The Basics

17
1 The Basics The Basics Permit Overview

description

The Basics. Permit Overview. Goal of Program. Reduce pollutants in discharges from the MS4 Change Behavior Permit Compliance. Requirement. Reduce pollutants in storm water discharges to the Maximum Extent Practicable (MEP) by implementing a Storm Water Management Program (SWMP). MEP. - PowerPoint PPT Presentation

Transcript of The Basics

Page 1: The Basics

1

The BasicsThe Basics

Permit Overview

Page 2: The Basics

2

Goal of ProgramGoal of Program

• Reduce pollutants in discharges from the MS4

• Change Behavior• Permit Compliance

Page 3: The Basics

3

RequirementRequirement

Reduce pollutants in storm water discharges to the Maximum Extent Practicable (MEP) by implementing

a Storm Water Management Program (SWMP)

Page 4: The Basics

4

MEPMEP

• Technology standard • Dynamic

Page 5: The Basics

5

SWMPSWMP

• 6 Minimum Control Measures as a basis for a SWMP

• BMPs to address 6 Minimum Control Measures

• Measurable Goals for each BMP• Time schedules for each

Measurable Goal

Page 6: The Basics

6

Minimum Control Minimum Control MeasuresMeasures

Page 7: The Basics

7

Public Education Public Education RequirementsRequirements

• Educate the public on – The impacts of storm water– The steps the public can take to

reduce pollutants in storm water runoff

Page 8: The Basics

8

Public Participation Public Participation RequirementsRequirements

• Comply with State and local public notice requirements

• Allow the public to review and comment on the permit and SWMP

• Involve the public in the implementation of SWMP

Page 9: The Basics

9

Illicit Discharge Illicit Discharge Detection and Detection and

Elimination Elimination RequirementsRequirements

• Storm sewer system map • An ordinance prohibiting non-storm

water discharges• Plan to detect and address non-

storm water discharges• Educate the public on the hazards

of illicit discharges

Page 10: The Basics

10

Construction Site Construction Site Control RequirementsControl Requirements

• An enforceable ordinance to require erosion and sediment controls at construction sites

• MS4 must require construction site operators to use BMPs

• Site plan and BMP review• Public comments/complaints procedures• Site inspections and enforcement

procedures

Page 11: The Basics

11

Post-Construction Post-Construction Management Management RequirementsRequirements

• An ordinance requiring long term BMPs

• On-going maintenance of BMPs

Page 12: The Basics

12

Pollution Pollution Prevention/Good Prevention/Good

Housekeeping Housekeeping RequirementsRequirements

• Examine municipal activities that have the potential to cause pollution in storm water

• Implement BMPs to reduce that potential

• Train employees

Page 13: The Basics

13

Annual ReportsAnnual Reports

• Have you done what you said you would do?

• In light of water quality, have you seen noticeable changes?

• Are the BMPs you chose effective?• Are they implemented well?• Improvements?• Reporting form

Page 14: The Basics

14

Supplemental Supplemental ProvisionsProvisions

• Communities over 50,000 or subject to high growth (>25%/10 yrs)– Comply with Receiving Water

Limitations– Incorporate Design Standards

Page 15: The Basics

15

Receiving Water Receiving Water LimitationsLimitations

• Water Quality Standard– may require more than MEP

• Objectives (http://www.swrcb.ca.gov/)– Basin Plans– California Toxics Rule– Statewide Water Quality Control Plan

• Iterative Approach– Ex: San Diego - trash (floatables) in

Chollas and Paleta Creeks

Page 16: The Basics

16

Design StandardsDesign Standards

• Post Construction Requirements

Page 17: The Basics

17