A work in progress lasting 7 long years….
- 1995 to 1998 - Uncapped rock is left in ½ of the basement
pending future development ideas …..
- 1999 - Excavation begins!
- 1999 to 2004 - Slow progress is
made….
As the rock is whittled and hauled away, bit by bit ….
By bit ….
- June 2005 - And is turned into walls and used as fill around
the property…
- June 2005 - The excavation is complete, the footings poured and the floor is
prepared for concrete….
-
-October 2005 – Jim wires and puts up gyproc
….
Gyproc dust!
-
- November 2005 - The gyproc is completed and the
room is painted ….
- November 2005 - The furniture is built and painted before the floor
is painted and the carpet installed ….
- December 2005 - The carpet is installed and so is the lighting ….
- December 2005 - Rocks are unpacked and reviewed ….
- December 2005 - Furniture is assembled ….
- December 2005 - The room starts to come together
….