The Final Link in the Sealift Chain Amphibious Construction Battalion Two.

27
The Final Link in the Sealift Chain Amphibious Construction Battalion Two

Transcript of The Final Link in the Sealift Chain Amphibious Construction Battalion Two.

Page 1: The Final Link in the Sealift Chain Amphibious Construction Battalion Two.

The Final Link in the Sealift Chain

Amphibious Construction Battalion Two

Page 2: The Final Link in the Sealift Chain Amphibious Construction Battalion Two.

Maritime Prepositioning Force

Joint Logistics Over The Shore (JLOTS)

Page 3: The Final Link in the Sealift Chain Amphibious Construction Battalion Two.

BENIGN

Page 4: The Final Link in the Sealift Chain Amphibious Construction Battalion Two.
Page 5: The Final Link in the Sealift Chain Amphibious Construction Battalion Two.
Page 6: The Final Link in the Sealift Chain Amphibious Construction Battalion Two.
Page 7: The Final Link in the Sealift Chain Amphibious Construction Battalion Two.

CMPF

Page 8: The Final Link in the Sealift Chain Amphibious Construction Battalion Two.
Page 9: The Final Link in the Sealift Chain Amphibious Construction Battalion Two.
Page 10: The Final Link in the Sealift Chain Amphibious Construction Battalion Two.
Page 11: The Final Link in the Sealift Chain Amphibious Construction Battalion Two.
Page 12: The Final Link in the Sealift Chain Amphibious Construction Battalion Two.
Page 13: The Final Link in the Sealift Chain Amphibious Construction Battalion Two.
Page 14: The Final Link in the Sealift Chain Amphibious Construction Battalion Two.
Page 15: The Final Link in the Sealift Chain Amphibious Construction Battalion Two.
Page 16: The Final Link in the Sealift Chain Amphibious Construction Battalion Two.

Chain of Command

COMNAVBCHGRUTWO

COMPHIBGRUTWO

COMNAVSURFLANT

CINCLANTFLT

ACB-2 ACU-2BMU-2 ACU-4

Page 17: The Final Link in the Sealift Chain Amphibious Construction Battalion Two.

Mission Areas

• Causeway Ferry

• Roll On/Roll Off Discharge Facility (RRDF)

• Amphibious Assault Bulk Fuel/Water System (AABFS/AABWS)

• Offshore Petroleum Discharge System (OPDS)

• Elevated Causeway, Modular (ELCAS-M)

• Defensive Military Operations

• Camp Support

Page 18: The Final Link in the Sealift Chain Amphibious Construction Battalion Two.

Barge Ferry System

• Side Loadable Warping Tug (SLWT)

• Causeway Section Powered (CSP)

• Causeway Section Non-Powered (CNSP)

Page 19: The Final Link in the Sealift Chain Amphibious Construction Battalion Two.

MPS-1 Lighterage

• 4 SLWTs• 16 CSPs• 14 Intermediates• 16 Beach Ends• 8 LCM-8s

• For Dynamic Mix:

Instream: 8 rolling stock/hour

Pierside: 20/hour.

Page 20: The Final Link in the Sealift Chain Amphibious Construction Battalion Two.

Roll On/Roll Off Discharge Facility (RRDF)

Page 21: The Final Link in the Sealift Chain Amphibious Construction Battalion Two.

• 5,000 ft of 6” conduit (Fuel)• 10,000 ft of 4” conduit (Water)• Deploy from Barge Ferry or LCU• Install in 8 hours• 700Kgal/day

Amphibious Assault BulkFuel/Water System

Page 22: The Final Link in the Sealift Chain Amphibious Construction Battalion Two.

Offshore Petroleum Discharge System (OPDS)

• Single Product 4 NM

• Dual Product 2 NM

• 1.2 Mgal/day

• First Fuel in 48 hrs.

• Total install in 7 days

• Water Depth 35-200 ft.

• Service Life 2 yrs.

Page 23: The Final Link in the Sealift Chain Amphibious Construction Battalion Two.

Lighterage support w/ OPDS

• SLWT Lighterage support:

• 3 tow tugs• Converted lay repair

barge 1 SLWT • Dive boat - LCM 8

• OUB Lighterage support:

• 3 tow tugs - OUBs• Converted lay repair

barge 1 OUB • Dive boat - OUB

Page 24: The Final Link in the Sealift Chain Amphibious Construction Battalion Two.

Elevated Causeway-Modular

- Up to 3000 ft length

- 20 FSW at MLW

- 7 Days to Erect

- UCT Site Survey

Page 25: The Final Link in the Sealift Chain Amphibious Construction Battalion Two.

Defensive Military Operations

Page 26: The Final Link in the Sealift Chain Amphibious Construction Battalion Two.

Camp Support

• Berthing Tents• Galley/Scullery• Laundry• Showers/Heads• Transportation• Beach Salvage• Water Purification• Medical/Admin

Page 27: The Final Link in the Sealift Chain Amphibious Construction Battalion Two.