The Final Link in the Sealift Chain Amphibious Construction Battalion Two.
The Final Link in the Sealift Chain
description
Transcript of The Final Link in the Sealift Chain
The Final Link in the Sealift Chain
Amphibious Construction Battalion Two
Maritime Prepositioning Force
Joint Logistics Over The Shore (JLOTS)
BENIGN
CMPF
Chain of Command
COMNAVBCHGRUTWO
COMPHIBGRUTWO
COMNAVSURFLANT
CINCLANTFLT
ACB-2 ACU-2BMU-2 ACU-4
Mission Areas
• Causeway Ferry
• Roll On/Roll Off Discharge Facility (RRDF)
• Amphibious Assault Bulk Fuel/Water System (AABFS/AABWS)
• Offshore Petroleum Discharge System (OPDS)
• Elevated Causeway, Modular (ELCAS-M)
• Defensive Military Operations
• Camp Support
Barge Ferry System
• Side Loadable Warping Tug (SLWT)
• Causeway Section Powered (CSP)
• Causeway Section Non-Powered (CNSP)
MPS-1 Lighterage
• 4 SLWTs• 16 CSPs• 14 Intermediates• 16 Beach Ends• 8 LCM-8s
• For Dynamic Mix:
Instream: 8 rolling stock/hour
Pierside: 20/hour.
Roll On/Roll Off Discharge Facility (RRDF)
• 5,000 ft of 6” conduit (Fuel)• 10,000 ft of 4” conduit (Water)• Deploy from Barge Ferry or LCU• Install in 8 hours• 700Kgal/day
Amphibious Assault BulkFuel/Water System
Offshore Petroleum Discharge System (OPDS)
• Single Product 4 NM
• Dual Product 2 NM
• 1.2 Mgal/day
• First Fuel in 48 hrs.
• Total install in 7 days
• Water Depth 35-200 ft.
• Service Life 2 yrs.
Lighterage support w/ OPDS
• SLWT Lighterage support:
• 3 tow tugs• Converted lay repair
barge 1 SLWT • Dive boat - LCM 8
• OUB Lighterage support:
• 3 tow tugs - OUBs• Converted lay repair
barge 1 OUB • Dive boat - OUB
Elevated Causeway-Modular
- Up to 3000 ft length
- 20 FSW at MLW
- 7 Days to Erect
- UCT Site Survey
Defensive Military Operations
Camp Support
• Berthing Tents• Galley/Scullery• Laundry• Showers/Heads• Transportation• Beach Salvage• Water Purification• Medical/Admin