The triangle Project - Visual integration analysis Brussels

download The triangle Project - Visual integration analysis Brussels

of 17

Transcript of The triangle Project - Visual integration analysis Brussels

  • 8/13/2019 The triangle Project - Visual integration analysis Brussels

    1/17

    THE TRIANGLE PROJECT

    A DIACHRONYC READING

    CORSO METODI QUANTITATIVI PER LANALISI DEL TERRITORIO 2011/2012

    VALERIA BALLERIN, VINCENZO PATERNO

    ACCADEMIA DI ARCHITETTURA - PROF. PAOLO GIORDANO

  • 8/13/2019 The triangle Project - Visual integration analysis Brussels

    2/17

    INTRODUCTION

    The atelier whose project we are focusing for this analisys worked in a col-

    lective effort do devolop a urban project in the area of Anderlecht, an area

    in southwest Brussels.

    The area, roughly in shape of a triangle, is a former industrial district along

    the Brussels Canal and is surrounded by densely populated streets, inhab-

    ited mainly by foreings.

    An important building lies in the center, the former Abbatoir now the

    biggest food market in Brussels, both retail and wholesale. The original

    19th century structure has been surrounded during the decades by many

    wharehouses and use large gated areas for parking and temporary mar-

    ket. This is peculiar of the whole Triangle, both from human scale and plan

    is felt as a big unaccessible void.

    The aim of the atelier was infact to liberate this space and donate it to the

    surrounding city enriched by new services and reshaped in a more open

    way. This was done with a work of selective demolition and a redesign of

    the edges, leaving the center void for public activities.

  • 8/13/2019 The triangle Project - Visual integration analysis Brussels

    3/17

    MOBILITY

  • 8/13/2019 The triangle Project - Visual integration analysis Brussels

    4/17

    EXISTING SITUATION

  • 8/13/2019 The triangle Project - Visual integration analysis Brussels

    5/17

    EXISTING PUBLIC SPACES

  • 8/13/2019 The triangle Project - Visual integration analysis Brussels

    6/17

    STATIONS

    PUBLIC BUILDINGS

    VISUAL INTEGRATIONACTUAL SITUATION

  • 8/13/2019 The triangle Project - Visual integration analysis Brussels

    7/17

    STATIONS

    PUBLIC BUILDINGS

    VISUAL INTEGRATIONSITUATION AFTER PROJECT

  • 8/13/2019 The triangle Project - Visual integration analysis Brussels

    8/17

    EXCLUSION BEFORE

    view from top of the site

    view of the area of the market warehouses

    access of the markets area from the Canal

    access to the markets area from the underground station

  • 8/13/2019 The triangle Project - Visual integration analysis Brussels

    9/17

    PERMEABILTY AFTER

    public transit through a green passage

    public transit through passages in a buildt limit

    public transit through light architectural devices

    Bird eye view of the Triangle after the intervention on edges and core

  • 8/13/2019 The triangle Project - Visual integration analysis Brussels

    10/17

    VISUAL INTEGRATION BEFORE

    CENTER-WEST BRUSSELS

  • 8/13/2019 The triangle Project - Visual integration analysis Brussels

    11/17

    VISUAL INTEGRATION AFTER

    CENTER-WEST BRUSSELS

  • 8/13/2019 The triangle Project - Visual integration analysis Brussels

    12/17

    VISUAL INTEGRATION

    PROJECT AREA

  • 8/13/2019 The triangle Project - Visual integration analysis Brussels

    13/17

    VISUAL INTEGRATION

    A COMPARISON BEFORE AND AFTER THE PROJECT

  • 8/13/2019 The triangle Project - Visual integration analysis Brussels

    14/17

    VISUAL INTEGRATION

    A COMPARISON BEFORE AND AFTER THE PROJECT

  • 8/13/2019 The triangle Project - Visual integration analysis Brussels

    15/17

    Center-west Brusssels

    - Vsual integration average value

    without project

    - Vsual integration average value

    with project

    - Relative Variation range

    Project Area

    - Vsual integration average value

    without project

    - Vsual integration average value

    with project

    - Relative Variation range

    2.97

    3.19

    199.9

    3.10

    3.35

    172.41

    VISUAL INTEGRATION

    RELEVANT DATAS

  • 8/13/2019 The triangle Project - Visual integration analysis Brussels

    16/17

    After the analisys with DepthMap we tested the design aim of the atelier, and both data

    and maps suggested us that was successful.

    The comparision of the maps shows how the surrounding urban fabric is infulenced by the

    project, and what kind of integration we nd in the developed area. The crossing analisys

    of the parameters of Visual Integration shows how the grows of integration at the city scale

    seems to be signicant being on a average value of 0.22 from 2.97 to 3.19. On a smaller

    scale, using the smallest rectangle around the site the grows value is 0.25 from 3.10 to

    3.35. The average as a parameter was veried with the standard deviation variation, that

    shows a very limited variation on a basic standard deviation always less of 1.

    On the design side the area that were chosen to accomodate transport facilities proved to

    be mainly the most integrated, together with the void that assume a relevant position on

    the urban scale. As a futher consideration is that the southern part of the area was less

    modied in his urban fabric but just at an architectonic scale, and for this reason the inte -

    gration is almost unchanged.

    CONSIDERATIONS

  • 8/13/2019 The triangle Project - Visual integration analysis Brussels

    17/17