Auroville: The universal Township

Location: Situated 10 Kms. North of Pondicherry in the state of Tamil Nadu, India.

Auroville is meant to be a Universal town where people from any country or caste can live in peace and harmony.

Currently Aurouville resides 2345 people from almost 45 countries amongst which around 1/3 are Indian.

The original master plan is meant to achieve a total population of 50,000 permanent residents from all around the world

Page 3: Town plan auroville

The Concept

The initial concept of the city was laid down by Mirra Alfassa (The mother).

The city was conceptualized in the form of a galaxy with central peace zone and other areas radiating out from the central zone and finally surrounded by a thick green zone

Page 4: Town plan auroville

Land Use

In the heart of the city is the Matrimandir and its gardens.

Whole of the city is surrounded by a thick green belt comprising of forest land & agricultural use(1.2 km wide).

The city is divided into five major zones:

1. Industrial Zone(109 hect.)2. International Zone(74 hec.)3. Residential Zone(189 hect.)4. Culctural Zone(103 hect)5. Peace Area

Page 5: Town plan auroville

Land Use(Built Area)

Use Area(Hectares)

%

Residential 95 40.9Village Settlements 20

Auroville Community 75Commercial 19 8.2•Manufacturing 10 4.3•Public/Semi Public 65 28•Roads/Streets 30 13•Playgrounds 13 5.6

Sub total 232 100

Page 6: Town plan auroville

Land Use(Unbuilt Area)

Land Use Area(Hectares) `

%

•Regenerated Land 598 34.5•Agricultural Land

Agriculture & Related 50 2.9Farming 940 54.3

•Water Bodies 45 2.6•Canyon, waste & others 98 5.7•Sub Total 1731 100

Land Use AreaGrand Total 1963

Page 7: Town plan auroville

Road Network

Car Free Plan1. All areas of the city are within 5 or 6 minutes

walking distance.2. The outer ring road could take motorized

traffic and connect with centralized parking areas there.

3. Onward travel would be BY bicycle .

Pedal-power within the city proper:1. Inside the outer ring road area, transport of 2. people and goods would be by pedal-power 3. (there will be a network of pleasant cycle and 4. walking paths) and electric-powered vehicles.

Parking at outer ring-road : The outer ring road will be large storage yards for accommodating supplies while awaiting dispatch into the city.

Schematic Road Network

Page 8: Town plan auroville

Waste Water Treatment

1. First wastewater recycling solutions : septic tank and soak pit

2. Develop planted filters, also called constructed wetlands or 3. Root zone treatment systems. 4. Effective Microorganism (EM) technology .

Page 9: Town plan auroville

Power Generation

1. About 150 houses use solar PV electricity and heaters for their energy requirements.

2. The power distribution of around 600 consumer connections is carried through a system of 28 distribution transformers.

RENEWABLE ENERGY :total of around 250kw of electricity producing solar panels are installed

Solar Kitchen : The solar concentrator that generates enough steam to cook for 2,000 people a day .

Solar Cooker Panel Solar Panels

Page 10: Town plan auroville

Resource Consumption

Water ConsumptionTotal Water Pumped 1, 502,029  KL

Total  Water  Pumped  for  Residential  Sector

522,748  KL

Per  Capita/Day  Consumption  of Total

1,779  litres

Per  Capita/Day  Consumption  Residential

620  litres

Electricity Sources

Consumption(MW/Yr.)

Total% CO2 Emission

% of Total

TNEV 3965 43 3767 78Renewable 1260 14 - 0

Diesel/Petrol 1753 19 373 8Thermal 2322 25 672 14

Page 11: Town plan auroville

WATER INFRASTRUCTURE

Auroville’s current water infrastructure is highly decentralized with an estimated number of 150 bore wells supplying the water requirements for the residential and other sectors of Auroville. Water pricing differs from location to location, as well as water metering systems, quality of operation and maintenance .Wastewater treatment at Auroville is either done at the settlement or the building level using technologies such as decentralized wastewater treatment systems or simple septic tanks.

Page 12: Town plan auroville

ELECTRICITY INFRASTRUCTURE

Auroville draws its main supply of electrical energy from the Tamil Nadu Electricity Board (TNEB) through the 110/22 kV sub-stations located at Irrumbai

village. Several load-centre sub-stations are located around the township to

step down the voltage from 22 kV to 415 V and supply 3-phase electricity

through low-tension distribution lines to the end users. As of 2014, there are

a total of 28 transformers in 15 sub-stations, with a cumulative capacity of

3,282 VA. Two standard sizes of transformers are used, either 63 kVA or 100

kVA. A few Auroville communities and establishments are also connected to

the transformers supplying electricity to the neighbouring villages.