The RAL Front End Test Stand David Findlay for Alan Letchford Accelerator Division, ISIS...

23
The RAL Front End Test Stand David Findlay for Alan Letchford Accelerator Division, ISIS Department Rutherford Appleton Laboratory HIPPI-05, Cosener’s House, Abingdon, 28–30 September 2005

description

3 3 FETS is a collaborative effort amongst CCLRC RAL ISIS CCLRC ASTeC Intense Beams Group Dept. Physics, Imperial College, London Dept. Physics, University of Warwick Promotion of accelerator science in UK universities

Transcript of The RAL Front End Test Stand David Findlay for Alan Letchford Accelerator Division, ISIS...

Page 1: The RAL Front End Test Stand David Findlay for Alan Letchford Accelerator Division, ISIS Department…

The RAL Front End Test StandDavid Findlay for Alan LetchfordAccelerator Division, ISIS DepartmentRutherford Appleton Laboratory

HIPPI-05, Cosener’s House, Abingdon, 28–30 September 2005

Page 2: The RAL Front End Test Stand David Findlay for Alan Letchford Accelerator Division, ISIS Department…

22

RAL Front End Test Stand (FETS)Part of CCLRC’s generic R&D programme on high power proton acceleratorsSpecifically, demonstration of some key technologies for the front ends of

Spallation neutron sourcesNeutrino factoriesWaste transmutersTritium productionEnergy amplifier

Page 3: The RAL Front End Test Stand David Findlay for Alan Letchford Accelerator Division, ISIS Department…

33

FETS is a collaborative effort amongstCCLRC RAL ISISCCLRC ASTeC Intense Beams GroupDept. Physics, Imperial College, LondonDept. Physics, University of Warwick

Promotion of accelerator science in UK universities

Page 4: The RAL Front End Test Stand David Findlay for Alan Letchford Accelerator Division, ISIS Department…

44

FETS collaboratorsJohn Back, Giulia Bellodi,Mike Clarke-Gayther, Dan Faircloth, Graham Gosling, Stephen Jolly,Ajit Kurup, Alan Letchford,Eddie McCarron, Ben Pine,Dan Ciprian Plostinar, Jürgen Pozimski, Peter Savage, Mark Whitehead,Trevor Wood

Page 5: The RAL Front End Test Stand David Findlay for Alan Letchford Accelerator Division, ISIS Department…

55

FETS fundingCCLRC, through ASTeC

ISIS and ASTeC staff + hardwarePPARC, through ASTeC

UK university staffCCLRC, through Infrastructure Fund

Reconfiguration of test stand areaEU, through HIPPI programme

Page 6: The RAL Front End Test Stand David Findlay for Alan Letchford Accelerator Division, ISIS Department…

66

RFQ

Chopper

FETS main components:High brightness H— ion sourceMagnetic LEBTHigh current, high duty factor RFQVery high speed beam chopperComprehensive diagnostics

RFQ

Chopper

Page 7: The RAL Front End Test Stand David Findlay for Alan Letchford Accelerator Division, ISIS Department…
Page 8: The RAL Front End Test Stand David Findlay for Alan Letchford Accelerator Division, ISIS Department…

Building R8 — being reconfigured for FETS

Page 9: The RAL Front End Test Stand David Findlay for Alan Letchford Accelerator Division, ISIS Department…

FETS builds on experience from ISIS RFQ test stand

Page 10: The RAL Front End Test Stand David Findlay for Alan Letchford Accelerator Division, ISIS Department…
Page 11: The RAL Front End Test Stand David Findlay for Alan Letchford Accelerator Division, ISIS Department…

1111

FETS specification60 mA H—, 2 ms, 50 pps75 keV 3-solenoid LEBT3 MeV, 324 MHz RFQ2 ns choppingComprehensive diagnosticsTest stand in practice

Page 12: The RAL Front End Test Stand David Findlay for Alan Letchford Accelerator Division, ISIS Department…

1212

H— surface Penning ion source35 mA, 200 µs (ISIS) 60 – 70 mA, 1 – 2 msIncrease largely achieved

Separate Penning fieldThermal modellingElectromagnetic modellingExtensive experimental work on dedicated ion source development rig

Page 13: The RAL Front End Test Stand David Findlay for Alan Letchford Accelerator Division, ISIS Department…
Page 14: The RAL Front End Test Stand David Findlay for Alan Letchford Accelerator Division, ISIS Department…

-80

-60

-40

-20

0

20

40

60

80

0 500 1000 1500 2000Time (us)

Beam Current (mA)Discharge Current (A)Extract Volts (kV)

Good extraction over 1.75 ms arc at 50 pps

Page 15: The RAL Front End Test Stand David Findlay for Alan Letchford Accelerator Division, ISIS Department…

1515

3-solenoid magnetic LEBTDesign proceeding well

Beam chopper[Other talks]

Page 16: The RAL Front End Test Stand David Findlay for Alan Letchford Accelerator Division, ISIS Department…

1616

RFQ — 3 MeV, 324 MHzReady availability of Toshiba E3740A 3 MW pulsed klystron (J-PARC)Electromagnetic DTL quadrupoles

Page 17: The RAL Front End Test Stand David Findlay for Alan Letchford Accelerator Division, ISIS Department…

1717

RFQ beam dynamics at 324 MHz encouraging

3 MeV, 4 metre design95% transmission, 80 kV electrode voltage

Low voltage design 4-rod type possible4-rod and 4-vane designs being investigated

Page 18: The RAL Front End Test Stand David Findlay for Alan Letchford Accelerator Division, ISIS Department…
Page 19: The RAL Front End Test Stand David Findlay for Alan Letchford Accelerator Division, ISIS Department…

4-rod RFQ has at least one operational advantage

Page 20: The RAL Front End Test Stand David Findlay for Alan Letchford Accelerator Division, ISIS Department…

2020

DiagnosticsFull suite of diagnostics to maximise the experimental capabilities

Beam currentsEmittancesEnergy spectra (magnetic + gas scattering spectrometers)Non-destructive laser/opticalResidual gas ion spectroscopy

Page 21: The RAL Front End Test Stand David Findlay for Alan Letchford Accelerator Division, ISIS Department…

2121

Possible beam halo monitor?Activate scandium annulus?45Sc(p,n)45TiEthresh 2.8 MeV, 45Ti t½ 3 hours, 85% β+ decay

Low background2.5 mA mean, 10—5 halo, 100 seconds → 30 BqSc melts

1540°C

Page 22: The RAL Front End Test Stand David Findlay for Alan Letchford Accelerator Division, ISIS Department…

2222

Radiation shielding60 mA, 2 ms, 50 pps, 3 MeV into copper

2 – 3 × 1010 neutrons/second ~100 mSv/hour at 1 metre

Say lose 3% ~1 mSv/hour at 2 metres~1 metre concrete ~1 µSv/hour

C (graphite) or Al(-Si alloy) for beam dump?C: 13C(p,n) threshold 3.00 MeV (13C (1.1%)); 10-minute 13N from 12C (p,γ)Al-Si: (p,n) > 5 MeV; no activity from (p,γ)

Page 23: The RAL Front End Test Stand David Findlay for Alan Letchford Accelerator Division, ISIS Department…

2323

ConclusionsRAL Front End Test Stand will make an important contribution to HPPA R&DGood progress from RAL/ISIS, ASTeC, Warwick and ImperialBuilds on experience gained with ISIS RFQpre-injector upgradeFirst LEBT beam anticipated for 2006