Texas Eastern Transmission, LP - Spectra Energy · 2019-10-02 · Texas Eastern Transmission, LP's...

41
Texas Eastern Transmission, LP Non Critical Notices Postings from 08/01/2019 to 08/31/2019 Page 1 of 41

Transcript of Texas Eastern Transmission, LP - Spectra Energy · 2019-10-02 · Texas Eastern Transmission, LP's...

Page 1: Texas Eastern Transmission, LP - Spectra Energy · 2019-10-02 · Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for

Texas Eastern Transmission, LP

Non Critical NoticesPostings from 08/01/2019 to 08/31/2019

Page 1 of 41

Page 2: Texas Eastern Transmission, LP - Spectra Energy · 2019-10-02 · Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Not a critical noticeNotice Eff Date/Time: 08/01/2019 09:24:41 AMNotice End Date/Time: 10/30/2019 09:24:41 AMNotice ID: 86995Notice Stat Desc: InitiateNotice Type: OtherPost Date/Time: 08/01/2019 09:24:41 AMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: CRP ELECTION

Notice Text: Other CRP Notice

Annual Election 11/1/19 - 10/31/20

August 1, 2019

To All Primary Firm Customers

Re: Customized Reservation Pattern ("CRP")Elections Due September 1, 2017

All customers under firm service agreements paying maximum reservation rates under Rate Schedule CDS, FT 1, LLFT, and SCT that desire to participate in the CRP Program for the period commencing November 1, 2019 and ending October 31, 2020, shall submit to Pipeline by September 1, 2019 via the LINK® System its annual election to participate in the CRP Program. The rate and volume elections by contract will be due by October 1, 2019 to be effective November 1, 2019.

The CRP Program is governed by the terms and conditions included in Section 3 of Rate Schedules CDS, FT 1, LLFT, and SCT, as applicable. If you have any questions or would like assistance, please contact your Account Manager or Texas Eastern's Senior Accounting Advisor, Mike Culver at (713) 627 5779.

Page 2 of 41

Page 3: Texas Eastern Transmission, LP - Spectra Energy · 2019-10-02 · Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Not a critical noticeNotice Eff Date/Time: 08/02/2019 09:00:00 AMNotice End Date/Time: 08/03/2019 08:59:59 AMNotice ID: 87024Notice Stat Desc: InitiateNotice Type: OtherPost Date/Time: 08/01/2019 03:43:08 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: Timely Cycle Volumes for gas day 08/02/2019

Notice Text: All Timely Cycle nominations for gas day Friday, 08/02/2019 have been scheduled as of the time of this notice.

Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for the rest of the subject gas day. This non-critical notice replaces the previous 04/22/2008 posting which is no longer available for viewing and now includes an attachment that describes the hourly scheduling process.

https://linkwc.spectraenergy.com/Scheduling/TE_NonCriticalPostingSchedulingProcess.pdf

Page 3 of 41

Page 4: Texas Eastern Transmission, LP - Spectra Energy · 2019-10-02 · Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Not a critical noticeNotice Eff Date/Time: 08/03/2019 09:00:00 AMNotice End Date/Time: 08/04/2019 08:59:59 AMNotice ID: 87039Notice Stat Desc: InitiateNotice Type: OtherPost Date/Time: 08/02/2019 02:43:08 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: Timely Cycle Volumes for gas day 08/03/2019

Notice Text: All Timely Cycle nominations for gas day Saturday, 08/03/2019 have been scheduled as of the time of this notice.

Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for the rest of the subject gas day. This non-critical notice replaces the previous 04/22/2008 posting which is no longer available for viewing and now includes an attachment that describes the hourly scheduling process.

https://linkwc.spectraenergy.com/Scheduling/TE_NonCriticalPostingSchedulingProcess.pdf

Page 4 of 41

Page 5: Texas Eastern Transmission, LP - Spectra Energy · 2019-10-02 · Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Not a critical noticeNotice Eff Date/Time: 08/04/2019 09:00:00 AMNotice End Date/Time: 08/05/2019 08:59:59 AMNotice ID: 87079Notice Stat Desc: InitiateNotice Type: OtherPost Date/Time: 08/03/2019 02:58:08 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: Timely Cycle Volumes for gas day 08/04/2019

Notice Text: All Timely Cycle nominations for gas day Sunday, 08/04/2019 have been scheduled as of the time of this notice.

Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for the rest of the subject gas day. This non-critical notice replaces the previous 04/22/2008 posting which is no longer available for viewing and now includes an attachment that describes the hourly scheduling process.

https://linkwc.spectraenergy.com/Scheduling/TE_NonCriticalPostingSchedulingProcess.pdf

Page 5 of 41

Page 6: Texas Eastern Transmission, LP - Spectra Energy · 2019-10-02 · Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Not a critical noticeNotice Eff Date/Time: 08/05/2019 09:00:00 AMNotice End Date/Time: 08/06/2019 08:59:59 AMNotice ID: 87088Notice Stat Desc: InitiateNotice Type: OtherPost Date/Time: 08/04/2019 02:43:08 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: Timely Cycle Volumes for gas day 08/05/2019

Notice Text: All Timely Cycle nominations for gas day Monday, 08/05/2019 have been scheduled as of the time of this notice.

Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for the rest of the subject gas day. This non-critical notice replaces the previous 04/22/2008 posting which is no longer available for viewing and now includes an attachment that describes the hourly scheduling process.

https://linkwc.spectraenergy.com/Scheduling/TE_NonCriticalPostingSchedulingProcess.pdf

Page 6 of 41

Page 7: Texas Eastern Transmission, LP - Spectra Energy · 2019-10-02 · Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Not a critical noticeNotice Eff Date/Time: 08/06/2019 09:00:00 AMNotice End Date/Time: 08/07/2019 08:59:59 AMNotice ID: 87152Notice Stat Desc: InitiateNotice Type: OtherPost Date/Time: 08/05/2019 03:28:08 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: Timely Cycle Volumes for gas day 08/06/2019

Notice Text: All Timely Cycle nominations for gas day Tuesday, 08/06/2019 have been scheduled as of the time of this notice.

Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for the rest of the subject gas day. This non-critical notice replaces the previous 04/22/2008 posting which is no longer available for viewing and now includes an attachment that describes the hourly scheduling process.

https://linkwc.spectraenergy.com/Scheduling/TE_NonCriticalPostingSchedulingProcess.pdf

Page 7 of 41

Page 8: Texas Eastern Transmission, LP - Spectra Energy · 2019-10-02 · Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Not a critical noticeNotice Eff Date/Time: 08/07/2019 09:00:00 AMNotice End Date/Time: 08/08/2019 08:59:59 AMNotice ID: 87185Notice Stat Desc: InitiateNotice Type: OtherPost Date/Time: 08/06/2019 02:43:08 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: Timely Cycle Volumes for gas day 08/07/2019

Notice Text: All Timely Cycle nominations for gas day Wednesday, 08/07/2019 have been scheduled as of the time of this notice.

Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for the rest of the subject gas day. This non-critical notice replaces the previous 04/22/2008 posting which is no longer available for viewing and now includes an attachment that describes the hourly scheduling process.

https://linkwc.spectraenergy.com/Scheduling/TE_NonCriticalPostingSchedulingProcess.pdf

Page 8 of 41

Page 9: Texas Eastern Transmission, LP - Spectra Energy · 2019-10-02 · Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Not a critical noticeNotice Eff Date/Time: 08/07/2019 09:10:56 AMNotice End Date/Time: 11/05/2019 09:10:56 AMNotice ID: 87210Notice Stat Desc: InitiateNotice Type: Cash OutPost Date/Time: 08/07/2019 09:10:56 AMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TETLP CASHOUT INDEXES - July 2019

Notice Text: see attached file

Download File: TETLP CASHOUT INDEXES - July 2019.pdf

Page 9 of 41

Page 10: Texas Eastern Transmission, LP - Spectra Energy · 2019-10-02 · Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Not a critical noticeNotice Eff Date/Time: 08/08/2019 09:00:00 AMNotice End Date/Time: 08/09/2019 08:59:59 AMNotice ID: 87237Notice Stat Desc: InitiateNotice Type: OtherPost Date/Time: 08/07/2019 04:43:07 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: Timely Cycle Volumes for gas day 08/08/2019

Notice Text: All Timely Cycle nominations for gas day Thursday, 08/08/2019 have been scheduled as of the time of this notice.

Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for the rest of the subject gas day. This non-critical notice replaces the previous 04/22/2008 posting which is no longer available for viewing and now includes an attachment that describes the hourly scheduling process.

https://linkwc.spectraenergy.com/Scheduling/TE_NonCriticalPostingSchedulingProcess.pdf

Page 10 of 41

Page 11: Texas Eastern Transmission, LP - Spectra Energy · 2019-10-02 · Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Not a critical noticeNotice Eff Date/Time: 08/09/2019 09:00:00 AMNotice End Date/Time: 08/10/2019 08:59:59 AMNotice ID: 87286Notice Stat Desc: InitiateNotice Type: OtherPost Date/Time: 08/08/2019 02:58:09 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: Timely Cycle Volumes for gas day 08/09/2019

Notice Text: All Timely Cycle nominations for gas day Friday, 08/09/2019 have been scheduled as of the time of this notice.

Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for the rest of the subject gas day. This non-critical notice replaces the previous 04/22/2008 posting which is no longer available for viewing and now includes an attachment that describes the hourly scheduling process.

https://linkwc.spectraenergy.com/Scheduling/TE_NonCriticalPostingSchedulingProcess.pdf

Page 11 of 41

Page 12: Texas Eastern Transmission, LP - Spectra Energy · 2019-10-02 · Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Not a critical noticeNotice Eff Date/Time: 08/10/2019 09:00:00 AMNotice End Date/Time: 08/11/2019 08:59:59 AMNotice ID: 87330Notice Stat Desc: InitiateNotice Type: OtherPost Date/Time: 08/09/2019 02:58:09 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: Timely Cycle Volumes for gas day 08/10/2019

Notice Text: All Timely Cycle nominations for gas day Saturday, 08/10/2019 have been scheduled as of the time of this notice.

Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for the rest of the subject gas day. This non-critical notice replaces the previous 04/22/2008 posting which is no longer available for viewing and now includes an attachment that describes the hourly scheduling process.

https://linkwc.spectraenergy.com/Scheduling/TE_NonCriticalPostingSchedulingProcess.pdf

Page 12 of 41

Page 13: Texas Eastern Transmission, LP - Spectra Energy · 2019-10-02 · Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Not a critical noticeNotice Eff Date/Time: 08/11/2019 09:00:00 AMNotice End Date/Time: 08/12/2019 08:59:59 AMNotice ID: 87343Notice Stat Desc: InitiateNotice Type: OtherPost Date/Time: 08/10/2019 02:43:08 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: Timely Cycle Volumes for gas day 08/11/2019

Notice Text: All Timely Cycle nominations for gas day Sunday, 08/11/2019 have been scheduled as of the time of this notice.

Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for the rest of the subject gas day. This non-critical notice replaces the previous 04/22/2008 posting which is no longer available for viewing and now includes an attachment that describes the hourly scheduling process.

https://linkwc.spectraenergy.com/Scheduling/TE_NonCriticalPostingSchedulingProcess.pdf

Page 13 of 41

Page 14: Texas Eastern Transmission, LP - Spectra Energy · 2019-10-02 · Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Not a critical noticeNotice Eff Date/Time: 08/10/2019 02:57:48 PMNotice End Date/Time: 11/08/2019 02:57:48 PMNotice ID: 87348Notice Stat Desc: InitiateNotice Type: OtherPost Date/Time: 08/10/2019 02:57:48 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TETLP Invoice Finalization

Notice Text: Invoices for the Period 07/01/2019 have been finalized and payment is due on 08/20/2019.Please login to the LINK System at: http//link.spectraenergy.com

Page 14 of 41

Page 15: Texas Eastern Transmission, LP - Spectra Energy · 2019-10-02 · Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Not a critical noticeNotice Eff Date/Time: 08/12/2019 09:00:00 AMNotice End Date/Time: 08/13/2019 08:59:59 AMNotice ID: 87385Notice Stat Desc: InitiateNotice Type: OtherPost Date/Time: 08/11/2019 02:58:08 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: Timely Cycle Volumes for gas day 08/12/2019

Notice Text: All Timely Cycle nominations for gas day Monday, 08/12/2019 have been scheduled as of the time of this notice.

Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for the rest of the subject gas day. This non-critical notice replaces the previous 04/22/2008 posting which is no longer available for viewing and now includes an attachment that describes the hourly scheduling process.

https://linkwc.spectraenergy.com/Scheduling/TE_NonCriticalPostingSchedulingProcess.pdf

Page 15 of 41

Page 16: Texas Eastern Transmission, LP - Spectra Energy · 2019-10-02 · Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Not a critical noticeNotice Eff Date/Time: 08/12/2019 03:00:00 PMNotice End Date/Time: 09/09/2019 04:00:00 PMNotice ID: 87393Notice Stat Desc: InitiateNotice Type: OtherPost Date/Time: 08/12/2019 02:53:33 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: Texas Eastern Venice Extension Project

Notice Text: Texas Eastern Transmission, LP ("Texas Eastern") is conducting a binding open season ("Open Season") for its Venice Extension Project ("Project"). The Project will provide shippers with an opportunity to obtain firm transportation service from receipt points in Texas Eastern's Zone ELA near its New Roads compressor station, at the head of the Venice Lateral, to onshore gulf coast markets along the lateral in Zone ELA. The anticipated Project in-service date is July 1, 2022.

This Open Season will begin on August 12, 2019 and end at 4:00 p.m. CST on September 9, 2019. Interested parties must submit the attached binding nomination form by the close of the Open Season, and will be required to execute a Precedent Agreement by November 1, 2019.

Download File: Venice Extension Project Open Season.pdf

Page 16 of 41

Page 17: Texas Eastern Transmission, LP - Spectra Energy · 2019-10-02 · Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Not a critical noticeNotice Eff Date/Time: 08/13/2019 09:00:00 AMNotice End Date/Time: 08/14/2019 08:59:59 AMNotice ID: 87413Notice Stat Desc: InitiateNotice Type: OtherPost Date/Time: 08/12/2019 03:58:08 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: Timely Cycle Volumes for gas day 08/13/2019

Notice Text: All Timely Cycle nominations for gas day Tuesday, 08/13/2019 have been scheduled as of the time of this notice.

Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for the rest of the subject gas day. This non-critical notice replaces the previous 04/22/2008 posting which is no longer available for viewing and now includes an attachment that describes the hourly scheduling process.

https://linkwc.spectraenergy.com/Scheduling/TE_NonCriticalPostingSchedulingProcess.pdf

Page 17 of 41

Page 18: Texas Eastern Transmission, LP - Spectra Energy · 2019-10-02 · Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Not a critical noticeNotice Eff Date/Time: 08/14/2019 09:00:00 AMNotice End Date/Time: 08/15/2019 08:59:59 AMNotice ID: 87441Notice Stat Desc: InitiateNotice Type: OtherPost Date/Time: 08/13/2019 03:28:13 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: Timely Cycle Volumes for gas day 08/14/2019

Notice Text: All Timely Cycle nominations for gas day Wednesday, 08/14/2019 have been scheduled as of the time of this notice.

Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for the rest of the subject gas day. This non-critical notice replaces the previous 04/22/2008 posting which is no longer available for viewing and now includes an attachment that describes the hourly scheduling process.

https://linkwc.spectraenergy.com/Scheduling/TE_NonCriticalPostingSchedulingProcess.pdf

Page 18 of 41

Page 19: Texas Eastern Transmission, LP - Spectra Energy · 2019-10-02 · Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Not a critical noticeNotice Eff Date/Time: 08/14/2019 01:00:00 PMNotice End Date/Time: 08/28/2019 01:00:00 PMNotice ID: 87472Notice Stat Desc: InitiateNotice Type: OtherPost Date/Time: 08/14/2019 01:00:00 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: August, 2019 - LINK&reg Enhancements

Notice Text: Nomination Analytics

LINK has released a new screen called Nomination Analytics, which is located under Nominations/Nomination Analytics from the Customer Activities Menu. The new screen provides statistical information on the amount of activity your company conducts when processing nominations. More specifically, for the for the criteria selected (date range, Service Requester, location, name, rate schedule) the system will provide information on how many nominations have been processed, scheduled receipt/delivery quantity by meter and scheduled receipt/delivery quantity by up/down entity. Information can be evaluated in total, by rate schedule, rolled up to month or year, and charted. For nominations processed, there is also a comparison feature between month and years that can be utilized.

Information under Nominations Processed includes a total number of nominations that LINK has processed, how many nominations were touched (updated) by your staff, the number of activities used and how many reductions occurred.

Information under the Scheduled Quantity options provides meter locations and associated scheduled quantities or up/down names and the associated scheduled quantities.

We hope these screens will assist you in quantifying the effort your team makes every day.

Offer Confirmation Dialog Enhancement

A "Show/Hide" button has been added to the Summary Map, Segments, Locations, 14.9 Capacity, and Contacts of the Offer Confirmation Dialog screen. This Offer Confirmation Dialog screen is located on the Offer Quick Release, Offer Quick Copy and through the related screen from the Offer Maintenance Screen. This allows customers to hide any of these sections when printing offer data.

If you have any questions, please contact [email protected], your Operational Account Representative or 1-800-827-5465.

Page 19 of 41

Page 20: Texas Eastern Transmission, LP - Spectra Energy · 2019-10-02 · Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Not a critical noticeNotice Eff Date/Time: 08/15/2019 09:00:00 AMNotice End Date/Time: 08/16/2019 08:59:59 AMNotice ID: 87524Notice Stat Desc: InitiateNotice Type: OtherPost Date/Time: 08/14/2019 04:13:08 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: Timely Cycle Volumes for gas day 08/15/2019

Notice Text: All Timely Cycle nominations for gas day Thursday, 08/15/2019 have been scheduled as of the time of this notice.

Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for the rest of the subject gas day. This non-critical notice replaces the previous 04/22/2008 posting which is no longer available for viewing and now includes an attachment that describes the hourly scheduling process.

https://linkwc.spectraenergy.com/Scheduling/TE_NonCriticalPostingSchedulingProcess.pdf

Page 20 of 41

Page 21: Texas Eastern Transmission, LP - Spectra Energy · 2019-10-02 · Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Not a critical noticeNotice Eff Date/Time: 08/16/2019 09:00:00 AMNotice End Date/Time: 08/17/2019 08:59:59 AMNotice ID: 87556Notice Stat Desc: InitiateNotice Type: OtherPost Date/Time: 08/15/2019 02:58:08 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: Timely Cycle Volumes for gas day 08/16/2019

Notice Text: All Timely Cycle nominations for gas day Friday, 08/16/2019 have been scheduled as of the time of this notice.

Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for the rest of the subject gas day. This non-critical notice replaces the previous 04/22/2008 posting which is no longer available for viewing and now includes an attachment that describes the hourly scheduling process.

https://linkwc.spectraenergy.com/Scheduling/TE_NonCriticalPostingSchedulingProcess.pdf

Page 21 of 41

Page 22: Texas Eastern Transmission, LP - Spectra Energy · 2019-10-02 · Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Not a critical noticeNotice Eff Date/Time: 08/16/2019 10:18:07 AMNotice End Date/Time: 11/14/2019 10:18:07 AMNotice ID: 87563Notice Stat Desc: InitiateNotice Type: Gas QualityPost Date/Time: 08/16/2019 10:18:07 AMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: Gas Quality Waiver

Notice Text: Pursuant to Section 5.5 in the General Terms and Conditions (GT&C) of its FERC Gas Tariff, Texas Eastern is granting a waiver of the water vapor limits at meter 59198 beginning at 4pm on 8/15/2019 and ending at 5pm on 9/06/2019.

Page 22 of 41

Page 23: Texas Eastern Transmission, LP - Spectra Energy · 2019-10-02 · Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Not a critical noticeNotice Eff Date/Time: 08/17/2019 09:00:00 AMNotice End Date/Time: 08/18/2019 08:59:59 AMNotice ID: 87586Notice Stat Desc: InitiateNotice Type: OtherPost Date/Time: 08/16/2019 02:58:08 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: Timely Cycle Volumes for gas day 08/17/2019

Notice Text: All Timely Cycle nominations for gas day Saturday, 08/17/2019 have been scheduled as of the time of this notice.

Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for the rest of the subject gas day. This non-critical notice replaces the previous 04/22/2008 posting which is no longer available for viewing and now includes an attachment that describes the hourly scheduling process.

https://linkwc.spectraenergy.com/Scheduling/TE_NonCriticalPostingSchedulingProcess.pdf

Page 23 of 41

Page 24: Texas Eastern Transmission, LP - Spectra Energy · 2019-10-02 · Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Not a critical noticeNotice Eff Date/Time: 08/18/2019 09:00:00 AMNotice End Date/Time: 08/19/2019 08:59:59 AMNotice ID: 87614Notice Stat Desc: InitiateNotice Type: OtherPost Date/Time: 08/17/2019 03:28:09 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: Timely Cycle Volumes for gas day 08/18/2019

Notice Text: All Timely Cycle nominations for gas day Sunday, 08/18/2019 have been scheduled as of the time of this notice.

Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for the rest of the subject gas day. This non-critical notice replaces the previous 04/22/2008 posting which is no longer available for viewing and now includes an attachment that describes the hourly scheduling process.

https://linkwc.spectraenergy.com/Scheduling/TE_NonCriticalPostingSchedulingProcess.pdf

Page 24 of 41

Page 25: Texas Eastern Transmission, LP - Spectra Energy · 2019-10-02 · Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Not a critical noticeNotice Eff Date/Time: 08/19/2019 09:00:00 AMNotice End Date/Time: 08/20/2019 08:59:59 AMNotice ID: 87638Notice Stat Desc: InitiateNotice Type: OtherPost Date/Time: 08/18/2019 02:58:09 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: Timely Cycle Volumes for gas day 08/19/2019

Notice Text: All Timely Cycle nominations for gas day Monday, 08/19/2019 have been scheduled as of the time of this notice.

Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for the rest of the subject gas day. This non-critical notice replaces the previous 04/22/2008 posting which is no longer available for viewing and now includes an attachment that describes the hourly scheduling process.

https://linkwc.spectraenergy.com/Scheduling/TE_NonCriticalPostingSchedulingProcess.pdf

Page 25 of 41

Page 26: Texas Eastern Transmission, LP - Spectra Energy · 2019-10-02 · Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Not a critical noticeNotice Eff Date/Time: 08/20/2019 09:00:00 AMNotice End Date/Time: 08/21/2019 08:59:59 AMNotice ID: 87666Notice Stat Desc: InitiateNotice Type: OtherPost Date/Time: 08/19/2019 03:13:08 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: Timely Cycle Volumes for gas day 08/20/2019

Notice Text: All Timely Cycle nominations for gas day Tuesday, 08/20/2019 have been scheduled as of the time of this notice.

Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for the rest of the subject gas day. This non-critical notice replaces the previous 04/22/2008 posting which is no longer available for viewing and now includes an attachment that describes the hourly scheduling process.

https://linkwc.spectraenergy.com/Scheduling/TE_NonCriticalPostingSchedulingProcess.pdf

Page 26 of 41

Page 27: Texas Eastern Transmission, LP - Spectra Energy · 2019-10-02 · Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Not a critical noticeNotice Eff Date/Time: 08/19/2019 05:16:45 PMNotice End Date/Time: 11/17/2019 05:16:45 PMNotice ID: 87670Notice Stat Desc: SupersedeNotice Type: Gas QualityPost Date/Time: 08/19/2019 05:16:45 PMPrior Notice: 87563Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: Gas Quality Waiver

Notice Text: This notice supersedes Notice ID 87563. Pursuant to Section 5.5 in the General Terms and Conditions (GT&C) of its FERC Gas Tariff, Texas Easternis granting a waiver of the water vapor limits at meter 73867 beginning at 4pm on 8/15/2019 and ending at 5pm on 9/06/2019.

Page 27 of 41

Page 28: Texas Eastern Transmission, LP - Spectra Energy · 2019-10-02 · Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Not a critical noticeNotice Eff Date/Time: 08/21/2019 09:00:00 AMNotice End Date/Time: 08/22/2019 08:59:59 AMNotice ID: 87699Notice Stat Desc: InitiateNotice Type: OtherPost Date/Time: 08/20/2019 02:58:08 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: Timely Cycle Volumes for gas day 08/21/2019

Notice Text: All Timely Cycle nominations for gas day Wednesday, 08/21/2019 have been scheduled as of the time of this notice.

Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for the rest of the subject gas day. This non-critical notice replaces the previous 04/22/2008 posting which is no longer available for viewing and now includes an attachment that describes the hourly scheduling process.

https://linkwc.spectraenergy.com/Scheduling/TE_NonCriticalPostingSchedulingProcess.pdf

Page 28 of 41

Page 29: Texas Eastern Transmission, LP - Spectra Energy · 2019-10-02 · Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Not a critical noticeNotice Eff Date/Time: 08/21/2019 09:00:00 AMNotice End Date/Time: 11/19/2019 09:00:00 AMNotice ID: 87721Notice Stat Desc: InitiateNotice Type: OtherPost Date/Time: 08/21/2019 09:00:00 AMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: October 2019 LINK Training

Notice Text: LINK Training courses are now available for enrollment.

To enroll click "Training" at top right corner of the LINK Home Screen. Once logged in the system will take you to the available classes. Select a class you are interested in enrolling and click the "Enroll" button (top right) to enroll in the specific class.

If you have any questions please contact LINK Helpline at 1-800-827-LINK (5465).

Page 29 of 41

Page 30: Texas Eastern Transmission, LP - Spectra Energy · 2019-10-02 · Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Not a critical noticeNotice Eff Date/Time: 08/22/2019 09:00:00 AMNotice End Date/Time: 08/23/2019 08:59:59 AMNotice ID: 87748Notice Stat Desc: InitiateNotice Type: OtherPost Date/Time: 08/21/2019 02:58:08 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: Timely Cycle Volumes for gas day 08/22/2019

Notice Text: All Timely Cycle nominations for gas day Thursday, 08/22/2019 have been scheduled as of the time of this notice.

Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for the rest of the subject gas day. This non-critical notice replaces the previous 04/22/2008 posting which is no longer available for viewing and now includes an attachment that describes the hourly scheduling process.

https://linkwc.spectraenergy.com/Scheduling/TE_NonCriticalPostingSchedulingProcess.pdf

Page 30 of 41

Page 31: Texas Eastern Transmission, LP - Spectra Energy · 2019-10-02 · Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Not a critical noticeNotice Eff Date/Time: 08/23/2019 09:00:00 AMNotice End Date/Time: 08/24/2019 08:59:59 AMNotice ID: 87776Notice Stat Desc: InitiateNotice Type: OtherPost Date/Time: 08/22/2019 03:43:08 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: Timely Cycle Volumes for gas day 08/23/2019

Notice Text: All Timely Cycle nominations for gas day Friday, 08/23/2019 have been scheduled as of the time of this notice.

Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for the rest of the subject gas day. This non-critical notice replaces the previous 04/22/2008 posting which is no longer available for viewing and now includes an attachment that describes the hourly scheduling process.

https://linkwc.spectraenergy.com/Scheduling/TE_NonCriticalPostingSchedulingProcess.pdf

Page 31 of 41

Page 32: Texas Eastern Transmission, LP - Spectra Energy · 2019-10-02 · Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Not a critical noticeNotice Eff Date/Time: 08/24/2019 09:00:00 AMNotice End Date/Time: 08/25/2019 08:59:59 AMNotice ID: 87793Notice Stat Desc: InitiateNotice Type: OtherPost Date/Time: 08/23/2019 02:43:07 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: Timely Cycle Volumes for gas day 08/24/2019

Notice Text: All Timely Cycle nominations for gas day Saturday, 08/24/2019 have been scheduled as of the time of this notice.

Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for the rest of the subject gas day. This non-critical notice replaces the previous 04/22/2008 posting which is no longer available for viewing and now includes an attachment that describes the hourly scheduling process.

https://linkwc.spectraenergy.com/Scheduling/TE_NonCriticalPostingSchedulingProcess.pdf

Page 32 of 41

Page 33: Texas Eastern Transmission, LP - Spectra Energy · 2019-10-02 · Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Not a critical noticeNotice Eff Date/Time: 08/25/2019 09:00:00 AMNotice End Date/Time: 08/26/2019 08:59:59 AMNotice ID: 87831Notice Stat Desc: InitiateNotice Type: OtherPost Date/Time: 08/24/2019 03:43:07 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: Timely Cycle Volumes for gas day 08/25/2019

Notice Text: All Timely Cycle nominations for gas day Sunday, 08/25/2019 have been scheduled as of the time of this notice.

Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for the rest of the subject gas day. This non-critical notice replaces the previous 04/22/2008 posting which is no longer available for viewing and now includes an attachment that describes the hourly scheduling process.

https://linkwc.spectraenergy.com/Scheduling/TE_NonCriticalPostingSchedulingProcess.pdf

Page 33 of 41

Page 34: Texas Eastern Transmission, LP - Spectra Energy · 2019-10-02 · Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Not a critical noticeNotice Eff Date/Time: 08/26/2019 09:00:00 AMNotice End Date/Time: 08/27/2019 08:59:59 AMNotice ID: 87856Notice Stat Desc: InitiateNotice Type: OtherPost Date/Time: 08/25/2019 03:13:08 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: Timely Cycle Volumes for gas day 08/26/2019

Notice Text: All Timely Cycle nominations for gas day Monday, 08/26/2019 have been scheduled as of the time of this notice.

Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for the rest of the subject gas day. This non-critical notice replaces the previous 04/22/2008 posting which is no longer available for viewing and now includes an attachment that describes the hourly scheduling process.

https://linkwc.spectraenergy.com/Scheduling/TE_NonCriticalPostingSchedulingProcess.pdf

Page 34 of 41

Page 35: Texas Eastern Transmission, LP - Spectra Energy · 2019-10-02 · Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Not a critical noticeNotice Eff Date/Time: 08/27/2019 09:00:00 AMNotice End Date/Time: 08/28/2019 08:59:59 AMNotice ID: 87887Notice Stat Desc: InitiateNotice Type: OtherPost Date/Time: 08/26/2019 02:58:13 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: Timely Cycle Volumes for gas day 08/27/2019

Notice Text: All Timely Cycle nominations for gas day Tuesday, 08/27/2019 have been scheduled as of the time of this notice.

Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for the rest of the subject gas day. This non-critical notice replaces the previous 04/22/2008 posting which is no longer available for viewing and now includes an attachment that describes the hourly scheduling process.

https://linkwc.spectraenergy.com/Scheduling/TE_NonCriticalPostingSchedulingProcess.pdf

Page 35 of 41

Page 36: Texas Eastern Transmission, LP - Spectra Energy · 2019-10-02 · Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Not a critical noticeNotice Eff Date/Time: 08/28/2019 09:00:00 AMNotice End Date/Time: 08/29/2019 08:59:59 AMNotice ID: 87925Notice Stat Desc: InitiateNotice Type: OtherPost Date/Time: 08/27/2019 03:28:12 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: Timely Cycle Volumes for gas day 08/28/2019

Notice Text: All Timely Cycle nominations for gas day Wednesday, 08/28/2019 have been scheduled as of the time of this notice.

Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for the rest of the subject gas day. This non-critical notice replaces the previous 04/22/2008 posting which is no longer available for viewing and now includes an attachment that describes the hourly scheduling process.

https://linkwc.spectraenergy.com/Scheduling/TE_NonCriticalPostingSchedulingProcess.pdf

Page 36 of 41

Page 37: Texas Eastern Transmission, LP - Spectra Energy · 2019-10-02 · Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Not a critical noticeNotice Eff Date/Time: 08/29/2019 09:00:00 AMNotice End Date/Time: 08/30/2019 08:59:59 AMNotice ID: 87960Notice Stat Desc: InitiateNotice Type: OtherPost Date/Time: 08/28/2019 03:28:13 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: Timely Cycle Volumes for gas day 08/29/2019

Notice Text: All Timely Cycle nominations for gas day Thursday, 08/29/2019 have been scheduled as of the time of this notice.

Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for the rest of the subject gas day. This non-critical notice replaces the previous 04/22/2008 posting which is no longer available for viewing and now includes an attachment that describes the hourly scheduling process.

https://linkwc.spectraenergy.com/Scheduling/TE_NonCriticalPostingSchedulingProcess.pdf

Page 37 of 41

Page 38: Texas Eastern Transmission, LP - Spectra Energy · 2019-10-02 · Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Not a critical noticeNotice Eff Date/Time: 08/30/2019 09:00:00 AMNotice End Date/Time: 08/31/2019 08:59:59 AMNotice ID: 87995Notice Stat Desc: InitiateNotice Type: OtherPost Date/Time: 08/29/2019 03:13:14 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: Timely Cycle Volumes for gas day 08/30/2019

Notice Text: All Timely Cycle nominations for gas day Friday, 08/30/2019 have been scheduled as of the time of this notice.

Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for the rest of the subject gas day. This non-critical notice replaces the previous 04/22/2008 posting which is no longer available for viewing and now includes an attachment that describes the hourly scheduling process.

https://linkwc.spectraenergy.com/Scheduling/TE_NonCriticalPostingSchedulingProcess.pdf

Page 38 of 41

Page 39: Texas Eastern Transmission, LP - Spectra Energy · 2019-10-02 · Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Not a critical noticeNotice Eff Date/Time: 08/30/2019 01:05:43 PMNotice End Date/Time: 11/28/2019 01:05:43 PMNotice ID: 88003Notice Stat Desc: InitiateNotice Type: OtherPost Date/Time: 08/30/2019 01:05:43 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: Texas Eastern Transmission, LP Tariff Filing - Docket No. RP19-1497-000

Notice Text: On August 29, 2019, Texas Eastern Transmission, LP made its Operational Entitlements filing to be effective November 1, 2019

Download File: Filing.pdf

Page 39 of 41

Page 40: Texas Eastern Transmission, LP - Spectra Energy · 2019-10-02 · Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Not a critical noticeNotice Eff Date/Time: 08/31/2019 09:00:00 AMNotice End Date/Time: 09/01/2019 08:59:59 AMNotice ID: 88029Notice Stat Desc: InitiateNotice Type: OtherPost Date/Time: 08/30/2019 02:58:13 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: Timely Cycle Volumes for gas day 08/31/2019

Notice Text: All Timely Cycle nominations for gas day Saturday, 08/31/2019 have been scheduled as of the time of this notice.

Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for the rest of the subject gas day. This non-critical notice replaces the previous 04/22/2008 posting which is no longer available for viewing and now includes an attachment that describes the hourly scheduling process.

https://linkwc.spectraenergy.com/Scheduling/TE_NonCriticalPostingSchedulingProcess.pdf

Page 40 of 41

Page 41: Texas Eastern Transmission, LP - Spectra Energy · 2019-10-02 · Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Not a critical noticeNotice Eff Date/Time: 09/01/2019 09:00:00 AMNotice End Date/Time: 09/02/2019 08:59:59 AMNotice ID: 88056Notice Stat Desc: InitiateNotice Type: OtherPost Date/Time: 08/31/2019 03:58:13 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: Timely Cycle Volumes for gas day 09/01/2019

Notice Text: All Timely Cycle nominations for gas day Sunday, 09/01/2019 have been scheduled as of the time of this notice.

Texas Eastern Transmission, LP's hourly scheduling process, as described in the attached link, is now in effect for the rest of the subject gas day. This non-critical notice replaces the previous 04/22/2008 posting which is no longer available for viewing and now includes an attachment that describes the hourly scheduling process.

https://linkwc.spectraenergy.com/Scheduling/TE_NonCriticalPostingSchedulingProcess.pdf

Page 41 of 41