1214
1215
1216
1217
1218
1219
1220
1221
1222
1223
1224
1225
1226
1227
1228
1229
1230
1231
1232
1233
1234
1235
1236
1237
1238
1239
1240
1241
1242
1243
1244
1598
1599
1600
1601
1602
1603
1125
1604
1605
1606
1607
1608
1609
1610
1611
1612
1613
1614
1615
1616
1617
1618
1619
1620
1621
1622
1623
1624
1625
1626
1627
1628
1629
1630
1631
1632
1633
1634
1635
1636
1637
1638
1639
1640
1641
1642
1643
1266
1265
1264
1263
1267
1268
1269
1270
1271
1272
1273
1274
1275
1276
1277
1278
1279
1280
1281
1282
1283
1284
1285
1286
1287
1288
1289
1290
1291
1292
1293
1294
1295
1296
1303
1297
1298
1299
1300
1301
1302
1304
1305
1306
1307
1308
1309
1310
1311
1312
1313
1314
1315
1316
1317
1318
1319
1320
1321
1322
1323
1324
1325
1326
1327
1328
1329
1330
1331
1332
1333
1334
1335
1336
1337
1338
1339
1340
1341
1342
1343
1344
1345
1346
1347
1348
1349
1350
1351
1352
1353
1354
1355
1356
1357
1358
1359
1360
1361
1362
1363
1364
1365
1366
1367
1368
1369
1370
1371
1372
1373
1374
1375
1376
1377
1378
1379
1380
1381
1382
1383
1384
1385
1386
1387
1388
1389
1390
1391
1392
1393
1394
1395
1396
1397
1398
1399
1400
1401
1402
1403
1404
1405
1406
1407
1408
1409
1410
1411
1412
1413
1414
1415
1416
1417
1418
1419
1420
1421
1422
1423
1584
1585
1586
1587
1588
1589
1590
1591
1592
1593
1594
1595
1596
1597
1558
1559
1560
1561
1562
1563
1564
1565
1566
1567
1568
1569
1570
1571
1572
1573
1574
1575
1576
1577
1578
1579
1580
1581
1582
1583
1534
1535
1536
1537
1538
1539
1540
1541
1542
1543
1544
1545
1546
1547
1548
1549
1550
1551
1552
1553
1554
1555
1556
1557
1500
1501
1502
1503
1504
1505
1506
1507
1508
1509
1510
1511
1512
1513
1514
1515
1516
1517
1518
1519
1520
1521
1522
1523
1524
1525
1526
1527
1528
1529
1530
1531
1532
1533
1466
1467
1468
1469
1470
1471
1472
1473
1474
1475
1476
1477
1478
1479
1480
1481
1482
1483
1484
1485
1486
1487
1488
1489
1490
1491
1492
1493
1494
1495
1496
1497
1498
1499
1446
1447
1448
1449
1450
1451
1452
1453
1454
1455
1456
1457
1458
1459
1460
1461
1462
1463
1464
1465
1425
1426
1427
1428
1429
1430
1431
1432
1433
1434
1435
1436
1437
1438
1439
1440
1441
1442
1443
1444
1445
1424
1663
1644
1645
1681
1646
1647
1648
1649
1650
1651
1652
1653
1654
1655
1656
1657
1658
1659
1660
1661
1662
1664
1665
1666
1667
1668
1669
1670
1671
1672
1673
1674
1675
1676
1677
1678
1679
1680
1682
1683
1684
1685
1686
1687
1688
1689
1690
1691
1692
1693
1694
1695
1696
1697
1698
1699
1700
1701
1702
1703
1704
1705
1706
1707
1708
1709
1710
1711
1712
1713
1714
1715
1716
1717
1718
1719
1720
1744
1721
1722
1723
1724
1725
1726
1727
1728
1729
1730
1731
1732
1733
1734
1735
1736
1737
1738
1739
1740
1741
1742
1743
1745
1746
1747
1748
1749
17501751
1752
1753
1754
1755
1756
1757
1758
1759
1760
1761
1762
1763
1764
1765
1766
1767
1768
1769
1770
1771
1772
1773
1774
1775
1776
1777
1778
1779
1780
1781
1782
1783
1784
1785
1786
1787
1788
1789
1790
1791
1792
1793
1794
1795
1796
1797
1798
1799
1800
1801
1802
1803
1804
1805
1806
1807
1808
1809
1810
1811
1812
1813
1814
1815
1816
1817
1818
1819
1820
1821
1822
1823
1824
1825
1826
1827
1828
1829
1830
1831
1832
1833
1834
1835
1836
1837
1838
1839
1840
1841
1842
1873
1843
1844
1845
1846
1847
1848
1849
1850
1851
18521853
1854
1855
1856
1857
1858
1859
1860
1861
1862
1863
1864
1865
1866
1867
1868
1869
1870
1871
1872
1887
1874
1875
1876
1877
1878
1879
1880
1881
1882
1883
1884
1885
1886
1911
1888
1910
1889
1890
1891
1892
1893
1894
1895
1896
1897
1898
1899
1900
1901
1902
1903
1904
1905
1906
1907
1908
1909
1935
1912
1913
1914
1915
1916
1917
1918
1919
1920
1921
1922
1923
1924
1925
1926
1927
1928
1929
1930
1931
1932
1933
1934
1936
1937
1938
1939
1940
1941
1942
1943
1944
1945
1946
1947
1948
1949
1950
1951
1952
1953
1954
1955
1956
1957
1958
1959
1960
1961
1962
1963
1964
1965
1966
1967
1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
2037
2038
2039
2040
2041
2042
2043
2044
2045
2046
2047
2048
2049
2050
2051
2052
2053
2054
2055
2056
2057
2058
2059
2060
2061
2062
2063
2064
2065
2066
2067
2068
2069
2077
2078
2079
2080
2081
2082
2083
2084
2085
2086
2088
2087
2089
20902102
2091
2092
2101
2100
20932094
2099
2098
2095
2096
2097
2070
2071
2103
20722073
2074
2075
2076
2104
2105
2106
2107
2108
2109
2110
2111
2112
2113
2114
2115
2116
2117
2118
2119
2120
2121
2122
2123
2124
2125
2126
2127
2128
2129
2130
2131
2132
2133
2134
2135
2136
2137
2138
2139
2140
2141
2142
2143
2144
2145
2146
2147
2148
2149
2150
2103
2103
2103
2103
2103
2103
2103
2103
2103
2103
2103
2103
2103
2103
2103
2103
2103
2103
2103
2103
2103
2151
2152
2153
2154
2155
2156
2157
2158
2159
2160
2161
2162
2163
2164
2165
2166
2167
2168
2169
2170
2171
2172
2173
2174
2175
2176
2177
2178
2179
2180
2181
2182
2183
2184
2185
2186
2187
2188
2189
2190
2191
2192
2193
2194
2195
2196
2197
2198
2199
2200
2201
2202
2203
2204
2205
2206
2207
2208
2209
2210
2211
2212
2213
2214
2215
2216
2217
2244
2245
2246
2247
2248
2249
2250
2251
2252
2253
2254
2255
2256
2257
2258
2259
2260
2261
2262
2263
2264
2265
2218
2219
2220
2221
2222
2223
2224
2225
2226
2227
2228
2229
2230
2231
2232
2233
2234
2235
2236
2237
2238
2239
2240
2241
2242
2243
2266
2267
2268
2269
2270
2271
2272
2273
2274
2275
2276
2277
2278
2279
2280
2281
2282
2283
2284
2285
2286
2287
2288
2289
2290
2291
2292
2293
2294
2295
2296
2297
2298
2299
2300
2301
2302
2303
2304
2305
2306
2307
2308
2309
2310
2311
2312
2313
2314
2315
2316
2317
2318
2319
2320
2321
2322
2323
2324
2325
2326
2327
2328
2329
2330
2331
2332
2333
2334
2335
2336
2337
2338
2339
2340
2341
2342
2343
2344
2345
2346
2347
2348
2349
2350
2351
2352
2353
2354
2355
2356
2357
2358
2359
2360
2361
2362
2363
2364
2365
2366
2367
2368
2369
2370
2371
2372
2373
2374
2375
2376
2377
2378
2379
2380
2381
2382
2383
2384
2385
2386
2387
2388
2389
2390
2391
2392
2393
2394
2395
2396
2397
2398
2399
2400
2401
2402
2403
2404
2405
2406
2407
2408
2217
2409
2411
2410
2412
2413
2414
2415
2416
2417
2418
2419
2420
2421
2422
2423
2424
2425
2426
2427
2428
2429
2430
2431
2432
2433
2434
2435
2436
2437
2438
2439
2440
2441
2442
2443
2444
2445
2446
2447
2448
2449
2450
2451
2452
2453
2454
2455
2456
2457
2458
2459
2460
2461
2462
2463
2464
2465
2466
2467
2468
2469
2470
2471
2472
2473
2474
2475
2476
2477
2478
2479
2480
2481
2482
2483
2484
2485
2486
2487
2488
2489
2490
2491
2492
2493
2494
2495
2496
2497
2498
2499
2500
2501
2502
2503
2504
2505
2506
2507
2508
2509
2510
2511
2512
2513
2514
2515
2516
2517
2518
2519
2520
2521
2522
2523
2524
2525
2526
2527
2528
2657
2656
2655
2654
2653
2652
2651
2650
2648
2649
2647
2645
2646
2644
2643
2642
2641
2640
2639
2638
2637
2636
2635
2634
2633
2632
2631
2630
2629
2628
2627
2626
2625
2624
2623
2622
2621
2620
2619
2618
2617
2616
2615
2614
2613
2612
2611
2610
2609
2608
2607
2606
2605
2604
2603
2602
2601
2600
2599
2598
2597
2596
2595
2594
2593
2592
2591
2590
2589
2588
2587
2586
2585
2584
2583
2582
2581
2580
2579
2578
2577
2576
2575
2574
2573
2572
2571
2570
2569
2568
2567
2566
2565
2564
2563
2562
2561
2560
2559
2557
2558
2556
2555
2554
2553
2552
2551
2550
2549
2548
2547
2546
2545
2544
2543
2542
2541
2540
2539
2538
2537
2536
2535
2534
2533
2532
2531
2530
2529
2659
2660
2661
2658
2662
2663
2664
2665
2666
2667
2668
2669
2670
2671
2672
2673
2674
2675
2676
2677
2678
2679
2680
2681
2682
2689
2688
2687
2686
2685
2684
2683
2691
2692
2693
2694
2695
2696
2697
2690
2661
1126