Thomas Bouvet European Space Agency 27 April 2010 presentation... · Thomas Bouvet. European Space...
Transcript of Thomas Bouvet European Space Agency 27 April 2010 presentation... · Thomas Bouvet. European Space...
Sibenik Croatia, April 2010 International Symposium on Humanitarian Demining
Space assets for demining assistance ?
Thomas Bouvet
European Space Agency
27 April 2010
Sibenik Croatia, April 2010 International Symposium on Humanitarian Demining
We believe that the efficiency of the land release process could still be improved, thanks to existing space technologies and assets, in particular Space borne Earth observation, navigation, telecommunication.
Introduction
Involvement of relevant stakeholders within the landmine / ERW community is sought.
ESA is about to fund a feasibility study, to pave the way to new services to assist land release for improved socio-economic impact.
Sibenik Croatia, April 2010 International Symposium on Humanitarian Demining
OUTLINE
How space could be relevant to land release ?
Introduction to the IAP programme of ESA
Highlights of the ITT for a feasibility study
Sibenik Croatia, April 2010 International Symposium on Humanitarian Demining
How could space
be relevant to
land release ?
Sibenik Croatia, April 2010 International Symposium on Humanitarian Demining
Loosely
defined
suspect
Area
Non
Priority
zones
Priority
zones
Landmine
Impact Survey
Non
technical
Survey
Technical
Survey
Low
hazard
zone
High hazard
zone
Zone with
undetermine
d hazard
Clearance (Test) & Release
Mine
decontaminate
d zone
Released
zone
Curren
tTo
ols
Action
step
s
Land
Status
Possible spa
ceassistan
ce
InterviewsStand‐off visual
inspection
Fencing
off
Manual
deminers
with
prodders, electronic
sensors
or dogs; Possible
mechanical
assistance
Reports of accidentConflict
dataCollection of
demographic
and
economic
data
Close‐in visual
inspectionAirborne
stand‐off
detection
(experimental)
5a4a
1a 1b2a 2b3
4b 4c 4d5b 5c 5d
Legendxxxxxx Service enabled by Service enabled by
t llitService enabled by
t llit
Could Space be relevant?
Sibenik Croatia, April 2010 International Symposium on Humanitarian Demining
Priority setting & assessment
For each euro spent…
• Evaluation of how much socio-economic value will be released.
• Evaluation of fit with priority development goals
(e.g. food autonomy ? Load on health system? Development of infrastructure?)
Suspected land0
Socio - economic value1
Practicality & cost2
Could Space be relevant?
Sibenik Croatia, April 2010 International Symposium on Humanitarian Demining
Loosely
defined
suspect
Area
Non
Priority
zones
Priority
zones
Landmine
Impact Survey
Non
technical
Survey
Technical
Survey
Low
hazard
zone
High hazard
zone
Zone with
undetermine
d hazard
Clearance (Test) & Release
Mine
decontaminate
d zone
Released
zone
Curren
tTo
ols
Action
step
s
Land
Status
Possible spa
ceassistan
ce
InterviewsStand‐off visual
inspection
Fencing
off
Manual
deminers
with
prodders, electronic
sensors
or dogs; Possible
mechanical
assistance
Reports of accidentConflict
dataCollection of
demographic
and
economic
data
Close‐in visual
inspectionAirborne
stand‐off
detection
(experimental)
5a4a
1a 1b2a 2b3
4b 4c 4d5b 5c 5d
Legendxxxxxx Service enabled by Service enabled by
t llitService enabled by
t llit
Could Space be relevant?
Sibenik Croatia, April 2010 International Symposium on Humanitarian Demining
Selecting the right detection tool(s)
Read my IAF report on technologies
Type of ERW / mine
Soil characteristics
Could Space be relevant?
Method / instrument 1
Method / instrument 2
Method / instrument 1+2
Optimal detection reliability given available technologies
Characterize the operational scenario.
Choose the tool(s) that will best work for your purpose (stand- off detection / close in detection / post release assessment).
Chose the time in year when it is best.
Sibenik Croatia, April 2010 International Symposium on Humanitarian Demining
Loosely
defined
suspect
Area
Non
Priority
zones
Priority
zones
Landmine
Impact Survey
Non
technical
Survey
Technical
Survey
Low
hazard
zone
High hazard
zone
Zone with
undetermine
d hazard
Clearance (Test) & Release
Mine
decontaminate
d zone
Released
zone
Curren
tTo
ols
Action
step
s
Land
Status
Possible spa
ceassistan
ce
InterviewsStand‐off visual
inspection
Fencing
off
Manual
deminers
with
prodders, electronic
sensors
or dogs; Possible
mechanical
assistance
Reports of accidentConflict
dataCollection of
demographic
and
economic
data
Close‐in visual
inspectionAirborne
stand‐off
detection
(experimental)
5a4a
1a 1b2a 2b3
4b 4c 4d5b 5c 5d
Legendxxxxxx Service enabled by Service enabled by
t llitService enabled by
t llit
Could Space be relevant?
Sibenik Croatia, April 2010 International Symposium on Humanitarian Demining
Discriminating mine free / contaminated lands
Amount of suspected land addressed
Desired situation
Rel
ease
d la
nd Close in detection
Air borne detection
Space borne detection
Could Space be relevant?
Actual situationM
ined
land
Mine free land
Close in detection
Amount of suspected land addressed
Reinforcem
ent of confidence in suspicion
Sibenik Croatia, April 2010 International Symposium on Humanitarian Demining
Discriminating mine free / contaminated lands
Amount of suspected land addressed
Desired situation
Rel
ease
d la
nd Close in detection
Air borne detection
Space borne detection
Could Space be relevant?
Detection of indirect indicators of mine absence / presence
Characterisation of scenario, to help define indicators
Direct detection of mine field signature
Selection of sensing technology
Navigation assistance
Payload data downlink to processing centers
Sibenik Croatia, April 2010 International Symposium on Humanitarian Demining
Assisting navigation to and within the operation area
Combination of readily available and updated elevation + land use maps and a GPS navigating tool, for any field operation:
- Interviews
- Field observations
- Stand off detection
- Demarcation
- Clearance
Could Space be relevant?
Geo-referencement of collected data
Sibenik Croatia, April 2010 International Symposium on Humanitarian Demining
Could Space be relevant?
Real time communication between field data collectors and IMSMA
For the field operator to get the right information, at the right place, at the right time.
To upload in real time field data collected into IMSMA (quality management)
Sibenik Croatia, April 2010 International Symposium on Humanitarian Demining
Loosely
defined
suspect
Area
Non
Priority
zones
Priority
zones
Landmine
Impact Survey
Non
technical
Survey
Technical
Survey
Low
hazard
zone
High hazard
zone
Zone with
undetermine
d hazard
Clearance (Test) & Release
Mine
decontaminate
d zone
Released
zone
Curren
tTo
ols
Action
step
s
Land
Status
Possible spa
ceassistan
ce
InterviewsStand‐off visual
inspection
Fencing
off
Manual
deminers
with
prodders, electronic
sensors
or dogs; Possible
mechanical
assistance
Reports of accidentConflict
dataCollection of
demographic
and
economic
data
Close‐in visual
inspectionAirborne
stand‐off
detection
(experimental)
5a4a
1a 1b2a 2b3
4b 4c 4d5b 5c 5d
Legendxxxxxx Service enabled by
satellite Earth Obs. Service enabled by satellite Navigation
Service enabled by satellite telecommunication
Could Space be relevant?
Sibenik Croatia, April 2010 International Symposium on Humanitarian Demining
Introduction to the ESA
IAP programme
Sibenik Croatia, April 2010 International Symposium on Humanitarian Demining
IAP? Rationale
IAP = Integrated Application Promotion
New ESA programme (2008), established to
Meet increasing demand for sustainable end-to-end services using integrated space & non space technologies and assets
Designed to overcome two major obstacles:
• Cultural gap and lack of dialogue potential users and the space sector.
• Compartmentalisation of space technologies
Sibenik Croatia, April 2010 International Symposium on Humanitarian Demining
IAP - Activities
IAP fundsfeasibility studies and pre-operational demonstration projects,
to facilitate the set up of new servicesleveraging on several space assets.
Incubator for services
IAP objective:
“The development of Operational services for a wide range of users through the combination of different systems”
Sibenik Croatia, April 2010 International Symposium on Humanitarian Demining
IAP - Peculiarities
Cross sectorial / topical programme, to address global challenges:
Health, Safety, development, transportation, energy, etc…
IAP activities are implemented through partnerships of users and relevant stakeholders across the value chain.
IAP activities are user - driven.
Short term to market services
i.e. enabled by mature technologies / existing system elements
Sibenik Croatia, April 2010 International Symposium on Humanitarian Demining
Health
Safety
Development
Energy
Other
Awareness FeasibilityStudies
DemonstrationProjects
IAP
Operations
Edu
cate
on
spac
e as
sets
pl
us u
nder
stan
d ne
eds
Iden
tify
user
requ
irem
ents
&
ass
ess
serv
ices
via
bilit
y
Opt
imis
ing
solu
tions
de
mon
stra
te in
ope
ratio
nal
cond
ition
s
Ens
ure
Sus
tain
abili
ty
Potential Users Partners progressive involvement
Feedback
IAP - Structure
Feasibility Studies, to assess the technical and economical viability of services responding to users’ requirements.Demonstration Projects: to implement pre-operational services on the basis of partnership with users/stakeholdersAwareness Activities, reaching out to stakeholders in order to understand their needs, foster their demand and facilitate their involvement
Sibenik Croatia, April 2010 International Symposium on Humanitarian Demining
Highlights of the ITT to implement a feasibility study
Sibenik Croatia, April 2010 International Symposium on Humanitarian Demining
Feasibility study
OBJECTIVES
To produce a concept for a user-driven integrated system and services based on existing space assets supporting the land release process in mine action at its various levels.
To assess, together with the users, the system and its associated services, including its added value and that of the space assets, and analyze its economic and non-economic viability.
To prepare a roadmap towards sustainable services, including definition of a demonstration project, the formal involvement of key stakeholders in that demonstration project (such as users, service providers, etc).
Sibenik Croatia, April 2010 International Symposium on Humanitarian Demining
Feasibility study
STUDY LOGICS
Sibenik Croatia, April 2010 International Symposium on Humanitarian Demining
Feasibility study
Stakeholders
Service end-users: Decision makers / Donors / Operators
R&D organisations with relevant expertise
Space service providers
Any organisation with relevant skills and experience to produce a study steering towards valuable and sustainable services
e.g.
Sibenik Croatia, April 2010 International Symposium on Humanitarian Demining
Feasibility study
SCHEDULE
Bidding closing date: 14 June 2008
Study kick-off: July / August
Study duration: 15 months
BUDGET
400 k€
Sibenik Croatia, April 2010 International Symposium on Humanitarian Demining
ESA IS WAITING FOR
YOUR BID
For questions and further information:
http://iap.esa.int
Come to me for ITT documents
Sibenik Croatia, April 2010 International Symposium on Humanitarian Demining
Questions?