Total Economic Value (TEV) Symposium

11
Performance Review Performance Review Commission Commission 16 July 2012 Keld Ludvigsen Chairman Performance Review Commission Member of Performance Review Body Total Economic Value (TEV) Symposium

description

16 July 2012 Keld Ludvigsen Chairman Performance Review Commission Member of Performance Review Body. Total Economic Value (TEV) Symposium. A well known concept. ‘To reduce the direct and indirect ATM-related costs per unit of aircraft operations.’ - PowerPoint PPT Presentation

Transcript of Total Economic Value (TEV) Symposium

Page 1: Total Economic Value (TEV) Symposium

Perf

orm

ance

Rev

iew

Com

mis

sion

Perf

orm

ance

Rev

iew

Com

mis

sion

16 July 2012

Keld LudvigsenChairman Performance Review CommissionMember of Performance Review Body

Total Economic Value (TEV) Symposium

Page 2: Total Economic Value (TEV) Symposium

2

Performance Review Commission

A well known concept

‘To reduce the direct and indirect ATM-related costs per unit of aircraft operations.’Air Traffic Management Strategy For The Years 2000+ , Approved January 2000

Page 3: Total Economic Value (TEV) Symposium

3

Performance Review Commission

Context & background

The Total Economic Value (TEV)

•Is an attempt to monetarise direct and indirect ANS costs borne by airspace users

•Provides a consolidated view of estimated ANS-related costs

•Does not include safety in the calculations

Page 4: Total Economic Value (TEV) Symposium

4

Performance Review Commission

6.8 6.9 6.7 6.9

1.5 1.5 1.5 1.4

3.9 3.5 3.7 3.7

1.91.2 2.2 1.5

10.1 9.89.59.4

0

2

4

6

8

10

12

14

16

18

2008 2009 2010 2011 (P)

Billi

on [€

2010

]

En-route & airport ATFM delays (Capacity)ANS-related inefficiencies gate-to-gate (Environment)Terminal ANS provision costs*En-route ANS provision costs Source: PRC analysis

Estimated ANS-related economic costs to airspace users (gate-to-gate)

ANS-provisioncosts

ANS quality of service related

costs Flight inefficiencies(taxi-out, en-route, terminal)

ATFM delays

Terminal charges

IFR flights (M)

* Note that terminal ANS provision costs only refer to 21 States

En-route charges

ANS-related economic costs

Page 5: Total Economic Value (TEV) Symposium

5

Performance Review Commission

The performance process and KPAs

Page 6: Total Economic Value (TEV) Symposium

6

Performance Review Commission

The PRB use of TEV so far

Target setting

Partially done for RP1 targetsNo specific KPIs targets on TEVNot mature for target settingWould blur accountability

Assessment of PPsWas taken into account during first loop of PPs assessmentPartially done in the second loop of PPs assessment

Monitoring PPsOverall economic performance of service provisionPerformance of one KPA/KPI deteriorates but overall performance improves

Page 7: Total Economic Value (TEV) Symposium

7

Performance Review Commission

What are the advantages of using the TEV?

• Consolidated view, easy to understand

• Enables to express all KPIs in monetary terms (except Safety)

• Visualises the relative weight of the different KPAs and priorities of policy objectives

• Provides a high level framework to illustrate interdependencies and trade-offs among KPAs over time

• Genuine opportunity for a State/FAB to contribute to the overall performance improvements while taking local circumstances and priorities into account.

Page 8: Total Economic Value (TEV) Symposium

8

Performance Review Commission

Methodological issues related to the TEV

• No commonly agreed methodology

• The TEV calculation is: • dependent on exogenous factors outside ANS control • relies on assumptions for the monetarisation of ANS related

inefficiencies

• Limitations in measuring precisely some ANS-related indirect costs

• Flight efficiency is primarily a network issue

• En-route KPIs are well established but ANS performance at airports is still a relatively new area

Page 9: Total Economic Value (TEV) Symposium

9

Performance Review Commission

Ability to drive the “right” behavior?

• Could reduce clear accountabilities for achieving performance improvements

• Could lead to the misconception that improvements in one area have to come at the detriment in another area

• Might lead to trade-offs between KPIs with different user groups

• Might be misused as a justification to trade-off between KPIs with ‘hard’ incentives and KPIs without ‘hard’ incentives

Page 10: Total Economic Value (TEV) Symposium

10

Performance Review Commission

Way forward

• A potential useful and powerful tool

• Need to better frame the TEV concept

• Build trust amongst all stakeholders

• Evolution not revolution

Page 11: Total Economic Value (TEV) Symposium

11

Performance Review Commission

Any questions?