Texas Eastern Transmission, LP Planned Service Outage Postings from 08/01/2015 to 08/31/2015 Page 1 of 84

Transcript of Texas Eastern Transmission, LP - Spectra Energy · receipt/delivery areas on the Texas Eastern...

Texas Eastern Transmission, LP

Planned Service OutagePostings from 08/01/2015 to 08/31/2015

Page 1 of 84

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Not a critical noticeNotice Eff Date/Time: 08/03/2015 10:59:00 AMNotice End Date/Time: 11/01/2015 10:59:00 AMNotice ID: 51719Notice Stat Desc: SupersedeNotice Type: MaintenancePost Date/Time: 08/03/2015 10:59:00 AMPrior Notice: 51555Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE 2015 Maintenance Schedule -- Revised

Notice Text: The text below is included in the attached Word document located at the bottom of this posting.

Listed below is a partial schedule for major outages that will affect capacity or that impact major receipt/delivery areas on the Texas Eastern Transmission (TE) system for the 2015 outage season. This schedule is not a complete list of all outages that will occur during the 2015 outage season. Due to unforeseen delays or scheduling conflicts, the dates below are subject to change. As TE continues to plan for the 2015 outage season, updates to the list below will be posted at the earliest known date.

Access Area Longview to Kosciusko:

Blessing to PEMEX Mexico EOL Line 16 (STX): Cleaning Tool Dates: See specific schedules belowIn-Line Tool Dates: See specific schedules belowPotential Repair Dates: See specific schedules belowPotential Run Comparison Repair Dates: See specific schedules below

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Line 16 between Blessing and PEMEX Mexico EOL. TE will coordinate system receipts and deliveries with point operators to minimize operational impacts, however, during the cleaning and in-line tools, meters listed below will be required to flow/shut in as follows:

Blessing to Tivoli:Cleaning Tool Dates: Fall 2015In-Line Tool Dates: December 10Potential Repair Dates: March 2016Potential Run Comparison Repair Dates: March 2016

The following meters may be unavailable for flow:73113 - ENTERPRISE TEXAS PIPELINE LLC - HIDALGO COUNTY, TX73719 - T2 GAS UTILITY LLC/REFUGIO INTERCONNECT

Tivoli to Petronilla:Cleaning Tool Dates: Fall 2015In-Line Tool Dates: CompletePotential Repair Dates: Approximately March 24 - mid September

Page 2 of 84

Potential Run Comparison Repair Dates: May 15 - mid September

The following meters will be unavailable for flow during the cleaning and in-line tool runs:73617 - ONYX PIPELINE/NUECES BAY73618 - ONYX PIPELINE/BARNEY DAVIS

The following meters will be unavailable for flow until the cleaning and in-line tools passes the meter:73310 - SOUTH SHORE P/L (NE&T), NUECES CO., TX 72603 - CROSSTEX ENERGY (FROM TE) UPRIVER RD., NUECES CO73719 - T2 GAS UTILITY LLC/REFUGIO INTERCONNECT

The following meters will be required to flow for the duration of the cleaning and in-line tool runs:73258 - MAGIC VALLEY P/L-CALPINE PWR. PROJECT (DEL)/HIDALGO73223 - DEFS, LP - EDINBURG POWER PLANT - HIDALGO CO., TX75333 - PEMEX - REYNOSA, MX (D 70333/R 76333)

Petronilla to Santa Fe:Cleaning Tool Dates: Fall 2015In-Line Tool Dates: December 9Potential Repair Dates: March 2016Potential Run Comparison: March 2016

The following meters will be unavailable for flow during the cleaning and in-line tool runs:73617 - ONYX PIPELINE/NUECES BAY73618 - ONYX PIPELINE/BARNEY DAVIS

The following meters will be required to flow for the duration of the cleaning and in-line tool runs:73258 - MAGIC VALLEY P/L-CALPINE PWR. PROJECT (DEL)/HIDALGO73223 - DEFS, LP - EDINBURG POWER PLANT - HIDALGO CO., TX 75333 - PEMEX - REYNOSA, MX (D 70333/R 76333)

Santa Fe to PEMEX Mexico (EOL):Cleaning Tool Dates: CompleteIn-Line Tool Dates: CompletePotential Repair Dates: CompletePotential Run Comparison Repair Dates: Complete

The following meters will be unavailable for flow during the cleaning and in-line tool runs:73617 - ONYX PIPELINE/NUECES BAY73618 - ONYX PIPELINE/BARNEY DAVIS73258 - MAGIC VALLEY P/L-CALPINE PWR. PROJECT (DEL)/HIDALGO73223 - DEFSDEFS, LP - EDINBURG POWER PLANT - HIDALGO CO., TX

The following meter will be required to flow for the duration of the cleaning and in-line tool runs:75333 - PEMEX - REYNOSA, MX (D 70333/R 76333)

As a result of these in-line inspections, certain locations could require further detailed investigations, which may require TE to isolate Line 16 between Blessing and PEMEX Mexico EOL. If an isolation of Line 16 is required, shippers sourcing gas for delivery points located between Blessing and PEMEX EOL will be required to source their supply from receipt points between Blessing and PEMEX EOL. Additionally, any gas sourced between Blessing and PEMEX EOL for delivery outside of this area may be restricted. Depending on the level of nominated quantities, if further investigations are required, restrictions are possible for interruptible, secondary firm services and primary firm services.

Page 3 of 84

Should any of these investigations lead to a reduction of capacity, TE will post on the bulletin board as soon as it is known. TE estimates that the investigations will begin on April 9 continuing through May 29.

West Monroe to Providence Line 26 (ELA): July 15 - August 21To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Program, TE will be conducting further investigations on Line 26 (a single line system) between West Monroe and Providence Stations. During these investigations the following meters may experience lower than normal pressures or be unavailable for flow:

71000 - GULF SOUTH PIPELINE COMPANY, LP - WEST MONROE, LA (RECEIPT71704 - GULF SOUTH PIPELINE COMPANY, LP - DARNELL, LA (DELIVERY)72568 - RELIANT ENERGY GAS TRANSMISSION - WEST MONROE, LA72614 - TRANSOK - OUACHITA PSH., LA

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Hempstead to Huntsville Line 11 (ETX) - Pipeline Maintenance: Cleaning Tool Date: CompleteIn-Line Tool Dates: CompletePotential Repair Dates: Complete Potential Run Comparison Repair Dates: VS3: August 10 - 16, VS6: October 3 - 10

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Line 11 between Provident City and Hempstead stations. During the cleaning and in-line inspection tool runs, the following meters may experience lower than normal pressures or be unavailable for flow:

73249 - ENTERGY - LEWIS CREEK / MONTGOMERY COUNTY, TX

Additionally, if further detailed investigations are required, the meters listed below could experience lower than normal pressure or be unavailable for flow during the potential repair dates:

72964ELLIOT OIL & GAS, BROWDER #C-1, SAN JACINTO CO., TX (REC)73175MME DESOTO PIPELINE, L.P. - PRAIRIE VIEW, TX - REC73249ENTERGY - LEWIS CREEK / MONTGOMERY COUNTY, TX73364BRAMMER-BROWDER GATHERING-SAN JACINTO CO., TX (REC)73388MONTGOMERY GAS TRANSMISSION, INC. - MONTGOMERY CO., TX (DEL73391FAMCOR OIL - GOLDEN MINER #1 / SAN JACINTO CO., TX (REC)73461UNIVERSAL NATURAL GAS/INTERCONNECT - MONTGOMERY CO., TX (DE73477PRIME OPERATING COMPANY - MONEY WORT #1 - WALKER CO., TX (R73669SK&CO./MASSEY FERGUSON GATHERING, SAN JACINTO CO., TX75475MME DESOTO PIPELINE, LP - (D70475/R76475)75778LONE STAR GAS - WALLER, TX-(D72778/R76778)75858KCS TX INTRASTATE GAS PIPELINE (D72858/R76858)

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Page 4 of 84

Hempstead to Huntsville Line 11 (ETX) - Pipeline Maintenance: August 10 - 16 To comply with the applicable regulatory requirements associated with TE ongoing DOT Pipeline Integrity Program, TE will be conducting further detailed investigations on Line 11 VS3 (a single line system) between Hempstead and Huntsville stations. As a result of these investigations, the following meter will be unavailable for flow:

73388 - MONTGOMERY GAS TRANSMISSION, INC. - MONTGOMERY CO., TX (DEL

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

TE / SESH Interconnect (Dentville): August 18 - 21 TE has been informed by Southeast Supply Header, LLC ("SESH") of the following outage below which will impact receipts and deliveries to/from SESH at the TE / SESH pipeline interconnect MR75583.

Southeast Supply Header, LLC (SESH) will be performing construction at the SESH interconnection with Texas Eastern Transmission, LP (Texas Eastern) associated with the expansion approved in FERC Docket No. CP14-87. In accordance with the provisions of its FERC Gas Tariff, SESH notifies its shippers that these construction activities will result in a service outage on the SESH system as described below.

During a 4 day period beginning on Gas Day August 18, 2015 at 9:00 am and continuing until August 22, 2015 at 9:00 am, service at the Texas Eastern interconnection (MR 83005) will be unavailable for either receipt or delivery point activity. This outage will not result in any service impacts to the pipeline capacity on the SESH system and all other receipt and delivery points will be available for service.

Providence to Yazoo Line 26 (ELA) - Pipeline Maintenance: In-Line Tool Dates: CompletePotential Repair Dates: August 18 - 25 Potential Run Comparison Repair Dates: September 10 - 18

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Line 26 between Providence and Yazoo stations. During the in-line inspection tool run, the following meters may experience lower than normal pressures or be unavailable for flow:

71000 - GULF SOUTH PIPELINE COMPANY, LP - WEST MONROE, LA (RECEIPT71704 - GULF SOUTH PIPELINE COMPANY, LP - DARNELL, LA (DELIVERY)72568 - RELIANT ENERGY GAS TRANSMISSION - WEST MONROE, LA72614 - TRANSOK - OUACHITA PSH., LA73106 - FEDERAL BUREAU OF PRISON - YAZOO CO. MS

Additionally, if further detailed investigations are required, the meters listed above could experience lower than normal pressure or be unavailable for flow during the potential repair dates.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Yazoo to Kosciusko Line 26 (ELA) - Pipeline Maintenance: September 15 - 19 TE will be conducting pipeline maintenance on Line 26 between Yazoo and Kosciusko stations. During this maintenance the following meters will be unavailable for flow:

Page 5 of 84

71000 - GULF SOUTH PIPELINE COMPANY, LP - WEST MONROE, LA (RECEIPT71704 - GULF SOUTH PIPELINE COMPANY, LP - DARNELL, LA (DELIVERY)72568 - RELIANT ENERGY GAS TRANSMISSION - WEST MONROE, LA72614 - TRANSOK - OUACHITA PSH., LA73141 - MISSISSIPPI CHEMICAL - YAZOO CITY, MS

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Blessing to Angleton Line 16 - Pipeline Maintenance: Cleaning Tool Dates: CompleteILI In-Line Tool Dates: CompletePotential Repair Dates: September 20 - October 7 Potential Run Comparison Dates: October 15 - 31

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting cleaning and in-line inspection tool runs on Line 16 between Blessing and Angleton stations.

During the cleaning tool runs, the following meters will be unavailable until the pig passes the meters:

73694 - SWEENY PLANT-CONOCO PIPELINE75558 - TRES PALACIOS GAS STORAGE - INJ/DEL

During the ILI in-line tool runs, the following meters will be unavailable for the duration of the tool run:

73694 - SWEENY PLANT-CONOCO PIPELINE75558 - TRES PALACIOS GAS STORAGE - INJ/DEL

Additionally, the following meters could experience lower than normal pressure during all cleaning and ILI tool runs:

72451 - WILMAR PIPELINE, INC. - #1 DUNCAN SLOUGH, MATAGORDA CO., T72601 - ENTERPRISE TEXAS PIPELINE LLC - MATAGORDA COUNTY, TX (REC)73148 - DEEP ROCK RESOURCES - FLOWERS / MATAGORDA CO., TX - RUN 0173283 - UNION PETROLEUM, LTD (LINE 16LL) - BRAZORIA CO., TX73338 - SANTOSUSA CORP73407 - CHESAPEAKE OPERATING INC-ANKENMEN GATHERING, BRAZORIA CO.,73412 - BUCKEYE RANCH GATHERING - MATAGORDA CO., TX73481 - ASPECT ENERGY - BINTLIFF GATHERING - BRAZORIA CO., TX73504 - WALTER OIL & GAS-KASMAN GATHERING - MATAGORDA CO., TX73626 - DAVIS SOUTHERN/BINTLIFF #1

Additionally, if further detailed investigations are required, all meters listed above could experience lower than normal pressure or be unavailable for flow during the potential repair dates.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Hempstead to Huntsville Line 11 (ETX) - Pipeline Maintenance: October 3 - 10Page 6 of 84

To comply with the applicable regulatory requirements associated with TE ongoing DOT Pipeline Integrity Program, TE will be conducting further detailed investigations on Line 11 VS6 (a single line system) between Hempstead and Huntsville stations. As a result of these investigations, the following meters will be unavailable for flow:

72964 - ELLIOT OIL & GAS, BROWDER #C-1, SAN JACINTO CO., TX (REC)73249 - ENTERGY - LEWIS CREEK / MONTGOMERY COUNTY, TX73364 - BRAMMER-BROWDER GATHERING-SAN JACINTO CO., TX (REC)73391 - FAMCOR OIL - GOLDEN MINER #1 / SAN JACINTO CO., TX (REC)73477 - PRIME OPERATING COMPANY - MONEY WORT #1-WALKER CO., TX R73669 - SK&CO./MASSEY FERGUSON GATHERING, SAN JACINTO CO., TX75858 - KCS TX INTRASTATE GAS PIPELINE (D72858/R76858)

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Castor to EOL Line 11 - Pipeline Maintenance: October 14 - 15 TE will be conducting pipeline maintenance on Line 11 between Castor and the end of the line. During this maintenance the following meters will be unavailable for flow:

70065 - TEXAS GAS TRANSMISSION - LISBON, LA (DELIVERY)73134 - PANENERGY FIELD SERVICES - LINCOLN PARISH, LA75078 - KOCH GATEWAY - CASTOR, LA-(D70078/R76078)

Additionally, the follow following meters may experience lower than normal pressures:

70192 - SMITH (HARVEY BROYLE)#2 MURPHY-BRYCELAND, BIENVILLE PSH., L70970 - NGC ENERGY RESOURCES - SLIGO GAS PLANT, LA (RECEIPT)72307 - JEEMS BAYOU - #1 CALHOUN / DESOTO PSH., LA72718 - SMITH OPER. (HARVEY BROYLE M.P. 0.00) - BIENVILLE PSH. LA72808 - COMSTOCK RESOURCES - #1 DESOTO - DESOTO PSH., LA73168 - WILLAMETTE INDUSTRIES - BIENVILLE PARISH, LA73328 - PETROCHEM OPERATING / LOTT #1 - BOSSIER PARISH, LA (REC)73523 - ENTERPRISE GATHERING LLC/BETHANY-DESOTO PARISH, LA-RUN 173672 - ENERGY TRANSFER/TIGER PIPELINE BIENVILLE, LA75688 - GULF STATES PIPELINE - BIENVILLE PA. LA-(D72688/R7

Based on current nomination levels TE doesn't anticipate any restrictions at this time.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Angleton to Mont. Belvieu Line 16 - Pipeline Maintenance: Cleaning Tool Date: CompleteGauge Tool Date: CompleteIn-Line Tool Date: CompletePotential Repair Dates: October 29 - November 4

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Line 16 between Angleton and Mont. Belvieu stations. During the cleaning and in-line inspection tool runs, the following meters may experience lower

Page 7 of 84

than normal pressures or be unavailable for flow:

70129 - LOUIS DREYFUS72382 - HOUSTON PIPE LINE CO.-ENERFIN LYONDELL SYS./ HARRIS CO., TX72837 - MONUMENT PIPELINE, LP - HARRIS COUNTY, TX72877 - DENBURY ONSHORE, LLC73539 - NET LP - MONUMENT PIPELINE - HARRIS COUNTY, TX73590 - NRG - CEDAR BAYOU73811 - ENTERPRISE PRODUCTS/WALLACE JUNCTION75300 - TEJAS GAS/CLEAR LK. STOR75301 - CALPINE BAYER PWR. PLANT ACCT. PT.

Additionally, if further detailed investigations are required, the meters listed above could experience lower than normal pressure or be unavailable for flow during the potential repair dates.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

24" System Longview to Berne:

***Gas City to Lebanon Line 69 - Pipeline Maintenance: July 21 - August 8

TE will be conducting pipeline maintenance on Line 69 between Gas City and Lebanon compressor stations. During this work, the following meters will be unavailable for flow:

72909 - DAYTON PWR & LT - RED LION, OH72911 - COL. GAS (I-O) & LEBANON, OH

Norris City to French Lick Line 1: July 27 - August 5 A DOT hydro test will block Line 1 VS3, a single line system, between Norris City and French Lick stations. During this outage the following meter will be unavailable for flow:

70063 - HUNTINGBURG, IN

Additionally, based on current nominations, TE doesn't anticipate any additional restrictions associated with this outage.

Norris City to Oakland City Line 72 (Vermilion Lateral) - Pipeline MaintenanceCleaning Tool Dates: Deferred to 2016In-Line Tool Date: Deferred to 2016Potential Repair Dates: Deferred to 2016

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Norris City to Oakland City Line 72. During the tool run and depending on the results of the ILI Tool runs and if further detailed investigations are required, the following meter may experience lower than normal pressures or be unavailable for flow:

73623 - DUKE ENERGY VERMILLION II, LLC

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize Page 8 of 84

operational impacts.

30 Inch System and Market Area:

Holbrook to Uniontown Line 2 - Pipeline Maintenance: July 13 - August 4

TE will be conducting pipeline maintenance on Line 2 between Holbrook and Uniontown compressor stations. During this work, the following meter will be unavailable for flow:

73152 - COLUMBIA GAS - WAYNESBURG, PA

Wheelersburg Compressor Station: July 20 - Aug 22

TE will be conducting compressor station maintenance at its Wheelersburg Compressor Station. During this outage TE anticipates that point operators on the 30 inch line south of Wheelersburg may see lower than normal operating pressures.

Additionally, during the timeframes detailed below, north to south capacity through stations on the 30 inch line will be reduced as follows:

July 27 - August 19

Posted:Reduced to approximately:Berne 30" South1,218,000 Dth /d1,118,000 Dth /dWheelersburg South 957,000 Dth /d 857,000 Dth /dTompkinsville South 734,000 Dth /d 634,000 Dth /dBarton South 606,000 Dth /d 506,000 Dth /d

Based on historical north to south nominations TE anticipates restrictions for interruptible and secondary firm nominations flowing north to south through Berne, Wheelersburg, Tompkinsville and Barton.

TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Delmont to Lilly Line 12 - Pipeline MaintenanceILI Tool Runs: CompletePotential Repair Dates: August 6 - 31

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Delmont to Lilly Line 12. Depending on the results of the ILI Tool runs and if further detailed investigations are required, the following meter may experience lower than normal pressures or be unavailable for flow:

73543 - XTO ENERGY INC. - EAST WHEATFIELD INTERCONNECT - CAMBRIA CO

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Heidlersburg to Marietta 36" Line 1-AF - Pipeline MaintenanceCaliper & ILI Tool Runs: Complete

Page 9 of 84

Potential Repair Dates: August 17 - 22

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on the Heidlersburg to Marietta 36" Line 1-AF. During the tool run and depending on the results of the ILI Tool runs and if further detailed investigations are required, the following meter may experience lower than normal pressures or be unavailable for flow:

73703 - WILLIAMS-TRANSCO, LOWER CHANCEFORD-YORK CO., PA.73718 - COLUMBIA-MARIETTA, LANCASTER CO., PA

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Kosciusko Compressor Station: August 24 - 30

TE will be conducting compressor station maintenance at its Kosciusko Compressor Station. Based on current north to south nomination levels through Kosciusko, no restrictions are anticipated; however if restrictions are necessary, restrictions to interruptible and secondary firm nominations flowing north to south through Berne, Wheelersburg, Tompkinsville and Barton are possible.

TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Lilly to Entriken Line 12 - Pipeline MaintenanceILI Tool Runs: CompletePotential Repair Dates: September 2 - 30

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Lilly to Entriken Line 12. Depending on the results of the ILI Tool runs and if further detailed investigations are required, the following meters may experience lower than normal pressures or be unavailable for flow:

70323 - PEOPLES NAT - CLAYSBURG, PA71189 - UGI CENTRAL - VALLEY GAS - MARTINSBURG, PA71455 - UGI CENTRAL - HUNTINGDON GAS - MAPLETON, PA70266 - UGI CENTRAL - HUNTINGDON GAS - HUNTINGDON, PA70308 - UGI CENTRAL - LEWISTOWN - JUNIATA CO., PA

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Marietta Compressor Station Maintenance: September 9 - 30

TE will be conducting compressor station maintenance at its Marietta Compressor Station. During this maintenance, capacity through Marietta will be reduced from a seasonal capacity of 1,848,000 Dth /d to approximately 1,335,000 Dth /d for nominations delivering to locations between Marietta and up to Lambertville on TE's 36 inch line.

Based on historical nominations through Marietta, TE anticipates restrictions for interruptible, secondary firm and potentially primary firm services.

Page 10 of 84

Holbrook to Uniontown Lines 10 and 30 - Pipeline Maintenance: September 19 - 22

TE will be conducting pipeline maintenance on Lines 10 and 30 between Holbrook and Uniontown compressor stations. During this work, the following meter will be unavailable for flow:

73813 - ACCESS MIDSTREAM / WIND RIDGE-MCNAY RIDGE ROAD - GREENE CO.

Holbrook to Uniontown Line 25 - Pipeline Maintenance: September 23 - October 18

TE will be conducting pipeline maintenance on Line 25 between Holbrook and Uniontown compressor stations. During this work, the following meter will be unavailable for flow:

73808 - DTI - CRAYNE LL, RT 188, GREENE CO., PA.

Athens to Berne - Pipeline Maintenance: TBD

TE will be conducting pipeline maintenance between Athens and Berne stations. During this work, the following meter will be unavailable for flow:

73297 - DUKE ENERGY WASHINGTON II, LLC

Mt. Pleasant to Gladeville Line 25 VS5- DOT Pipe Replacement: 2016

TE will be conducting a DOT pipe replacement between Mt. Pleasant and Gladeville stations on Line 25 VS5. During this work, the following meter will be unavailable for flow:

73423 - PIEDMONT NATURAL GAS - RUTHERFORD

Texas Eastern DOT Pipeline Integrity Project

TE will be conducting, as part of its ongoing DOT Pipeline Integrity Project, in-line inspection tool runs at various locations throughout the Texas Eastern pipeline system. As a result of these in-line inspections, certain locations could be identified for an investigation which could lead to possible reduction of capacity. Should any of these investigations lead to a reduction of capacity, TE will post on the bulletin board as soon as it is known. Listed below are the pipeline segments scheduled for inspection this year. Each segment will have a caliper tool run, and an ILI tool run. Also listed below are the dates of a possible investigation as a result of the in-line inspection.

CaliperILIPossible Run CompSegment Access AreaDateDateRepl DtPoss Repl DtBlessing to Tivoli (Line 16)* ---12/10/1503/01/1603/01/16Tivoli to Petronilla (Line 16)* ---Complete04/15/1505/15/15Petronilla to Santa Fe (Line 16)* ---12/09/1503/01/1603/01/16Santa Fe to PEMEX EOL (Line 16)* ---CompleteCompleteCompleteHempstead to Huntsville (Line 11)* ---CompleteAug & OctAug & OctOpelousas to St. Francisville (Line 14) ---CompleteCompleteAugustSt. Francisville to Union Church (Line 18) ---201620162016Union Church to Clinton (Line 14) ---CompleteNovemberNovember

Page 11 of 84

Atlanta to Hope (Line 1) ---08/27/1510/04/1510/27/15Providence to Yazoo City (Line 26)* ---Complete08/18/1509/09/15Blessing to Angleton (Line 16)* ---Complete09/20/1510/15/15Angleton to Mont Belvieu (Line 16)* CompleteComplete10/29/15 ---

CaliperILIPossible Run CompSegment M1/M2 AreaDateDateRepl DtPoss Repl DtNorris City to Oakland City (Line 72)* ---20162016 ---Owingsville to Wheelersburg (Line 15) ---Complete08/03/15 ---Wheelersburg to Athens (Line 15) ---Complete09/01/15 ---Holbrook to Uniontown (Line 10) ---20162016 ---

CaliperILIPossible Run CompSegment M3 AreaDateDateRepl DtPoss Repl DtLambertville to Linden (Line 1)CompleteComplete08/10/15 ---Heidlersburg to Marietta (Line 1-AF)* ---Complete08/17/15 ---Perulack to Shermansdale (Line 27) ---TBDTBD ---Entriken to Perulack (Line 19) ---Complete07/15/15 ---Perulack (Line 24-AUX1) ---08/27/1510/15/15 ---Delmont to Lilly (Line 12)*CompleteComplete08/05/15 ---Lilly to Entriken (Line 12)*CompleteComplete08/31/15 ---Perulack to Leidy (Line 37) ---Complete08/10/15 ---

As a result of prior DOT mandated investigations, the following locations have been identified as requiring additional evaluation which may require a reduction of capacity. Should any of these investigations lead to a reduction of capacity, TE will post on the bulletin board as soon as it is known:

Angleton to Mont. Belvieu (Line 16)Angleton to Mont. Belvieu (Line 16-PP)Armagh to Lilly (Line 12)Armagh to Lilly (Line 19)Atlanta to Hope (Line 1)Bernville to Bechtelsville (Line 12)Blessing to Angleton (Line 16)Blessing to Tivoli (Line 16)Carthage to Longview (Line 13)Chambersburg to Marietta (Line 2)Chambersburg to Heidlersburg (Line 2-U)Clinton to Kosciusko (Line 14)Danville to Owingsville (Line 10)Danville to Owingsville (Line 15)Danville to Owingsville (Line 25)Delmont to Lilly (Line 12)Delmont to Lilly (Line 19)Delmont to Lilly (Line 27)Delmont to Armagh (Line 19)Delmont to Armagh (Line 27-1)Delmont to Armagh (Line 27-2)Donaldson to N. Little Rock (Line 1)Donaldson to N. Little Rock (Line 1-AUX-1)Eagle to Lambertville (Line 1)Eagle to Lambertville (Line 2)Entriken to Perulack (Line 19)

Page 12 of 84

French Lick to Seymour (Line 1)Gillis to Opelousas (Line 14)Gladeville to Tompkinsville (Line 10)Gladeville to Tompkinsville (Line 15)Grantville to Bernville (Line 12)Grantville to Bernville (Line 19)Grantville to Bernville (Line 28)Holbrook to Uniontown (Line 9)Holbrook to Uniontown (Line 10)Hope to Donaldson (Line 1)Kosciusko to Egypt (Line 10)Kosciusko to Egypt (Line 15)Lambertville to Linden (Line 1)Lambertville to Linden (Line 2)Lambertville to Linden (Line 20-B)Lambertville to Linden (Line 20-D)Longview to Atlanta (Line 1)Longview to Atlanta (Line 1N)Lilly to Entriken (Line 12)Lilly to Entriken (Line 12-Aux-1)Lilly to Entriken (Line 27-Aux-1)Mt. Pleasant to Gladeville (Line 25)Norris City to Oakland City (Line 1)Oakland City to French Lick (Line 1)Perulack to Grantville (Line 19)Perulack to Leidy (Line 24)Perulack to Shermansdale (Line 24 Aux-1)Perulack to Shermansdale (Line 27)Perulack to Leidy (Line 37)Pollard to Oran (Line 1)Provident to Yazoo (Line 26)Providence City to Hempstead (Line 11-H)Provident City to Hempstead (Line 11)Provident City to Thomaston (Line 21)Red River to Castor (Line 11)Shermansdale to Grantville (Line 19)St. Francisville to Union Church (Line 14)St. Francisville to Union Church (Line 18)Thomaston to Provident City (Line 21)Tivoli to Petronilla (Line 16)Union Church to Clinton (Line 14)Union Church to Clinton (Line 18)Uniontown to Delmont (Line 9)Uniontown to Delmont (Line 39)Vidor to Gillis (Line 14)West Monroe to Providence (Line 26)Wheelersburg to Athens (Line 10)Wheelersburg to Athens (Line 15)

Download File: TE 2015 Maintenance Schedule Rev18.docxPage 13 of 84

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Not a critical noticeNotice Eff Date/Time: 08/06/2015 03:50:00 PMNotice End Date/Time: 11/01/2015 09:00:00 AMNotice ID: 51810Notice Stat Desc: SupersedeNotice Type: MaintenancePost Date/Time: 08/06/2015 03:50:00 PMPrior Notice: 51719Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE 2015 Maintenance Schedule -- Revised

Notice Text: The text below is included in the attached Word document located at the bottom of this posting.

Listed below is a partial schedule for major outages that will affect capacity or that impact major receipt/delivery areas on the Texas Eastern Transmission (TE) system for the 2015 outage season. This schedule is not a complete list of all outages that will occur during the 2015 outage season. Due to unforeseen delays or scheduling conflicts, the dates below are subject to change. As TE continues to plan for the 2015 outage season, updates to the list below will be posted at the earliest known date.

Access Area Longview to Kosciusko:

Blessing to PEMEX Mexico EOL Line 16 (STX): Cleaning Tool Dates: See specific schedules belowIn-Line Tool Dates: See specific schedules belowPotential Repair Dates: See specific schedules belowPotential Run Comparison Repair Dates: See specific schedules below

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Line 16 between Blessing and PEMEX Mexico EOL. TE will coordinate system receipts and deliveries with point operators to minimize operational impacts, however, during the cleaning and in-line tools, meters listed below will be required to flow/shut in as follows:

Blessing to Tivoli:Cleaning Tool Dates: Fall 2015In-Line Tool Dates: December 10Potential Repair Dates: March 2016Potential Run Comparison Repair Dates: March 2016

The following meters may be unavailable for flow:73113 - ENTERPRISE TEXAS PIPELINE LLC - HIDALGO COUNTY, TX73719 - T2 GAS UTILITY LLC/REFUGIO INTERCONNECT

Tivoli to Petronilla:Cleaning Tool Dates: Fall 2015In-Line Tool Dates: CompletePotential Repair Dates: Approximately March 24 - mid September

Page 14 of 84

Potential Run Comparison Repair Dates: May 15 - mid September

The following meters will be unavailable for flow during the cleaning and in-line tool runs:73617 - ONYX PIPELINE/NUECES BAY73618 - ONYX PIPELINE/BARNEY DAVIS

The following meters will be unavailable for flow until the cleaning and in-line tools passes the meter:73310 - SOUTH SHORE P/L (NE&T), NUECES CO., TX 72603 - CROSSTEX ENERGY (FROM TE) UPRIVER RD., NUECES CO73719 - T2 GAS UTILITY LLC/REFUGIO INTERCONNECT

The following meters will be required to flow for the duration of the cleaning and in-line tool runs:73258 - MAGIC VALLEY P/L-CALPINE PWR. PROJECT (DEL)/HIDALGO73223 - DEFS, LP - EDINBURG POWER PLANT - HIDALGO CO., TX75333 - PEMEX - REYNOSA, MX (D 70333/R 76333)

Petronilla to Santa Fe:Cleaning Tool Dates: Fall 2015In-Line Tool Dates: December 9Potential Repair Dates: March 2016Potential Run Comparison: March 2016

The following meters will be unavailable for flow during the cleaning and in-line tool runs:73617 - ONYX PIPELINE/NUECES BAY73618 - ONYX PIPELINE/BARNEY DAVIS

The following meters will be required to flow for the duration of the cleaning and in-line tool runs:73258 - MAGIC VALLEY P/L-CALPINE PWR. PROJECT (DEL)/HIDALGO73223 - DEFS, LP - EDINBURG POWER PLANT - HIDALGO CO., TX 75333 - PEMEX - REYNOSA, MX (D 70333/R 76333)

Santa Fe to PEMEX Mexico (EOL):Cleaning Tool Dates: CompleteIn-Line Tool Dates: CompletePotential Repair Dates: CompletePotential Run Comparison Repair Dates: Complete

The following meters will be unavailable for flow during the cleaning and in-line tool runs:73617 - ONYX PIPELINE/NUECES BAY73618 - ONYX PIPELINE/BARNEY DAVIS73258 - MAGIC VALLEY P/L-CALPINE PWR. PROJECT (DEL)/HIDALGO73223 - DEFSDEFS, LP - EDINBURG POWER PLANT - HIDALGO CO., TX

The following meter will be required to flow for the duration of the cleaning and in-line tool runs:75333 - PEMEX - REYNOSA, MX (D 70333/R 76333)

As a result of these in-line inspections, certain locations could require further detailed investigations, which may require TE to isolate Line 16 between Blessing and PEMEX Mexico EOL. If an isolation of Line 16 is required, shippers sourcing gas for delivery points located between Blessing and PEMEX EOL will be required to source their supply from receipt points between Blessing and PEMEX EOL. Additionally, any gas sourced between Blessing and PEMEX EOL for delivery outside of this area may be restricted. Depending on the level of nominated quantities, if further investigations are required, restrictions are possible for interruptible, secondary firm services and primary firm services.

Page 15 of 84

Should any of these investigations lead to a reduction of capacity, TE will post on the bulletin board as soon as it is known. TE estimates that the investigations will begin on April 9 continuing through May 29.

West Monroe to Providence Line 26 (ELA): July 15 - August 21To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Program, TE will be conducting further investigations on Line 26 (a single line system) between West Monroe and Providence Stations. During these investigations the following meters may experience lower than normal pressures or be unavailable for flow:

71000 - GULF SOUTH PIPELINE COMPANY, LP - WEST MONROE, LA (RECEIPT71704 - GULF SOUTH PIPELINE COMPANY, LP - DARNELL, LA (DELIVERY)72568 - RELIANT ENERGY GAS TRANSMISSION - WEST MONROE, LA72614 - TRANSOK - OUACHITA PSH., LA

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Hempstead to Huntsville Line 11 (ETX) - Pipeline Maintenance: Cleaning Tool Date: CompleteIn-Line Tool Dates: CompletePotential Repair Dates: Complete Potential Run Comparison Repair Dates: VS3: August 10 - 16, VS6: October 3 - 10

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Line 11 between Provident City and Hempstead stations. During the cleaning and in-line inspection tool runs, the following meters may experience lower than normal pressures or be unavailable for flow:

73249 - ENTERGY - LEWIS CREEK / MONTGOMERY COUNTY, TX

Additionally, if further detailed investigations are required, the meters listed below could experience lower than normal pressure or be unavailable for flow during the potential repair dates:

72964ELLIOT OIL & GAS, BROWDER #C-1, SAN JACINTO CO., TX (REC)73175MME DESOTO PIPELINE, L.P. - PRAIRIE VIEW, TX - REC73249ENTERGY - LEWIS CREEK / MONTGOMERY COUNTY, TX73364BRAMMER-BROWDER GATHERING-SAN JACINTO CO., TX (REC)73388MONTGOMERY GAS TRANSMISSION, INC. - MONTGOMERY CO., TX (DEL73391FAMCOR OIL - GOLDEN MINER #1 / SAN JACINTO CO., TX (REC)73461UNIVERSAL NATURAL GAS/INTERCONNECT - MONTGOMERY CO., TX (DE73477PRIME OPERATING COMPANY - MONEY WORT #1 - WALKER CO., TX (R73669SK&CO./MASSEY FERGUSON GATHERING, SAN JACINTO CO., TX75475MME DESOTO PIPELINE, LP - (D70475/R76475)75778LONE STAR GAS - WALLER, TX-(D72778/R76778)75858KCS TX INTRASTATE GAS PIPELINE (D72858/R76858)

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Page 16 of 84

Hempstead to Huntsville Line 11 (ETX) - Pipeline Maintenance: August 10 - 16 To comply with the applicable regulatory requirements associated with TE ongoing DOT Pipeline Integrity Program, TE will be conducting further detailed investigations on Line 11 VS3 (a single line system) between Hempstead and Huntsville stations. As a result of these investigations, the following meter will be unavailable for flow:

73388 - MONTGOMERY GAS TRANSMISSION, INC. - MONTGOMERY CO., TX (DEL

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

***Blessing Compressor Station Maintenance: August 15 - 31

TE will be conducting compressor station maintenance at its Blessing Compressor Station. During this maintenance, capacity through Blessing will be reduced to approximately 285,000 Dth /d. Based on current nomination levels through Blessing, TE doesn't anticipate restrictions resulting from this outage, however if restrictions are required, restrictions to interruptible nominations may be necessary.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

TE / SESH Interconnect (Dentville): August 18 - 21 TE has been informed by Southeast Supply Header, LLC ("SESH") of the following outage below which will impact receipts and deliveries to/from SESH at the TE / SESH pipeline interconnect MR75583.

Southeast Supply Header, LLC (SESH) will be performing construction at the SESH interconnection with Texas Eastern Transmission, LP (Texas Eastern) associated with the expansion approved in FERC Docket No. CP14-87. In accordance with the provisions of its FERC Gas Tariff, SESH notifies its shippers that these construction activities will result in a service outage on the SESH system as described below.

During a 4 day period beginning on Gas Day August 18, 2015 at 9:00 am and continuing until August 22, 2015 at 9:00 am, service at the Texas Eastern interconnection (MR 83005) will be unavailable for either receipt or delivery point activity. This outage will not result in any service impacts to the pipeline capacity on the SESH system and all other receipt and delivery points will be available for service.

Providence to Yazoo Line 26 (ELA) - Pipeline Maintenance: In-Line Tool Dates: CompletePotential Repair Dates: August 18 - 25 Potential Run Comparison Repair Dates: September 10 - 18

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Line 26 between Providence and Yazoo stations. During the in-line inspection tool run, the following meters may experience lower than normal pressures or be unavailable for flow:

71000 - GULF SOUTH PIPELINE COMPANY, LP - WEST MONROE, LA (RECEIPT71704 - GULF SOUTH PIPELINE COMPANY, LP - DARNELL, LA (DELIVERY)72568 - RELIANT ENERGY GAS TRANSMISSION - WEST MONROE, LA72614 - TRANSOK - OUACHITA PSH., LA73106 - FEDERAL BUREAU OF PRISON - YAZOO CO. MS

Page 17 of 84

Additionally, if further detailed investigations are required, the meters listed above could experience lower than normal pressure or be unavailable for flow during the potential repair dates.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Yazoo to Kosciusko Line 26 (ELA) - Pipeline Maintenance: September 15 - 19 TE will be conducting pipeline maintenance on Line 26 between Yazoo and Kosciusko stations. During this maintenance the following meters will be unavailable for flow:

71000 - GULF SOUTH PIPELINE COMPANY, LP - WEST MONROE, LA (RECEIPT71704 - GULF SOUTH PIPELINE COMPANY, LP - DARNELL, LA (DELIVERY)72568 - RELIANT ENERGY GAS TRANSMISSION - WEST MONROE, LA72614 - TRANSOK - OUACHITA PSH., LA73141 - MISSISSIPPI CHEMICAL - YAZOO CITY, MS

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Blessing to Angleton Line 16 - Pipeline Maintenance: Cleaning Tool Dates: CompleteILI In-Line Tool Dates: CompletePotential Repair Dates: September 20 - October 7 Potential Run Comparison Dates: October 15 - 31

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting cleaning and in-line inspection tool runs on Line 16 between Blessing and Angleton stations.

During the cleaning tool runs, the following meters will be unavailable until the pig passes the meters:

73694 - SWEENY PLANT-CONOCO PIPELINE75558 - TRES PALACIOS GAS STORAGE - INJ/DEL

During the ILI in-line tool runs, the following meters will be unavailable for the duration of the tool run:

73694 - SWEENY PLANT-CONOCO PIPELINE75558 - TRES PALACIOS GAS STORAGE - INJ/DEL

Additionally, the following meters could experience lower than normal pressure during all cleaning and ILI tool runs:

72451 - WILMAR PIPELINE, INC. - #1 DUNCAN SLOUGH, MATAGORDA CO., T72601 - ENTERPRISE TEXAS PIPELINE LLC - MATAGORDA COUNTY, TX (REC)73148 - DEEP ROCK RESOURCES - FLOWERS / MATAGORDA CO., TX - RUN 0173283 - UNION PETROLEUM, LTD (LINE 16LL) - BRAZORIA CO., TX73338 - SANTOSUSA CORP73407 - CHESAPEAKE OPERATING INC-ANKENMEN GATHERING, BRAZORIA CO.,73412 - BUCKEYE RANCH GATHERING - MATAGORDA CO., TX73481 - ASPECT ENERGY - BINTLIFF GATHERING - BRAZORIA CO., TX

Page 18 of 84

73504 - WALTER OIL & GAS-KASMAN GATHERING - MATAGORDA CO., TX73626 - DAVIS SOUTHERN/BINTLIFF #1

Additionally, if further detailed investigations are required, all meters listed above could experience lower than normal pressure or be unavailable for flow during the potential repair dates.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Hempstead to Huntsville Line 11 (ETX) - Pipeline Maintenance: October 3 - 10To comply with the applicable regulatory requirements associated with TE ongoing DOT Pipeline Integrity Program, TE will be conducting further detailed investigations on Line 11 VS6 (a single line system) between Hempstead and Huntsville stations. As a result of these investigations, the following meters will be unavailable for flow:

72964 - ELLIOT OIL & GAS, BROWDER #C-1, SAN JACINTO CO., TX (REC)73249 - ENTERGY - LEWIS CREEK / MONTGOMERY COUNTY, TX73364 - BRAMMER-BROWDER GATHERING-SAN JACINTO CO., TX (REC)73391 - FAMCOR OIL - GOLDEN MINER #1 / SAN JACINTO CO., TX (REC)73477 - PRIME OPERATING COMPANY - MONEY WORT #1-WALKER CO., TX R73669 - SK&CO./MASSEY FERGUSON GATHERING, SAN JACINTO CO., TX75858 - KCS TX INTRASTATE GAS PIPELINE (D72858/R76858)

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Castor to EOL Line 11 - Pipeline Maintenance: October 14 - 15 TE will be conducting pipeline maintenance on Line 11 between Castor and the end of the line. During this maintenance the following meters will be unavailable for flow:

70065 - TEXAS GAS TRANSMISSION - LISBON, LA (DELIVERY)73134 - PANENERGY FIELD SERVICES - LINCOLN PARISH, LA75078 - KOCH GATEWAY - CASTOR, LA-(D70078/R76078)

Additionally, the follow following meters may experience lower than normal pressures:

70192 - SMITH (HARVEY BROYLE)#2 MURPHY-BRYCELAND, BIENVILLE PSH., L70970 - NGC ENERGY RESOURCES - SLIGO GAS PLANT, LA (RECEIPT)72307 - JEEMS BAYOU - #1 CALHOUN / DESOTO PSH., LA72718 - SMITH OPER. (HARVEY BROYLE M.P. 0.00) - BIENVILLE PSH. LA72808 - COMSTOCK RESOURCES - #1 DESOTO - DESOTO PSH., LA73168 - WILLAMETTE INDUSTRIES - BIENVILLE PARISH, LA73328 - PETROCHEM OPERATING / LOTT #1 - BOSSIER PARISH, LA (REC)73523 - ENTERPRISE GATHERING LLC/BETHANY-DESOTO PARISH, LA-RUN 173672 - ENERGY TRANSFER/TIGER PIPELINE BIENVILLE, LA75688 - GULF STATES PIPELINE - BIENVILLE PA. LA-(D72688/R7

Based on current nomination levels TE doesn't anticipate any restrictions at this time.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Page 19 of 84

Angleton to Mont. Belvieu Line 16 - Pipeline Maintenance: Cleaning Tool Date: CompleteGauge Tool Date: CompleteIn-Line Tool Date: CompletePotential Repair Dates: October 29 - November 4

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Line 16 between Angleton and Mont. Belvieu stations. During the cleaning and in-line inspection tool runs, the following meters may experience lower than normal pressures or be unavailable for flow:

70129 - LOUIS DREYFUS72382 - HOUSTON PIPE LINE CO.-ENERFIN LYONDELL SYS./ HARRIS CO., TX72837 - MONUMENT PIPELINE, LP - HARRIS COUNTY, TX72877 - DENBURY ONSHORE, LLC73539 - NET LP - MONUMENT PIPELINE - HARRIS COUNTY, TX73590 - NRG - CEDAR BAYOU73811 - ENTERPRISE PRODUCTS/WALLACE JUNCTION75300 - TEJAS GAS/CLEAR LK. STOR75301 - CALPINE BAYER PWR. PLANT ACCT. PT.

Additionally, if further detailed investigations are required, the meters listed above could experience lower than normal pressure or be unavailable for flow during the potential repair dates.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

24" System Longview to Berne:

***Gas City to Lebanon Line 69 - Pipeline Maintenance: July 21 - August 15

TE will be conducting pipeline maintenance on Line 69 between Gas City and Lebanon compressor stations. During this work, the following meters will be unavailable for flow:

72909 - DAYTON PWR & LT - RED LION, OH72911 - COL. GAS (I-O) & LEBANON, OH

***Norris city to French Lick Line 1 VS4 - Pipeline Maintenance: August 24 - 28 To comply with the applicable regulatory requirements associated with TE ongoing DOT Pipeline Integrity Program, TE will be conducting further detailed investigations on Line 1 VS4 (a single line system) between Norris city and French Lick stations. Based on current nominations levels, TE doesn't anticipate any additional restrictions associated with this outage.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Norris City to Oakland City Line 72 (Vermilion Lateral) - Pipeline MaintenanceCleaning Tool Dates: Deferred to 2016

Page 20 of 84

In-Line Tool Date: Deferred to 2016Potential Repair Dates: Deferred to 2016

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Norris City to Oakland City Line 72. During the tool run and depending on the results of the ILI Tool runs and if further detailed investigations are required, the following meter may experience lower than normal pressures or be unavailable for flow:

73623 - DUKE ENERGY VERMILLION II, LLC

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

30 Inch System and Market Area:

Wheelersburg Compressor Station: July 20 - Aug 22

TE will be conducting compressor station maintenance at its Wheelersburg Compressor Station. During this outage TE anticipates that point operators on the 30 inch line south of Wheelersburg may see lower than normal operating pressures.

Additionally, during the timeframes detailed below, north to south capacity through stations on the 30 inch line will be reduced as follows:

July 27 - August 19

Posted:Reduced to approximately:Berne 30" South1,218,000 Dth /d1,118,000 Dth /dWheelersburg South 957,000 Dth /d 857,000 Dth /dTompkinsville South 734,000 Dth /d 634,000 Dth /dBarton South 606,000 Dth /d 506,000 Dth /d

Based on historical north to south nominations TE anticipates restrictions for interruptible and secondary firm nominations flowing north to south through Berne, Wheelersburg, Tompkinsville and Barton.

TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Delmont to Lilly Line 12 - Pipeline MaintenanceILI Tool Runs: CompletePotential Repair Dates: August 6 - 31

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Delmont to Lilly Line 12. Depending on the results of the ILI Tool runs and if further detailed investigations are required, the following meter may experience lower than normal pressures or be unavailable for flow:

73543 - XTO ENERGY INC. - EAST WHEATFIELD INTERCONNECT - CAMBRIA CO

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Page 21 of 84

Heidlersburg to Marietta 36" Line 1-AF - Pipeline MaintenanceCaliper & ILI Tool Runs: CompletePotential Repair Dates: August 17 - 22

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on the Heidlersburg to Marietta 36" Line 1-AF. During the tool run and depending on the results of the ILI Tool runs and if further detailed investigations are required, the following meter may experience lower than normal pressures or be unavailable for flow:

73703 - WILLIAMS-TRANSCO, LOWER CHANCEFORD-YORK CO., PA.73718 - COLUMBIA-MARIETTA, LANCASTER CO., PA

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Kosciusko Compressor Station: August 24 - 30

TE will be conducting compressor station maintenance at its Kosciusko Compressor Station. Based on current north to south nomination levels through Kosciusko, no restrictions are anticipated; however if restrictions are necessary, restrictions to interruptible and secondary firm nominations flowing north to south through Berne, Wheelersburg, Tompkinsville and Barton are possible.

TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Lilly to Entriken Line 12 - Pipeline MaintenanceILI Tool Runs: CompletePotential Repair Dates: September 2 - 30

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Lilly to Entriken Line 12. Depending on the results of the ILI Tool runs and if further detailed investigations are required, the following meters may experience lower than normal pressures or be unavailable for flow:

70323 - PEOPLES NAT - CLAYSBURG, PA71189 - UGI CENTRAL - VALLEY GAS - MARTINSBURG, PA71455 - UGI CENTRAL - HUNTINGDON GAS - MAPLETON, PA70266 - UGI CENTRAL - HUNTINGDON GAS - HUNTINGDON, PA70308 - UGI CENTRAL - LEWISTOWN - JUNIATA CO., PA

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

***Marietta Compressor Station Maintenance: September 9 - October 9

TE will be conducting compressor station maintenance at its Marietta Compressor Station. During this maintenance, capacity through Marietta will be reduced from a seasonal capacity of 1,848,000 Dth /d to approximately 1,335,000 Dth /d for nominations delivering to locations between Marietta and up to Lambertville on TE's 36 inch line.

Page 22 of 84

Based on historical nominations through Marietta, TE anticipates restrictions for interruptible, secondary firm and potentially primary firm services.

Holbrook to Uniontown Lines 10 and 30 - Pipeline Maintenance: September 19 - 22

TE will be conducting pipeline maintenance on Lines 10 and 30 between Holbrook and Uniontown compressor stations. During this work, the following meter will be unavailable for flow:

73813 - ACCESS MIDSTREAM / WIND RIDGE-MCNAY RIDGE ROAD - GREENE CO.

Holbrook to Uniontown Line 25 - Pipeline Maintenance: September 23 - October 18

TE will be conducting pipeline maintenance on Line 25 between Holbrook and Uniontown compressor stations. During this work, the following meter will be unavailable for flow:

73808 - DTI - CRAYNE LL, RT 188, GREENE CO., PA.

Athens to Berne - Pipeline Maintenance: TBD

TE will be conducting pipeline maintenance between Athens and Berne stations. During this work, the following meter will be unavailable for flow:

73297 - DUKE ENERGY WASHINGTON II, LLC

Mt. Pleasant to Gladeville Line 25 VS5- DOT Pipe Replacement: 2016

TE will be conducting a DOT pipe replacement between Mt. Pleasant and Gladeville stations on Line 25 VS5. During this work, the following meter will be unavailable for flow:

73423 - PIEDMONT NATURAL GAS - RUTHERFORD

Texas Eastern DOT Pipeline Integrity Project

TE will be conducting, as part of its ongoing DOT Pipeline Integrity Project, in-line inspection tool runs at various locations throughout the Texas Eastern pipeline system. As a result of these in-line inspections, certain locations could be identified for an investigation which could lead to possible reduction of capacity. Should any of these investigations lead to a reduction of capacity, TE will post on the bulletin board as soon as it is known. Listed below are the pipeline segments scheduled for inspection this year. Each segment will have a caliper tool run, and an ILI tool run. Also listed below are the dates of a possible investigation as a result of the in-line inspection.

CaliperILIPossible Run CompSegment Access AreaDateDateRepl DtPoss Repl DtBlessing to Tivoli (Line 16)* ---12/10/1503/01/1603/01/16Tivoli to Petronilla (Line 16)* ---Complete04/15/1505/15/15Petronilla to Santa Fe (Line 16)* ---12/09/1503/01/1603/01/16Santa Fe to PEMEX EOL (Line 16)* ---CompleteCompleteCompleteHempstead to Huntsville (Line 11)* ---CompleteAug & OctAug & Oct

Page 23 of 84

Opelousas to St. Francisville (Line 14) ---CompleteCompleteAugustSt. Francisville to Union Church (Line 18) ---201620162016Union Church to Clinton (Line 14) ---CompleteNovemberNovemberAtlanta to Hope (Line 1) ---08/27/1510/04/1510/27/15Providence to Yazoo City (Line 26)* ---Complete08/18/1509/09/15Blessing to Angleton (Line 16)* ---Complete09/20/1510/15/15Angleton to Mont Belvieu (Line 16)* CompleteComplete10/29/15 ---

CaliperILIPossible Run CompSegment M1/M2 AreaDateDateRepl DtPoss Repl DtNorris City to Oakland City (Line 72)* ---20162016 ---Owingsville to Wheelersburg (Line 15) ---Complete08/03/15 ---Wheelersburg to Athens (Line 15) ---Complete09/01/15 ---Holbrook to Uniontown (Line 10) ---20162016 ---

CaliperILIPossible Run CompSegment M3 AreaDateDateRepl DtPoss Repl DtLambertville to Linden (Line 1)CompleteComplete08/10/15 ---Heidlersburg to Marietta (Line 1-AF)* ---Complete08/17/15 ---Perulack to Shermansdale (Line 27) ---TBDTBD ---Entriken to Perulack (Line 19) ---Complete07/15/15 ---Perulack (Line 24-AUX1) ---08/27/1510/15/15 ---Delmont to Lilly (Line 12)*CompleteComplete08/05/15 ---Lilly to Entriken (Line 12)*CompleteComplete08/31/15 ---Perulack to Leidy (Line 37) ---Complete08/10/15 ---

As a result of prior DOT mandated investigations, the following locations have been identified as requiring additional evaluation which may require a reduction of capacity. Should any of these investigations lead to a reduction of capacity, TE will post on the bulletin board as soon as it is known:

Angleton to Mont. Belvieu (Line 16)Angleton to Mont. Belvieu (Line 16-PP)Armagh to Lilly (Line 12)Armagh to Lilly (Line 19)Atlanta to Hope (Line 1)Bernville to Bechtelsville (Line 12)Blessing to Angleton (Line 16)Blessing to Tivoli (Line 16)Carthage to Longview (Line 13)Chambersburg to Marietta (Line 2)Chambersburg to Heidlersburg (Line 2-U)Clinton to Kosciusko (Line 14)Danville to Owingsville (Line 10)Danville to Owingsville (Line 15)Danville to Owingsville (Line 25)Delmont to Lilly (Line 12)Delmont to Lilly (Line 19)Delmont to Lilly (Line 27)Delmont to Armagh (Line 19)Delmont to Armagh (Line 27-1)Delmont to Armagh (Line 27-2)Donaldson to N. Little Rock (Line 1)Donaldson to N. Little Rock (Line 1-AUX-1)

Page 24 of 84

Eagle to Lambertville (Line 1)Eagle to Lambertville (Line 2)Entriken to Perulack (Line 19)French Lick to Seymour (Line 1)Gillis to Opelousas (Line 14)Gladeville to Tompkinsville (Line 10)Gladeville to Tompkinsville (Line 15)Grantville to Bernville (Line 12)Grantville to Bernville (Line 19)Grantville to Bernville (Line 28)Holbrook to Uniontown (Line 9)Holbrook to Uniontown (Line 10)Hope to Donaldson (Line 1)Kosciusko to Egypt (Line 10)Kosciusko to Egypt (Line 15)Lambertville to Linden (Line 1)Lambertville to Linden (Line 2)Lambertville to Linden (Line 20-B)Lambertville to Linden (Line 20-D)Longview to Atlanta (Line 1)Longview to Atlanta (Line 1N)Lilly to Entriken (Line 12)Lilly to Entriken (Line 12-Aux-1)Lilly to Entriken (Line 27-Aux-1)Mt. Pleasant to Gladeville (Line 25)Norris City to Oakland City (Line 1)Oakland City to French Lick (Line 1)Perulack to Grantville (Line 19)Perulack to Leidy (Line 24)Perulack to Shermansdale (Line 24 Aux-1)Perulack to Shermansdale (Line 27)Perulack to Leidy (Line 37)Pollard to Oran (Line 1)Provident to Yazoo (Line 26)Providence City to Hempstead (Line 11-H)Provident City to Hempstead (Line 11)Provident City to Thomaston (Line 21)Red River to Castor (Line 11)Shermansdale to Grantville (Line 19)St. Francisville to Union Church (Line 14)St. Francisville to Union Church (Line 18)Thomaston to Provident City (Line 21)Tivoli to Petronilla (Line 16)Union Church to Clinton (Line 14)Union Church to Clinton (Line 18)Uniontown to Delmont (Line 9)Uniontown to Delmont (Line 39)Vidor to Gillis (Line 14)West Monroe to Providence (Line 26)Wheelersburg to Athens (Line 10)Wheelersburg to Athens (Line 15)

Page 25 of 84

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Not a critical noticeNotice Eff Date/Time: 08/13/2015 12:10:00 PMNotice End Date/Time: 11/01/2015 09:00:00 AMNotice ID: 51943Notice Stat Desc: SupersedeNotice Type: MaintenancePost Date/Time: 08/13/2015 12:10:00 PMPrior Notice: 51810Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE 2015 Maintenance Schedule -- Revised

Notice Text: The text below is included in the attached Word document located at the bottom of this posting.

Listed below is a partial schedule for major outages that will affect capacity or that impact major receipt/delivery areas on the Texas Eastern Transmission (TE) system for the 2015 outage season. This schedule is not a complete list of all outages that will occur during the 2015 outage season. Due to unforeseen delays or scheduling conflicts, the dates below are subject to change. As TE continues to plan for the 2015 outage season, updates to the list below will be posted at the earliest known date.

Access Area Longview to Kosciusko:

Blessing to PEMEX Mexico EOL Line 16 (STX): Cleaning Tool Dates: See specific schedules belowIn-Line Tool Dates: See specific schedules belowPotential Repair Dates: See specific schedules belowPotential Run Comparison Repair Dates: See specific schedules below

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Line 16 between Blessing and PEMEX Mexico EOL. TE will coordinate system receipts and deliveries with point operators to minimize operational impacts, however, during the cleaning and in-line tools, meters listed below will be required to flow/shut in as follows:

Blessing to Tivoli:Cleaning Tool Dates: Fall 2015In-Line Tool Dates: December 10Potential Repair Dates: March 2016Potential Run Comparison Repair Dates: March 2016

The following meters may be unavailable for flow:73113 - ENTERPRISE TEXAS PIPELINE LLC - HIDALGO COUNTY, TX73719 - T2 GAS UTILITY LLC/REFUGIO INTERCONNECT

Tivoli to Petronilla:Cleaning Tool Dates: Fall 2015In-Line Tool Dates: CompletePotential Repair Dates: Approximately March 24 - mid September

Page 27 of 84

Potential Run Comparison Repair Dates: May 15 - mid September

The following meters will be unavailable for flow during the cleaning and in-line tool runs:73617 - ONYX PIPELINE/NUECES BAY73618 - ONYX PIPELINE/BARNEY DAVIS

The following meters will be unavailable for flow until the cleaning and in-line tools passes the meter:73310 - SOUTH SHORE P/L (NE&T), NUECES CO., TX 72603 - CROSSTEX ENERGY (FROM TE) UPRIVER RD., NUECES CO73719 - T2 GAS UTILITY LLC/REFUGIO INTERCONNECT

The following meters will be required to flow for the duration of the cleaning and in-line tool runs:73258 - MAGIC VALLEY P/L-CALPINE PWR. PROJECT (DEL)/HIDALGO73223 - DEFS, LP - EDINBURG POWER PLANT - HIDALGO CO., TX75333 - PEMEX - REYNOSA, MX (D 70333/R 76333)

Petronilla to Santa Fe:Cleaning Tool Dates: Fall 2015In-Line Tool Dates: December 9Potential Repair Dates: March 2016Potential Run Comparison: March 2016

The following meters will be unavailable for flow during the cleaning and in-line tool runs:73617 - ONYX PIPELINE/NUECES BAY73618 - ONYX PIPELINE/BARNEY DAVIS

The following meters will be required to flow for the duration of the cleaning and in-line tool runs:73258 - MAGIC VALLEY P/L-CALPINE PWR. PROJECT (DEL)/HIDALGO73223 - DEFS, LP - EDINBURG POWER PLANT - HIDALGO CO., TX 75333 - PEMEX - REYNOSA, MX (D 70333/R 76333)

Santa Fe to PEMEX Mexico (EOL):Cleaning Tool Dates: CompleteIn-Line Tool Dates: CompletePotential Repair Dates: CompletePotential Run Comparison Repair Dates: Complete

The following meters will be unavailable for flow during the cleaning and in-line tool runs:73617 - ONYX PIPELINE/NUECES BAY73618 - ONYX PIPELINE/BARNEY DAVIS73258 - MAGIC VALLEY P/L-CALPINE PWR. PROJECT (DEL)/HIDALGO73223 - DEFSDEFS, LP - EDINBURG POWER PLANT - HIDALGO CO., TX

The following meter will be required to flow for the duration of the cleaning and in-line tool runs:75333 - PEMEX - REYNOSA, MX (D 70333/R 76333)

As a result of these in-line inspections, certain locations could require further detailed investigations, which may require TE to isolate Line 16 between Blessing and PEMEX Mexico EOL. If an isolation of Line 16 is required, shippers sourcing gas for delivery points located between Blessing and PEMEX EOL will be required to source their supply from receipt points between Blessing and PEMEX EOL. Additionally, any gas sourced between Blessing and PEMEX EOL for delivery outside of this area may be restricted. Depending on the level of nominated quantities, if further investigations are required, restrictions are possible for interruptible, secondary firm services and primary firm services.

Page 28 of 84

Should any of these investigations lead to a reduction of capacity, TE will post on the bulletin board as soon as it is known. TE estimates that the investigations will begin on April 9 continuing through May 29.

West Monroe to Providence Line 26 (ELA): July 15 - August 21To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Program, TE will be conducting further investigations on Line 26 (a single line system) between West Monroe and Providence Stations. During these investigations the following meters may experience lower than normal pressures or be unavailable for flow:

71000 - GULF SOUTH PIPELINE COMPANY, LP - WEST MONROE, LA (RECEIPT71704 - GULF SOUTH PIPELINE COMPANY, LP - DARNELL, LA (DELIVERY)72568 - RELIANT ENERGY GAS TRANSMISSION - WEST MONROE, LA72614 - TRANSOK - OUACHITA PSH., LA

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Blessing Compressor Station Maintenance: August 15 - 31

TE will be conducting compressor station maintenance at its Blessing Compressor Station. During this maintenance, capacity through Blessing will be reduced to approximately 285,000 Dth /d. Based on current nomination levels through Blessing, TE doesn't anticipate restrictions resulting from this outage, however if restrictions are required, restrictions to interruptible nominations may be necessary.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

TE / SESH Interconnect (Dentville): August 18 - 21 TE has been informed by Southeast Supply Header, LLC ("SESH") of the following outage below which will impact receipts and deliveries to/from SESH at the TE / SESH pipeline interconnect MR75583.

Southeast Supply Header, LLC (SESH) will be performing construction at the SESH interconnection with Texas Eastern Transmission, LP (Texas Eastern) associated with the expansion approved in FERC Docket No. CP14-87. In accordance with the provisions of its FERC Gas Tariff, SESH notifies its shippers that these construction activities will result in a service outage on the SESH system as described below.

During a 4 day period beginning on Gas Day August 18, 2015 at 9:00 am and continuing until August 22, 2015 at 9:00 am, service at the Texas Eastern interconnection (MR 83005) will be unavailable for either receipt or delivery point activity. This outage will not result in any service impacts to the pipeline capacity on the SESH system and all other receipt and delivery points will be available for service.

Providence to Yazoo Line 26 (ELA) - Pipeline Maintenance: In-Line Tool Dates: CompletePotential Repair Dates: August 18 - 25 Potential Run Comparison Repair Dates: September 10 - 18

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Line 26 between Providence and Yazoo

Page 29 of 84

stations. During the in-line inspection tool run, the following meters may experience lower than normal pressures or be unavailable for flow:

71000 - GULF SOUTH PIPELINE COMPANY, LP - WEST MONROE, LA (RECEIPT71704 - GULF SOUTH PIPELINE COMPANY, LP - DARNELL, LA (DELIVERY)72568 - RELIANT ENERGY GAS TRANSMISSION - WEST MONROE, LA72614 - TRANSOK - OUACHITA PSH., LA73106 - FEDERAL BUREAU OF PRISON - YAZOO CO. MS

Additionally, if further detailed investigations are required, the meters listed above could experience lower than normal pressure or be unavailable for flow during the potential repair dates.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

***Donaldson to North Little Rock Line 1 - Pipeline Maintenance: August 28 - September 11 TE will be conducting pipeline maintenance on Line 1 between Donaldson and North Little Rock stations. During this maintenance TE will be required to isolate its Line 1 mainline (24 inch) that crosses the Arkansas River.

Based on current nominations levels, TE doesn't anticipate any restrictions associated with this outage.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

***Atlanta to Hope Line 1 - Pipeline Maintenance: Cleaning Tool Dates: September 12 - 21 In-Line Tool Dates: September 21Potential Repair Dates: November 30 - December 13Potential Run Comparison Repair Dates: December 20 - January 6, 2016

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Line 1 between Atlanta and Hope stations. During the cleaning and in-line inspection tool run, the following meter will be unavailable for flow while the tool passes the meter:

72871 - NORAM - BODCAW, AR

Additionally, if further detailed investigations are required, the meter listed above could experience lower than normal pressure or be unavailable for flow during the potential repair dates.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

***Donaldson to North Little Rock Line 1 - Pipeline Maintenance: Cleaning Tool Dates: September 14 - 18 In-Line Tool Dates: September 24Potential Repair Dates: December 14 - 21 Potential Run Comparison Repair Dates: January 7 - 21

Page 30 of 84

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line cleaning and inspection tool runs on Line 1 between Donaldson and North Little Rock stations. Based on current nominations and flow levels no restrictions are anticipated during the cleaning tool runs, however if nominations and/or flow levels change, the following meter may be required to shut-in during the cleaning tool run:

73667 - HOT SPRING POWER PLANT, HOT SPRING CO, AR

Additionally, during the in-line inspection tool run, the following meter will be unavailable for flow:

73667 - HOT SPRING POWER PLANT, HOT SPRING CO, AR

If further detailed investigations are required, the meter listed above could experience lower than normal pressure or be unavailable for flow during the potential repair dates.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Yazoo to Kosciusko Line 26 (ELA) - Pipeline Maintenance: September 15 - 19 TE will be conducting pipeline maintenance on Line 26 between Yazoo and Kosciusko stations. During this maintenance the following meters will be unavailable for flow:

71000 - GULF SOUTH PIPELINE COMPANY, LP - WEST MONROE, LA (RECEIPT71704 - GULF SOUTH PIPELINE COMPANY, LP - DARNELL, LA (DELIVERY)72568 - RELIANT ENERGY GAS TRANSMISSION - WEST MONROE, LA72614 - TRANSOK - OUACHITA PSH., LA73141 - MISSISSIPPI CHEMICAL - YAZOO CITY, MS

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Blessing to Angleton Line 16 - Pipeline Maintenance: Cleaning Tool Dates: CompleteILI In-Line Tool Dates: CompletePotential Repair Dates: September 20 - October 7 Potential Run Comparison Dates: October 15 - 31

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting cleaning and in-line inspection tool runs on Line 16 between Blessing and Angleton stations.

During the cleaning tool runs, the following meters will be unavailable until the pig passes the meters:

73694 - SWEENY PLANT-CONOCO PIPELINE75558 - TRES PALACIOS GAS STORAGE - INJ/DEL

During the ILI in-line tool runs, the following meters will be unavailable for the duration of the tool run:

73694 - SWEENY PLANT-CONOCO PIPELINE75558 - TRES PALACIOS GAS STORAGE - INJ/DEL

Page 31 of 84

Additionally, the following meters could experience lower than normal pressure during all cleaning and ILI tool runs:72451 - WILMAR PIPELINE, INC. - #1 DUNCAN SLOUGH, MATAGORDA CO., T72601 - ENTERPRISE TEXAS PIPELINE LLC - MATAGORDA COUNTY, TX (REC)73148 - DEEP ROCK RESOURCES - FLOWERS / MATAGORDA CO., TX - RUN 0173283 - UNION PETROLEUM, LTD (LINE 16LL) - BRAZORIA CO., TX73338 - SANTOSUSA CORP73407 - CHESAPEAKE OPERATING INC-ANKENMEN GATHERING, BRAZORIA CO.,73412 - BUCKEYE RANCH GATHERING - MATAGORDA CO., TX73481 - ASPECT ENERGY - BINTLIFF GATHERING - BRAZORIA CO., TX73504 - WALTER OIL & GAS-KASMAN GATHERING - MATAGORDA CO., TX73626 - DAVIS SOUTHERN/BINTLIFF #1

Additionally, if further detailed investigations are required, all meters listed above could experience lower than normal pressure or be unavailable for flow during the potential repair dates.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

***Thomaston to Provident City Line 21 - Pipeline Maintenance: September 22 - 23 To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Program, TE will be conducting further detailed investigations on Line 21 (a single line system) between Thomaston and Provident City Stations. During these investigations, TE will be required to isolate Line 21 at mile post 28.43. As a result of this isolation the following meters will be unavailable for flow:

70633 - B&T OIL CO., YOWARD C.P. - BEE CO., TX70655 - DEVON ENERGY PRODUCTION COMPANY, L.P- SOUTHWEST GOHLKE CP70675 - MOSBACHER-MORGAN #1, LIVE OAK CO. TX70689 - WOFFORD #1 CHILDREN'S HOME - BEE CO., TX70691 - INCA OIL & GAS CO..-#1 WILKINSON, GOLIAD CO., TX70912 - BRITANCO, LLC WILCOX - TULETA CP, BEE CO., TX71290 - BRITANCO, LLC - LOMA ALTA HAGIST CP, DUVAL CO., TX71607 - VICTORIA OPERATING - ANNA BARRE FIELD, DEWITT CO., TX (REC71773 - JAMES L. NELSON - JUNKER, DEWITT CO., TX71862 - BRITANCO, LLC - #1D GOREE, BEE CO., TX72103 - WELDER EXPLORATION&PRODUCTION- #1 YOUNG, BEE CO., TX72249 - TRI-UNION DEV. CORP.-#1 WRIGHT / GOLIAD COUNTY, TX (REC)72309 - CHAPARRAL ENERGY, L.L.C. - #1 HESTER, GOLIAD CO., TX72457 - GMT GAS MARKETING - #1 VAL HOLTZ, DEWITT CO., TX (REC)72621 - WILLIAMS FIELD SERVICES - DUVAL CO., TX72626 - WING CORP - C.P., DEWITT COUNTY, TX (REC)72654 - BLUESTONE NATURAL RESOURCES, LLC- BONNE TERRE FIELD, MCMULL72723 - ABRAXAS PETROLEUM CORP.- TIPTON LEASE / GOLIAD CO., TX (REC72950 - APTIAN GAS CORP., K.W. SCHREINER #1 - LIVE OAK CO., TX72951 - APTIAN GAS CORP., SCHREINER RANCH - LIVE OAK CO., TX72963 - AUBURN ENTERPRISES - KERLICK #1, DEWITT, TX73139 - DCP MIDSTREAM, LP- #1 DIEBEL, GOLIAD CO., TX73164 - DCP MIDSTREAM, LP - GOLIAD CO., TX73165 - SANCHEZ O'BRIEN-BODDEN FROST, LIVE OAK CO., TX73199 - DCP MIDSTREAM, LP - BEE CO., TX73214 - DEFS - PETTUS, BEE CO., TX73232 - DEFS - GOLIAD COUNTY, TX

Page 32 of 84

73242 - COASTAL OIL & GAS - PAWLIK #1, LIVE OAK CO., TX73244 - WINN EXPLORATION/KERLICK #1 - DEWITT COUNTY, TX (REC)73276 - HURD ENTERPRISES - LUKER #2, GOLIAD CO., TX (REC)73341 - CIMA ENERGY LTD - GATH. SYSTEM / DEWITT CO., TX (REC)73452 - DEFS/SOUTHERN RESOURCES GATH. - BEE CO., TX (REC)73454 - KALER ENERGY-CARPENTER #1/BEE CO., TX (REC)73482 - MAGNUM LP - CHICOLETE CREEK - LAVACA CO., TX (REC)73505 - DESF-ANGEL CITY GATHERING-GOLIAD CO. TX73604 - MILAGRO/WRIGHT MATERIALS-GOLIAD CO., TX73717 - ESENJAY PETROLEUM/HOBLIT UNIT #1-RUN 173810 - JAMES L NELSON OPERATING/GOEHRING GATHERING-FM 584-GOLIAD C73876 - ELLIOTT OIL&GAS/STEINDORF #1-FM 799-BEE CO., TX

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Hempstead to Huntsville Line 11 (ETX) - Pipeline Maintenance: Cleaning Tool Date: CompleteIn-Line Tool Dates: CompletePotential Repair Dates: Complete Potential Run Comparison Repair Dates: VS6: October 3 - 10

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Line 11 between Provident City and Hempstead stations. During the cleaning and in-line inspection tool runs, the following meters may experience lower than normal pressures or be unavailable for flow:

73249 - ENTERGY - LEWIS CREEK / MONTGOMERY COUNTY, TX

Additionally, if further detailed investigations are required, the meters listed below could experience lower than normal pressure or be unavailable for flow during the potential repair dates:

72964ELLIOT OIL & GAS, BROWDER #C-1, SAN JACINTO CO., TX (REC)73175MME DESOTO PIPELINE, L.P. - PRAIRIE VIEW, TX - REC73249ENTERGY - LEWIS CREEK / MONTGOMERY COUNTY, TX73364BRAMMER-BROWDER GATHERING-SAN JACINTO CO., TX (REC)73388MONTGOMERY GAS TRANSMISSION, INC. - MONTGOMERY CO., TX (DEL73391FAMCOR OIL - GOLDEN MINER #1 / SAN JACINTO CO., TX (REC)73461UNIVERSAL NATURAL GAS/INTERCONNECT - MONTGOMERY CO., TX (DE73477PRIME OPERATING COMPANY - MONEY WORT #1 - WALKER CO., TX (R73669SK&CO./MASSEY FERGUSON GATHERING, SAN JACINTO CO., TX75475MME DESOTO PIPELINE, LP - (D70475/R76475)75778LONE STAR GAS - WALLER, TX-(D72778/R76778)75858KCS TX INTRASTATE GAS PIPELINE (D72858/R76858)

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Hempstead to Huntsville Line 11 (ETX) - Pipeline Maintenance: October 3 - 10To comply with the applicable regulatory requirements associated with TE ongoing DOT Pipeline Integrity Program, TE will be conducting further detailed investigations on Line 11 VS6 (a single line system)

Page 33 of 84

between Hempstead and Huntsville stations. As a result of these investigations, the following meters will be unavailable for flow:

72964 - ELLIOT OIL & GAS, BROWDER #C-1, SAN JACINTO CO., TX (REC)73249 - ENTERGY - LEWIS CREEK / MONTGOMERY COUNTY, TX73364 - BRAMMER-BROWDER GATHERING-SAN JACINTO CO., TX (REC)73391 - FAMCOR OIL - GOLDEN MINER #1 / SAN JACINTO CO., TX (REC)73477 - PRIME OPERATING COMPANY - MONEY WORT #1-WALKER CO., TX R73669 - SK&CO./MASSEY FERGUSON GATHERING, SAN JACINTO CO., TX75858 - KCS TX INTRASTATE GAS PIPELINE (D72858/R76858)

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Castor to EOL Line 11 - Pipeline Maintenance: October 14 - 15 TE will be conducting pipeline maintenance on Line 11 between Castor and the end of the line. During this maintenance the following meters will be unavailable for flow:

70065 - TEXAS GAS TRANSMISSION - LISBON, LA (DELIVERY)73134 - PANENERGY FIELD SERVICES - LINCOLN PARISH, LA75078 - KOCH GATEWAY - CASTOR, LA-(D70078/R76078)

Additionally, the follow following meters may experience lower than normal pressures:

70192 - SMITH (HARVEY BROYLE)#2 MURPHY-BRYCELAND, BIENVILLE PSH., L70970 - NGC ENERGY RESOURCES - SLIGO GAS PLANT, LA (RECEIPT)72307 - JEEMS BAYOU - #1 CALHOUN / DESOTO PSH., LA72718 - SMITH OPER. (HARVEY BROYLE M.P. 0.00) - BIENVILLE PSH. LA72808 - COMSTOCK RESOURCES - #1 DESOTO - DESOTO PSH., LA73168 - WILLAMETTE INDUSTRIES - BIENVILLE PARISH, LA73328 - PETROCHEM OPERATING / LOTT #1 - BOSSIER PARISH, LA (REC)73523 - ENTERPRISE GATHERING LLC/BETHANY-DESOTO PARISH, LA-RUN 173672 - ENERGY TRANSFER/TIGER PIPELINE BIENVILLE, LA75688 - GULF STATES PIPELINE - BIENVILLE PA. LA-(D72688/R7

Based on current nomination levels TE doesn't anticipate any restrictions at this time.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Angleton to Mont. Belvieu Line 16 - Pipeline Maintenance: Cleaning Tool Date: CompleteGauge Tool Date: CompleteIn-Line Tool Date: CompletePotential Repair Dates: October 29 - November 4

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Line 16 between Angleton and Mont. Belvieu stations. During the cleaning and in-line inspection tool runs, the following meters may experience lower than normal pressures or be unavailable for flow:

Page 34 of 84

70129 - LOUIS DREYFUS72382 - HOUSTON PIPE LINE CO.-ENERFIN LYONDELL SYS./ HARRIS CO., TX72837 - MONUMENT PIPELINE, LP - HARRIS COUNTY, TX72877 - DENBURY ONSHORE, LLC73539 - NET LP - MONUMENT PIPELINE - HARRIS COUNTY, TX73590 - NRG - CEDAR BAYOU73811 - ENTERPRISE PRODUCTS/WALLACE JUNCTION75300 - TEJAS GAS/CLEAR LK. STOR75301 - CALPINE BAYER PWR. PLANT ACCT. PT.

Additionally, if further detailed investigations are required, the meters listed above could experience lower than normal pressure or be unavailable for flow during the potential repair dates.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

24" System Longview to Berne:

Gas City to Lebanon Line 69 - Pipeline Maintenance: July 21 - August 15

TE will be conducting pipeline maintenance on Line 69 between Gas City and Lebanon compressor stations. During this work, the following meters will be unavailable for flow:

72909 - DAYTON PWR & LT - RED LION, OH72911 - COL. GAS (I-O) & LEBANON, OH

***Norris city to French Lick Line 1 VS4 - Pipeline Maintenance: August 24 - 27 To comply with the applicable regulatory requirements associated with TE ongoing DOT Pipeline Integrity Program, TE will be conducting further detailed investigations on Line 1 VS4 (a single line system) between Norris city and French Lick stations. Based on current nominations levels, TE doesn't anticipate any additional restrictions associated with this outage.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Norris City to Oakland City Line 72 (Vermilion Lateral) - Pipeline MaintenanceCleaning Tool Dates: Deferred to 2016In-Line Tool Date: Deferred to 2016Potential Repair Dates: Deferred to 2016

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Norris City to Oakland City Line 72. During the tool run and depending on the results of the ILI Tool runs and if further detailed investigations are required, the following meter may experience lower than normal pressures or be unavailable for flow:

73623 - DUKE ENERGY VERMILLION II, LLC

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Page 35 of 84

30 Inch System and Market Area:

Wheelersburg Compressor Station: July 20 - Aug 22

TE will be conducting compressor station maintenance at its Wheelersburg Compressor Station. During this outage TE anticipates that point operators on the 30 inch line south of Wheelersburg may see lower than normal operating pressures.

Additionally, during the timeframes detailed below, north to south capacity through stations on the 30 inch line will be reduced as follows:

July 27 - August 19

Posted:Reduced to approximately:Berne 30" South1,218,000 Dth /d1,118,000 Dth /dWheelersburg South 957,000 Dth /d 857,000 Dth /dTompkinsville South 734,000 Dth /d 634,000 Dth /dBarton South 606,000 Dth /d 506,000 Dth /d

Based on historical north to south nominations TE anticipates restrictions for interruptible and secondary firm nominations flowing north to south through Berne, Wheelersburg, Tompkinsville and Barton.

TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.?Delmont to Lilly Line 12 - Pipeline MaintenanceILI Tool Runs: CompletePotential Repair Dates: August 6 - 31

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Delmont to Lilly Line 12. Depending on the results of the ILI Tool runs and if further detailed investigations are required, the following meter may experience lower than normal pressures or be unavailable for flow:

73543 - XTO ENERGY INC. - EAST WHEATFIELD INTERCONNECT - CAMBRIA CO

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Heidlersburg to Marietta 36" Line 1-AF - Pipeline MaintenanceCaliper & ILI Tool Runs: CompletePotential Repair Dates: August 17 - 22

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on the Heidlersburg to Marietta 36" Line 1-AF. During the tool run and depending on the results of the ILI Tool runs and if further detailed investigations are required, the following meter may experience lower than normal pressures or be unavailable for flow:

73703 - WILLIAMS-TRANSCO, LOWER CHANCEFORD-YORK CO., PA.73718 - COLUMBIA-MARIETTA, LANCASTER CO., PA

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize Page 36 of 84

operational impacts.

***Bedford Compressor Station Maintenance: August 17 -- 30

TE will be conducting compressor station maintenance at its Bedford Compressor Station. During this outage capacity through Bedford will be reduced to approximately 1,939,000 Dth /d for nominations delivering to locations between Bedford and up to Lambertville on TE's 36 inch line.

Based on current nominations levels, TE doesn't anticipate any restrictions associated with this outage.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Lilly to Entriken Line 12 - Pipeline MaintenanceILI Tool Runs: CompletePotential Repair Dates: September 2 - 30

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Lilly to Entriken Line 12. Depending on the results of the ILI Tool runs and if further detailed investigations are required, the following meters may experience lower than normal pressures or be unavailable for flow:

70323 - PEOPLES NAT - CLAYSBURG, PA71189 - UGI CENTRAL - VALLEY GAS - MARTINSBURG, PA71455 - UGI CENTRAL - HUNTINGDON GAS - MAPLETON, PA70266 - UGI CENTRAL - HUNTINGDON GAS - HUNTINGDON, PA70308 - UGI CENTRAL - LEWISTOWN - JUNIATA CO., PA

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Marietta Compressor Station Maintenance: September 9 - October 9

TE will be conducting compressor station maintenance at its Marietta Compressor Station. During this maintenance, capacity through Marietta will be reduced from a seasonal capacity of 1,848,000 Dth /d to approximately 1,335,000 Dth /d for nominations delivering to locations between Marietta and up to Lambertville on TE's 36 inch line.

Based on historical nominations through Marietta, TE anticipates restrictions for interruptible, secondary firm and potentially primary firm services.

***Holbrook to Uniontown Lines 10 and 30 - Pipeline Maintenance: September 21 - 25

TE will be conducting pipeline maintenance on Lines 10 and 30 between Holbrook and Uniontown compressor stations. During this work, the following meter will be unavailable for flow:

73813 - ACCESS MIDSTREAM / WIND RIDGE-MCNAY RIDGE ROAD - GREENE CO.

Page 37 of 84

***Holbrook to Uniontown Line 25 - Pipeline Maintenance: September 26 - October 21

TE will be conducting pipeline maintenance on Line 25 between Holbrook and Uniontown compressor stations. During this work, the following meter will be unavailable for flow:

73808 - DTI - CRAYNE LL, RT 188, GREENE CO., PA.

***Kosciusko Compressor Station: October 12 - 18

TE will be conducting compressor station maintenance at its Kosciusko Compressor Station. Based on current north to south nomination levels through Kosciusko, no restrictions are anticipated; however if restrictions are necessary, restrictions to interruptible and secondary firm nominations flowing north to south through Berne, Wheelersburg, Tompkinsville and Barton are possible.

TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Athens to Berne - Pipeline Maintenance: TBD

TE will be conducting pipeline maintenance between Athens and Berne stations. During this work, the following meter will be unavailable for flow:

73297 - DUKE ENERGY WASHINGTON II, LLC

Mt. Pleasant to Gladeville Line 25 VS5- DOT Pipe Replacement: 2016

TE will be conducting a DOT pipe replacement between Mt. Pleasant and Gladeville stations on Line 25 VS5. During this work, the following meter will be unavailable for flow:

73423 - PIEDMONT NATURAL GAS - RUTHERFORD

Texas Eastern DOT Pipeline Integrity Project

TE will be conducting, as part of its ongoing DOT Pipeline Integrity Project, in-line inspection tool runs at various locations throughout the Texas Eastern pipeline system. As a result of these in-line inspections, certain locations could be identified for an investigation which could lead to possible reduction of capacity. Should any of these investigations lead to a reduction of capacity, TE will post on the bulletin board as soon as it is known. Listed below are the pipeline segments scheduled for inspection this year. Each segment will have a caliper tool run, and an ILI tool run. Also listed below are the dates of a possible investigation as a result of the in-line inspection.

CaliperILIPossible Run CompSegment Access AreaDateDateRepl DtPoss Repl DtBlessing to Tivoli (Line 16)* ---12/10/1503/01/1603/01/16Tivoli to Petronilla (Line 16)* ---Complete04/15/1505/15/15Petronilla to Santa Fe (Line 16)* ---12/09/1503/01/1603/01/16Santa Fe to PEMEX EOL (Line 16)* ---CompleteCompleteCompleteHempstead to Huntsville (Line 11)* ---Complete10/03/1510/03/15Opelousas to St. Francisville (Line 14) ---CompleteCompleteAugustSt. Francisville to Union Church (Line 18) ---201620162016

Page 38 of 84

Union Church to Clinton (Line 14) ---CompleteNovemberNovember***Atlanta to Hope (Line 1)* ---09/21/1511/30/1512/20/15***Donaldson to North Little Rock (Line 1)* ---09/24/1512/14/1501/07/16Providence to Yazoo City (Line 26)* ---Complete08/18/1509/09/15Blessing to Angleton (Line 16)* ---Complete09/20/1510/15/15Angleton to Mont Belvieu (Line 16)* CompleteComplete10/29/15 ---

CaliperILIPossible Run CompSegment M1/M2 AreaDateDateRepl DtPoss Repl DtNorris City to Oakland City (Line 72)* ---20162016 ---Owingsville to Wheelersburg (Line 15) ---Complete08/03/15 ---Wheelersburg to Athens (Line 15) ---Complete09/01/15 ---Holbrook to Uniontown (Line 10) ---20162016 ---

CaliperILIPossible Run CompSegment M3 AreaDateDateRepl DtPoss Repl DtLambertville to Linden (Line 1)CompleteComplete08/10/15 ---Heidlersburg to Marietta (Line 1-AF)* ---Complete08/17/15 ---Perulack to Shermansdale (Line 27) ---TBDTBD ---Perulack (Line 24-AUX1) ---08/27/1510/15/15 ---Delmont to Lilly (Line 12)*CompleteComplete08/05/15 ---Lilly to Entriken (Line 12)*CompleteComplete08/31/15 ---

As a result of prior DOT mandated investigations, the following locations have been identified as requiring additional evaluation which may require a reduction of capacity. Should any of these investigations lead to a reduction of capacity, TE will post on the bulletin board as soon as it is known:

Angleton to Mont. Belvieu (Line 16)Angleton to Mont. Belvieu (Line 16-PP)Armagh to Lilly (Line 12)Armagh to Lilly (Line 19)Atlanta to Hope (Line 1)Bernville to Bechtelsville (Line 12)Blessing to Angleton (Line 16)Blessing to Tivoli (Line 16)Carthage to Longview (Line 13)Chambersburg to Marietta (Line 2)Chambersburg to Heidlersburg (Line 2-U)Clinton to Kosciusko (Line 14)Danville to Owingsville (Line 10)Danville to Owingsville (Line 15)Danville to Owingsville (Line 25)Delmont to Lilly (Line 12)Delmont to Lilly (Line 19)Delmont to Lilly (Line 27)Delmont to Armagh (Line 19)Delmont to Armagh (Line 27-1)Delmont to Armagh (Line 27-2)Donaldson to N. Little Rock (Line 1)Donaldson to N. Little Rock (Line 1-AUX-1)Eagle to Lambertville (Line 1)Eagle to Lambertville (Line 2)

Page 39 of 84

Entriken to Perulack (Line 19)French Lick to Seymour (Line 1)Gillis to Opelousas (Line 14)Gladeville to Tompkinsville (Line 10)Gladeville to Tompkinsville (Line 15)Grantville to Bernville (Line 12)Grantville to Bernville (Line 19)Grantville to Bernville (Line 28)Holbrook to Uniontown (Line 9)Holbrook to Uniontown (Line 10)Hope to Donaldson (Line 1)Kosciusko to Egypt (Line 10)Kosciusko to Egypt (Line 15)Lambertville to Linden (Line 1)Lambertville to Linden (Line 2)Lambertville to Linden (Line 20-B)Lambertville to Linden (Line 20-D)Longview to Atlanta (Line 1)Longview to Atlanta (Line 1N)Lilly to Entriken (Line 12)Lilly to Entriken (Line 12-Aux-1)Lilly to Entriken (Line 27-Aux-1)Mt. Pleasant to Gladeville (Line 25)Norris City to Oakland City (Line 1)Oakland City to French Lick (Line 1)Perulack to Grantville (Line 19)Perulack to Leidy (Line 24)Perulack to Shermansdale (Line 24 Aux-1)Perulack to Shermansdale (Line 27)Perulack to Leidy (Line 37)Pollard to Oran (Line 1)Provident to Yazoo (Line 26)Providence City to Hempstead (Line 11-H)Provident City to Hempstead (Line 11)Provident City to Thomaston (Line 21)Red River to Castor (Line 11)Shermansdale to Grantville (Line 19)St. Francisville to Union Church (Line 14)St. Francisville to Union Church (Line 18)Thomaston to Provident City (Line 21)Tivoli to Petronilla (Line 16)Union Church to Clinton (Line 14)Union Church to Clinton (Line 18)Uniontown to Delmont (Line 9)Uniontown to Delmont (Line 39)Vidor to Gillis (Line 14)West Monroe to Providence (Line 26)Wheelersburg to Athens (Line 10)Wheelersburg to Athens (Line 15)

Page 40 of 84

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Not a critical noticeNotice Eff Date/Time: 08/14/2015 08:30:00 AMNotice End Date/Time: 11/01/2015 09:00:00 AMNotice ID: 51960Notice Stat Desc: SupersedeNotice Type: MaintenancePost Date/Time: 08/14/2015 08:30:00 AMPrior Notice: 51943Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE 2015 Maintenance Schedule -- Revised

Notice Text: The text below is included in the attached Word document located at the bottom of this posting.

Listed below is a partial schedule for major outages that will affect capacity or that impact major receipt/delivery areas on the Texas Eastern Transmission (TE) system for the 2015 outage season. This schedule is not a complete list of all outages that will occur during the 2015 outage season. Due to unforeseen delays or scheduling conflicts, the dates below are subject to change. As TE continues to plan for the 2015 outage season, updates to the list below will be posted at the earliest known date.

Access Area Longview to Kosciusko:

Blessing to PEMEX Mexico EOL Line 16 (STX): Cleaning Tool Dates: See specific schedules belowIn-Line Tool Dates: See specific schedules belowPotential Repair Dates: See specific schedules belowPotential Run Comparison Repair Dates: See specific schedules below

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Line 16 between Blessing and PEMEX Mexico EOL. TE will coordinate system receipts and deliveries with point operators to minimize operational impacts, however, during the cleaning and in-line tools, meters listed below will be required to flow/shut in as follows:

Blessing to Tivoli:Cleaning Tool Dates: Fall 2015In-Line Tool Dates: December 10Potential Repair Dates: March 2016Potential Run Comparison Repair Dates: March 2016

The following meters may be unavailable for flow:73113 - ENTERPRISE TEXAS PIPELINE LLC - HIDALGO COUNTY, TX73719 - T2 GAS UTILITY LLC/REFUGIO INTERCONNECT

Tivoli to Petronilla:Cleaning Tool Dates: Fall 2015In-Line Tool Dates: CompletePotential Repair Dates: Approximately March 24 - mid September

Page 42 of 84

Potential Run Comparison Repair Dates: May 15 - mid September

The following meters will be unavailable for flow during the cleaning and in-line tool runs:73617 - ONYX PIPELINE/NUECES BAY73618 - ONYX PIPELINE/BARNEY DAVIS

The following meters will be unavailable for flow until the cleaning and in-line tools passes the meter:73310 - SOUTH SHORE P/L (NE&T), NUECES CO., TX 72603 - CROSSTEX ENERGY (FROM TE) UPRIVER RD., NUECES CO73719 - T2 GAS UTILITY LLC/REFUGIO INTERCONNECT

The following meters will be required to flow for the duration of the cleaning and in-line tool runs:73258 - MAGIC VALLEY P/L-CALPINE PWR. PROJECT (DEL)/HIDALGO73223 - DEFS, LP - EDINBURG POWER PLANT - HIDALGO CO., TX75333 - PEMEX - REYNOSA, MX (D 70333/R 76333)

Petronilla to Santa Fe:Cleaning Tool Dates: Fall 2015In-Line Tool Dates: December 9Potential Repair Dates: March 2016Potential Run Comparison: March 2016

The following meters will be unavailable for flow during the cleaning and in-line tool runs:73617 - ONYX PIPELINE/NUECES BAY73618 - ONYX PIPELINE/BARNEY DAVIS

The following meters will be required to flow for the duration of the cleaning and in-line tool runs:73258 - MAGIC VALLEY P/L-CALPINE PWR. PROJECT (DEL)/HIDALGO73223 - DEFS, LP - EDINBURG POWER PLANT - HIDALGO CO., TX 75333 - PEMEX - REYNOSA, MX (D 70333/R 76333)

Santa Fe to PEMEX Mexico (EOL):Cleaning Tool Dates: CompleteIn-Line Tool Dates: CompletePotential Repair Dates: CompletePotential Run Comparison Repair Dates: Complete

The following meters will be unavailable for flow during the cleaning and in-line tool runs:73617 - ONYX PIPELINE/NUECES BAY73618 - ONYX PIPELINE/BARNEY DAVIS73258 - MAGIC VALLEY P/L-CALPINE PWR. PROJECT (DEL)/HIDALGO73223 - DEFSDEFS, LP - EDINBURG POWER PLANT - HIDALGO CO., TX

The following meter will be required to flow for the duration of the cleaning and in-line tool runs:75333 - PEMEX - REYNOSA, MX (D 70333/R 76333)

As a result of these in-line inspections, certain locations could require further detailed investigations, which may require TE to isolate Line 16 between Blessing and PEMEX Mexico EOL. If an isolation of Line 16 is required, shippers sourcing gas for delivery points located between Blessing and PEMEX EOL will be required to source their supply from receipt points between Blessing and PEMEX EOL. Additionally, any gas sourced between Blessing and PEMEX EOL for delivery outside of this area may be restricted. Depending on the level of nominated quantities, if further investigations are required, restrictions are possible

Page 43 of 84

for interruptible, secondary firm services and primary firm services.

Should any of these investigations lead to a reduction of capacity, TE will post on the bulletin board as soon as it is known. TE estimates that the investigations will begin on April 9 continuing through May 29.

West Monroe to Providence Line 26 (ELA): July 15 - August 21To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Program, TE will be conducting further investigations on Line 26 (a single line system) between West Monroe and Providence Stations. During these investigations the following meters may experience lower than normal pressures or be unavailable for flow:

71000 - GULF SOUTH PIPELINE COMPANY, LP - WEST MONROE, LA (RECEIPT71704 - GULF SOUTH PIPELINE COMPANY, LP - DARNELL, LA (DELIVERY)72568 - RELIANT ENERGY GAS TRANSMISSION - WEST MONROE, LA72614 - TRANSOK - OUACHITA PSH., LA

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Blessing Compressor Station Maintenance: August 15 - 31

TE will be conducting compressor station maintenance at its Blessing Compressor Station. During this maintenance, capacity through Blessing will be reduced to approximately 285,000 Dth /d. Based on current nomination levels through Blessing, TE doesn't anticipate restrictions resulting from this outage, however if restrictions are required, restrictions to interruptible nominations may be necessary.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

TE / SESH Interconnect (Dentville): August 18 - 21 TE has been informed by Southeast Supply Header, LLC ("SESH") of the following outage below which will impact receipts and deliveries to/from SESH at the TE / SESH pipeline interconnect MR75583.

Southeast Supply Header, LLC (SESH) will be performing construction at the SESH interconnection with Texas Eastern Transmission, LP (Texas Eastern) associated with the expansion approved in FERC Docket No. CP14-87. In accordance with the provisions of its FERC Gas Tariff, SESH notifies its shippers that these construction activities will result in a service outage on the SESH system as described below.

During a 4 day period beginning on Gas Day August 18, 2015 at 9:00 am and continuing until August 22, 2015 at 9:00 am, service at the Texas Eastern interconnection (MR 83005) will be unavailable for either receipt or delivery point activity. This outage will not result in any service impacts to the pipeline capacity on the SESH system and all other receipt and delivery points will be available for service.

Providence to Yazoo Line 26 (ELA) - Pipeline Maintenance: In-Line Tool Dates: CompletePotential Repair Dates: August 18 - 25 Potential Run Comparison Repair Dates: September 10 - 18

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Page 44 of 84

Project, TE will be conducting in-line inspection tool runs on Line 26 between Providence and Yazoo stations. During the in-line inspection tool run, the following meters may experience lower than normal pressures or be unavailable for flow:

71000 - GULF SOUTH PIPELINE COMPANY, LP - WEST MONROE, LA (RECEIPT71704 - GULF SOUTH PIPELINE COMPANY, LP - DARNELL, LA (DELIVERY)72568 - RELIANT ENERGY GAS TRANSMISSION - WEST MONROE, LA72614 - TRANSOK - OUACHITA PSH., LA73106 - FEDERAL BUREAU OF PRISON - YAZOO CO. MS

Additionally, if further detailed investigations are required, the meters listed above could experience lower than normal pressure or be unavailable for flow during the potential repair dates.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Donaldson to North Little Rock Line 1 - Pipeline Maintenance: August 28 - September 11 TE will be conducting pipeline maintenance on Line 1 between Donaldson and North Little Rock stations. During this maintenance TE will be required to isolate its Line 1 mainline (24 inch) that crosses the Arkansas River.

Based on current nominations levels, TE doesn't anticipate any restrictions associated with this outage.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

?Atlanta to Hope Line 1 - Pipeline Maintenance: Cleaning Tool Dates: September 12 - 21 In-Line Tool Dates: September 21Potential Repair Dates: November 30 - December 13Potential Run Comparison Repair Dates: December 20 - January 6, 2016

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Line 1 between Atlanta and Hope stations. During the cleaning and in-line inspection tool run, the following meter will be unavailable for flow while the tool passes the meter:

72871 - NORAM - BODCAW, AR

Additionally, if further detailed investigations are required, the meter listed above could experience lower than normal pressure or be unavailable for flow during the potential repair dates.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Donaldson to North Little Rock Line 1 - Pipeline Maintenance: Cleaning Tool Dates: September 14 - 18 In-Line Tool Dates: September 24Potential Repair Dates: December 14 - 21

Page 45 of 84

Potential Run Comparison Repair Dates: January 7 - 21

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line cleaning and inspection tool runs on Line 1 between Donaldson and North Little Rock stations. Based on current nominations and flow levels no restrictions are anticipated during the cleaning tool runs, however if nominations and/or flow levels change, the following meter may be required to shut-in during the cleaning tool run:

73667 - HOT SPRING POWER PLANT, HOT SPRING CO, AR

Additionally, during the in-line inspection tool run, the following meter will be unavailable for flow:

73667 - HOT SPRING POWER PLANT, HOT SPRING CO, AR

If further detailed investigations are required, the meter listed above could experience lower than normal pressure or be unavailable for flow during the potential repair dates.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

?Yazoo to Kosciusko Line 26 (ELA) - Pipeline Maintenance: September 15 - 19 TE will be conducting pipeline maintenance on Line 26 between Yazoo and Kosciusko stations. During this maintenance the following meters will be unavailable for flow:

71000 - GULF SOUTH PIPELINE COMPANY, LP - WEST MONROE, LA (RECEIPT71704 - GULF SOUTH PIPELINE COMPANY, LP - DARNELL, LA (DELIVERY)72568 - RELIANT ENERGY GAS TRANSMISSION - WEST MONROE, LA72614 - TRANSOK - OUACHITA PSH., LA73141 - MISSISSIPPI CHEMICAL - YAZOO CITY, MS

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Blessing to Angleton Line 16 - Pipeline Maintenance: Cleaning Tool Dates: CompleteILI In-Line Tool Dates: CompletePotential Repair Dates: September 20 - October 7 Potential Run Comparison Dates: October 15 - 31

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting cleaning and in-line inspection tool runs on Line 16 between Blessing and Angleton stations.

During the cleaning tool runs, the following meters will be unavailable until the pig passes the meters:

73694 - SWEENY PLANT-CONOCO PIPELINE75558 - TRES PALACIOS GAS STORAGE - INJ/DEL

During the ILI in-line tool runs, the following meters will be unavailable for the duration of the tool run:

Page 46 of 84

73694 - SWEENY PLANT-CONOCO PIPELINE75558 - TRES PALACIOS GAS STORAGE - INJ/DEL

Additionally, the following meters could experience lower than normal pressure during all cleaning and ILI tool runs:72451 - WILMAR PIPELINE, INC. - #1 DUNCAN SLOUGH, MATAGORDA CO., T72601 - ENTERPRISE TEXAS PIPELINE LLC - MATAGORDA COUNTY, TX (REC)73148 - DEEP ROCK RESOURCES - FLOWERS / MATAGORDA CO., TX - RUN 0173283 - UNION PETROLEUM, LTD (LINE 16LL) - BRAZORIA CO., TX73338 - SANTOSUSA CORP73407 - CHESAPEAKE OPERATING INC-ANKENMEN GATHERING, BRAZORIA CO.,73412 - BUCKEYE RANCH GATHERING - MATAGORDA CO., TX73481 - ASPECT ENERGY - BINTLIFF GATHERING - BRAZORIA CO., TX73504 - WALTER OIL & GAS-KASMAN GATHERING - MATAGORDA CO., TX73626 - DAVIS SOUTHERN/BINTLIFF #1

Additionally, if further detailed investigations are required, all meters listed above could experience lower than normal pressure or be unavailable for flow during the potential repair dates.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Thomaston to Provident City Line 21 - Pipeline Maintenance: September 22 - 23 To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Program, TE will be conducting further detailed investigations on Line 21 (a single line system) between Thomaston and Provident City Stations. During these investigations, TE will be required to isolate Line 21 at mile post 28.43. As a result of this isolation the following meters will be unavailable for flow:

70633 - B&T OIL CO., YOWARD C.P. - BEE CO., TX70655 - DEVON ENERGY PRODUCTION COMPANY, L.P- SOUTHWEST GOHLKE CP70675 - MOSBACHER-MORGAN #1, LIVE OAK CO. TX70689 - WOFFORD #1 CHILDREN'S HOME - BEE CO., TX70691 - INCA OIL & GAS CO..-#1 WILKINSON, GOLIAD CO., TX70912 - BRITANCO, LLC WILCOX - TULETA CP, BEE CO., TX71290 - BRITANCO, LLC - LOMA ALTA HAGIST CP, DUVAL CO., TX71607 - VICTORIA OPERATING - ANNA BARRE FIELD, DEWITT CO., TX (REC71773 - JAMES L. NELSON - JUNKER, DEWITT CO., TX71862 - BRITANCO, LLC - #1D GOREE, BEE CO., TX72103 - WELDER EXPLORATION&PRODUCTION- #1 YOUNG, BEE CO., TX72249 - TRI-UNION DEV. CORP.-#1 WRIGHT / GOLIAD COUNTY, TX (REC)72309 - CHAPARRAL ENERGY, L.L.C. - #1 HESTER, GOLIAD CO., TX72457 - GMT GAS MARKETING - #1 VAL HOLTZ, DEWITT CO., TX (REC)72621 - WILLIAMS FIELD SERVICES - DUVAL CO., TX72626 - WING CORP - C.P., DEWITT COUNTY, TX (REC)72654 - BLUESTONE NATURAL RESOURCES, LLC- BONNE TERRE FIELD, MCMULL72723 - ABRAXAS PETROLEUM CORP.- TIPTON LEASE / GOLIAD CO., TX (REC72950 - APTIAN GAS CORP., K.W. SCHREINER #1 - LIVE OAK CO., TX72951 - APTIAN GAS CORP., SCHREINER RANCH - LIVE OAK CO., TX72963 - AUBURN ENTERPRISES - KERLICK #1, DEWITT, TX73139 - DCP MIDSTREAM, LP- #1 DIEBEL, GOLIAD CO., TX73164 - DCP MIDSTREAM, LP - GOLIAD CO., TX73165 - SANCHEZ O'BRIEN-BODDEN FROST, LIVE OAK CO., TX

Page 47 of 84

73199 - DCP MIDSTREAM, LP - BEE CO., TX73214 - DEFS - PETTUS, BEE CO., TX73232 - DEFS - GOLIAD COUNTY, TX73242 - COASTAL OIL & GAS - PAWLIK #1, LIVE OAK CO., TX73244 - WINN EXPLORATION/KERLICK #1 - DEWITT COUNTY, TX (REC)73276 - HURD ENTERPRISES - LUKER #2, GOLIAD CO., TX (REC)73341 - CIMA ENERGY LTD - GATH. SYSTEM / DEWITT CO., TX (REC)73452 - DEFS/SOUTHERN RESOURCES GATH. - BEE CO., TX (REC)73454 - KALER ENERGY-CARPENTER #1/BEE CO., TX (REC)73482 - MAGNUM LP - CHICOLETE CREEK - LAVACA CO., TX (REC)73505 - DESF-ANGEL CITY GATHERING-GOLIAD CO. TX73604 - MILAGRO/WRIGHT MATERIALS-GOLIAD CO., TX73717 - ESENJAY PETROLEUM/HOBLIT UNIT #1-RUN 173810 - JAMES L NELSON OPERATING/GOEHRING GATHERING-FM 584-GOLIAD C73876 - ELLIOTT OIL&GAS/STEINDORF #1-FM 799-BEE CO., TX

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Hempstead to Huntsville Line 11 (ETX) - Pipeline Maintenance: Cleaning Tool Date: CompleteIn-Line Tool Dates: CompletePotential Repair Dates: Complete Potential Run Comparison Repair Dates: VS6: October 3 - 10

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Line 11 between Provident City and Hempstead stations. During the cleaning and in-line inspection tool runs, the following meters may experience lower than normal pressures or be unavailable for flow:

73249 - ENTERGY - LEWIS CREEK / MONTGOMERY COUNTY, TX

Additionally, if further detailed investigations are required, the meters listed below could experience lower than normal pressure or be unavailable for flow during the potential repair dates:

72964ELLIOT OIL & GAS, BROWDER #C-1, SAN JACINTO CO., TX (REC)73175MME DESOTO PIPELINE, L.P. - PRAIRIE VIEW, TX - REC73249ENTERGY - LEWIS CREEK / MONTGOMERY COUNTY, TX73364BRAMMER-BROWDER GATHERING-SAN JACINTO CO., TX (REC)73388MONTGOMERY GAS TRANSMISSION, INC. - MONTGOMERY CO., TX (DEL73391FAMCOR OIL - GOLDEN MINER #1 / SAN JACINTO CO., TX (REC)73461UNIVERSAL NATURAL GAS/INTERCONNECT - MONTGOMERY CO., TX (DE73477PRIME OPERATING COMPANY - MONEY WORT #1 - WALKER CO., TX (R73669SK&CO./MASSEY FERGUSON GATHERING, SAN JACINTO CO., TX75475MME DESOTO PIPELINE, LP - (D70475/R76475)75778LONE STAR GAS - WALLER, TX-(D72778/R76778)75858KCS TX INTRASTATE GAS PIPELINE (D72858/R76858)

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Page 48 of 84

Hempstead to Huntsville Line 11 (ETX) - Pipeline Maintenance: October 3 - 10To comply with the applicable regulatory requirements associated with TE ongoing DOT Pipeline Integrity Program, TE will be conducting further detailed investigations on Line 11 VS6 (a single line system) between Hempstead and Huntsville stations. As a result of these investigations, the following meters will be unavailable for flow:

72964 - ELLIOT OIL & GAS, BROWDER #C-1, SAN JACINTO CO., TX (REC)73249 - ENTERGY - LEWIS CREEK / MONTGOMERY COUNTY, TX73364 - BRAMMER-BROWDER GATHERING-SAN JACINTO CO., TX (REC)73391 - FAMCOR OIL - GOLDEN MINER #1 / SAN JACINTO CO., TX (REC)73477 - PRIME OPERATING COMPANY - MONEY WORT #1-WALKER CO., TX R73669 - SK&CO./MASSEY FERGUSON GATHERING, SAN JACINTO CO., TX75858 - KCS TX INTRASTATE GAS PIPELINE (D72858/R76858)

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Castor to EOL Line 11 - Pipeline Maintenance: October 14 - 15 TE will be conducting pipeline maintenance on Line 11 between Castor and the end of the line. During this maintenance the following meters will be unavailable for flow:

70065 - TEXAS GAS TRANSMISSION - LISBON, LA (DELIVERY)73134 - PANENERGY FIELD SERVICES - LINCOLN PARISH, LA75078 - KOCH GATEWAY - CASTOR, LA-(D70078/R76078)

Additionally, the follow following meters may experience lower than normal pressures:

70192 - SMITH (HARVEY BROYLE)#2 MURPHY-BRYCELAND, BIENVILLE PSH., L70970 - NGC ENERGY RESOURCES - SLIGO GAS PLANT, LA (RECEIPT)72307 - JEEMS BAYOU - #1 CALHOUN / DESOTO PSH., LA72718 - SMITH OPER. (HARVEY BROYLE M.P. 0.00) - BIENVILLE PSH. LA72808 - COMSTOCK RESOURCES - #1 DESOTO - DESOTO PSH., LA73168 - WILLAMETTE INDUSTRIES - BIENVILLE PARISH, LA73328 - PETROCHEM OPERATING / LOTT #1 - BOSSIER PARISH, LA (REC)73523 - ENTERPRISE GATHERING LLC/BETHANY-DESOTO PARISH, LA-RUN 173672 - ENERGY TRANSFER/TIGER PIPELINE BIENVILLE, LA75688 - GULF STATES PIPELINE - BIENVILLE PA. LA-(D72688/R7

Based on current nomination levels TE doesn't anticipate any restrictions at this time.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

?Angleton to Mont. Belvieu Line 16 - Pipeline Maintenance: Cleaning Tool Date: CompleteGauge Tool Date: CompleteIn-Line Tool Date: CompletePotential Repair Dates: October 29 - November 4

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Page 49 of 84

Project, TE will be conducting in-line inspection tool runs on Line 16 between Angleton and Mont. Belvieu stations. During the cleaning and in-line inspection tool runs, the following meters may experience lower than normal pressures or be unavailable for flow:

70129 - LOUIS DREYFUS72382 - HOUSTON PIPE LINE CO.-ENERFIN LYONDELL SYS./ HARRIS CO., TX72837 - MONUMENT PIPELINE, LP - HARRIS COUNTY, TX72877 - DENBURY ONSHORE, LLC73539 - NET LP - MONUMENT PIPELINE - HARRIS COUNTY, TX73590 - NRG - CEDAR BAYOU73811 - ENTERPRISE PRODUCTS/WALLACE JUNCTION75300 - TEJAS GAS/CLEAR LK. STOR75301 - CALPINE BAYER PWR. PLANT ACCT. PT.

Additionally, if further detailed investigations are required, the meters listed above could experience lower than normal pressure or be unavailable for flow during the potential repair dates.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

24" System Longview to Berne:

***Gas City to Lebanon Line 69 - Pipeline Maintenance: July 21 - August 18

TE will be conducting pipeline maintenance on Line 69 between Gas City and Lebanon compressor stations. During this work, the following meters will be unavailable for flow:

72909 - DAYTON PWR & LT - RED LION, OH72911 - COL. GAS (I-O) & LEBANON, OH

Norris city to French Lick Line 1 VS4 - Pipeline Maintenance: August 24 - 27 To comply with the applicable regulatory requirements associated with TE ongoing DOT Pipeline Integrity Program, TE will be conducting further detailed investigations on Line 1 VS4 (a single line system) between Norris city and French Lick stations. Based on current nominations levels, TE doesn't anticipate any additional restrictions associated with this outage.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Norris City to Oakland City Line 72 (Vermilion Lateral) - Pipeline MaintenanceCleaning Tool Dates: Deferred to 2016In-Line Tool Date: Deferred to 2016Potential Repair Dates: Deferred to 2016

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Norris City to Oakland City Line 72. During the tool run and depending on the results of the ILI Tool runs and if further detailed investigations are required, the following meter may experience lower than normal pressures or be unavailable for flow:

73623 - DUKE ENERGY VERMILLION II, LLCPage 50 of 84

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

30 Inch System and Market Area:

Wheelersburg Compressor Station: July 20 - Aug 22

TE will be conducting compressor station maintenance at its Wheelersburg Compressor Station. During this outage TE anticipates that point operators on the 30 inch line south of Wheelersburg may see lower than normal operating pressures.

Additionally, during the timeframes detailed below, north to south capacity through stations on the 30 inch line will be reduced as follows:

July 27 - August 19

Posted:Reduced to approximately:Berne 30" South1,218,000 Dth /d1,118,000 Dth /dWheelersburg South 957,000 Dth /d 857,000 Dth /dTompkinsville South 734,000 Dth /d 634,000 Dth /dBarton South 606,000 Dth /d 506,000 Dth /d

Based on historical north to south nominations TE anticipates restrictions for interruptible and secondary firm nominations flowing north to south through Berne, Wheelersburg, Tompkinsville and Barton.

TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

?Delmont to Lilly Line 12 - Pipeline MaintenanceILI Tool Runs: CompletePotential Repair Dates: August 6 - 31

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Delmont to Lilly Line 12. Depending on the results of the ILI Tool runs and if further detailed investigations are required, the following meter may experience lower than normal pressures or be unavailable for flow:

73543 - XTO ENERGY INC. - EAST WHEATFIELD INTERCONNECT - CAMBRIA CO

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Heidlersburg to Marietta 36" Line 1-AF - Pipeline MaintenanceCaliper & ILI Tool Runs: CompletePotential Repair Dates: August 17 - 22

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on the Heidlersburg to Marietta 36" Line 1-AF. During the tool run and depending on the results of the ILI Tool runs and if further detailed investigations are

Page 51 of 84

required, the following meter may experience lower than normal pressures or be unavailable for flow:

73703 - WILLIAMS-TRANSCO, LOWER CHANCEFORD-YORK CO., PA.73718 - COLUMBIA-MARIETTA, LANCASTER CO., PA

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Bedford Compressor Station Maintenance: August 17 -- 30

TE will be conducting compressor station maintenance at its Bedford Compressor Station. During this outage capacity through Bedford will be reduced to approximately 1,939,000 Dth /d for nominations delivering to locations between Bedford and up to Lambertville on TE's 36 inch line.

Based on current nominations levels, TE doesn't anticipate any restrictions associated with this outage.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

?Lilly to Entriken Line 12 - Pipeline MaintenanceILI Tool Runs: CompletePotential Repair Dates: September 2 - 30

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Lilly to Entriken Line 12. Depending on the results of the ILI Tool runs and if further detailed investigations are required, the following meters may experience lower than normal pressures or be unavailable for flow:

70323 - PEOPLES NAT - CLAYSBURG, PA71189 - UGI CENTRAL - VALLEY GAS - MARTINSBURG, PA71455 - UGI CENTRAL - HUNTINGDON GAS - MAPLETON, PA70266 - UGI CENTRAL - HUNTINGDON GAS - HUNTINGDON, PA70308 - UGI CENTRAL - LEWISTOWN - JUNIATA CO., PA

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Marietta Compressor Station Maintenance: September 9 - October 9

TE will be conducting compressor station maintenance at its Marietta Compressor Station. During this maintenance, capacity through Marietta will be reduced from a seasonal capacity of 1,848,000 Dth /d to approximately 1,335,000 Dth /d for nominations delivering to locations between Marietta and up to Lambertville on TE's 36 inch line.

Based on historical nominations through Marietta, TE anticipates restrictions for interruptible, secondary firm and potentially primary firm services.

Holbrook to Uniontown Lines 10 and 30 - Pipeline Maintenance: September 21 - 25Page 52 of 84

TE will be conducting pipeline maintenance on Lines 10 and 30 between Holbrook and Uniontown compressor stations. During this work, the following meter will be unavailable for flow:

73813 - ACCESS MIDSTREAM / WIND RIDGE-MCNAY RIDGE ROAD - GREENE CO.

Holbrook to Uniontown Line 25 - Pipeline Maintenance: September 26 - October 21

TE will be conducting pipeline maintenance on Line 25 between Holbrook and Uniontown compressor stations. During this work, the following meter will be unavailable for flow:

73808 - DTI - CRAYNE LL, RT 188, GREENE CO., PA.

Kosciusko Compressor Station: October 12 - 18

TE will be conducting compressor station maintenance at its Kosciusko Compressor Station. Based on current north to south nomination levels through Kosciusko, no restrictions are anticipated; however if restrictions are necessary, restrictions to interruptible and secondary firm nominations flowing north to south through Berne, Wheelersburg, Tompkinsville and Barton are possible.

TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Athens to Berne - Pipeline Maintenance: TBD

TE will be conducting pipeline maintenance between Athens and Berne stations. During this work, the following meter will be unavailable for flow:

73297 - DUKE ENERGY WASHINGTON II, LLC

Mt. Pleasant to Gladeville Line 25 VS5- DOT Pipe Replacement: 2016

TE will be conducting a DOT pipe replacement between Mt. Pleasant and Gladeville stations on Line 25 VS5. During this work, the following meter will be unavailable for flow:

73423 - PIEDMONT NATURAL GAS - RUTHERFORD

Texas Eastern DOT Pipeline Integrity Project

TE will be conducting, as part of its ongoing DOT Pipeline Integrity Project, in-line inspection tool runs at various locations throughout the Texas Eastern pipeline system. As a result of these in-line inspections, certain locations could be identified for an investigation which could lead to possible reduction of capacity. Should any of these investigations lead to a reduction of capacity, TE will post on the bulletin board as soon as it is known. Listed below are the pipeline segments scheduled for inspection this year. Each segment will have a caliper tool run, and an ILI tool run. Also listed below are the dates of a possible investigation as a result of the in-line inspection.

CaliperILIPossible Run CompSegment Access AreaDateDateRepl DtPoss Repl Dt

Page 53 of 84

Blessing to Tivoli (Line 16)* ---12/10/1503/01/1603/01/16Tivoli to Petronilla (Line 16)* ---Complete04/15/1505/15/15Petronilla to Santa Fe (Line 16)* ---12/09/1503/01/1603/01/16Santa Fe to PEMEX EOL (Line 16)* ---CompleteCompleteCompleteHempstead to Huntsville (Line 11)* ---Complete10/03/1510/03/15Opelousas to St. Francisville (Line 14) ---CompleteCompleteAugustSt. Francisville to Union Church (Line 18) ---201620162016Union Church to Clinton (Line 14) ---CompleteNovemberNovemberAtlanta to Hope (Line 1)* ---09/21/1511/30/1512/20/15Donaldson to North Little Rock (Line 1)* ---09/24/1512/14/1501/07/16Providence to Yazoo City (Line 26)* ---Complete08/18/1509/09/15Blessing to Angleton (Line 16)* ---Complete09/20/1510/15/15Angleton to Mont Belvieu (Line 16)* CompleteComplete10/29/15 ---

CaliperILIPossible Run CompSegment M1/M2 AreaDateDateRepl DtPoss Repl DtNorris City to Oakland City (Line 72)* ---20162016 ---Owingsville to Wheelersburg (Line 15) ---Complete08/03/15 ---Wheelersburg to Athens (Line 15) ---Complete09/01/15 ---Holbrook to Uniontown (Line 10) ---20162016 ---

CaliperILIPossible Run CompSegment M3 AreaDateDateRepl DtPoss Repl DtLambertville to Linden (Line 1)CompleteComplete08/10/15 ---Heidlersburg to Marietta (Line 1-AF)* ---Complete08/17/15 ---Perulack to Shermansdale (Line 27) ---TBDTBD ---Perulack (Line 24-AUX1) ---08/27/1510/15/15 ---Delmont to Lilly (Line 12)*CompleteComplete08/05/15 ---Lilly to Entriken (Line 12)*CompleteComplete08/31/15 ---

As a result of prior DOT mandated investigations, the following locations have been identified as requiring additional evaluation which may require a reduction of capacity. Should any of these investigations lead to a reduction of capacity, TE will post on the bulletin board as soon as it is known:

Angleton to Mont. Belvieu (Line 16)Angleton to Mont. Belvieu (Line 16-PP)Armagh to Lilly (Line 12)Armagh to Lilly (Line 19)Atlanta to Hope (Line 1)Bernville to Bechtelsville (Line 12)Blessing to Angleton (Line 16)Blessing to Tivoli (Line 16)Carthage to Longview (Line 13)Chambersburg to Marietta (Line 2)Chambersburg to Heidlersburg (Line 2-U)Clinton to Kosciusko (Line 14)Danville to Owingsville (Line 10)Danville to Owingsville (Line 15)Danville to Owingsville (Line 25)Delmont to Lilly (Line 12)Delmont to Lilly (Line 19)Delmont to Lilly (Line 27)

Page 54 of 84

Delmont to Armagh (Line 19)Delmont to Armagh (Line 27-1)Delmont to Armagh (Line 27-2)Donaldson to N. Little Rock (Line 1)Donaldson to N. Little Rock (Line 1-AUX-1)Eagle to Lambertville (Line 1)Eagle to Lambertville (Line 2)Entriken to Perulack (Line 19)French Lick to Seymour (Line 1)Gillis to Opelousas (Line 14)Gladeville to Tompkinsville (Line 10)Gladeville to Tompkinsville (Line 15)Grantville to Bernville (Line 12)Grantville to Bernville (Line 19)Grantville to Bernville (Line 28)Holbrook to Uniontown (Line 9)Holbrook to Uniontown (Line 10)Hope to Donaldson (Line 1)Kosciusko to Egypt (Line 10)Kosciusko to Egypt (Line 15)Lambertville to Linden (Line 1)Lambertville to Linden (Line 2)Lambertville to Linden (Line 20-B)Lambertville to Linden (Line 20-D)Longview to Atlanta (Line 1)Longview to Atlanta (Line 1N)Lilly to Entriken (Line 12)Lilly to Entriken (Line 12-Aux-1)Lilly to Entriken (Line 27-Aux-1)Mt. Pleasant to Gladeville (Line 25)Norris City to Oakland City (Line 1)Oakland City to French Lick (Line 1)Perulack to Grantville (Line 19)Perulack to Leidy (Line 24)Perulack to Shermansdale (Line 24 Aux-1)Perulack to Shermansdale (Line 27)Perulack to Leidy (Line 37)Pollard to Oran (Line 1)Provident to Yazoo (Line 26)Providence City to Hempstead (Line 11-H)Provident City to Hempstead (Line 11)Provident City to Thomaston (Line 21)Red River to Castor (Line 11)Shermansdale to Grantville (Line 19)St. Francisville to Union Church (Line 14)St. Francisville to Union Church (Line 18)Thomaston to Provident City (Line 21)Tivoli to Petronilla (Line 16)Union Church to Clinton (Line 14)Union Church to Clinton (Line 18)Uniontown to Delmont (Line 9)Uniontown to Delmont (Line 39)Vidor to Gillis (Line 14)

Page 55 of 84

West Monroe to Providence (Line 26)Wheelersburg to Athens (Line 10)Wheelersburg to Athens (Line 15)

Download File: TE 2015 Maintenance Schedule Rev21.docx

Page 56 of 84

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Not a critical noticeNotice Eff Date/Time: 08/18/2015 03:50:00 PMNotice End Date/Time: 11/01/2015 09:00:00 AMNotice ID: 52047Notice Stat Desc: SupersedeNotice Type: MaintenancePost Date/Time: 08/18/2015 03:50:00 PMPrior Notice: 51960Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE 2015 Maintenance Schedule -- Revised

Notice Text: The text below is included in the attached Word document located at the bottom of this posting.

Listed below is a partial schedule for major outages that will affect capacity or that impact major receipt/delivery areas on the Texas Eastern Transmission (TE) system for the 2015 outage season. This schedule is not a complete list of all outages that will occur during the 2015 outage season. Due to unforeseen delays or scheduling conflicts, the dates below are subject to change. As TE continues to plan for the 2015 outage season, updates to the list below will be posted at the earliest known date.

Access Area Longview to Kosciusko:

Blessing to PEMEX Mexico EOL Line 16 (STX): Cleaning Tool Dates: See specific schedules belowIn-Line Tool Dates: See specific schedules belowPotential Repair Dates: See specific schedules belowPotential Run Comparison Repair Dates: See specific schedules below

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Line 16 between Blessing and PEMEX Mexico EOL. TE will coordinate system receipts and deliveries with point operators to minimize operational impacts, however, during the cleaning and in-line tools, meters listed below will be required to flow/shut in as follows:

Blessing to Tivoli:Cleaning Tool Dates: Fall 2015In-Line Tool Dates: December 10Potential Repair Dates: March 2016Potential Run Comparison Repair Dates: March 2016

The following meters may be unavailable for flow:73113 - ENTERPRISE TEXAS PIPELINE LLC - HIDALGO COUNTY, TX73719 - T2 GAS UTILITY LLC/REFUGIO INTERCONNECT

Tivoli to Petronilla:Cleaning Tool Dates: Fall 2015In-Line Tool Dates: CompletePotential Repair Dates: Approximately March 24 - mid SeptemberPotential Run Comparison Repair Dates: May 15 - mid September

Page 57 of 84

The following meters will be unavailable for flow during the cleaning and in-line tool runs:73617 - ONYX PIPELINE/NUECES BAY73618 - ONYX PIPELINE/BARNEY DAVIS

The following meters will be unavailable for flow until the cleaning and in-line tools passes the meter:73310 - SOUTH SHORE P/L (NE&T), NUECES CO., TX 72603 - CROSSTEX ENERGY (FROM TE) UPRIVER RD., NUECES CO73719 - T2 GAS UTILITY LLC/REFUGIO INTERCONNECT

The following meters will be required to flow for the duration of the cleaning and in-line tool runs:73258 - MAGIC VALLEY P/L-CALPINE PWR. PROJECT (DEL)/HIDALGO73223 - DEFS, LP - EDINBURG POWER PLANT - HIDALGO CO., TX75333 - PEMEX - REYNOSA, MX (D 70333/R 76333)

Petronilla to Santa Fe:Cleaning Tool Dates: Fall 2015In-Line Tool Dates: December 9Potential Repair Dates: March 2016Potential Run Comparison: March 2016

The following meters will be unavailable for flow during the cleaning and in-line tool runs:73617 - ONYX PIPELINE/NUECES BAY73618 - ONYX PIPELINE/BARNEY DAVIS

The following meters will be required to flow for the duration of the cleaning and in-line tool runs:73258 - MAGIC VALLEY P/L-CALPINE PWR. PROJECT (DEL)/HIDALGO73223 - DEFS, LP - EDINBURG POWER PLANT - HIDALGO CO., TX 75333 - PEMEX - REYNOSA, MX (D 70333/R 76333)

Santa Fe to PEMEX Mexico (EOL):Cleaning Tool Dates: CompleteIn-Line Tool Dates: CompletePotential Repair Dates: CompletePotential Run Comparison Repair Dates: Complete

The following meters will be unavailable for flow during the cleaning and in-line tool runs:73617 - ONYX PIPELINE/NUECES BAY73618 - ONYX PIPELINE/BARNEY DAVIS73258 - MAGIC VALLEY P/L-CALPINE PWR. PROJECT (DEL)/HIDALGO73223 - DEFSDEFS, LP - EDINBURG POWER PLANT - HIDALGO CO., TX

The following meter will be required to flow for the duration of the cleaning and in-line tool runs:75333 - PEMEX - REYNOSA, MX (D 70333/R 76333)

As a result of these in-line inspections, certain locations could require further detailed investigations, which may require TE to isolate Line 16 between Blessing and PEMEX Mexico EOL. If an isolation of Line 16 is required, shippers sourcing gas for delivery points located between Blessing and PEMEX EOL will be required to source their supply from receipt points between Blessing and PEMEX EOL. Additionally, any gas sourced between Blessing and PEMEX EOL for delivery outside of this area may be restricted. Depending on the level of nominated quantities, if further investigations are required, restrictions are possible for interruptible, secondary firm services and primary firm services.

Page 58 of 84

Should any of these investigations lead to a reduction of capacity, TE will post on the bulletin board as soon as it is known. TE estimates that the investigations will begin on April 9 continuing through May 29.

West Monroe to Providence Line 26 (ELA): July 15 - August 21To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Program, TE will be conducting further investigations on Line 26 (a single line system) between West Monroe and Providence Stations. During these investigations the following meters may experience lower than normal pressures or be unavailable for flow:

71000 - GULF SOUTH PIPELINE COMPANY, LP - WEST MONROE, LA (RECEIPT71704 - GULF SOUTH PIPELINE COMPANY, LP - DARNELL, LA (DELIVERY)72568 - RELIANT ENERGY GAS TRANSMISSION - WEST MONROE, LA72614 - TRANSOK - OUACHITA PSH., LA

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Blessing Compressor Station Maintenance: August 15 - 31

TE will be conducting compressor station maintenance at its Blessing Compressor Station. During this maintenance, capacity through Blessing will be reduced to approximately 285,000 Dth /d. Based on current nomination levels through Blessing, TE doesn't anticipate restrictions resulting from this outage, however if restrictions are required, restrictions to interruptible nominations may be necessary.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

TE / SESH Interconnect (Dentville): August 18 - 21 TE has been informed by Southeast Supply Header, LLC ("SESH") of the following outage below which will impact receipts and deliveries to/from SESH at the TE / SESH pipeline interconnect MR75583.

Southeast Supply Header, LLC (SESH) will be performing construction at the SESH interconnection with Texas Eastern Transmission, LP (Texas Eastern) associated with the expansion approved in FERC Docket No. CP14-87. In accordance with the provisions of its FERC Gas Tariff, SESH notifies its shippers that these construction activities will result in a service outage on the SESH system as described below.

During a 4 day period beginning on Gas Day August 18, 2015 at 9:00 am and continuing until August 22, 2015 at 9:00 am, service at the Texas Eastern interconnection (MR 83005) will be unavailable for either receipt or delivery point activity. This outage will not result in any service impacts to the pipeline capacity on the SESH system and all other receipt and delivery points will be available for service.

Providence to Yazoo Line 26 (ELA) - Pipeline Maintenance: In-Line Tool Dates: CompletePotential Repair Dates: August 18 - 25 Potential Run Comparison Repair Dates: September 10 - 18

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Line 26 between Providence and Yazoo stations. During the in-line inspection tool run, the following meters may experience lower than normal

Page 59 of 84

pressures or be unavailable for flow:

71000 - GULF SOUTH PIPELINE COMPANY, LP - WEST MONROE, LA (RECEIPT71704 - GULF SOUTH PIPELINE COMPANY, LP - DARNELL, LA (DELIVERY)72568 - RELIANT ENERGY GAS TRANSMISSION - WEST MONROE, LA72614 - TRANSOK - OUACHITA PSH., LA73106 - FEDERAL BUREAU OF PRISON - YAZOO CO. MS

Additionally, if further detailed investigations are required, the meters listed above could experience lower than normal pressure or be unavailable for flow during the potential repair dates.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Donaldson to North Little Rock Line 1 - Pipeline Maintenance: August 28 - September 11 TE will be conducting pipeline maintenance on Line 1 between Donaldson and North Little Rock stations. During this maintenance TE will be required to isolate its Line 1 mainline (24 inch) that crosses the Arkansas River.

Based on current nominations levels, TE doesn't anticipate any restrictions associated with this outage.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.?Atlanta to Hope Line 1 - Pipeline Maintenance: Cleaning Tool Dates: September 12 - 21 In-Line Tool Dates: September 21Potential Repair Dates: November 30 - December 13Potential Run Comparison Repair Dates: December 20 - January 6, 2016

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Line 1 between Atlanta and Hope stations. During the cleaning and in-line inspection tool run, the following meter will be unavailable for flow while the tool passes the meter:

72871 - NORAM - BODCAW, AR

Additionally, if further detailed investigations are required, the meter listed above could experience lower than normal pressure or be unavailable for flow during the potential repair dates.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Donaldson to North Little Rock Line 1 - Pipeline Maintenance: Cleaning Tool Dates: September 14 - 18 In-Line Tool Dates: September 24Potential Repair Dates: December 14 - 21 Potential Run Comparison Repair Dates: January 7 - 21

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line cleaning and inspection tool runs on Line 1 between Donaldson and

Page 60 of 84

North Little Rock stations. Based on current nominations and flow levels no restrictions are anticipated during the cleaning tool runs, however if nominations and/or flow levels change, the following meter may be required to shut-in during the cleaning tool run:

73667 - HOT SPRING POWER PLANT, HOT SPRING CO, AR

Additionally, during the in-line inspection tool run, the following meter will be unavailable for flow:

73667 - HOT SPRING POWER PLANT, HOT SPRING CO, AR

If further detailed investigations are required, the meter listed above could experience lower than normal pressure or be unavailable for flow during the potential repair dates.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.?Yazoo to Kosciusko Line 26 (ELA) - Pipeline Maintenance: September 15 - 19 TE will be conducting pipeline maintenance on Line 26 between Yazoo and Kosciusko stations. During this maintenance the following meters will be unavailable for flow:

71000 - GULF SOUTH PIPELINE COMPANY, LP - WEST MONROE, LA (RECEIPT71704 - GULF SOUTH PIPELINE COMPANY, LP - DARNELL, LA (DELIVERY)72568 - RELIANT ENERGY GAS TRANSMISSION - WEST MONROE, LA72614 - TRANSOK - OUACHITA PSH., LA73141 - MISSISSIPPI CHEMICAL - YAZOO CITY, MS

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Blessing to Angleton Line 16 - Pipeline Maintenance: Cleaning Tool Dates: CompleteILI In-Line Tool Dates: CompletePotential Repair Dates: September 20 - October 7 Potential Run Comparison Dates: October 15 - 31

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting cleaning and in-line inspection tool runs on Line 16 between Blessing and Angleton stations.

During the cleaning tool runs, the following meters will be unavailable until the pig passes the meters:

73694 - SWEENY PLANT-CONOCO PIPELINE75558 - TRES PALACIOS GAS STORAGE - INJ/DEL

During the ILI in-line tool runs, the following meters will be unavailable for the duration of the tool run:

73694 - SWEENY PLANT-CONOCO PIPELINE75558 - TRES PALACIOS GAS STORAGE - INJ/DEL

Additionally, the following meters could experience lower than normal pressure during all cleaning and ILI tool runs:72451 - WILMAR PIPELINE, INC. - #1 DUNCAN SLOUGH, MATAGORDA CO., T

Page 61 of 84

72601 - ENTERPRISE TEXAS PIPELINE LLC - MATAGORDA COUNTY, TX (REC)73148 - DEEP ROCK RESOURCES - FLOWERS / MATAGORDA CO., TX - RUN 0173283 - UNION PETROLEUM, LTD (LINE 16LL) - BRAZORIA CO., TX73338 - SANTOSUSA CORP73407 - CHESAPEAKE OPERATING INC-ANKENMEN GATHERING, BRAZORIA CO.,73412 - BUCKEYE RANCH GATHERING - MATAGORDA CO., TX73481 - ASPECT ENERGY - BINTLIFF GATHERING - BRAZORIA CO., TX73504 - WALTER OIL & GAS-KASMAN GATHERING - MATAGORDA CO., TX73626 - DAVIS SOUTHERN/BINTLIFF #1

Additionally, if further detailed investigations are required, all meters listed above could experience lower than normal pressure or be unavailable for flow during the potential repair dates.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Thomaston to Provident City Line 21 - Pipeline Maintenance: September 22 - 23 To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Program, TE will be conducting further detailed investigations on Line 21 (a single line system) between Thomaston and Provident City Stations. During these investigations, TE will be required to isolate Line 21 at mile post 28.43. As a result of this isolation the following meters will be unavailable for flow:

70633 - B&T OIL CO., YOWARD C.P. - BEE CO., TX70655 - DEVON ENERGY PRODUCTION COMPANY, L.P- SOUTHWEST GOHLKE CP70675 - MOSBACHER-MORGAN #1, LIVE OAK CO. TX70689 - WOFFORD #1 CHILDREN'S HOME - BEE CO., TX70691 - INCA OIL & GAS CO..-#1 WILKINSON, GOLIAD CO., TX70912 - BRITANCO, LLC WILCOX - TULETA CP, BEE CO., TX71290 - BRITANCO, LLC - LOMA ALTA HAGIST CP, DUVAL CO., TX71607 - VICTORIA OPERATING - ANNA BARRE FIELD, DEWITT CO., TX (REC71773 - JAMES L. NELSON - JUNKER, DEWITT CO., TX71862 - BRITANCO, LLC - #1D GOREE, BEE CO., TX72103 - WELDER EXPLORATION&PRODUCTION- #1 YOUNG, BEE CO., TX72249 - TRI-UNION DEV. CORP.-#1 WRIGHT / GOLIAD COUNTY, TX (REC)72309 - CHAPARRAL ENERGY, L.L.C. - #1 HESTER, GOLIAD CO., TX72457 - GMT GAS MARKETING - #1 VAL HOLTZ, DEWITT CO., TX (REC)72621 - WILLIAMS FIELD SERVICES - DUVAL CO., TX72626 - WING CORP - C.P., DEWITT COUNTY, TX (REC)72654 - BLUESTONE NATURAL RESOURCES, LLC- BONNE TERRE FIELD, MCMULL72723 - ABRAXAS PETROLEUM CORP.- TIPTON LEASE / GOLIAD CO., TX (REC72950 - APTIAN GAS CORP., K.W. SCHREINER #1 - LIVE OAK CO., TX72951 - APTIAN GAS CORP., SCHREINER RANCH - LIVE OAK CO., TX72963 - AUBURN ENTERPRISES - KERLICK #1, DEWITT, TX73139 - DCP MIDSTREAM, LP- #1 DIEBEL, GOLIAD CO., TX73164 - DCP MIDSTREAM, LP - GOLIAD CO., TX73165 - SANCHEZ O'BRIEN-BODDEN FROST, LIVE OAK CO., TX73199 - DCP MIDSTREAM, LP - BEE CO., TX73214 - DEFS - PETTUS, BEE CO., TX73232 - DEFS - GOLIAD COUNTY, TX73242 - COASTAL OIL & GAS - PAWLIK #1, LIVE OAK CO., TX73244 - WINN EXPLORATION/KERLICK #1 - DEWITT COUNTY, TX (REC)73276 - HURD ENTERPRISES - LUKER #2, GOLIAD CO., TX (REC)

Page 62 of 84

73341 - CIMA ENERGY LTD - GATH. SYSTEM / DEWITT CO., TX (REC)73452 - DEFS/SOUTHERN RESOURCES GATH. - BEE CO., TX (REC)73454 - KALER ENERGY-CARPENTER #1/BEE CO., TX (REC)73482 - MAGNUM LP - CHICOLETE CREEK - LAVACA CO., TX (REC)73505 - DESF-ANGEL CITY GATHERING-GOLIAD CO. TX73604 - MILAGRO/WRIGHT MATERIALS-GOLIAD CO., TX73717 - ESENJAY PETROLEUM/HOBLIT UNIT #1-RUN 173810 - JAMES L NELSON OPERATING/GOEHRING GATHERING-FM 584-GOLIAD C73876 - ELLIOTT OIL&GAS/STEINDORF #1-FM 799-BEE CO., TX

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Hempstead to Huntsville Line 11 (ETX) - Pipeline Maintenance: Cleaning Tool Date: CompleteIn-Line Tool Dates: CompletePotential Repair Dates: Complete Potential Run Comparison Repair Dates: VS6: October 3 - 10

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Line 11 between Provident City and Hempstead stations. During the cleaning and in-line inspection tool runs, the following meters may experience lower than normal pressures or be unavailable for flow:

73249 - ENTERGY - LEWIS CREEK / MONTGOMERY COUNTY, TX

Additionally, if further detailed investigations are required, the meters listed below could experience lower than normal pressure or be unavailable for flow during the potential repair dates:

72964ELLIOT OIL & GAS, BROWDER #C-1, SAN JACINTO CO., TX (REC)73175MME DESOTO PIPELINE, L.P. - PRAIRIE VIEW, TX - REC73249ENTERGY - LEWIS CREEK / MONTGOMERY COUNTY, TX73364BRAMMER-BROWDER GATHERING-SAN JACINTO CO., TX (REC)73388MONTGOMERY GAS TRANSMISSION, INC. - MONTGOMERY CO., TX (DEL73391FAMCOR OIL - GOLDEN MINER #1 / SAN JACINTO CO., TX (REC)73461UNIVERSAL NATURAL GAS/INTERCONNECT - MONTGOMERY CO., TX (DE73477PRIME OPERATING COMPANY - MONEY WORT #1 - WALKER CO., TX (R73669SK&CO./MASSEY FERGUSON GATHERING, SAN JACINTO CO., TX75475MME DESOTO PIPELINE, LP - (D70475/R76475)75778LONE STAR GAS - WALLER, TX-(D72778/R76778)75858KCS TX INTRASTATE GAS PIPELINE (D72858/R76858)

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Hempstead to Huntsville Line 11 (ETX) - Pipeline Maintenance: October 3 - 10To comply with the applicable regulatory requirements associated with TE ongoing DOT Pipeline Integrity Program, TE will be conducting further detailed investigations on Line 11 VS6 (a single line system) between Hempstead and Huntsville stations. As a result of these investigations, the following meters will be unavailable for flow:

Page 63 of 84

72964 - ELLIOT OIL & GAS, BROWDER #C-1, SAN JACINTO CO., TX (REC)73249 - ENTERGY - LEWIS CREEK / MONTGOMERY COUNTY, TX73364 - BRAMMER-BROWDER GATHERING-SAN JACINTO CO., TX (REC)73391 - FAMCOR OIL - GOLDEN MINER #1 / SAN JACINTO CO., TX (REC)73477 - PRIME OPERATING COMPANY - MONEY WORT #1-WALKER CO., TX R73669 - SK&CO./MASSEY FERGUSON GATHERING, SAN JACINTO CO., TX75858 - KCS TX INTRASTATE GAS PIPELINE (D72858/R76858)

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Castor to EOL Line 11 - Pipeline Maintenance: October 14 - 15 TE will be conducting pipeline maintenance on Line 11 between Castor and the end of the line. During this maintenance the following meters will be unavailable for flow:

70065 - TEXAS GAS TRANSMISSION - LISBON, LA (DELIVERY)73134 - PANENERGY FIELD SERVICES - LINCOLN PARISH, LA75078 - KOCH GATEWAY - CASTOR, LA-(D70078/R76078)

Additionally, the follow following meters may experience lower than normal pressures:

70192 - SMITH (HARVEY BROYLE)#2 MURPHY-BRYCELAND, BIENVILLE PSH., L70970 - NGC ENERGY RESOURCES - SLIGO GAS PLANT, LA (RECEIPT)72307 - JEEMS BAYOU - #1 CALHOUN / DESOTO PSH., LA72718 - SMITH OPER. (HARVEY BROYLE M.P. 0.00) - BIENVILLE PSH. LA72808 - COMSTOCK RESOURCES - #1 DESOTO - DESOTO PSH., LA73168 - WILLAMETTE INDUSTRIES - BIENVILLE PARISH, LA73328 - PETROCHEM OPERATING / LOTT #1 - BOSSIER PARISH, LA (REC)73523 - ENTERPRISE GATHERING LLC/BETHANY-DESOTO PARISH, LA-RUN 173672 - ENERGY TRANSFER/TIGER PIPELINE BIENVILLE, LA75688 - GULF STATES PIPELINE - BIENVILLE PA. LA-(D72688/R7

Based on current nomination levels TE doesn't anticipate any restrictions at this time.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.?Angleton to Mont. Belvieu Line 16 - Pipeline Maintenance: Cleaning Tool Date: CompleteGauge Tool Date: CompleteIn-Line Tool Date: CompletePotential Repair Dates: October 29 - November 4

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Line 16 between Angleton and Mont. Belvieu stations. During the cleaning and in-line inspection tool runs, the following meters may experience lower than normal pressures or be unavailable for flow:

70129 - LOUIS DREYFUS72382 - HOUSTON PIPE LINE CO.-ENERFIN LYONDELL SYS./ HARRIS CO., TX72837 - MONUMENT PIPELINE, LP - HARRIS COUNTY, TX72877 - DENBURY ONSHORE, LLC

Page 64 of 84

73539 - NET LP - MONUMENT PIPELINE - HARRIS COUNTY, TX73590 - NRG - CEDAR BAYOU73811 - ENTERPRISE PRODUCTS/WALLACE JUNCTION75300 - TEJAS GAS/CLEAR LK. STOR75301 - CALPINE BAYER PWR. PLANT ACCT. PT.

Additionally, if further detailed investigations are required, the meters listed above could experience lower than normal pressure or be unavailable for flow during the potential repair dates.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

24" System Longview to Berne:

Norris city to French Lick Line 1 VS4 - Pipeline Maintenance: August 24 - 27 To comply with the applicable regulatory requirements associated with TE ongoing DOT Pipeline Integrity Program, TE will be conducting further detailed investigations on Line 1 VS4 (a single line system) between Norris city and French Lick stations. Based on current nominations levels, TE doesn't anticipate any additional restrictions associated with this outage.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Norris City to Oakland City Line 72 (Vermilion Lateral) - Pipeline MaintenanceCleaning Tool Dates: Deferred to 2016In-Line Tool Date: Deferred to 2016Potential Repair Dates: Deferred to 2016

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Norris City to Oakland City Line 72. During the tool run and depending on the results of the ILI Tool runs and if further detailed investigations are required, the following meter may experience lower than normal pressures or be unavailable for flow:

73623 - DUKE ENERGY VERMILLION II, LLC

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

30 Inch System and Market Area:

***Wheelersburg Compressor Station: July 20 - Aug 24TE will be conducting compressor station maintenance at its Wheelersburg Compressor Station. During this outage TE anticipates that point operators on the 30 inch line south of Wheelersburg may see lower than normal operating pressures.

Additionally, during the timeframes detailed below, north to south capacity through stations on the 30 inch line will be reduced as follows:

July 27 - August 24

Posted:Reduced to approximately:Page 65 of 84

Berne 30" South1,218,000 Dth /d1,118,000 Dth /dWheelersburg South 957,000 Dth /d 857,000 Dth /dTompkinsville South 734,000 Dth /d 634,000 Dth /dBarton South 606,000 Dth /d 506,000 Dth /d

Based on historical north to south nominations TE anticipates restrictions for interruptible and secondary firm nominations flowing north to south through Berne, Wheelersburg, Tompkinsville and Barton.

TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Delmont to Lilly Line 12 - Pipeline MaintenanceILI Tool Runs: CompletePotential Repair Dates: August 6 - 31

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Delmont to Lilly Line 12. Depending on the results of the ILI Tool runs and if further detailed investigations are required, the following meter may experience lower than normal pressures or be unavailable for flow:

73543 - XTO ENERGY INC. - EAST WHEATFIELD INTERCONNECT - CAMBRIA CO

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Bedford Compressor Station Maintenance: August 17 -- 30

TE will be conducting compressor station maintenance at its Bedford Compressor Station. During this outage capacity through Bedford will be reduced to approximately 1,939,000 Dth /d for nominations delivering to locations between Bedford and up to Lambertville on TE's 36 inch line.

Based on current nominations levels, TE doesn't anticipate any restrictions associated with this outage.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

***Heidlersburg to Marietta 36" Line 1-AF - Pipeline MaintenanceCaliper & ILI Tool Runs: CompletePotential Repair Dates: August 31 - September 5

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on the Heidlersburg to Marietta 36" Line 1-AF. During the tool run and depending on the results of the ILI Tool runs and if further detailed investigations are required, the following meter may experience lower than normal pressures or be unavailable for flow:

73703 - WILLIAMS-TRANSCO, LOWER CHANCEFORD-YORK CO., PA.73718 - COLUMBIA-MARIETTA, LANCASTER CO., PA

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Page 66 of 84

Lilly to Entriken Line 12 - Pipeline MaintenanceILI Tool Runs: CompletePotential Repair Dates: September 2 - 30

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Lilly to Entriken Line 12. Depending on the results of the ILI Tool runs and if further detailed investigations are required, the following meters may experience lower than normal pressures or be unavailable for flow:

70323 - PEOPLES NAT - CLAYSBURG, PA71189 - UGI CENTRAL - VALLEY GAS - MARTINSBURG, PA71455 - UGI CENTRAL - HUNTINGDON GAS - MAPLETON, PA70266 - UGI CENTRAL - HUNTINGDON GAS - HUNTINGDON, PA70308 - UGI CENTRAL - LEWISTOWN - JUNIATA CO., PA

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Marietta Compressor Station Maintenance: September 9 - October 9

TE will be conducting compressor station maintenance at its Marietta Compressor Station. During this maintenance, capacity through Marietta will be reduced from a seasonal capacity of 1,848,000 Dth /d to approximately 1,335,000 Dth /d for nominations delivering to locations between Marietta and up to Lambertville on TE's 36 inch line.

Based on historical nominations through Marietta, TE anticipates restrictions for interruptible, secondary firm and potentially primary firm services.

Holbrook to Uniontown Lines 10 and 30 - Pipeline Maintenance: September 21 - 25

TE will be conducting pipeline maintenance on Lines 10 and 30 between Holbrook and Uniontown compressor stations. During this work, the following meter will be unavailable for flow:

73813 - ACCESS MIDSTREAM / WIND RIDGE-MCNAY RIDGE ROAD - GREENE CO.

Holbrook to Uniontown Line 25 - Pipeline Maintenance: September 26 - October 21

TE will be conducting pipeline maintenance on Line 25 between Holbrook and Uniontown compressor stations. During this work, the following meter will be unavailable for flow:

73808 - DTI - CRAYNE LL, RT 188, GREENE CO., PA.

Kosciusko Compressor Station: October 12 - 18

TE will be conducting compressor station maintenance at its Kosciusko Compressor Station. Based on current north to south nomination levels through Kosciusko, no restrictions are anticipated; however if restrictions are necessary, restrictions to interruptible and secondary firm nominations flowing north to south through Berne, Wheelersburg, Tompkinsville and Barton are possible.

Page 67 of 84

TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Athens to Berne - Pipeline Maintenance: TBD

TE will be conducting pipeline maintenance between Athens and Berne stations. During this work, the following meter will be unavailable for flow:

73297 - DUKE ENERGY WASHINGTON II, LLC

Mt. Pleasant to Gladeville Line 25 VS5- DOT Pipe Replacement: 2016

TE will be conducting a DOT pipe replacement between Mt. Pleasant and Gladeville stations on Line 25 VS5. During this work, the following meter will be unavailable for flow:

73423 - PIEDMONT NATURAL GAS - RUTHERFORD

Texas Eastern DOT Pipeline Integrity Project

TE will be conducting, as part of its ongoing DOT Pipeline Integrity Project, in-line inspection tool runs at various locations throughout the Texas Eastern pipeline system. As a result of these in-line inspections, certain locations could be identified for an investigation which could lead to possible reduction of capacity. Should any of these investigations lead to a reduction of capacity, TE will post on the bulletin board as soon as it is known. Listed below are the pipeline segments scheduled for inspection this year. Each segment will have a caliper tool run, and an ILI tool run. Also listed below are the dates of a possible investigation as a result of the in-line inspection.

CaliperILIPossible Run CompSegment Access AreaDateDateRepl DtPoss Repl DtBlessing to Tivoli (Line 16)* ---12/10/1503/01/1603/01/16Tivoli to Petronilla (Line 16)* ---Complete04/15/1505/15/15Petronilla to Santa Fe (Line 16)* ---12/09/1503/01/1603/01/16Santa Fe to PEMEX EOL (Line 16)* ---CompleteCompleteCompleteHempstead to Huntsville (Line 11)* ---Complete10/03/1510/03/15Opelousas to St. Francisville (Line 14) ---CompleteCompleteAugustSt. Francisville to Union Church (Line 18) ---201620162016Union Church to Clinton (Line 14) ---CompleteNovemberNovemberAtlanta to Hope (Line 1)* ---09/21/1511/30/1512/20/15Donaldson to North Little Rock (Line 1)* ---09/24/1512/14/1501/07/16Providence to Yazoo City (Line 26)* ---Complete08/18/1509/09/15Blessing to Angleton (Line 16)* ---Complete09/20/1510/15/15Angleton to Mont Belvieu (Line 16)* CompleteComplete10/29/15 ---

CaliperILIPossible Run CompSegment M1/M2 AreaDateDateRepl DtPoss Repl DtNorris City to Oakland City (Line 72)* ---20162016 ---Owingsville to Wheelersburg (Line 15) ---Complete08/03/15 ---Wheelersburg to Athens (Line 15) ---Complete09/01/15 ---Holbrook to Uniontown (Line 10) ---20162016 ---

CaliperILIPossible Run CompPage 68 of 84

Segment M3 AreaDateDateRepl DtPoss Repl DtLambertville to Linden (Line 1)CompleteComplete08/10/15 ---Heidlersburg to Marietta (Line 1-AF)* ---Complete08/17/15 ---Perulack to Shermansdale (Line 27) ---TBDTBD ---Perulack (Line 24-AUX1) ---08/27/1510/15/15 ---Delmont to Lilly (Line 12)*CompleteComplete08/05/15 ---Lilly to Entriken (Line 12)*CompleteComplete08/31/15 ---

As a result of prior DOT mandated investigations, the following locations have been identified as requiring additional evaluation which may require a reduction of capacity. Should any of these investigations lead to a reduction of capacity, TE will post on the bulletin board as soon as it is known:

Angleton to Mont. Belvieu (Line 16)Angleton to Mont. Belvieu (Line 16-PP)Armagh to Lilly (Line 12)Armagh to Lilly (Line 19)Atlanta to Hope (Line 1)Bernville to Bechtelsville (Line 12)Blessing to Angleton (Line 16)Blessing to Tivoli (Line 16)Carthage to Longview (Line 13)Chambersburg to Marietta (Line 2)Chambersburg to Heidlersburg (Line 2-U)Clinton to Kosciusko (Line 14)Danville to Owingsville (Line 10)Danville to Owingsville (Line 15)Danville to Owingsville (Line 25)Delmont to Lilly (Line 12)Delmont to Lilly (Line 19)Delmont to Lilly (Line 27)Delmont to Armagh (Line 19)Delmont to Armagh (Line 27-1)Delmont to Armagh (Line 27-2)Donaldson to N. Little Rock (Line 1)Donaldson to N. Little Rock (Line 1-AUX-1)Eagle to Lambertville (Line 1)Eagle to Lambertville (Line 2)Entriken to Perulack (Line 19)French Lick to Seymour (Line 1)Gillis to Opelousas (Line 14)Gladeville to Tompkinsville (Line 10)Gladeville to Tompkinsville (Line 15)Grantville to Bernville (Line 12)Grantville to Bernville (Line 19)Grantville to Bernville (Line 28)Holbrook to Uniontown (Line 9)Holbrook to Uniontown (Line 10)Hope to Donaldson (Line 1)Kosciusko to Egypt (Line 10)Kosciusko to Egypt (Line 15)Lambertville to Linden (Line 1)Lambertville to Linden (Line 2)Lambertville to Linden (Line 20-B)

Page 69 of 84

Lambertville to Linden (Line 20-D)Longview to Atlanta (Line 1)Longview to Atlanta (Line 1N)Lilly to Entriken (Line 12)Lilly to Entriken (Line 12-Aux-1)Lilly to Entriken (Line 27-Aux-1)Mt. Pleasant to Gladeville (Line 25)Norris City to Oakland City (Line 1)Oakland City to French Lick (Line 1)Perulack to Grantville (Line 19)Perulack to Leidy (Line 24)Perulack to Shermansdale (Line 24 Aux-1)Perulack to Shermansdale (Line 27)Perulack to Leidy (Line 37)Pollard to Oran (Line 1)Provident to Yazoo (Line 26)Providence City to Hempstead (Line 11-H)Provident City to Hempstead (Line 11)Provident City to Thomaston (Line 21)Red River to Castor (Line 11)Shermansdale to Grantville (Line 19)St. Francisville to Union Church (Line 14)St. Francisville to Union Church (Line 18)Thomaston to Provident City (Line 21)Tivoli to Petronilla (Line 16)Union Church to Clinton (Line 14)Union Church to Clinton (Line 18)Uniontown to Delmont (Line 9)Uniontown to Delmont (Line 39)Vidor to Gillis (Line 14)West Monroe to Providence (Line 26)Wheelersburg to Athens (Line 10)Wheelersburg to Athens (Line 15)

Download File: TE 2015 Maintenance Schedule Rev22.docx

Page 70 of 84

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Not a critical noticeNotice Eff Date/Time: 08/25/2015 04:10:00 PMNotice End Date/Time: 11/01/2015 09:00:00 AMNotice ID: 52165Notice Stat Desc: SupersedeNotice Type: MaintenancePost Date/Time: 08/25/2015 04:10:00 PMPrior Notice: 52047Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE 2015 Maintenance Schedule -- Revised

Notice Text: The text below is included in the attached Word document located at the bottom of this posting.

Listed below is a partial schedule for major outages that will affect capacity or that impact major receipt/delivery areas on the Texas Eastern Transmission (TE) system for the 2015 outage season. This schedule is not a complete list of all outages that will occur during the 2015 outage season. Due to unforeseen delays or scheduling conflicts, the dates below are subject to change. As TE continues to plan for the 2015 outage season, updates to the list below will be posted at the earliest known date.

Access Area Longview to Kosciusko:

***Blessing to PEMEX Mexico EOL Line 16 (STX): Cleaning Tool Dates: See specific schedules belowIn-Line Tool Dates: See specific schedules belowPotential Repair Dates: See specific schedules belowPotential Run Comparison Repair Dates: See specific schedules below

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Line 16 between Blessing and PEMEX Mexico EOL. TE will coordinate system receipts and deliveries with point operators to minimize operational impacts, however, during the cleaning and in-line tools, meters listed below will be required to flow/shut in as follows:

***Blessing to Tivoli:Cleaning Tool Dates: Fall 2015In-Line Tool Dates: December 9Potential Repair Dates: March 2016Potential Run Comparison Repair Dates: March 2016

The following meters may be unavailable for flow:73113 - ENTERPRISE TEXAS PIPELINE LLC - HIDALGO COUNTY, TX73719 - T2 GAS UTILITY LLC/REFUGIO INTERCONNECT

***Tivoli to Petronilla:Cleaning Tool Dates: Fall 2015In-Line Tool Dates: CompletePotential Repair Dates: Approximately March 24 - mid September

Page 71 of 84

Potential Run Comparison Repair Dates: May 15 - mid September

The following meters will be unavailable for flow during the cleaning and in-line tool runs:73617 - ONYX PIPELINE/NUECES BAY73618 - ONYX PIPELINE/BARNEY DAVIS

Depending on the level of nominations, the following meter may be unavailable for flow for the duration of the cleaning and in-line tools:73113 - ENTERPRISE TEXAS PIPELINE LLC - HIDALGO COUNTY, TX

The following meters will be unavailable for flow until the cleaning and in-line tools passes the meter:72603 - CROSSTEX ENERGY (FROM TE) UPRIVER RD., NUECES CO73310 - SOUTH SHORE P/L (NE&T), NUECES CO., TX 73719 - T2 GAS UTILITY LLC/REFUGIO INTERCONNECT

The following meters will be required to flow for the duration of the cleaning and in-line tool runs:73258 - MAGIC VALLEY P/L-CALPINE PWR. PROJECT (DEL)/HIDALGO73223 - DEFS, LP - EDINBURG POWER PLANT - HIDALGO CO., TX

***Petronilla to Santa Fe:Cleaning Tool Dates: November 30 - December 3In-Line Tool Dates: December 10Potential Repair Dates: March 2016Potential Run Comparison: March 2016

The following meters will be unavailable for flow during the cleaning and in-line tool runs:73617 - ONYX PIPELINE/NUECES BAY73618 - ONYX PIPELINE/BARNEY DAVIS

Depending on the level of nominations, the following meter may be unavailable for flow for the duration of the cleaning and in-line tools:73113 - ENTERPRISE TEXAS PIPELINE LLC - HIDALGO COUNTY, TX

The following meters will be required to flow for the duration of the cleaning and in-line tool runs:73258 - MAGIC VALLEY P/L-CALPINE PWR. PROJECT (DEL)/HIDALGO73223 - DEFS, LP - EDINBURG POWER PLANT - HIDALGO CO., TX

Santa Fe to PEMEX Mexico (EOL):Cleaning Tool Dates: CompleteIn-Line Tool Dates: CompletePotential Repair Dates: CompletePotential Run Comparison Repair Dates: Complete

The following meters will be unavailable for flow during the cleaning and in-line tool runs:73617 - ONYX PIPELINE/NUECES BAY73618 - ONYX PIPELINE/BARNEY DAVIS73258 - MAGIC VALLEY P/L-CALPINE PWR. PROJECT (DEL)/HIDALGO73223 - DEFSDEFS, LP - EDINBURG POWER PLANT - HIDALGO CO., TX

Page 72 of 84

The following meter will be required to flow for the duration of the cleaning and in-line tool runs:75333 - PEMEX - REYNOSA, MX (D 70333/R 76333)

As a result of these in-line inspections, certain locations could require further detailed investigations, which may require TE to isolate Line 16 between Blessing and PEMEX Mexico EOL. If an isolation of Line 16 is required, shippers sourcing gas for delivery points located between Blessing and PEMEX EOL will be required to source their supply from receipt points between Blessing and PEMEX EOL. Additionally, any gas sourced between Blessing and PEMEX EOL for delivery outside of this area may be restricted. Depending on the level of nominated quantities, if further investigations are required, restrictions are possible for interruptible, secondary firm services and primary firm services.

Should any of these investigations lead to a reduction of capacity, TE will post on the bulletin board as soon as it is known. TE estimates that the investigations will begin on April 9.

Blessing Compressor Station Maintenance: August 15 - 31

TE will be conducting compressor station maintenance at its Blessing Compressor Station. During this maintenance, capacity through Blessing will be reduced to approximately 285,000 Dth /d. Based on current nomination levels through Blessing, TE doesn't anticipate restrictions resulting from this outage, however if restrictions are required, restrictions to interruptible nominations may be necessary.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

***Donaldson to North Little Rock Line 1 - Pipeline Maintenance: August 26 - September 11 TE will be conducting pipeline maintenance on Line 1 between Donaldson and North Little Rock stations. During this maintenance TE will be required to isolate its Line 1 mainline (24 inch) that crosses the Arkansas River.

Based on current nominations levels, TE doesn't anticipate any restrictions associated with this outage.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

?Providence to Yazoo Line 26 (ELA) - Pipeline Maintenance: In-Line Tool Dates: CompletePotential Repair Dates: Complete Potential Run Comparison Repair Dates: September 10 - 18

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Line 26 between Providence and Yazoo stations. During the in-line inspection tool run, the following meters may experience lower than normal pressures or be unavailable for flow:

71000 - GULF SOUTH PIPELINE COMPANY, LP - WEST MONROE, LA (RECEIPT71704 - GULF SOUTH PIPELINE COMPANY, LP - DARNELL, LA (DELIVERY)72568 - RELIANT ENERGY GAS TRANSMISSION - WEST MONROE, LA72614 - TRANSOK - OUACHITA PSH., LA73106 - FEDERAL BUREAU OF PRISON - YAZOO CO. MS

Page 73 of 84

Additionally, if further detailed investigations are required, the meters listed above could experience lower than normal pressure or be unavailable for flow during the potential repair dates.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Atlanta to Hope Line 1 - Pipeline Maintenance: Cleaning Tool Dates: September 12 - 21 In-Line Tool Dates: September 21Potential Repair Dates: November 30 - December 13Potential Run Comparison Repair Dates: December 20 - January 6, 2016

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Line 1 between Atlanta and Hope stations. During the cleaning and in-line inspection tool run, the following meter will be unavailable for flow while the tool passes the meter:

72871 - NORAM - BODCAW, AR

Additionally, if further detailed investigations are required, the meter listed above could experience lower than normal pressure or be unavailable for flow during the potential repair dates.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

?Donaldson to North Little Rock Line 1 - Pipeline Maintenance: Cleaning Tool Dates: September 14 - 18 In-Line Tool Dates: September 24Potential Repair Dates: December 14 - 21 Potential Run Comparison Repair Dates: January 7 - 21

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line cleaning and inspection tool runs on Line 1 between Donaldson and North Little Rock stations. Based on current nominations and flow levels no restrictions are anticipated during the cleaning tool runs, however if nominations and/or flow levels change, the following meter may be required to shut-in during the cleaning tool run:

73667 - HOT SPRING POWER PLANT, HOT SPRING CO, AR

Additionally, during the in-line inspection tool run, the following meter will be unavailable for flow:

73667 - HOT SPRING POWER PLANT, HOT SPRING CO, AR

If further detailed investigations are required, the meter listed above could experience lower than normal pressure or be unavailable for flow during the potential repair dates.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Page 74 of 84

***Yazoo to Kosciusko Line 26 (ELA) - Pipeline Maintenance: September 14 - 20 TE will be conducting pipeline maintenance on Line 26 between Yazoo and Kosciusko stations. During this maintenance the following meters will be unavailable for flow:

71000 - GULF SOUTH PIPELINE COMPANY, LP - WEST MONROE, LA (RECEIPT71704 - GULF SOUTH PIPELINE COMPANY, LP - DARNELL, LA (DELIVERY)72568 - RELIANT ENERGY GAS TRANSMISSION - WEST MONROE, LA72614 - TRANSOK - OUACHITA PSH., LA73141 - MISSISSIPPI CHEMICAL - YAZOO CITY, MS

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Blessing to Angleton Line 16 - Pipeline Maintenance: Cleaning Tool Dates: CompleteILI In-Line Tool Dates: CompletePotential Repair Dates: September 20 - October 7 Potential Run Comparison Dates: October 15 - 31

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting cleaning and in-line inspection tool runs on Line 16 between Blessing and Angleton stations.

During the cleaning tool runs, the following meters will be unavailable until the pig passes the meters:

73694 - SWEENY PLANT-CONOCO PIPELINE75558 - TRES PALACIOS GAS STORAGE - INJ/DEL

During the ILI in-line tool runs, the following meters will be unavailable for the duration of the tool run:

73694 - SWEENY PLANT-CONOCO PIPELINE75558 - TRES PALACIOS GAS STORAGE - INJ/DEL

Additionally, the following meters could experience lower than normal pressure during all cleaning and ILI tool runs:72451 - WILMAR PIPELINE, INC. - #1 DUNCAN SLOUGH, MATAGORDA CO., T72601 - ENTERPRISE TEXAS PIPELINE LLC - MATAGORDA COUNTY, TX (REC)73148 - DEEP ROCK RESOURCES - FLOWERS / MATAGORDA CO., TX - RUN 0173283 - UNION PETROLEUM, LTD (LINE 16LL) - BRAZORIA CO., TX73338 - SANTOSUSA CORP73407 - CHESAPEAKE OPERATING INC-ANKENMEN GATHERING, BRAZORIA CO.,73412 - BUCKEYE RANCH GATHERING - MATAGORDA CO., TX73481 - ASPECT ENERGY - BINTLIFF GATHERING - BRAZORIA CO., TX73504 - WALTER OIL & GAS-KASMAN GATHERING - MATAGORDA CO., TX73626 - DAVIS SOUTHERN/BINTLIFF #1

Additionally, if further detailed investigations are required, all meters listed above could experience lower than normal pressure or be unavailable for flow during the potential repair dates.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Page 75 of 84

Thomaston to Provident City Line 21 - Pipeline Maintenance: September 22 - 23 To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Program, TE will be conducting further detailed investigations on Line 21 (a single line system) between Thomaston and Provident City Stations. During these investigations, TE will be required to isolate Line 21 at mile post 28.43. As a result of this isolation the following meters will be unavailable for flow:

70633 - B&T OIL CO., YOWARD C.P. - BEE CO., TX70655 - DEVON ENERGY PRODUCTION COMPANY, L.P- SOUTHWEST GOHLKE CP70675 - MOSBACHER-MORGAN #1, LIVE OAK CO. TX70689 - WOFFORD #1 CHILDREN'S HOME - BEE CO., TX70691 - INCA OIL & GAS CO..-#1 WILKINSON, GOLIAD CO., TX70912 - BRITANCO, LLC WILCOX - TULETA CP, BEE CO., TX71290 - BRITANCO, LLC - LOMA ALTA HAGIST CP, DUVAL CO., TX71607 - VICTORIA OPERATING - ANNA BARRE FIELD, DEWITT CO., TX (REC71773 - JAMES L. NELSON - JUNKER, DEWITT CO., TX71862 - BRITANCO, LLC - #1D GOREE, BEE CO., TX72103 - WELDER EXPLORATION&PRODUCTION- #1 YOUNG, BEE CO., TX72249 - TRI-UNION DEV. CORP.-#1 WRIGHT / GOLIAD COUNTY, TX (REC)72309 - CHAPARRAL ENERGY, L.L.C. - #1 HESTER, GOLIAD CO., TX72457 - GMT GAS MARKETING - #1 VAL HOLTZ, DEWITT CO., TX (REC)72621 - WILLIAMS FIELD SERVICES - DUVAL CO., TX72626 - WING CORP - C.P., DEWITT COUNTY, TX (REC)72654 - BLUESTONE NATURAL RESOURCES, LLC- BONNE TERRE FIELD, MCMULL72723 - ABRAXAS PETROLEUM CORP.- TIPTON LEASE / GOLIAD CO., TX (REC72950 - APTIAN GAS CORP., K.W. SCHREINER #1 - LIVE OAK CO., TX72951 - APTIAN GAS CORP., SCHREINER RANCH - LIVE OAK CO., TX72963 - AUBURN ENTERPRISES - KERLICK #1, DEWITT, TX73139 - DCP MIDSTREAM, LP- #1 DIEBEL, GOLIAD CO., TX73164 - DCP MIDSTREAM, LP - GOLIAD CO., TX73165 - SANCHEZ O'BRIEN-BODDEN FROST, LIVE OAK CO., TX73199 - DCP MIDSTREAM, LP - BEE CO., TX73214 - DEFS - PETTUS, BEE CO., TX73232 - DEFS - GOLIAD COUNTY, TX73242 - COASTAL OIL & GAS - PAWLIK #1, LIVE OAK CO., TX73244 - WINN EXPLORATION/KERLICK #1 - DEWITT COUNTY, TX (REC)73276 - HURD ENTERPRISES - LUKER #2, GOLIAD CO., TX (REC)73341 - CIMA ENERGY LTD - GATH. SYSTEM / DEWITT CO., TX (REC)73452 - DEFS/SOUTHERN RESOURCES GATH. - BEE CO., TX (REC)73454 - KALER ENERGY-CARPENTER #1/BEE CO., TX (REC)73482 - MAGNUM LP - CHICOLETE CREEK - LAVACA CO., TX (REC)73505 - DESF-ANGEL CITY GATHERING-GOLIAD CO. TX73604 - MILAGRO/WRIGHT MATERIALS-GOLIAD CO., TX73717 - ESENJAY PETROLEUM/HOBLIT UNIT #1-RUN 173810 - JAMES L NELSON OPERATING/GOEHRING GATHERING-FM 584-GOLIAD C73876 - ELLIOTT OIL&GAS/STEINDORF #1-FM 799-BEE CO., TX

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Page 76 of 84

***West Monroe to Providence Line 26 (ELA): September 24 - October 2To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Program, TE will be conducting further investigations on Line 26 (a single line system) between West Monroe and Providence Stations. During these investigations the following meters may experience lower than normal pressures or be unavailable for flow:

71000 - GULF SOUTH PIPELINE COMPANY, LP - WEST MONROE, LA (RECEIPT71704 - GULF SOUTH PIPELINE COMPANY, LP - DARNELL, LA (DELIVERY)72568 - RELIANT ENERGY GAS TRANSMISSION - WEST MONROE, LA72614 - TRANSOK - OUACHITA PSH., LA

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

***Hempstead to Huntsville Line 11 (ETX) - Pipeline Maintenance: Cleaning Tool Date: CompleteIn-Line Tool Dates: CompletePotential Repair Dates: Complete Potential Run Comparison Repair Dates: VS6: October 3 - 7

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Line 11 between Provident City and Hempstead stations. During the cleaning and in-line inspection tool runs, the following meters may experience lower than normal pressures or be unavailable for flow:

73249 - ENTERGY - LEWIS CREEK / MONTGOMERY COUNTY, TX

Additionally, if further detailed investigations are required, the meters listed below could experience lower than normal pressure or be unavailable for flow during the potential repair dates:

72964ELLIOT OIL & GAS, BROWDER #C-1, SAN JACINTO CO., TX (REC)73175MME DESOTO PIPELINE, L.P. - PRAIRIE VIEW, TX - REC73249ENTERGY - LEWIS CREEK / MONTGOMERY COUNTY, TX73364BRAMMER-BROWDER GATHERING-SAN JACINTO CO., TX (REC)73388MONTGOMERY GAS TRANSMISSION, INC. - MONTGOMERY CO., TX (DEL73391FAMCOR OIL - GOLDEN MINER #1 / SAN JACINTO CO., TX (REC)73461UNIVERSAL NATURAL GAS/INTERCONNECT - MONTGOMERY CO., TX (DE73477PRIME OPERATING COMPANY - MONEY WORT #1 - WALKER CO., TX (R73669SK&CO./MASSEY FERGUSON GATHERING, SAN JACINTO CO., TX75475MME DESOTO PIPELINE, LP - (D70475/R76475)75778LONE STAR GAS - WALLER, TX-(D72778/R76778)75858KCS TX INTRASTATE GAS PIPELINE (D72858/R76858)

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

***Hempstead to Huntsville Line 11 (ETX) - Pipeline Maintenance: October 3 - 7To comply with the applicable regulatory requirements associated with TE ongoing DOT Pipeline Integrity Program, TE will be conducting further detailed investigations on Line 11 VS6 (a single line system) between Hempstead and Huntsville stations. As a result of these investigations, the following meters will be unavailable for flow:

Page 77 of 84

72964 - ELLIOT OIL & GAS, BROWDER #C-1, SAN JACINTO CO., TX (REC)73249 - ENTERGY - LEWIS CREEK / MONTGOMERY COUNTY, TX73364 - BRAMMER-BROWDER GATHERING-SAN JACINTO CO., TX (REC)73391 - FAMCOR OIL - GOLDEN MINER #1 / SAN JACINTO CO., TX (REC)73477 - PRIME OPERATING COMPANY - MONEY WORT #1-WALKER CO., TX R73669 - SK&CO./MASSEY FERGUSON GATHERING, SAN JACINTO CO., TX75858 - KCS TX INTRASTATE GAS PIPELINE (D72858/R76858)

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

***Batesville to Lebanon Line 1 - Pipeline Maintenance: October 9 - 11To comply with the applicable regulatory requirements associated with TE ongoing DOT Pipeline Integrity Program, TE will be conducting further detailed investigations on Line 1 VS6 (a single line system) between Batesville and Lebanon stations. As a result of these investigations, the following meters will be unavailable for flow:

70521 - DUKE ENERGY OHIO, INC.71353 - COL. GAS - EAST MIDDLETOWN, OH71841 - OHIO INTRASTATE ENERGY, LLC (FORD) - BUTLER CO., OH

In addition, if further isolations are necessary the following meter will be required to shut-in:

70552 - TE TODHUNTER - TODHUNTER, OH

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Castor to EOL Line 11 - Pipeline Maintenance: October 14 - 15 TE will be conducting pipeline maintenance on Line 11 between Castor and the end of the line. During this maintenance the following meters will be unavailable for flow:

70065 - TEXAS GAS TRANSMISSION - LISBON, LA (DELIVERY)73134 - PANENERGY FIELD SERVICES - LINCOLN PARISH, LA75078 - KOCH GATEWAY - CASTOR, LA-(D70078/R76078)

Additionally, the follow following meters may experience lower than normal pressures:

70192 - SMITH (HARVEY BROYLE)#2 MURPHY-BRYCELAND, BIENVILLE PSH., L70970 - NGC ENERGY RESOURCES - SLIGO GAS PLANT, LA (RECEIPT)72307 - JEEMS BAYOU - #1 CALHOUN / DESOTO PSH., LA72718 - SMITH OPER. (HARVEY BROYLE M.P. 0.00) - BIENVILLE PSH. LA72808 - COMSTOCK RESOURCES - #1 DESOTO - DESOTO PSH., LA73168 - WILLAMETTE INDUSTRIES - BIENVILLE PARISH, LA73328 - PETROCHEM OPERATING / LOTT #1 - BOSSIER PARISH, LA (REC)73523 - ENTERPRISE GATHERING LLC/BETHANY-DESOTO PARISH, LA-RUN 173672 - ENERGY TRANSFER/TIGER PIPELINE BIENVILLE, LA75688 - GULF STATES PIPELINE - BIENVILLE PA. LA-(D72688/R7

Based on current nomination levels TE doesn't anticipate any restrictions at this time.Page 78 of 84

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Angleton to Mont. Belvieu Line 16 - Pipeline Maintenance: Cleaning Tool Date: CompleteGauge Tool Date: CompleteIn-Line Tool Date: CompletePotential Repair Dates: October 29 - November 4

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Line 16 between Angleton and Mont. Belvieu stations. During the cleaning and in-line inspection tool runs, the following meters may experience lower than normal pressures or be unavailable for flow:

70129 - LOUIS DREYFUS72382 - HOUSTON PIPE LINE CO.-ENERFIN LYONDELL SYS./ HARRIS CO., TX72837 - MONUMENT PIPELINE, LP - HARRIS COUNTY, TX72877 - DENBURY ONSHORE, LLC73539 - NET LP - MONUMENT PIPELINE - HARRIS COUNTY, TX73590 - NRG - CEDAR BAYOU73811 - ENTERPRISE PRODUCTS/WALLACE JUNCTION75300 - TEJAS GAS/CLEAR LK. STOR75301 - CALPINE BAYER PWR. PLANT ACCT. PT.

Additionally, if further detailed investigations are required, the meters listed above could experience lower than normal pressure or be unavailable for flow during the potential repair dates.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

?24" System Longview to Berne:

Norris city to French Lick Line 1 VS4 - Pipeline Maintenance: August 24 - 27 To comply with the applicable regulatory requirements associated with TE ongoing DOT Pipeline Integrity Program, TE will be conducting further detailed investigations on Line 1 VS4 (a single line system) between Norris city and French Lick stations. Based on current nominations levels, TE doesn't anticipate any additional restrictions associated with this outage.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Norris City to Oakland City Line 72 (Vermilion Lateral) - Pipeline MaintenanceCleaning Tool Dates: Deferred to 2016In-Line Tool Date: Deferred to 2016Potential Repair Dates: Deferred to 2016

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Norris City to Oakland City Line 72. During

Page 79 of 84

the tool run and depending on the results of the ILI Tool runs and if further detailed investigations are required, the following meter may experience lower than normal pressures or be unavailable for flow:

73623 - DUKE ENERGY VERMILLION II, LLC

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

30 Inch System and Market Area:

***Wheelersburg Compressor Station: July 20 - Aug 28TE will be conducting compressor station maintenance at its Wheelersburg Compressor Station. During this outage TE anticipates that point operators on the 30 inch line south of Wheelersburg may see lower than normal operating pressures.

Additionally, during the timeframes detailed below, north to south capacity through stations on the 30 inch line will be reduced as follows:

July 27 - August 28

Posted:Reduced to approximately:Berne 30" South1,218,000 Dth /d1,118,000 Dth /dWheelersburg South 957,000 Dth /d 857,000 Dth /dTompkinsville South 734,000 Dth /d 634,000 Dth /dBarton South 606,000 Dth /d 506,000 Dth /d

Based on historical north to south nominations TE anticipates restrictions for interruptible and secondary firm nominations flowing north to south through Berne, Wheelersburg, Tompkinsville and Barton.

TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Bedford Compressor Station Maintenance: August 17 - 30

TE will be conducting compressor station maintenance at its Bedford Compressor Station. During this outage capacity through Bedford will be reduced to approximately 1,939,000 Dth /d for nominations delivering to locations between Bedford and up to Lambertville on TE's 36 inch line.

Based on current nominations levels, TE doesn't anticipate any restrictions associated with this outage.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Heidlersburg to Marietta 36" Line 1-AF - Pipeline MaintenanceCaliper & ILI Tool Runs: CompletePotential Repair Dates: August 31 - September 5

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on the Heidlersburg to Marietta 36" Line 1-AF. During the tool run and depending on the results of the ILI Tool runs and if further detailed investigations are required, the following meter may experience lower than normal pressures or be unavailable for flow:

Page 80 of 84

73703 - WILLIAMS-TRANSCO, LOWER CHANCEFORD-YORK CO., PA.73718 - COLUMBIA-MARIETTA, LANCASTER CO., PA

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Lilly to Entriken Line 12 - Pipeline MaintenanceILI Tool Runs: CompletePotential Repair Dates: September 2 - 30

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Lilly to Entriken Line 12. Depending on the results of the ILI Tool runs and if further detailed investigations are required, the following meters may experience lower than normal pressures or be unavailable for flow:

70323 - PEOPLES NAT - CLAYSBURG, PA71189 - UGI CENTRAL - VALLEY GAS - MARTINSBURG, PA71455 - UGI CENTRAL - HUNTINGDON GAS - MAPLETON, PA70266 - UGI CENTRAL - HUNTINGDON GAS - HUNTINGDON, PA70308 - UGI CENTRAL - LEWISTOWN - JUNIATA CO., PA

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Marietta Compressor Station Maintenance: September 9 - October 9

TE will be conducting compressor station maintenance at its Marietta Compressor Station. During this maintenance, capacity through Marietta will be reduced from a seasonal capacity of 1,848,000 Dth /d to approximately 1,335,000 Dth /d for nominations delivering to locations between Marietta and up to Lambertville on TE's 36 inch line.

Based on historical nominations through Marietta, TE anticipates restrictions for interruptible, secondary firm and potentially primary firm services.

Holbrook to Uniontown Lines 10 and 30 - Pipeline Maintenance: September 21 - 25

TE will be conducting pipeline maintenance on Lines 10 and 30 between Holbrook and Uniontown compressor stations. During this work, the following meter will be unavailable for flow:

73813 - ACCESS MIDSTREAM / WIND RIDGE-MCNAY RIDGE ROAD - GREENE CO.

Holbrook to Uniontown Line 25 - Pipeline Maintenance: September 26 - October 21

TE will be conducting pipeline maintenance on Line 25 between Holbrook and Uniontown compressor stations. During this work, the following meter will be unavailable for flow:

73808 - DTI - CRAYNE LL, RT 188, GREENE CO., PA.

Page 81 of 84

Kosciusko Compressor Station: October 12 - 18

TE will be conducting compressor station maintenance at its Kosciusko Compressor Station. Based on current north to south nomination levels through Kosciusko, no restrictions are anticipated; however if restrictions are necessary, restrictions to interruptible and secondary firm nominations flowing north to south through Berne, Wheelersburg, Tompkinsville and Barton are possible.

TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Athens to Berne - Pipeline Maintenance: TBD

TE will be conducting pipeline maintenance between Athens and Berne stations. During this work, the following meter will be unavailable for flow:

73297 - DUKE ENERGY WASHINGTON II, LLC

Mt. Pleasant to Gladeville Line 25 VS5- DOT Pipe Replacement: 2016

TE will be conducting a DOT pipe replacement between Mt. Pleasant and Gladeville stations on Line 25 VS5. During this work, the following meter will be unavailable for flow:

73423 - PIEDMONT NATURAL GAS - RUTHERFORD

Texas Eastern DOT Pipeline Integrity Project

TE will be conducting, as part of its ongoing DOT Pipeline Integrity Project, in-line inspection tool runs at various locations throughout the Texas Eastern pipeline system. As a result of these in-line inspections, certain locations could be identified for an investigation which could lead to possible reduction of capacity. Should any of these investigations lead to a reduction of capacity, TE will post on the bulletin board as soon as it is known. Listed below are the pipeline segments scheduled for inspection this year. Each segment will have a caliper tool run, and an ILI tool run. Also listed below are the dates of a possible investigation as a result of the in-line inspection.

CaliperILIPossible Run CompSegment Access AreaDateDateRepl DtPoss Repl Dt***Blessing to Tivoli (Line 16)* ---12/09/1503/01/1603/01/16Tivoli to Petronilla (Line 16)* ---Complete04/15/1505/15/15***Petronilla to Santa Fe (Line 16)* ---12/10/1503/01/1603/01/16Santa Fe to PEMEX EOL (Line 16)* ---CompleteCompleteCompleteHempstead to Huntsville (Line 11)* ---Complete10/03/1510/03/15Opelousas to St. Francisville (Line 14) ---CompleteCompleteAugustSt. Francisville to Union Church (Line 18) ---201620162016Union Church to Clinton (Line 14) ---CompleteNovemberNovemberAtlanta to Hope (Line 1)*; ---09/21/1511/30/1512/20/15Donaldson to North Little Rock (Line 1)* ---09/24/1512/14/1501/07/16Providence to Yazoo City (Line 26)* ---CompleteComplete09/09/15Blessing to Angleton (Line 16)* ---Complete09/20/1510/15/15Angleton to Mont Belvieu (Line 16)* CompleteComplete10/29/15 ---

CaliperILIPossible Run CompPage 82 of 84

Segment M1/M2 AreaDateDateRepl DtPoss Repl DtNorris City to Oakland City (Line 72)* ---20162016 ---Owingsville to Wheelersburg (Line 15) ---Complete08/03/15 ---Wheelersburg to Athens (Line 15) ---Complete09/01/15 ---Holbrook to Uniontown (Line 10) ---20162016 ---

CaliperILIPossible Run CompSegment M3 AreaDateDateRepl DtPoss Repl DtLambertville to Linden (Line 1)CompleteComplete08/10/15 ---Heidlersburg to Marietta (Line 1-AF)* ---Complete08/31/15 ---Perulack to Shermansdale (Line 27) ---TBDTBD ---Perulack (Line 24-AUX1) ---08/27/1510/15/15 ---Lilly to Entriken (Line 12)*CompleteComplete08/31/15 ---

As a result of prior DOT mandated investigations, the following locations have been identified as requiring additional evaluation which may require a reduction of capacity. Should any of these investigations lead to a reduction of capacity, TE will post on the bulletin board as soon as it is known:

Angleton to Mont. Belvieu (Line 16)Angleton to Mont. Belvieu (Line 16-PP)Armagh to Lilly (Line 12)Armagh to Lilly (Line 19)Atlanta to Hope (Line 1)Bernville to Bechtelsville (Line 12)Blessing to Angleton (Line 16)Blessing to Tivoli (Line 16)Carthage to Longview (Line 13)Chambersburg to Marietta (Line 2)Chambersburg to Heidlersburg (Line 2-U)Clinton to Kosciusko (Line 14)Danville to Owingsville (Line 10)Danville to Owingsville (Line 15)Danville to Owingsville (Line 25)Delmont to Lilly (Line 12)Delmont to Lilly (Line 19)Delmont to Lilly (Line 27)Delmont to Armagh (Line 19)Delmont to Armagh (Line 27-1)Delmont to Armagh (Line 27-2)Donaldson to N. Little Rock (Line 1)Donaldson to N. Little Rock (Line 1-AUX-1)Eagle to Lambertville (Line 1)Eagle to Lambertville (Line 2)Entriken to Perulack (Line 19)French Lick to Seymour (Line 1)Gillis to Opelousas (Line 14)Gladeville to Tompkinsville (Line 10)Gladeville to Tompkinsville (Line 15)Grantville to Bernville (Line 12)Grantville to Bernville (Line 19)Grantville to Bernville (Line 28)Holbrook to Uniontown (Line 9)Holbrook to Uniontown (Line 10)

Page 83 of 84

Hope to Donaldson (Line 1)Kosciusko to Egypt (Line 10)Kosciusko to Egypt (Line 15)Lambertville to Linden (Line 1)Lambertville to Linden (Line 2)Lambertville to Linden (Line 20-B)Lambertville to Linden (Line 20-D)Longview to Atlanta (Line 1)Longview to Atlanta (Line 1N)Lilly to Entriken (Line 12)Lilly to Entriken (Line 12-Aux-1)Lilly to Entriken (Line 27-Aux-1)Mt. Pleasant to Gladeville (Line 25)Norris City to Oakland City (Line 1)Oakland City to French Lick (Line 1)Perulack to Grantville (Line 19)Perulack to Leidy (Line 24)Perulack to Shermansdale (Line 24 Aux-1)Perulack to Shermansdale (Line 27)Perulack to Leidy (Line 37)Pollard to Oran (Line 1)Provident to Yazoo (Line 26)Providence City to Hempstead (Line 11-H)Provident City to Hempstead (Line 11)Provident City to Thomaston (Line 21)Red River to Castor (Line 11)Shermansdale to Grantville (Line 19)St. Francisville to Union Church (Line 14)St. Francisville to Union Church (Line 18)Thomaston to Provident City (Line 21)Tivoli to Petronilla (Line 16)Union Church to Clinton (Line 14)Union Church to Clinton (Line 18)Uniontown to Delmont (Line 9)Uniontown to Delmont (Line 39)Vidor to Gillis (Line 14)West Monroe to Providence (Line 26)Wheelersburg to Athens (Line 10)Wheelersburg to Athens (Line 15)

Download File: TE 2015 Maintenance Schedule Rev23.docx