Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION UPDATE Community Meeting April 16, 2019 1

Transcript of Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION UPDATE ·...

Page 1: Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION UPDATE · 2019-04-17 · Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION

Davisville Junior Public School / Spectrum Alternative Senior School

CONSTRUCTION UPDATE

Community Meeting April 16, 2019

1

Page 2: Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION UPDATE · 2019-04-17 · Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION

AGENDA

• WELCOME/INTRODUCTIONS This meeting will update the community

on key aspects of this complex project as we start the construction phase of the new Davisville/Spectrum building

• PROJECT RECAP Reminder of the key aspects of the

project - Evolution of the design • The Site • The Building • Key Events

• TIMELINE The overall construction schedule –

identifying key milestone dates to be anticipated

• NEXT STEPS How will we keep the community

updated?

• QUESTIONS & ANSWERS

2

CONSTRUCTION UPDATE – April, 2019

Page 3: Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION UPDATE · 2019-04-17 · Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION

3

CONSTRUCTION UPDATE – April, 2019

Page 4: Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION UPDATE · 2019-04-17 · Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION

4

CONSTRUCTION UPDATE – April, 2019

• A new school building & integrated Childcare fronting on Davisville Ave

• Provision for a future Aquatic Centre – to be built by the City of Toronto

• Coordination with key aspects of the Midtown in Focus initiatives – through block pedestrian access & provision for a boulevard treatment along Davisville

• Addressing community concerns – site access and vehicular circulation – one-way flow from Millwood Rd to Davisville Ave

THE SITE Utilization - Key areas and features of the proposed site development

Page 5: Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION UPDATE · 2019-04-17 · Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION

5

CONSTRUCTION UPDATE – April, 2019

Page 6: Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION UPDATE · 2019-04-17 · Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION

6

CONSTRUCTION UPDATE – April, 2019 THE BUILDING

Vision: 21st century school

student-centred

daylight & views

learning grounds

community

Page 7: Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION UPDATE · 2019-04-17 · Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION

7

CONSTRUCTION UPDATE – April, 2019 THE BUILDING: Ground Floor Plan

Davisville Entrance

Page 8: Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION UPDATE · 2019-04-17 · Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION

8

CONSTRUCTION UPDATE – April, 2019 THE BUILDING: Ground Floor Plan

Page 9: Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION UPDATE · 2019-04-17 · Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION

9

CONSTRUCTION UPDATE – April, 2019 THE BUILDING: Ground Floor Plan

Page 10: Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION UPDATE · 2019-04-17 · Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION

10

CONSTRUCTION UPDATE – April, 2019 THE BUILDING: Ground Floor Plan

North Entrance

Page 11: Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION UPDATE · 2019-04-17 · Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION

11

CONSTRUCTION UPDATE – April, 2019 THE BUILDING: Ground Floor Plan

feature wall (to be rendered)

Page 12: Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION UPDATE · 2019-04-17 · Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION

12

CONSTRUCTION UPDATE – April, 2019 THE BUILDING: Ground Floor Plan

Child Care play

Kindergarten play

Kindergarten play

Entrance

Page 13: Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION UPDATE · 2019-04-17 · Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION

13

CONSTRUCTION UPDATE – April, 2019 THE BUILDING: Ground Floor Plan

Page 14: Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION UPDATE · 2019-04-17 · Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION

14

CONSTRUCTION UPDATE – April, 2019 THE BUILDING: Ground Floor Plan

Page 15: Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION UPDATE · 2019-04-17 · Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION

15

CONSTRUCTION UPDATE – April, 2019 THE BUILDING: Parking Plan

Page 16: Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION UPDATE · 2019-04-17 · Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION

THE BUILDING: Parking Plan

16

CONSTRUCTION UPDATE – April, 2019

Page 17: Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION UPDATE · 2019-04-17 · Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION

THE BUILDING: Ground Floor Plan

17

CONSTRUCTION UPDATE – April, 2019

Page 18: Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION UPDATE · 2019-04-17 · Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION

THE BUILDING: Second Floor Plan

18

CONSTRUCTION UPDATE – April, 2019

Page 19: Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION UPDATE · 2019-04-17 · Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION

THE BUILDING: Second Floor Plan

19

CONSTRUCTION UPDATE – April, 2019

Page 20: Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION UPDATE · 2019-04-17 · Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION

20

CONSTRUCTION UPDATE – April, 2019 THE BUILDING: Second Floor Plan

Page 21: Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION UPDATE · 2019-04-17 · Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION

THE BUILDING: Second Floor Plan

21

CONSTRUCTION UPDATE – April, 2019

Page 22: Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION UPDATE · 2019-04-17 · Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION

THE BUILDING: Second Floor Plan

22

CONSTRUCTION UPDATE – April, 2019

Page 23: Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION UPDATE · 2019-04-17 · Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION

23

CONSTRUCTION UPDATE – April, 2019 THE BUILDING: Third Floor Plan

Spectrum

Page 24: Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION UPDATE · 2019-04-17 · Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION

THE BUILDING: Third Floor Plan

24

CONSTRUCTION UPDATE – April, 2019

Page 25: Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION UPDATE · 2019-04-17 · Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION

25

CONSTRUCTION UPDATE – April, 2019 THE BUILDING: Classroom Configuration

Page 26: Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION UPDATE · 2019-04-17 · Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION

26

CONSTRUCTION UPDATE – April, 2019 THE BUILDING: Cross-Sectional Perspective

Page 27: Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION UPDATE · 2019-04-17 · Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION

27

CONSTRUCTION UPDATE – April, 2019 THE BUILDING: Massing Model

Page 28: Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION UPDATE · 2019-04-17 · Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION

28

CONSTRUCTION UPDATE – April, 2019 THE BUILDING: South-West 3D View

Page 29: Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION UPDATE · 2019-04-17 · Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION

29

CONSTRUCTION UPDATE – April, 2019 THE BUILDING: South Elevation

Page 30: Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION UPDATE · 2019-04-17 · Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION

30

CONSTRUCTION UPDATE – April, 2019 THE BUILDING: North-East 3D View

Page 31: Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION UPDATE · 2019-04-17 · Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION

31

CONSTRUCTION UPDATE – April, 2019 THE BUILDING: North Elevation

Page 32: Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION UPDATE · 2019-04-17 · Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION

32

CONSTRUCTION UPDATE – April, 2019 THE BUILDING

Vision: 21st century school

student-centred

daylight & views

learning grounds

community

Page 33: Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION UPDATE · 2019-04-17 · Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION

33

CONSTRUCTION UPDATE – April, 2019

KEY EVENTS – PROJECT TIMELINE: For the replacement JK-8 school; integrated Childcare - with provision for a future Aquatic Centre

These events affected the approval and delivery of the new replacement school: •CITY OF TORONTO – Municipal Approvals – Site Plan Approval & Building Permit

• Notice of Approval Conditions (NOAC) • Demolition Permit • Conditional Building Permit • Formal Site Plan Agreement and Full Building Permit

•CITY OF TORONTO – Future Aquatic Centre – Land Lease & Shared Use Agreements • Use Agreements • Release of Identified Funding

•PROVINCE OF ONTARIO – Ministry of Education (EDU) – Approval to Proceed to Tender • Review of Cost and Program Compliance Submission • Review of Extra Ordinary Costs • Formal Release of “Approval to Proceed” (ATP) to Construction Tender

•CONSTRUCTION TENDER – • Tender Period – 6-8 weeks • Tender Review & TDSB Board Approval to Award

•TENDER AWARD – MOBILIZATION & CONSTRUCTION START

Page 34: Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION UPDATE · 2019-04-17 · Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION

34

CONSTRUCTION UPDATE – April, 2019 Key Events Timeline:

J F M A M J J A S O N D J F M A M J J

SPA Site Plan ApprovalNOACBuilding Permit - ConditionalBuilding Permit -Full

LAND LEASE Shared Use AgreementReleased Funding

Review of Compliance$ Extra Ordinary CostsATP Approval To Proceed to Tender ``

Tender Period (6-8 weeks)TDSB Board Approval to AwardBid Hold Tender $ held Tender Award Letter of Intent

Letter of Intent TDSBConfirmation of Sub-Trade AgreementsMobilization & Start of Work

ONGOING MUNICIPAL ELECTION

PROVINCIAL ELECTION

DAVISVILLE - Key Event Timeline

2018 2019Activity

CITY - Aquatic Centre Approvals

ELECTION BLACK-OUT

CONSTRUCTION TENDER

CONSTRUCTION START

CITY - Municipal Approvals

PROVINCE - Ministry Approvals

Page 35: Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION UPDATE · 2019-04-17 · Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION

35

CONSTRUCTION UPDATE – April, 2019

TIMELINE:

Key Stages of Construction – Identified per the Contractor`s Preliminary Schedule:

•Anticipated duration of construction – 24 months from start of work

• 3 storey structure with below-grade garage

• Complex site in an urban context

CONSRUCTION COMPONENTS:

•Shoring, Excavation & Substructure – 100 Days

•Superstructure – 165 Days

•Building Envelope – 140 Days

•Interior Finishes – 190 Days

•Site Development-Exterior & Landscape Features – 135 Days

Note: These are the major stages of construction and anticipated duration. Overlaps in schedule & efficiencies are currently being evaluated.

TDSB Staff will be involved in regular construction meetings & will provide updates to the Trustee, Superintendent and Principal.

Page 36: Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION UPDATE · 2019-04-17 · Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION

36

CONSTRUCTION UPDATE – April, 2019

AVONDALE PS:

Replacement School - 860 pupil place school: This replacement school was opened at the beginning of April, 2019 – School occupied; landscape development & Childcare to follow for September occupancy

GEORGE WEBSTER ES:

Replacement School - 840 pupil place school: This replacement school was opened in September, 2018 – School occupied; landscape development & Childcare to follow for September occupancy

What does completion look like?

Lessons learned from previous, recent projects –

Page 37: Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION UPDATE · 2019-04-17 · Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION

37

CONSTRUCTION UPDATE – April, 2019

NEXT STEPS:

•Communication Plan – TDSB Facility staff will provide regular updates to the School Principal (who will also be involved in construction meetings).

•As the work proceeds we will confirm the nature and timing of construction through updates that will be posted on the school’s website https://schoolweb.tdsb.on.ca/davisville/ click on “The New Build”. There is also a link to the parent page at https://davisvilleparents.com/redevelopment/ ; we will be getting quarterly construction reports which will also be posted.

HEALTH & SAFETY:

•All work will be done per industry standards, and per the City guidelines for environmental protection, noise suppression and dust control.

IN AN EMERGENCY:

•If you notice anything you can reach our Security Operations Centre at 416-395-4620

Page 38: Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION UPDATE · 2019-04-17 · Davisville Junior Public School / Spectrum Alternative Senior School CONSTRUCTION

38

CONSTRUCTION UPDATE – April, 2019 THANK YOU FOR COMING –

QUESTIONS & ANSWERS: