Tidal Power CAUSE 2003 Final Project Pete Clark Klossner...

67
Tidal Power Tidal Power CAUSE 2003 Final Project CAUSE 2003 Final Project Pete Clark Pete Clark Rebecca Rebecca Klossner Klossner Lauren Lauren Kologe Kologe

Transcript of Tidal Power CAUSE 2003 Final Project Pete Clark Klossner...

Tida

l Pow

erTi

dal P

ower

CAU

SE 2

003

Fina

l Pro

ject

CAU

SE 2

003

Fina

l Pro

ject

Pete

Cla

rkPe

te C

lark

Reb

ecca

Reb

ecca

Klo

ssne

rKl

ossn

erLa

uren

La

uren

Kol

oge

Kolo

ge

Ove

rvie

wO

verv

iew

••In

trod

uctio

nIn

trod

uctio

n••

Basi

c Sc

ienc

e of

Tid

esBa

sic

Scie

nce

of T

ides

••H

isto

rical

Asp

ects

His

toric

al A

spec

ts••

New

Tec

hnol

ogy

from

an

Old

Ide

aN

ew T

echn

olog

y fr

om a

n O

ld I

dea

••La

La

Ran

ceRan

ceCa

se S

tudy

Case

Stu

dy••

Seve

rn P

roje

ct

Seve

rn P

roje

ct ––

Will

The

re E

ver

Be a

Bar

rage

?W

ill T

here

Eve

r Be

a B

arra

ge?

••Lo

ng I

slan

d So

und

Barr

age

Case

Stu

dy f

or t

he F

utur

eLo

ng I

slan

d So

und

Barr

age

Case

Stu

dy f

or t

he F

utur

e••

Fund

yFu

ndy

Bay

Bay

--Ca

se S

tudy

Case

Stu

dy––

Envi

ronm

enta

l Im

pact

s of

Tid

al E

nerg

yEn

viro

nmen

tal I

mpa

cts

of T

idal

Ene

rgy

––Ec

onom

ics

of T

idal

Ene

rgy

Econ

omic

s of

Tid

al E

nerg

y––

Polic

y Co

ncer

nsPo

licy

Conc

erns

––O

ther

Tid

al S

chem

esO

ther

Tid

al S

chem

es••

A M

ore

Futu

ristic

App

roac

h A

Mor

e Fu

turis

tic A

ppro

ach

–– Art

ifici

al R

eef

Prog

ram

: Ar

tific

ial R

eef

Prog

ram

: O

ffsh

ore

Rig

sO

ffsh

ore

Rig

s

Basi

c Sc

ienc

e of

Ba

sic

Scie

nce

of

the

Tide

sth

e Ti

des

Luna

r Ti

dal D

ynam

ics

Luna

r Ti

dal D

ynam

ics

Tida

l Bas

ics

Tida

l Bas

ics

••M

ost

loca

tions

hav

e tw

o tid

al c

ycle

s pe

r da

y: 1

2 M

ost

loca

tions

hav

e tw

o tid

al c

ycle

s pe

r da

y: 1

2 ho

urs,

25

min

utes

hour

s, 2

5 m

inut

es

••Es

sent

ially

cau

sed

by in

tera

ctio

n of

moo

n, e

arth

, Es

sent

ially

cau

sed

by in

tera

ctio

n of

moo

n, e

arth

, an

d su

n ce

ntrif

ugal

for

ces

and

sun

cent

rifug

al f

orce

s

••D

iurn

al t

ides

are

gen

erat

ed b

ecau

se t

he m

axim

a D

iurn

al t

ides

are

gen

erat

ed b

ecau

se t

he m

axim

a an

d m

inim

a in

eac

h da

ily r

otat

ion

are

uneq

ual i

n an

d m

inim

a in

eac

h da

ily r

otat

ion

are

uneq

ual i

n am

plitu

de

ampl

itude

New

ton

New

ton ’’

s La

w o

f G

ravi

tatio

nal

s La

w o

f G

ravi

tatio

nal

Stat

e St

ate

F =

G

F =

G m

1m2

m1m

2RR

22

Tida

l For

ce =

Ti

dal F

orce

= 2

Gm

m1a

2Gm

m1a

RR33

Dis

tanc

e be

twee

n Ea

rth

and

Moo

n

Rad

ius

of

Eart

h

Part

icle

(W

ater

)

Tida

l Fac

tsTi

dal F

acts

••Ti

dal R

ange

= D

ista

nce

betw

een

high

tid

e Ti

dal R

ange

= D

ista

nce

betw

een

high

tid

e m

ark

and

low

tid

e m

ark

mar

k an

d lo

w t

ide

mar

k

••La

rges

t Ran

ges

Larg

est

Ran

ges

Coas

tal R

egio

ns w

ith

Coas

tal R

egio

ns w

ith

extr

eme

dept

h gr

adie

nt (

extr

eme

dept

h gr

adie

nt (

Mou

zel

Mou

zel =

=

ex

celle

nt t

idal

ran

ge)

exce

llent

tid

al r

ange

)

••Sm

alle

st R

ange

sSm

alle

st R

ange

sO

pen

Oce

an (

<.5

m)

Ope

n O

cean

(<

.5 m

)

Sprin

g Ti

des

Sprin

g Ti

des

••Ye

ar r

ound

Year

rou

nd

••O

ccur

dur

ing

full

moo

n an

d ne

w m

oon

Occ

ur d

urin

g fu

ll m

oon

and

new

moo

n

••D

ue t

o th

e lin

ear

patt

ern

of S

ME

Due

to

the

linea

r pa

tter

n of

SM

E

••Ca

uses

str

onge

r tid

es:

incr

ease

d cu

rren

t an

d Ca

uses

str

onge

r tid

es:

incr

ease

d cu

rren

t an

d tid

al r

ange

stid

al r

ange

s

Nea

p Ti

des

Nea

p Ti

des

••M

oon

and

sun

are

perp

endi

cula

r to

eac

h M

oon

and

sun

are

perp

endi

cula

r to

eac

h ot

her

othe

r

••W

eak

curr

ents

, low

er t

idal

ran

ges

Wea

k cu

rren

ts, l

ower

tid

al r

ange

s

••O

ccur

dur

ing

quar

ter

moo

nsO

ccur

dur

ing

quar

ter

moo

ns

Nea

p Ti

des

Vers

us S

prin

g Ti

des

Nea

p Ti

des

Vers

us S

prin

g Ti

des

Bulg

ing

Effe

ct

Barr

age

Logi

stic

sBa

rrag

e Lo

gist

ics

••La

rges

t su

rfac

e ar

ea, g

reat

est

tidal

ran

geLa

rges

t su

rfac

e ar

ea, g

reat

est

tidal

ran

ge––

Squa

re E

ffec

tSq

uare

Eff

ect

••Ef

fect

s of

eco

syst

em (

fish,

sed

imen

t, e

tc.)

Effe

cts

of e

cosy

stem

(fis

h, s

edim

ent,

etc

.)

••Pr

oxim

ity t

o po

pula

tion

Prox

imity

to

popu

latio

n

Wat

erw

ay M

easu

rem

ent

Logi

stic

sW

ater

way

Mea

sure

men

t Lo

gist

ics

852.

5G

arol

imB

ay, S

outh

K

orea

420

4S

ever

n E

stua

ry

63.

2A

nnap

olis

, Nov

a S

cotia

240

5.5

Bay

of F

undy

, Can

ada

174

La R

ance

, Fra

nce

Bas

in A

rea

(km

2 )M

ean

Tida

l Am

plitu

de(m

)

Bay

of F

undy

VS

Ches

apea

ke B

ayBa

y of

Fun

dy V

S Ch

esap

eake

Bay

Gre

ater

Fric

tion

His

toric

al A

spec

tsH

isto

rical

Asp

ects

Anci

ent

Tide

Mill

sAn

cien

t Ti

de M

ills

••D

urin

g th

e Rom

an o

ccup

atio

n of

Eng

land

, D

urin

g th

e Rom

an o

ccup

atio

n of

Eng

land

, tid

e m

ills

wer

e bu

ilt t

o gr

ind

grai

n an

d tid

e m

ills

wer

e bu

ilt t

o gr

ind

grai

n an

d co

rnco

rn••

Thes

e tid

e m

ills

oper

ated

by

stor

ing

wat

er

Thes

e tid

e m

ills

oper

ated

by

stor

ing

wat

er

behi

nd a

dam

dur

ing

high

tid

e.

As t

he

behi

nd a

dam

dur

ing

high

tid

e.

As t

he

tide

rece

ded

the

wat

er w

as s

low

ly le

t ou

t tid

e re

cede

d th

e w

ater

was

slo

wly

let

out

from

beh

ind

the

dam

in o

rder

to

pow

er

from

beh

ind

the

dam

in o

rder

to

pow

er

the

mill

. th

e m

ill.

Nen

drum

Nen

drum

Mon

astic

Tid

al S

iteM

onas

tic T

idal

Site

••D

isco

vere

d in

199

9D

isco

vere

d in

199

9••

Unv

eile

d w

as a

sto

ne

Unv

eile

d w

as a

sto

ne

built

tid

al m

ill a

nd

built

tid

al m

ill a

nd

evid

ence

of

an

evid

ence

of

an

anci

ent

tidal

mill

an

cien

t tid

al m

ill

datin

g ba

ck t

o 78

7 da

ting

back

to

787

A.D

. A.

D.

Elin

gEl

ing

Mill

Mill

••Th

e m

ill w

as in

clud

ed in

the

Th

e m

ill w

as in

clud

ed in

the

Dom

esda

yD

omes

day

Surv

ey o

f 10

86Su

rvey

of

1086

••O

rigin

ally

mill

ed f

our

tons

of

flour

eac

h O

rigin

ally

mill

ed f

our

tons

of

flour

eac

h da

y at

max

imum

out

put

day

at m

axim

um o

utpu

t••

Reb

uilt

man

y tim

es, b

ut o

pera

tes

in t

he

Reb

uilt

man

y tim

es, b

ut o

pera

tes

in t

he

sam

e m

anne

rsa

me

man

ner

Elin

gEl

ing

Mill

M

ill ––

How

it W

orks

How

it W

orks

Elin

gEl

ing

Mill

Mill

Tide

P

ond

Tide

Mill

The

Sea

New

Tec

hnol

ogy

New

Tec

hnol

ogy

from

an

Old

Ide

afr

om a

n O

ld I

dea

Indu

stria

l Rev

olut

ion

Indu

stria

l Rev

olut

ion

••Br

ough

t ch

eap

ener

gy in

the

for

m o

f Br

ough

t ch

eap

ener

gy in

the

for

m o

f el

ectr

icity

elec

tric

ity••

Smal

l tid

al m

ills

wer

e re

plac

ed w

ith la

rge

Smal

l tid

al m

ills

wer

e re

plac

ed w

ith la

rge

stea

mst

eam

-- pow

ered

rol

ler

mill

spo

wer

ed r

olle

r m

ills

••Pa

leot

echn

ic p

erio

d m

eans

ful

l ste

am

Pale

otec

hnic

per

iod

mea

ns f

ull s

team

ah

ead

with

litt

le t

houg

h of

wha

t w

as

ahea

d w

ith li

ttle

tho

ugh

of w

hat

was

ha

ppen

ing

to t

he e

nviro

nmen

t ha

ppen

ing

to t

he e

nviro

nmen

t

From

Mill

ing

to E

lect

ricity

From

Mill

ing

to E

lect

ricity

••M

ost

com

mon

gen

erat

ing

syst

em is

the

ebb

M

ost

com

mon

gen

erat

ing

syst

em is

the

ebb

ge

nera

ting

syst

emge

nera

ting

syst

em••

Dou

ble

effe

ct t

urbi

nes

are

now

bec

omin

g D

oubl

e ef

fect

tur

bine

s ar

e no

w b

ecom

ing

tech

nolo

gica

lly f

easi

ble

tech

nolo

gica

lly f

easi

ble

Cons

truc

tion

Cons

truc

tion

••Ca

isso

ns a

re m

anuf

actu

red

at s

hore

Cais

sons

are

man

ufac

ture

d at

sho

re-- b

ased

ba

sed

cons

truc

tion

yard

s ar

e de

liver

ed t

o w

ater

co

nstr

uctio

n ya

rds

are

deliv

ered

to

wat

er

site

s by

bar

ges

and

then

pos

ition

ed b

y si

tes

by b

arge

s an

d th

en p

ositi

oned

by

cran

es t

o al

low

for

the

str

uctu

res

to

cran

es t

o al

low

for

the

str

uctu

res

to

corr

ectly

set

tle o

n th

e m

arin

e flo

or.

corr

ectly

set

tle o

n th

e m

arin

e flo

or.

••An

othe

r m

etho

d ca

lls f

or c

onst

ruct

ing

Anot

her

met

hod

calls

for

con

stru

ctin

g di

aphr

agm

wal

ls o

f re

info

rced

con

cret

e di

aphr

agm

wal

ls o

f re

info

rced

con

cret

e w

ithin

a t

empo

rary

san

d is

land

. w

ithin

a t

empo

rary

san

d is

land

.

Loca

tion

Loca

tion

••Ti

dal m

ills

wer

e us

ually

bui

lt on

inle

ts b

ranc

hing

Ti

dal m

ills

wer

e us

ually

bui

lt on

inle

ts b

ranc

hing

of

f tid

al e

stua

ries.

of

f tid

al e

stua

ries.

••

An e

stua

ry is

a w

ide

part

of

a riv

er w

here

it

An e

stua

ry is

a w

ide

part

of

a riv

er w

here

it

mee

ts t

he s

ea.

mee

ts t

he s

ea.

••Ti

dal e

stua

ries

are

char

acte

rized

by

narr

ow,

Tida

l est

uarie

s ar

e ch

arac

teriz

ed b

y na

rrow

, sh

allo

w c

hann

els

with

a r

elat

ivel

y co

nsta

nt w

idth

sh

allo

w c

hann

els

with

a r

elat

ivel

y co

nsta

nt w

idth

an

d de

pth.

and

dept

h.••

Tide

s ar

e gr

eatly

am

plifi

ed in

the

se a

reas

of

Tide

s ar

e gr

eatly

am

plifi

ed in

the

se a

reas

of

smal

ler

volu

me,

whi

ch c

ause

s th

e tid

e to

tra

vel

smal

ler

volu

me,

whi

ch c

ause

s th

e tid

e to

tra

vel

up t

he r

iver

. up

the

riv

er.

Tida

l Bar

rage

Tida

l Bar

rage

••Si

mila

r to

a d

amSi

mila

r to

a d

am••

Stru

ctur

e m

ust

span

the

ent

ire w

idth

and

St

ruct

ure

mus

t sp

an t

he e

ntire

wid

th a

nd

heig

ht o

f th

e es

tuar

yhe

ight

of

the

estu

ary

Evol

utio

n of

Tur

bine

Typ

esEv

olut

ion

of T

urbi

ne T

ypes

••W

ater

whe

el t

urbi

nes

Wat

erw

heel

tur

bine

s w

ere

used

in t

idal

w

ere

used

in t

idal

m

ills

mill

s

Ove

rsho

t

Und

ersh

ot

Brea

st-s

hot

Rec

ent

Turb

ines

Rec

ent

Turb

ines

••Bu

lb, R

im, a

nd T

ubul

arBu

lb, R

im, a

nd T

ubul

ar

Rim

Tur

bine

(Co

pyrig

ht B

oyle

, 19

96)

Bulb

Tur

bine

(Co

pyrig

ht

Boyl

e, 1

996)

Tubu

lar

Turb

ine

(Cop

yrig

ht

Boyl

e, 1

996)

La

La R

ance

Ran

ceCa

se

Case

St

udy

Stud

y

La

La R

ance

Ran

ceTi

dal P

ower

Pla

ntTi

dal P

ower

Pla

nt

••O

nly

full

scal

e po

wer

O

nly

full

scal

e po

wer

st

atio

n of

its

type

in

stat

ion

of it

s ty

pe in

th

e w

orld

the

wor

ld••

Loca

ted

in n

orth

ern

Loca

ted

in n

orth

ern

Fran

ce o

n th

e La

Fr

ance

on

the

La

Ranc

eRa

nce

Riv

er

Riv

er

La

La R

ance

Ran

ce

••Co

mpl

eted

in 1

967

afte

r 25

yea

rs o

f Co

mpl

eted

in 1

967

afte

r 25

yea

rs o

f st

udie

s an

d si

x ye

ars

of c

onst

ruct

ion

stud

ies

and

six

year

s of

con

stru

ctio

n••

24 b

ulb

turb

ines

, eac

h ca

pabl

e of

24

bul

b tu

rbin

es, e

ach

capa

ble

of

prod

ucin

g te

n m

egaw

atts

of

pow

erpr

oduc

ing

ten

meg

awat

ts o

f po

wer

••Th

e da

m is

246

0 fe

et (

750

met

ers)

long

, Th

e da

m is

246

0 fe

et (

750

met

ers)

long

, an

d 43

fee

t (1

3 m

eter

s) h

igh

and

43 f

eet

(13

met

ers)

hig

h••

One

of

the

grea

test

tid

al r

ange

s in

the

O

ne o

f th

e gr

eate

st t

idal

ran

ges

in t

he

wor

ld, a

t 13

.5m

. w

orld

, at

13.5

m.

La

La R

ance

Ran

ceTu

rbin

esTu

rbin

es

••Bu

lb t

urbi

nes

Bu

lb t

urbi

nes

••

The

blad

es o

f th

e tu

rbin

e ca

n ch

ange

dire

ctio

ns

The

blad

es o

f th

e tu

rbin

e ca

n ch

ange

dire

ctio

ns

depe

ndin

g on

the

cur

rent

flo

w.

depe

ndin

g on

the

cur

rent

flo

w.

••Th

e tu

rbin

es w

eigh

470

ton

s an

d ha

ve a

bla

de

The

turb

ines

wei

gh 4

70 t

ons

and

have

a b

lade

di

amet

er o

f ov

er s

even

teen

fee

t.

diam

eter

of

over

sev

ente

en f

eet.

••

The

plan

t is

als

o eq

uipp

ed w

ith p

umps

tha

t Th

e pl

ant

is a

lso

equi

pped

with

pum

ps t

hat

allo

w w

ater

to

be p

umpe

d in

to t

he b

asin

whe

n al

low

wat

er t

o be

pum

ped

into

the

bas

in w

hen

the

sea

is c

lose

to

basi

n le

vel a

t hi

gh t

ide.

Thi

s th

e se

a is

clo

se t

o ba

sin

leve

l at

high

tid

e. T

his

allo

ws

for

mor

e el

ectr

icity

to

be g

ener

ated

if

allo

ws

for

mor

e el

ectr

icity

to

be g

ener

ated

if

ther

e is

an

antic

ipat

ed in

crea

se in

dem

and.

th

ere

is a

n an

ticip

ated

incr

ease

in d

eman

d.

No

Dra

wba

cks?

No

Dra

wba

cks?

••N

o ad

vers

e im

pact

on

spec

ies

nativ

e to

the

N

o ad

vers

e im

pact

on

spec

ies

nativ

e to

the

w

ater

wat

er••

No

flood

ing

has

occu

rred

No

flood

ing

has

occu

rred

••Roa

d w

as c

reat

edRoa

d w

as c

reat

ed••

Tour

ist

site

Tour

ist

site

••G

ener

ates

ele

ctric

ity f

or o

ver

300,

000

hom

esG

ener

ates

ele

ctric

ity f

or o

ver

300,

000

hom

es••

Not

all

tidal

bar

rage

s w

ill h

ave

such

neg

ligib

le

Not

all

tidal

bar

rage

s w

ill h

ave

such

neg

ligib

le

affe

cts

affe

cts

Seve

rn P

roje

ct

Seve

rn P

roje

ct

Seve

rn B

arra

ge H

isto

rySe

vern

Bar

rage

His

tory

••Se

cond

larg

est

tidal

ran

ges

in t

he w

orld

Seco

nd la

rges

t tid

al r

ange

s in

the

wor

ld••

Prop

osal

s to

dam

the

Sev

ern

have

exi

sted

Pr

opos

als

to d

am t

he S

ever

n ha

ve e

xist

ed

for

over

one

hun

dred

yea

rsfo

r ov

er o

ne h

undr

ed y

ears

••W

hen

the

Seve

rn B

arra

ge c

once

pt w

as

Whe

n th

e Se

vern

Bar

rage

con

cept

was

or

igin

ally

pro

pose

d in

the

184

0s, i

t w

as t

o or

igin

ally

pro

pose

d in

the

184

0s, i

t w

as t

o im

prov

e sh

ippi

ng a

nd p

reve

nt f

lood

ing.

In

im

prov

e sh

ippi

ng a

nd p

reve

nt f

lood

ing.

In

ad

ditio

n, t

he b

arra

ge w

ould

cre

ate

a ad

ditio

n, t

he b

arra

ge w

ould

cre

ate

a ro

adw

ay a

nd r

ailw

ay a

cros

s th

e riv

er.

road

way

and

rai

lway

acr

oss

the

river

.

Pow

er P

lant

Pro

posa

lsPo

wer

Pla

nt P

ropo

sals

••Pr

opos

al in

191

8, b

ut t

he lo

w c

ost

of c

oal u

sed

to g

ener

ate

Prop

osal

in 1

918,

but

the

low

cos

t of

coa

l use

d to

gen

erat

e el

ectr

icity

did

not

mak

e th

e pr

ojec

t ec

onom

ical

ly f

easi

ble.

elec

tric

ity d

id n

ot m

ake

the

proj

ect

econ

omic

ally

fea

sibl

e.••

In 1

943

the

form

atio

n In

194

3 th

e fo

rmat

ion

Brab

azon

Brab

azon

Com

mis

sion

to

Com

mis

sion

to

rein

vest

igat

e th

e ba

rrag

e.

rein

vest

igat

e th

e ba

rrag

e.

––Th

e pr

opos

al c

alle

d fo

r a

sing

le b

asin

ope

ratin

g on

dis

char

ge o

nTh

e pr

opos

al c

alle

d fo

r a

sing

le b

asin

ope

ratin

g on

dis

char

ge o

n ly ly

that

wou

ld p

rodu

ce 8

00,0

00 k

ilow

atts

of

outp

ut (

UN

, 195

7).

that

wou

ld p

rodu

ce 8

00,0

00 k

ilow

atts

of

outp

ut (

UN

, 195

7).

––Ag

ain,

the

pla

n w

as a

band

oned

, bec

ause

of

poor

eco

nom

ic

Agai

n, t

he p

lan

was

aba

ndon

ed, b

ecau

se o

f po

or e

cono

mic

fe

asib

ility

. fe

asib

ility

.

••Th

e Se

vern

Bar

rage

Com

mitt

ee w

as o

rgan

ized

in 1

978

The

Seve

rn B

arra

ge C

omm

ittee

was

org

aniz

ed in

197

8––

The

com

mitt

ee s

pent

tw

o an

d a

half

year

s de

cidi

ng t

hat

a ba

rrag

eTh

e co

mm

ittee

spe

nt t

wo

and

a ha

lf ye

ars

deci

ding

tha

t a

barr

age

acro

ss t

he S

ever

n w

ould

be

tech

nolo

gica

lly f

easi

ble,

but

not

ac

ross

the

Sev

ern

wou

ld b

e te

chno

logi

cally

fea

sibl

e, b

ut n

ot

econ

omic

ally

fea

sibl

e ec

onom

ical

ly f

easi

ble

The

Prop

osed

Sch

eme

The

Prop

osed

Sch

eme

••10

mile

long

bar

rage

bet

wee

n 10

mile

long

bar

rage

bet

wee

n Br

ean

Brea

nD

own

in S

omer

set

Dow

n in

Som

erse

t an

d an

d La

vern

ock

Lave

rnoc

kPo

int

in

Poin

t in

Gla

mor

gan

Gla

mor

gan .

. ••

The

tidal

bas

in w

ould

be

over

190

squ

are

mile

s (5

00

The

tidal

bas

in w

ould

be

over

190

squ

are

mile

s (5

00

squa

re k

ilom

eter

s).

squa

re k

ilom

eter

s).

••Th

e pr

opos

ed b

arra

ge w

ould

be

com

pris

ed o

f ca

isso

ns t

o Th

e pr

opos

ed b

arra

ge w

ould

be

com

pris

ed o

f ca

isso

ns t

o ho

use

the

turb

ines

and

slu

ices

. ho

use

the

turb

ines

and

slu

ices

. ••

The

216

tubu

lar

turb

ines

wou

ld b

e lo

cate

d in

the

cen

tral

Th

e 21

6 tu

bula

r tu

rbin

es w

ould

be

loca

ted

in t

he c

entr

al

port

ion

of t

he b

arra

ge, a

nd e

ach

wou

ld d

rive

a 40

po

rtio

n of

the

bar

rage

, and

eac

h w

ould

driv

e a

40

meg

awat

t ge

nera

tor

meg

awat

t ge

nera

tor

••Es

timat

ed 1

7TW

h ea

ch y

ear

Estim

ated

17T

Wh

each

yea

r ••

The

prop

osed

sch

eme

has

a lif

etim

e of

at

leas

t 12

0 Th

e pr

opos

ed s

chem

e ha

s a

lifet

ime

of a

t le

ast

120

year

s ye

ars

••Sh

ip lo

cks

wer

e al

so in

clud

ed in

the

sch

eme

Ship

lock

s w

ere

also

incl

uded

in t

he s

chem

e••

Ebb

gene

ratin

g sc

hem

e w

ith p

umps

Ebb

gene

ratin

g sc

hem

e w

ith p

umps

Will

It

Be F

easi

ble?

Will

It

Be F

easi

ble?

••W

hat

has

chan

ged?

Wha

t ha

s ch

ange

d?––

Kyot

oKy

oto

––G

over

nmen

t Po

licy

Gov

ernm

ent

Polic

y ––

Ren

ewab

les

Ren

ewab

les

Obl

igat

ion

Obl

igat

ion

––G

loba

l War

min

g an

d po

ssib

le f

lood

ing?

Glo

bal W

arm

ing

and

poss

ible

flo

odin

g?

The

The

Ren

ewab

les

Ren

ewab

les

Obl

igat

ion

Obl

igat

ion

••10

% o

f el

ectr

icity

fro

m

10%

of

elec

tric

ity f

rom

ren

ewab

les

rene

wab

les

by

by

2010

, 20%

by

2020

2010

, 20%

by

2020

••Th

is s

chem

e co

uld

prov

ide

6% o

f th

e U

KTh

is s

chem

e co

uld

prov

ide

6% o

f th

e U

K’’ s

s to

tal e

lect

ricity

tota

l ele

ctric

ity••

Not

onl

ine

until

at

leas

t 20

14N

ot o

nlin

e un

til a

t le

ast

2014

Kyot

o Pr

otoc

olKy

oto

Prot

ocol

••Th

e Pr

otoc

ol c

alls

for

dev

elop

ed n

atio

ns t

o Th

e Pr

otoc

ol c

alls

for

dev

elop

ed n

atio

ns t

o re

duce

the

ir gr

eenh

ouse

gas

em

issi

ons.

re

duce

the

ir gr

eenh

ouse

gas

em

issi

ons.

••

A m

arke

t ba

sed

perm

it sy

stem

was

use

d A

mar

ket

base

d pe

rmit

syst

em w

as u

sed

to c

reat

e in

cent

ive

for

gree

nhou

se g

as

to c

reat

e in

cent

ive

for

gree

nhou

se g

as

emis

sion

red

uctio

ns.

emis

sion

red

uctio

ns.

••Th

e el

ectr

icity

fro

m t

he b

arra

ge w

ould

Th

e el

ectr

icity

fro

m t

he b

arra

ge w

ould

av

oid

the

emis

sion

of

eigh

teen

mill

ion

tons

av

oid

the

emis

sion

of

eigh

teen

mill

ion

tons

of

car

bon

diox

ide

ever

y ye

ar.

of c

arbo

n di

oxid

e ev

ery

year

.

Floo

ding

Floo

ding

••G

loba

l War

min

g m

ay c

ause

flo

odin

g an

d co

asta

l G

loba

l War

min

g m

ay c

ause

flo

odin

g an

d co

asta

l er

osio

n in

the

Sev

ern

Estu

ary

Reg

ion

eros

ion

in t

he S

ever

n Es

tuar

y Reg

ion

••Th

e an

nual

ave

rage

flo

odin

g da

mag

e co

st r

isk

The

annu

al a

vera

ge f

lood

ing

dam

age

cost

ris

k cu

rren

tly t

otal

s cu

rren

tly t

otal

s ££ 4

040-- 2

00 m

illio

n, a

nd t

his

is

200

mill

ion,

and

thi

s is

ex

pect

ed t

o ris

e.

expe

cted

to

rise.

••

Thes

e co

sts

and

cost

s of

pot

entia

lly in

stal

ling

Thes

e co

sts

and

cost

s of

pot

entia

lly in

stal

ling

flood

miti

gatio

n co

uld

be a

void

ed if

the

Sev

ern

flood

miti

gatio

n co

uld

be a

void

ed if

the

Sev

ern

Barr

age

was

con

stru

cted

.Ba

rrag

e w

as c

onst

ruct

ed.

New

Def

initi

on S

tudy

N

ew D

efin

ition

Stu

dy ––

New

Hop

e?N

ew H

ope?

••Co

sts

are

still

ver

y hi

gh (

Cost

s ar

e st

ill v

ery

high

(££ 1

0.3

10.3

––14

14

bi

llion

) an

d th

e pr

ojec

t co

uld

take

up

to

billi

on)

and

the

proj

ect

coul

d ta

ke u

p to

ni

ne y

ears

to

cons

truc

t.

nine

yea

rs t

o co

nstr

uct.

••

Diff

icul

t to

fin

d in

vest

ors

beca

use

of lo

ng

Diff

icul

t to

fin

d in

vest

ors

beca

use

of lo

ng

payb

ack

perio

d.pa

ybac

k pe

riod.

••If

pos

itive

ext

erna

litie

s ar

e in

clud

ed in

the

If

pos

itive

ext

erna

litie

s ar

e in

clud

ed in

the

m

arke

t, t

hen

the

elec

tric

ity f

rom

tid

al c

an

mar

ket,

the

n th

e el

ectr

icity

fro

m t

idal

can

be

com

petit

ive

with

tha

t of

oth

er

be c

ompe

titiv

e w

ith t

hat

of o

ther

re

sour

ces

reso

urce

s

Long

Isl

and

Soun

d Lo

ng I

slan

d So

und

Barr

age

Case

Stu

dy

Barr

age

Case

Stu

dy

for

the

Futu

refo

r th

e Fu

ture

Whe

re o

n th

e Ea

st C

oast

do

we

Whe

re o

n th

e Ea

st C

oast

do

we

have

a la

rge

popu

latio

n ne

ar a

ha

ve a

larg

e po

pula

tion

near

a

wat

erw

ay w

ith a

larg

e tid

al

wat

erw

ay w

ith a

larg

e tid

al

rang

e?ra

nge?

Long

Isl

and

Soun

dLo

ng I

slan

d So

und

Long

Isl

and

Soun

d Ba

rrag

eLo

ng I

slan

d So

und

Barr

age

••Ti

dal r

ange

incr

ease

s he

adin

g w

est

Tida

l ran

ge in

crea

ses

head

ing

wes

t

••M

ax t

idal

ran

ge =

10

met

ers

Max

tid

al r

ange

= 1

0 m

eter

s

••Bu

ild b

arra

ge h

alfw

ay in

to s

ound

Build

bar

rage

hal

fway

into

sou

ndgr

eate

r ra

nge,

less

gr

eate

r ra

nge,

less

su

rfac

e ar

easu

rfac

e ar

ea

••Su

rfac

e Ar

ea =

2,0

92 k

mSu

rfac

e Ar

ea =

2,0

92 k

m22

••Ti

dal A

mpl

itude

= 3

.5 m

eter

s at

Mt.

Sin

ai

Tida

l Am

plitu

de =

3.5

met

ers

at M

t. S

inai

Plac

emen

t of

Bar

rage

Str

uctu

rePl

acem

ent

of B

arra

ge S

truc

ture

Levy

Sys

tem

for

tr

affic

Sout

h ha

lf of

Sou

nd is

sh

allo

w

=le

ss

frei

ghte

r tr

affic

Theo

retic

al M

ean

Pow

er O

utpu

tTh

eore

tical

Mea

n Po

wer

Out

put

S S ∫∫ ρρ

gdz

gdz

2S2Sρρ g

HgH22

Surf

ace

Area

Gra

vita

tiona

l Acc

eler

atio

nMea

n Am

plitu

de o

f Ti

de

Surf

ace

Area

Den

sity

G

ravi

tatio

nal

Acce

lera

tion

Chan

ge in

W

ater

H

eigh

t Co

lum

n

LI S

ound

Bar

rage

LI S

ound

Bar

rage

——En

ergy

En

ergy

O

utpu

tO

utpu

t

2,13

5 M

w2,

135

Mw

-- Abo

ut 1

/3 o

f w

hat

is e

xpec

ted

from

Sev

ern

Abou

t 1/

3 of

wha

t is

exp

ecte

d fr

om S

ever

n Ba

rrag

eBa

rrag

e-- I

f ca

lcul

atio

ns w

ere

85%

inac

cura

te, L

ISB

If c

alcu

latio

ns w

ere

85%

inac

cura

te, L

ISB

wou

ld s

till p

rodu

ce m

ore

pow

er t

han

La

wou

ld s

till p

rodu

ce m

ore

pow

er t

han

La

Ran

ceRan

ce

Maj

or S

etba

ckM

ajor

Set

back

——Fi

sher

y M

igra

tion

Fish

ery

Mig

ratio

n

Wou

ld B

arra

ge h

elp

clea

n up

W

ould

Bar

rage

hel

p cl

ean

up

sedi

men

t pr

oble

m?

sedi

men

t pr

oble

m?

Fund

yFu

ndy

Bay

Bay

--Ca

se S

tudy

Case

Stu

dy

Envi

ronm

enta

l Im

pact

s of

Tid

al E

nerg

yEn

viro

nmen

tal I

mpa

cts

of T

idal

Ene

rgy

Econ

omic

s of

Tid

al E

nerg

yEc

onom

ics

of T

idal

Ene

rgy

Polic

y Co

ncer

nsPo

licy

Conc

erns

Oth

er T

idal

Sch

emes

Oth

er T

idal

Sch

emes

Rom

ancin

g th

e Tid

eRo

man

cing

the T

ide

Crea

ting

a ne

w p

arad

igm

for

Cr

eatin

g a

new

par

adig

m f

or

rene

wab

le e

nerg

y ch

oice

s re

new

able

ene

rgy

choi

ces

Impa

cts

Impa

cts

••En

viro

nmen

tal

Envi

ronm

enta

l ••

Econ

omic

Ec

onom

ic

••So

cial

So

cial

Boun

dary

Lay

er E

ffec

tsBo

unda

ry L

ayer

Eff

ects

http

://1

29.1

73.3

.163

/BBL

Ch1.

htm

l

Red

Tid

e In

cide

nce

Red

Tid

e In

cide

nce

Bunn

ies

aren

Bunn

ies

aren

’’ t fe

roci

ous

enou

ght

fero

ciou

s en

ough

But

Squi

rrel

s Ar

eBu

t Sq

uirr

els

Are

Polit

ics

and

Polic

y: S

pin

mak

es t

he

Polit

ics

and

Polic

y: S

pin

mak

es t

he

eart

h go

ea

rth

go ‘‘ r

ound

ro

und

City

by

the b

ayCi

ty b

y th

e bay

San

Fran

cisc

oSa

n Fr

anci

sco ’’

s Ti

dal P

ower

s

Tida

l Pow

er

Pote

ntia

lPo

tent

ial

The

Loya

l Sub

ject

s of

Kin

g Th

e Lo

yal S

ubje

cts

of K

ing

Canu

teCa

nute

ItIt’’ s

the

end

of

the

wor

ld a

s s

the

end

of t

he w

orld

as

we

know

it

we

know

it ……

••Ye

ster

day

is p

ast,

the

fut

ure

will

com

e w

ithou

t Ye

ster

day

is p

ast,

the

fut

ure

will

com

e w

ithou

t w

arni

ng, b

ut t

oday

is a

w

arni

ng, b

ut t

oday

is a

pre

sent

pres

ent

••W

e ca

nnot

go

back

to

the

hist

oric

al c

onte

xt o

f a

We

cann

ot g

o ba

ck t

o th

e hi

stor

ical

con

text

of

a sp

arse

ly p

opul

ated

wor

ld ~

our

ene

rgy

choi

ces

spar

sely

pop

ulat

ed w

orld

~ o

ur e

nerg

y ch

oice

s to

day

refle

ct a

diff

eren

t st

artin

g po

int

toda

y re

flect

a d

iffer

ent

star

ting

poin

t

Choo

se y

our

own

futu

reCh

oose

you

r ow

n fu

ture

http

://w

ww

.ope

n.ac

.uk/

T206

/4lo

ngto

ur.h

tmht

tp:/

/ww

w.in

finity

trad

ing.

com

/cru

de_

oil_

futu

res_

optio

ns.h

tml

A M

ore

Futu

ristic

App

roac

h A

Mor

e Fu

turis

tic A

ppro

ach

–– Art

ifici

al R

eef

Prog

ram

: Ar

tific

ial R

eef

Prog

ram

: O

ffsh

ore

Rig

sO

ffsh

ore

Rig

s

NJ

Artif

icia

l Ree

f Pr

ogra

mN

J Ar

tific

ial R

eef

Prog

ram

Mar

ine

Cons

erva

tion

Stru

ctur

eM

arin

e Co

nser

vatio

n St

ruct

ure

Max

imiz

ed C

onse

rvat

ion

Conc

lusi

ons

Conc

lusi

ons

••Ti

dal E

nerg

y is

inte

rest

ing!

Tida

l Ene

rgy

is in

tere

stin

g!••

Econ

omic

s ar

e di

ffic

ult

to g

et a

roun

dEc

onom

ics

are

diff

icul

t to

get

aro

und

••Th

ese

proj

ects

are

exp

ensi

veTh

ese

proj

ects

are

exp

ensi

ve••

Are

peop

le r

eally

will

ing

to p

ay?

Are

peop

le r

eally

will

ing

to p

ay?