PT. GEO DIPA ENERGIPT. GEO DIPA ENERGIThe Leader in Geothermal
Total daya pembangkit di Indonesia 29.705 MW Jawa-Bali 22.302 MW dan luar Jawa-Bali 7.403 MW.PLN : 24.856 MW, sisanya milik swasta.
Beban puncak di Jawa Bali mencapai 17.000 MWDaya terpasang 22.000 MW, Cadangan daya pembangkit tersisa 5.000 MW (~ 20%)
Suatu negara idealnya memiliki cadangan minimal 30% Akibat keterbatasan daya, PLN mengendalikan beban,antara lain dengan pemadaman bergilir.
KRISIS LISTRIK di Indonesia
Sumber Energi1990 2000 2010
MW persen MW persen MW persenBatubaraGasSolarMinyakPanas BumiAirBiomassLain-lain(Surya, Angin)
1.9303.530
11.0202.210
1702.850
27020
8.816.050.110.0
0.813.0
1.20.1
10.7507.0809.4101.950
5007.720
290160
28.418.724.8
5.21.3
20.40.80.4
28.05014.760
4.060 320430
10.310460370
35.321.5
5.90.50.6
15.00.70.5
Total 22.000 100.0 37.860 100.0 68.760 100.0
Sumber: Djojonegoro, 1992 & Wibawa, 1996
PRAKIRAAN PENYEDIAAN ENERGI LISTRIK di Indonesia
Sumber: IsnaputraIskandar, 2009
2009MW persen
3416
310
29.705 100.0
37
SKEMA PENGUSAHAAN TENAGA LISTRIK
PLTA, PLTD, PLTU, PLTG, PLTP, PLTN
TET : 500 KVTT : 150 KV
JTM 20KV, JTR 380 VOLT, JTR 220 VOLT
PEMBANGKITAN DiSTRIBUSI
Konsumen
TRANSMISI/PENYALURAN
MAGMA(HEAT SOURCE)
SiklusSiklus EnergiEnergi PANASBUMIPANASBUMI
SUMBER PANAS
UAP/ STEAM
RESERVOIR GENERATORLISTRIK
No. NEGARA POTENSI(MWe)
Telah Dimanfaatkansbg Pembangkit Listrik
(MWe)PEMANFAATAN
1 Iceland 5,800 202.00 3.5%
2 USA 22,990 2,534.00 11.0%
3 Indonesia 27,189 982.00 3.6%
4 Philippines 4,335 1,931.00 44.5%
5 Japan 20,000 535.25 2.7%
6 Mexico 6,000 953.00 15.9%
7 New Zealand 3,650 435.00 11.9%
POTENSI ENERGI PANASBUMI DI POTENSI ENERGI PANASBUMI DI INDONESIA SANGAT BESARINDONESIA SANGAT BESAR
11
SALAK375 MW
DARAJAT255 MW
WAY. WINDU I110 MW
PATUHA400 MW
KARAHA400 MW
KAMOJANG200 MW
DIENG60 MW
LUMUTBALAI(UNOCAL)
SIBAYAK12 MW
ULUBELU110 MW
SARULA330 MW
LUMUT BALAI110 MW
ULUMBU10 MW
MATALOKO2.5 MW
LAHENDONG I – II40 MW
BEDUGUL175 MW
Tahap Pengembangan : 1647,5 MW
Tahap Produksi : 1052 MW
WILAYAH PENGEMBANGAN PANAS BUMI SAAT INIWILAYAH PENGEMBANGAN PANAS BUMI SAAT INI(status April 2008)(status April 2008)
Akan Ditenderkan : 680 MW
UNGARAN50 MW
TAMPOMAS50 MW
NGEBEL120 MW
JAILOLO75 MW
WAY. WINDU II110 MW
CISOLOK45 MW
T.PERAHU100 MW
JABOI50 MW
SOKORIA30 MW
SEULAWAH AGAM160 MW