THE PS NEUTRINO FACILITY …..JUST A FEW INFORMAL SLIDES….
Rende Steerenberg
1st Informal LArTPC at PSNF Get Together
10 August 2011, CERN, Geneve
2
Contents
The Proposed Layout The Infrastructure A word on the primary beam Present status The Experimental Requirements
Informal Get Together LArTPC@PSNF, 10Aug2011
Rende Steerenberg, CERN Switzerland
THE
PS N
EUTR
INO
FAC
ILIT
Y….J
UST
A F
EW IN
FORM
AL S
LID
ES
3
The Proposed Lay-out
Informal Get Together LArTPC@PSNF, 10Aug2011
Rende Steerenberg, CERN Switzerland
Re-use the old TT7 tunnel and cavern to house primary beam line and target station
Proton beam to be provide by CERN PS
Near detector
Far detector
THE
PS N
EUTR
INO
FAC
ILIT
Y….J
UST
A F
EW IN
FORM
AL S
LID
ES
4
The Accelerator Complex with PSNF
Informal Get Together LArTPC@PSNF, 10Aug2011
Rende Steerenberg, CERN Switzerland
PSNF
Beam delivery by
partial time sharing
THE
PS N
EUTR
INO
FAC
ILIT
Y….J
UST
A F
EW IN
FORM
AL S
LID
ES
5
The Proposed Layout The Infrastructure A word on the primary beam Present status The Experimental Requirements
Informal Get Together LArTPC@PSNF, 10Aug2011
Rende Steerenberg, CERN Switzerland
THE
PS N
EUTR
INO
FAC
ILIT
Y….J
UST
A F
EW IN
FORM
AL S
LID
ES
6
The TT7 Tunnel The TT7 tunnel:
Informal Get Together LArTPC@PSNF, 10Aug2011
Rende Steerenberg, CERN Switzerland
Jura
Geneva
Geneva
Jura
THE
PS N
EUTR
INO
FAC
ILIT
Y….J
UST
A F
EW IN
FORM
AL S
LID
ES
7
TT7 Cavern
8 meter under ground Material access shaft
Informal Get Together LArTPC@PSNF, 10Aug2011
Rende Steerenberg, CERN Switzerland
Emergency exit
Side view
Front view AD power
converters
New building needed
THE
PS N
EUTR
INO
FAC
ILIT
Y….J
UST
A F
EW IN
FORM
AL S
LID
ES
8
Decay Tunnel The available decay tunnel is 50 meters long Cross section:
3.5 x 2.8 m2 for the 1st 25 m 5.0 x 2.8 m2 for the remainder
Informal Get Together LArTPC@PSNF, 10Aug2011
Rende Steerenberg, CERN Switzerland
No vacuum or helium filled decay tube available to be considered
Consider also muon detectors for beam steering and target/horn alignment
THE
PS N
EUTR
INO
FAC
ILIT
Y….J
UST
A F
EW IN
FORM
AL S
LID
ES
9
Beam Dump / Hadron Absorber
Informal Get Together LArTPC@PSNF, 10Aug2011
Rende Steerenberg, CERN Switzerland
4 meter thick beam dump (none sealed iron blocks) 65 meter of earth No cooling
To be reviewed !
Improvement – muon
backgroundTHE
PS N
EUTR
INO
FAC
ILIT
Y….J
UST
A F
EW IN
FORM
AL S
LID
ES
10
The TT7 tunnel towards the target
Informal Get Together LArTPC@PSNF, 10Aug2011
Rende Steerenberg, CERN Switzerland
THE
PS N
EUTR
INO
FAC
ILIT
Y….J
UST
A F
EW IN
FORM
AL S
LID
ES
11
The TT7 Target Cavern
Informal Get Together LArTPC@PSNF, 10Aug2011
Rende Steerenberg, CERN Switzerland
TT7 cavern shaft
TT7 cavern TT7 cavern
TT7 emergency
exit
TT7 cable & ventilation
shaft
THE
PS N
EUTR
INO
FAC
ILIT
Y….J
UST
A F
EW IN
FORM
AL S
LID
ES
12
The Proposed Layout The Infrastructure A word on the primary beam Present status The Experimental Requirements
Informal Get Together LArTPC@PSNF, 10Aug2011
Rende Steerenberg, CERN Switzerland
THE
PS N
EUTR
INO
FAC
ILIT
Y….J
UST
A F
EW IN
FORM
AL S
LID
ES
13
Primary Beam Parameters
Informal Get Together LArTPC@PSNF, 10Aug2011
Rende Steerenberg, CERN Switzerland
Old neutrino facilityPS possibilities for
New neutrino facilityPS dedicated Feb-Mar 1983
PS parallel 1983 - 1984 PS dedicated PS parasitic
Proton Momentum 19.2 GeV/c 19.2 GeV/c 20 GeV/c 20 GeV/c
Protons/pulse 1.25x1013 1.2x1013 3x1013 2.6x1013
Max. rep. rate 1.2 s 14.4 s 1.2 s 1.2 s
Beam energy 38 kJ 38 kJ 96 kJ 84 kJ
Average beam power 32 kW 2.5 kW 80 kW 70 kW
Exact capabilities of PS and Neutrino facility remain to be determined/confirmed: PS beam tests PSNF Simulations (FLUKA)
In any case a design should be based on more than maximum capabilities, even if they would be beyond the present PS capabilities
THE
PS N
EUTR
INO
FAC
ILIT
Y….J
UST
A F
EW IN
FORM
AL S
LID
ES
14
The Proposed Layout The Infrastructure A word on the primary beam Present status The Experimental Requirements
Informal Get Together LArTPC@PSNF, 10Aug2011
Rende Steerenberg, CERN Switzerland
THE
PS N
EUTR
INO
FAC
ILIT
Y….J
UST
A F
EW IN
FORM
AL S
LID
ES
15
Present Status A partial feasibility study, addressing the most critical
issues, was made and results have been reported to the CERN management
The collaboration memorandum was discussed in the CERN SPSC in April CERN has shown a genuine interest, but is awaiting a
formal proposal to be evaluated Presently the potential issue for the near detector
location (B181) and the present occupation of the neutrino pit and main floor is being addressed.
The existing rough cost estimate should not be used, but a complete conceptual/technical design study should be made instead (no green light) Complete and realistic cost estimate Possible project planning
Informal Get Together LArTPC@PSNF, 10Aug2011
Rende Steerenberg, CERN Switzerland
THE
PS N
EUTR
INO
FAC
ILIT
Y….J
UST
A F
EW IN
FORM
AL S
LID
ES
16
The Proposed Layout The Infrastructure A word on the primary beam Present status The Experimental Requirements
Informal Get Together LArTPC@PSNF, 10Aug2011
Rende Steerenberg, CERN Switzerland
THE
PS N
EUTR
INO
FAC
ILIT
Y….J
UST
A F
EW IN
FORM
AL S
LID
ES
17
What are the experimental requirements Proton request based on 80’s production yields:
2.5x1020 for νμ mode used until now in memorandum, presentations and calculations
7.5x1020 for νμ mode to be added ??? Correct productions yields can only be determined
when final design of target and horn are made What is the realistic time line for the
preparation of the experiment ? Transport and re-commissioning of ICARUS Design, construction and commissioning of near
detector Other time constraints will/might come from the
reconstruction of the PSNFInformal Get Together LArTPC@PSNF,
10Aug2011Rende Steerenberg, CERN Switzerland
THE
PS N
EUTR
INO
FAC
ILIT
Y….J
UST
A F
EW IN
FORM
AL S
LID
ES