# ItEm ACtION
1.1 Welcome and Introductions Superintendent Ian Allison
1.2 Greetings from Elected Representatives Trustee Shelley Laskin
1.3 Project Background & ScheduleSenior Manager MCP & BP
Jeff Latto
1.4 Site Plan & Building Design Snyder Architects
1.5 Questions
1.6 Next StepsSenior Manager MCP & BP
Jeff Latto
2
WELCOmE AND INtRODUCtIONS
• Shona Farrelly, Principal
• Cecile Robertson, Vice Principal
• Shelley Laskin, Trustee, Ward 11
• Ian Allison, Superintendent of Schools, Learning Network 2
• Jeff Latto, Senior Manager Major Capital Projects & Building Partnerships
• Elsa Chow, Toronto Children’s Services
• Doug Snyder, Snyder Architects
• Avinash Garde, Snyder Architects
• Rochelle Moncarz, Snyder Architects
• Sharon Sterling and Racheal Saunders, WSP
3
GREEtINGS FROm ELECtED REPRESENtAtIVES
4
PROJECt BACKGROUND & SCHEDULEBACKGROUND
• In 2012, the TDSB Board approved the plans to redevelop the Davisville/Spectrum property involving:
• A Surplus Declaration of .98 acres of the school property for residential development. This land disposition would fund the construction of a new 668 pupil placement school;
• With the announcement of funding from the Ministry of Education for the new replacement school in late 2015, the need to redevelop the school property no longer was required;
• Design has gone from integrated with development to a stand alone school on the site;
5
PROJECt BACKGROUND & SCHEDULEBACKGROUND
• New school will have:
• Accommodation for 731 students;
• Dedicated area for Spectrum Alternative School;
• Dedicated child care space (5 rooms) for 88 children from Infants up to Pre-school age;
• A City of Toronto funded Third Gymnasium;
• City of Toronto funded below-grade parking garage with 60 parking spaces that accommodates 40 parking spaces for school staff (during the school day). This parking garage will have direct access to the new school and a future Aquatic Centre (City of Toronto funded);
• The Toronto Lands Corporation (TLC) is currently negotiating an agreement with the City of Toronto to determine lease arrangements for the land for the Aquatic Centre and a shared use agreement for the facilities.
6
PROJECt BACKGROUND & SCHEDULEBACKGROUND
• Through the New School Review Process for the Replacement School the following milestones have been completed:
• Introductory Public Meeting was held on 20 September 2016;
• The New School Review Team (NSRT) signed off on the Site Plan layout on 14 December, 2016;
• The NSRT signed off on the School Design on 23 March 2017; and
• Site Plan Application was submitted to the City of Toronto on 1 May 2017.
• We are looking to this evening’s Public Meeting as a chance to show the School Design, listen to community feedback, and to discuss time lines related to the Replacement School project.
7
PROJECt BACKGROUND & SCHEDULENEW REPLACEMENT SCHOOL - MAP
8
PROJECt BACKGROUND & SCHEDULECONSTRUCTION SCHEDULE OF REPLACEMENT SCHOOL
• January 2016: Space Template Approved
• June 2016: Snyder Architects awarded commission for architectural services for project
• December 2016/March 2017: NSRT Meetings
• May 2017: Public Meeting
• November 2017 – January 2018: Tendering of contract to select contractor
• Construction of Replacement School: assuming school operates on-site during construction
• July 2018: Construction start
• July 2020: Construction is Substantially Complete
• September 2020: New Replacement School opens
• October 2020 – August 2021: Existing school is demolished, and completion of outdoor play areas.
• September 2021: Completion of school play grounds and fields.
9
SItE PARAmEtERS RECAP
10
SItE PARAmEtERS RECAP
11
SItE PARAmEtERS RECAP
12
SItE PARAmEtERS RECAP
13
SItE PARAmEtERS RECAP
14
SItE PARAmEtERS RECAP
15
SItE PARAmEtERS RECAP
16
SItE PARAmEtERS RECAP
17
SItE PARAmEtERS RECAP
18
SItE PARAmEtERS RECAP
19
PROPOSED DESIGN
20
PROPOSED DESIGNSITE PLAN
UP
UP
UP
DN
DN
DN
DN
Childcare Play
FDK PlayFDK Play
Entrance Court
Ram
p do
wn
OutdoorClassroom
DNDNDN
DN
ExistingHydrant
28452
SiameseConnection
21
UP
UP
UP
DN
DN
DN
DN
Childcare Play
FDK PlayFDK Play
Entrance Court
Ram
p do
wn
OutdoorClassroom
DNDNDN
DN
ExistingHydrant
28452
SiameseConnection
PROPOSED DESIGNUNDERGROUND PARKING PLAN
P A R K I N G
bike
22
PROPOSED DESIGNSITE PLAN
UP
UP
UP
DN
DN
DN
DN
Childcare Play
FDK PlayFDK Play
Entrance Court
Ram
p do
wn
OutdoorClassroom
DNDNDN
DN
ExistingHydrant
28452
SiameseConnection
23
G Y M N A S I U M
A D M I N
K I N D E R G A R T E N S K I N D E R G A R T E N S
C H I L DC A R E
RECEIVING
A T R I U Mkitchen
PROPOSED DESIGNGROUND FLOOR PLAN
24
G Y M N A S I U M
A D M I N
K I N D E R G A R T E N S K I N D E R G A R T E N S
C H I L DC A R E
RECEIVING
A T R I U Mkitchen
PROPOSED DESIGNGROUND FLOOR PLAN
25
G Y M N A S I U M
A D M I N
K I N D E R G A R T E N S K I N D E R G A R T E N S
C H I L DC A R E
RECEIVING
A T R I U Mkitchen
PROPOSED DESIGNGROUND FLOOR PLAN
26
G Y M N A S I U M
A D M I N
K I N D E R G A R T E N S K I N D E R G A R T E N S
C H I L DC A R E
RECEIVING
A T R I U Mkitchen
PROPOSED DESIGNGROUND FLOOR PLAN
27
G Y M N A S I U M
A D M I N
K I N D E R G A R T E N S K I N D E R G A R T E N S
C H I L DC A R E
RECEIVING
A T R I U Mkitchen
PROPOSED DESIGNGROUND FLOOR PLAN
28
PROPOSED DESIGNSECOND FLOOR PLAN
PLAY AREA
OPEN TO GYM BELOW
C L A S S R O O M S C L A S S R O O M S
C L A S S R O O M S
L I B R A R Y
C H I L D C A R E
MULCH
29
PROPOSED DESIGNSECOND FLOOR PLAN
PLAY AREA
OPEN TO GYM BELOW
C L A S S R O O M S C L A S S R O O M S
C L A S S R O O M S
L I B R A R Y
C H I L D C A R E
MULCH
30
PROPOSED DESIGNSECOND FLOOR PLAN
PLAY AREA
OPEN TO GYM BELOW
C L A S S R O O M S C L A S S R O O M S
C L A S S R O O M S
L I B R A R Y
C H I L D C A R E
MULCH
31
PROPOSED DESIGNSECOND FLOOR PLAN
PLAY AREA
OPEN TO GYM BELOW
C L A S S R O O M S C L A S S R O O M S
C L A S S R O O M S
L I B R A R Y
C H I L D C A R E
MULCH
32
PROPOSED DESIGNSECOND FLOOR PLAN
PLAY AREA
OPEN TO GYM BELOW
C L A S S R O O M S C L A S S R O O M S
C L A S S R O O M S
L I B R A R Y
C H I L D C A R E
MULCH
33
PROPOSED DESIGNTHIRD FLOOR PLAN
GREEN ROOF
C L A S S R O O M S C L A S S R O O M S
C L A S S R O O M S M E C H M U S I C S P E C T R U M
S T A F F
p l a y g r o u n d
34
PROPOSED DESIGNTHIRD FLOOR PLAN
GREEN ROOF
C L A S S R O O M S C L A S S R O O M S
C L A S S R O O M S M E C H M U S I C S P E C T R U M
S T A F F
p l a y g r o u n d
35
PROPOSED DESIGNTHIRD FLOOR PLAN
GREEN ROOF
C L A S S R O O M S C L A S S R O O M S
C L A S S R O O M S M E C H M U S I C S P E C T R U M
S T A F F
p l a y g r o u n d
36
PROPOSED DESIGNCLASSROOM CONFIGURATION
37
PROPOSED DESIGNMASSING MODEL
FutureCommunity Aquatics Centre
Triple Gym
School
Childcare
Field &Learning Grounds
Vehicular Access& Ramp
MILLWOOD ROAD
DAVISVILLE AVENUE
38
PROPOSED DESIGNSOUTH-WEST 3D VIEW
39
PROPOSED DESIGNSOUTH ELEVATION
Davi sv i l le J r. Pub l i c Sc hoo l Spectrum Alternative School
40
PROPOSED DESIGNNORTH-EAST 3D VIEW
41
PROPOSED DESIGNNORTH ELEVATION
42
http://www.tdsb.on.ca/AboutUs/StrategyPlanning/CommunityInvolvement.aspx?id=131
qUEStIONS
43
NExt StEPS
• City of Toronto Site Plan Approval - first comments: end of June 2017
• Detailed Design & Construction Documents
• Building Permit Submission: early 2018
• Tender: early 2018
Davi sv i l le J r. Pub l i c Sc hoo l Spectrum Alternative School
44