TITAN THERMOPLASTIC - BMI Installs,...

20
D. Brock Industries • Innovating solutions Our commitment is to continually bring to market the best… Engineered flooring systems, custom cleaning equipment, specialized customizable chemicals and other engineered solutions. We are here to make things happen. Challenge us to make a positive impact on your business PO Box 1387 • Cary, NC 27512 919-740-2949 / FAX 919-803-0069 Master Installation Contractor MEETS OR EXCEEDS THE LEED PERFORMANCE STANDARDS.

Transcript of TITAN THERMOPLASTIC - BMI Installs,...

Page 1: TITAN THERMOPLASTIC - BMI Installs, Incbmiinstalls.com/wp-content/uploads/2017/11/Titan-Thermoplastic-Cooler-Floor... · D. Brock Industries • Innovating solutions Our commitment

D. Brock Industries • Innovating solutions

Our commitment is to continually bring to market the best…Engineered flooring systems, custom cleaning equipment, specialized

customizable chemicals and other engineered solutions. We are here to make things happen.

Challenge us to make a positive impact on your business

TITAN™ THERMOPLASTIC COOLER FLOOR REPLACEMENT

PO Box 1387 • Cary, NC 27512919-740-2949 / fax 919-803-0069

Master Installation Contractor

BMIBMIMEETS OR EXCEEDS THE LEED PERFORMANCE STANDARDS.

Page 2: TITAN THERMOPLASTIC - BMI Installs, Incbmiinstalls.com/wp-content/uploads/2017/11/Titan-Thermoplastic-Cooler-Floor... · D. Brock Industries • Innovating solutions Our commitment

This is the first flooring of its kind…made from thermoplastic and elastomeric

products designed to be dimensionally stable which eliminates seam splits or

failures due to expansion and contraction of the material.

A COOLER-FREEZER SOLUTION THAT

WORKS!• New surface pattern pushes the coefficient

of friction to .92 which exceeds all competi-tors and gives a new meaning to slip resistant.

• Resistant over 100 harsh chemical and floods including muriatic acid, oleic acid, phosphoric acids.

• Ten year warranty on cooler-freezer new floors, concrete or 5/8” inside surface OSB. Compare any cooler manufacture warranty on this floor!

• Impact/puncture resistant.

• Most cost-effective floor over 10 years.

• Prevents mold and bacterial growth.

• Can stand up to wet environment, power washing, 24/7, waterproof and easy to clean.

• Eliminate leaks through floor below or other areas.

• Increased energy efficiency, durability and reliability to the unit thus increasing cost effectiveness.

• Non-corrosive.

AfterBefore

Coolers, Freezers in…Restaurants, Casinos, Resorts, Supermarkets, Hotels, Hospitals and Veterinary Clinics

PO Box 1387 • Cary, NC 27512

office: 919-740-2949 • fax 919-803-0069

www.bmiinstalls.com

Contact us for additional information

We’re committed to the our industry today and for years to come. We must

do everything possible to meet this demand. THAT’S OUR JOB. Our public commitment is to produce the BEST

SERVICE, BEST INSTALLATION, and BEST WARRANTY

Page 3: TITAN THERMOPLASTIC - BMI Installs, Incbmiinstalls.com/wp-content/uploads/2017/11/Titan-Thermoplastic-Cooler-Floor... · D. Brock Industries • Innovating solutions Our commitment

RETRO FLOOR™ PANEL SPEC SHEETReinforced Standard Replacement Floor Panel• 24 Ga Galvanized on both sides of surface• Inside 5/8” OSB• R32 Urethane foam core in compliance with federal standards• Uniform distributed load of 1000 lbs. per square foot• Top side surface 5/8” OSB• 1/4” Titan™ Thermoplastic on top of OSB (see diagram)• 4’0 x 8’0 x 4 1/4” Thick• With additional 5/8” OSB and 1/4” Titan™ Thermoplastic floor uniform distributed load exceeds 2500 lbs. per square foot• Can stand up to wet environment, power washing 24/7 and easy to clean• Warranty retrofit coolers/freezers standard floor 5 years.

Standard Replacement Floor Panel• Outside - 24 Ga Galvanized• Inside Surface 5/8” OSB• R32 Urethane foam core• Uniform distributer load of 1000 lbs. per sq. foot• 4’0” x 8’0” x 4” (thick)

5/8” OSB Top Surface Exposed

Inside Surface 5/8” OSB

5/8” OSB

Titan™ Thermoplastic Flooring Installed over OSB by BMI

Outside Surface24 Ga Galvanized both sides

R32 Urethane Foam Core

4 1/4”

3 1/2”

Page 4: TITAN THERMOPLASTIC - BMI Installs, Incbmiinstalls.com/wp-content/uploads/2017/11/Titan-Thermoplastic-Cooler-Floor... · D. Brock Industries • Innovating solutions Our commitment

SUPER RETRO FLOOR™ PANEL SPEC SHEET

Super Reinforced Replacement Floor Panel• 24 Ga Galvanized on both sides of surface• Inside surface - 5/8” OSB• R32 Urethane foam core• Uniform distributed load 5000 lbs. per sq. ft.• Rolling load of 2000 lbs.• Top surface 3/4” PVC additional 3000 lbs. per sq. ft.• 1/4” Titan™ Thermoplastic on top of PVC (see diagram)• 4’0” x 8’0” x 4 1/2” (thick)• With additional 3/4” PVC and 1/4” Titan™ Thermoplastic floor uniform distributed load exceeds 8500 lbs. per sq. ft.• Can stand up to wet environment, power washing 24/7 and easy to clean• Warranty Super Retrofit Coolers/Freezers guaranteed waterproof 10 years

ExCel PVC sheets are lead free and Cadmium free. This makes ExCel an environment friendly product.

Solid White PVC 3/4” PVC

Titan™ Thermoplastic Flooring Installed over PVC by BMI

Outside Surface24 Ga Galvanized both sides

4 1/2”

3 1/2”

8”

Bottom

Top

Page 5: TITAN THERMOPLASTIC - BMI Installs, Incbmiinstalls.com/wp-content/uploads/2017/11/Titan-Thermoplastic-Cooler-Floor... · D. Brock Industries • Innovating solutions Our commitment

TITAN™ THERMOPLASTIC COOLER FLOOR SPECIFICATIONS

Laboratories, Inc. (UL) or another testing and inspection agency acceptable to authorities having jurisdiction.

Absorption loss ................................................ 0.20 grams

Bacteria and Mildew Resistance ...................... Excellent............ASTM G-21

Coefficient of Friction (Slip Resistance) avg.

Wet .88c ..................................................... Dry .92c .............ASTM D-2047

Elongation ........................................................ 100.0% min. ......ASTM D-412

Embossing ........................................................ Face=Stipple .....Back=Cloth

Fire Test (NFDA Type 1 Rated)

Critical Radiant Flux ................................. .0.05 w/cm2 ........ASTM E-648

Burn Distance ............................................ 40 cm .................ASTM E-648

Resistivity (ohm-cm) ........................................ 4.9 x 109 ............ASTM C-657

Shore “A” Hardness ......................................... 90+/- 5 ...............ASTM C-657

Tensile Strength (md) ....................................... 600 PSI (min) 1. ASTM D-412

Thermal Expansion .......................................... 15.4 x 10-6 ..........ASTM E-831

Thickness ......................................................... .250 inches ........ASTM D-751

Weight (oz./sq. ft.) ............................................ 27.15 ..................ASTM D-751amd=machine directionbcmd=cross machine directionccoefficient of friction (slip resistance) measured on a scale of .00 to 1.00. OSHA regulations require minimum of .50 wet

or dry. ADA regulations require minimum of .60 we or dry. At .88 wet and .92 dry the Slip Resistant Safety Floor has a

substantially greater degree of coefficient of friction (slip resistance) than is required by either OSHA or ADA.

HIGH DENSITY PANEL ALSO AVAILABLE

• High density panel with fiberglass grating reinforcement 5/8” OSB and Galvanized on both sides 4’ x 8’

• High density panel with fiberglass grating reinforcement Celtec PVC in lieu of OSB and Galvanized on both sides 4’ x 8’

Call for special pricing on these two panels.

Page 6: TITAN THERMOPLASTIC - BMI Installs, Incbmiinstalls.com/wp-content/uploads/2017/11/Titan-Thermoplastic-Cooler-Floor... · D. Brock Industries • Innovating solutions Our commitment

PVC Celtec® Typical Properties Property Units Value11mm, 6mm Value 10mm-25mmm ASTM Method

Page 7: TITAN THERMOPLASTIC - BMI Installs, Incbmiinstalls.com/wp-content/uploads/2017/11/Titan-Thermoplastic-Cooler-Floor... · D. Brock Industries • Innovating solutions Our commitment

INTERIOR RAMP

Freont

36 1/8”

1”

3”

4”1”

29 1/2” 1” Holefor foaming

Page 8: TITAN THERMOPLASTIC - BMI Installs, Incbmiinstalls.com/wp-content/uploads/2017/11/Titan-Thermoplastic-Cooler-Floor... · D. Brock Industries • Innovating solutions Our commitment

RAMP SIDE VIEW

Wall Panel

Seal Joints with E-6100 Next to WallCooler Floor

Titan™ 1/4” Flooring

Ramp

4”1”

Panel 36 1/8” Wide25 1/2” Long

Page 9: TITAN THERMOPLASTIC - BMI Installs, Incbmiinstalls.com/wp-content/uploads/2017/11/Titan-Thermoplastic-Cooler-Floor... · D. Brock Industries • Innovating solutions Our commitment

OUTSIDE CORNER DETAIL

6 ¾”

5 ¼”

COVE BASE DETAIL

“V” Weld Heat Techniques to Connect Pieces

3/8” Curve

6 ¾

NOTE: STANDARD COVE BASE 6” ALSO AVAILABLE IN 12”, 18” AND 54” AREAS WHERE NEEDED.

Round Rod to Connect Pieces

COOLER/FREEZER COVE BASE DETAIL

6” 12” 18” 54”

Page 10: TITAN THERMOPLASTIC - BMI Installs, Incbmiinstalls.com/wp-content/uploads/2017/11/Titan-Thermoplastic-Cooler-Floor... · D. Brock Industries • Innovating solutions Our commitment

Certificate No.: _____________________________ Date of Installation: __________________________

Upon payment in full for services rendered by BMI Installs, Inc., (hereafter “BMI Installs, Inc.”) BMI Installs, Inc. provides the following warranty on RETROFIT COMMERCIAL COOLER & FREEZER INSTALLATIONS providing that all terms and conditions set forth are complied with:

WARRANTY PERIOD AND SCOPE: BMI Installs, Inc. warrants the installation of Titan™ Thermoplastic Flooring against seam failure, improperly sealed drains or base material allowing water penetration, separation of flooring from substrate due to improper adhesive application, installation of defective materials, improper installation of stainless steel accessories or base trim, and damage or failure of the flooring system caused by an employee or agent of BMI Installs, Inc., Inc. for a period of five (5) years from date of installation.

EXCLUSIONS: This warranty does not cover damages resulting from negligence, intentional misconduct or other destructive behavior on the part of the facility owner or its employees, agents, vendors or invitees including but not limited to; cutting with sharp objects, damage from other trades, dropping objects onto the floor surface, drain tampering, repairs and or renovations made to facility following flooring installation completion that alter, penetrate or damage the flooring installation, improper use, electrical or plumbing repairs made after flooring installation, improperly cured or prepared sub-floors, building damage caused by fire, flood, or other acts of God, or any repairs made to the floor system during the warranty period that are conducted by personnel not specifically authorized by BMI Installs, Inc. to make such repairs.

REMEDIES: In the event a warranted failure or problem to a BMI Installs, Inc. floor system becomes apparent during the warranty period specified herein, BMI Installs, Inc. shall at its own expense make the necessary repairs to the floor system.

THE REMEDIES STATED HEREIN ARE THE SOLE AND EXCLUSIVE REMEDIES FOR ALLEGED FAILURE OF THE BMI INSTALLS, INC. FLOORING SYSTEM. BMI INSTALLS, INC. DISCLAIMS LIABILITY FOR CONSEQUENTIAL, INCIDENTAL OR OTHER DAMAGES OF ANY KIND, INCLUDING BUT NOT LIMITED TO LOST PROFITS AND/OR DAMAGE TO BUILDING AND/OR CONTENTS. ANY IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE LIMITED IN TIME TO THE DURATION OF THIS EXPRESS WARRANTY. SOME STATES DO NOT ALLOW EXCLUSION OR LIMITATION OF INCIDENTAL OR CONSEQUENTIAL DAMAGES OR LIMITATION OF THE DURATION OF THE IMPLIED WARRANTIES, SO THE ABOVE LIMITATIONS OR EXCLUSIONS MAY NOT APPLY TO YOU.

COOLER AND FREEZER FLOORINGRETROFIT INSTALLATION WARRANTY

_________________________________________________

Date

_________________________________________________

Company Name

_________________________________________________

Name and Address of Building

___________________________________________________

BMI Installs, Inc. Authorized Representative

___________________________________________________

Company Address

___________________________________________________

City, State, Zip

PO Box 1387, Cary, NC 27512919-740-2949 • fax 919-803-0069 • www.bmiinstalls.com

Titan™ Thermoplastic Flooring Master Installation Contractor

BMIBMI

Page 11: TITAN THERMOPLASTIC - BMI Installs, Incbmiinstalls.com/wp-content/uploads/2017/11/Titan-Thermoplastic-Cooler-Floor... · D. Brock Industries • Innovating solutions Our commitment

Certificate No.: _____________________________ Date of Installation: __________________________

Upon payment in full for services rendered by BMI Installs, Inc., (hereafter “BMI Installs, Inc.”) BMI Installs, Inc. provides the following warranty on NEW COOLER & FREEZER INSTALLATIONS providing that all terms and conditions set forth are complied with:

WARRANTY PERIOD AND SCOPE: BMI Installs, Inc. warrants the installation of Titan™ Thermoplastic Flooring against seam failure, improperly sealed drains or base material allowing water penetration, separation of flooring from substrate due to improper adhesive application, installation of defective materials, improper installation of stainless steel accessories or base trim, and damage or failure of the flooring system caused by an employee or agent of BMI Installs, Inc., Inc. for a period of ten (10) years from date of installation.

EXCLUSIONS: This warranty does not cover damages resulting from negligence, intentional misconduct or other destructive behavior on the part of the facility owner or its employees, agents, vendors or invitees including but not limited to; cutting with sharp objects, damage from other trades, dropping objects onto the floor surface, drain tampering, repairs and or renovations made to facility following flooring installation completion that alter, penetrate or damage the flooring installation, improper use, electrical or plumbing repairs made after flooring installation, improperly cured or prepared sub-floors, building damage caused by fire, flood, or other acts of God, or any repairs made to the floor system during the warranty period that are conducted by personnel not specifically authorized by BMI Installs, Inc. to make such repairs.

REMEDIES: In the event a warranted failure or problem to a BMI Installs, Inc. floor system becomes apparent during the warranty period specified herein, BMI Installs, Inc. shall at its own expense make the necessary repairs to the floor system.

THE REMEDIES STATED HEREIN ARE THE SOLE AND EXCLUSIVE REMEDIES FOR ALLEGED FAILURE OF THE BMI INSTALLS, INC. FLOORING SYSTEM. BMI INSTALLS, INC. DISCLAIMS LIABILITY FOR CONSEQUENTIAL, INCIDENTAL OR OTHER DAMAGES OF ANY KIND, INCLUDING BUT NOT LIMITED TO LOST PROFITS AND/OR DAMAGE TO BUILDING AND/OR CONTENTS. ANY IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE LIMITED IN TIME TO THE DURATION OF THIS EXPRESS WARRANTY. SOME STATES DO NOT ALLOW EXCLUSION OR LIMITATION OF INCIDENTAL OR CONSEQUENTIAL DAMAGES OR LIMITATION OF THE DURATION OF THE IMPLIED WARRANTIES, SO THE ABOVE LIMITATIONS OR EXCLUSIONS MAY NOT APPLY TO YOU.

COOLER AND FREEZER FLOORINGNEW INSTALLATION WARRANTY

_________________________________________________

Date

_________________________________________________

Company Name

_________________________________________________

Name and Address of Building

___________________________________________________

BMI Installs, Inc. Authorized Representative

___________________________________________________

Company Address

___________________________________________________

City, State, Zip

PO Box 1387, Cary, NC 27512919-740-2949 • fax 919-803-0069 • www.bmiinstalls.com

Titan™ Thermoplastic Flooring Master Installation Contractor

BMIBMI

Page 12: TITAN THERMOPLASTIC - BMI Installs, Incbmiinstalls.com/wp-content/uploads/2017/11/Titan-Thermoplastic-Cooler-Floor... · D. Brock Industries • Innovating solutions Our commitment

Certificate No.: _____________________________ Date of Installation: __________________________

Upon payment in full for services rendered by BMI Installs, Inc., (hereafter “BMI Installs, Inc.”) BMI Installs, Inc. provides the following warranty on RETROFIT HIGH-DENSITY, REINFORCEMENT, WATERPROOF, PVC providing that all terms and conditions set forth are complied with:

WARRANTY PERIOD AND SCOPE: BMI Installs, Inc. warrants the installation of Titan™ Thermoplastic Flooring against seam failure, improperly sealed drains or base material allowing water penetration, separation of flooring from substrate due to improper adhesive application, installation of defective materials, improper installation of stainless steel accessories or base trim, and damage or failure of the flooring system caused by an employee or agent of BMI Installs, Inc., Inc. for a period of ten (10) years from date of installation.

EXCLUSIONS: This warranty does not cover damages resulting from negligence, intentional misconduct or other destructive behavior on the part of the facility owner or its employees, agents, vendors or invitees including but not limited to; cutting with sharp objects, damage from other trades, dropping objects onto the floor surface, drain tampering, repairs and or renovations made to facility following flooring installation completion that alter, penetrate or damage the flooring installation, improper use, electrical or plumbing repairs made after flooring installation, improperly cured or prepared sub-floors, building damage caused by fire, flood, or other acts of God, or any repairs made to the floor system during the warranty period that are conducted by personnel not specifically authorized by BMI Installs, Inc. to make such repairs.

REMEDIES: In the event a warranted failure or problem to a BMI Installs, Inc. floor system becomes apparent during the warranty period specified herein, BMI Installs, Inc. shall at its own expense make the necessary repairs to the floor system.

THE REMEDIES STATED HEREIN ARE THE SOLE AND EXCLUSIVE REMEDIES FOR ALLEGED FAILURE OF THE BMI INSTALLS, INC. FLOORING SYSTEM. BMI INSTALLS, INC. DISCLAIMS LIABILITY FOR CONSEQUENTIAL, INCIDENTAL OR OTHER DAMAGES OF ANY KIND, INCLUDING BUT NOT LIMITED TO LOST PROFITS AND/OR DAMAGE TO BUILDING AND/OR CONTENTS. ANY IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE LIMITED IN TIME TO THE DURATION OF THIS EXPRESS WARRANTY. SOME STATES DO NOT ALLOW EXCLUSION OR LIMITATION OF INCIDENTAL OR CONSEQUENTIAL DAMAGES OR LIMITATION OF THE DURATION OF THE IMPLIED WARRANTIES, SO THE ABOVE LIMITATIONS OR EXCLUSIONS MAY NOT APPLY TO YOU.

RETROFIT HIGH-DENSITY, REINFORCEMENT, WATERPROOF, PVC TITAN™ FLOORING

_________________________________________________

Date

_________________________________________________

Company Name

_________________________________________________

Name and Address of Building

___________________________________________________

BMI Installs, Inc. Authorized Representative

___________________________________________________

Company Address

___________________________________________________

City, State, Zip

PO Box 1387, Cary, NC 27512919-740-2949 • fax 919-803-0069 • www.bmiinstalls.com

Titan™ Thermoplastic Flooring Master Installation Contractor

BMIBMI

Page 13: TITAN THERMOPLASTIC - BMI Installs, Incbmiinstalls.com/wp-content/uploads/2017/11/Titan-Thermoplastic-Cooler-Floor... · D. Brock Industries • Innovating solutions Our commitment

Thermoplastics division

Page 14: TITAN THERMOPLASTIC - BMI Installs, Incbmiinstalls.com/wp-content/uploads/2017/11/Titan-Thermoplastic-Cooler-Floor... · D. Brock Industries • Innovating solutions Our commitment

Original Cooler Floor Removed Old Floor Panels

Renovated and Ready for New RetroFloor™ Panel

New RetroFloor™ Panels

Page 15: TITAN THERMOPLASTIC - BMI Installs, Incbmiinstalls.com/wp-content/uploads/2017/11/Titan-Thermoplastic-Cooler-Floor... · D. Brock Industries • Innovating solutions Our commitment

COOLER FLOOR REPLACEMENT

Page 16: TITAN THERMOPLASTIC - BMI Installs, Incbmiinstalls.com/wp-content/uploads/2017/11/Titan-Thermoplastic-Cooler-Floor... · D. Brock Industries • Innovating solutions Our commitment
Page 17: TITAN THERMOPLASTIC - BMI Installs, Incbmiinstalls.com/wp-content/uploads/2017/11/Titan-Thermoplastic-Cooler-Floor... · D. Brock Industries • Innovating solutions Our commitment

New Installation Complete

Page 18: TITAN THERMOPLASTIC - BMI Installs, Incbmiinstalls.com/wp-content/uploads/2017/11/Titan-Thermoplastic-Cooler-Floor... · D. Brock Industries • Innovating solutions Our commitment

REFERENCES

Page 19: TITAN THERMOPLASTIC - BMI Installs, Incbmiinstalls.com/wp-content/uploads/2017/11/Titan-Thermoplastic-Cooler-Floor... · D. Brock Industries • Innovating solutions Our commitment
Page 20: TITAN THERMOPLASTIC - BMI Installs, Incbmiinstalls.com/wp-content/uploads/2017/11/Titan-Thermoplastic-Cooler-Floor... · D. Brock Industries • Innovating solutions Our commitment

Certified Installers with Nationwide Coverage

PO Box 1387

Cary, NC 27512

office 919-740-2949

fax 919-803-0069

www.bmiinstalls.comMaster Installation Contractor

BMIBMI

new coolers/freezers

10 Year Warranty

standard replacement retrofit floor panel

coolers/freezers5 Year Warranty

retrofit high-density, reinforcement, waterproof, pvc

titan™ flooring10 Year Warranty

BMIcfm400-14