Document Revision No.: 1 Revised: 07/06/22 RIT KGCOE MSD Program P10511 Miniaturization of Xerography Test Plans & Test Results By: Derek Meinke, Matthew Liff, Tony Zhang, Zaw Htoo Table of Contents 1. MSD I: WKS 8-10 PRELIMINARY TEST PLAN.................2 1.1..........Introduction; Overview; Summary; Purpose; History, etc. 2 1.2.Project Description; Sub-Systems/ Critical Components Being Tested 2 1.3......................................Approval; Guide, Sponsor 3 1.4................................................ Test Strategy 4 1.5...................Definitions; Important Terminology; Key Words 8 1.6................................................... References 9 2. MSD II WKS 2-3: FINAL TEST PLAN.......................10 2.1............................Data Collection Plan; Sampling Plan 10 2.2..............................Measurement Capability, Equipment 10 2.3............................Test Conditions, Setup Instructions 10 2.4........Sponsor/Customer, Site Related, Requests / Considerations 10 2.5...............Test Procedure, Work Breakdown Structure, Schedule 10 2.6.................................................. Assumptions 11 3. MSD II – WKS 3-10 DESIGN TEST VERIFICATION............12 3.1................................................. Test Results 12 3.2....................................Logistics and Documentation 12 3.3............Definition of a Successful Test, Pass / Fail Criteria 12 3.4. Contingencies/ Mitigation for Preliminary or Insufficient Results 12 3.5..............................Analysis of Data – Design Summary 12 3.6...................................Conclusion or Design Summary 12 3.7..................................Function/ Performance Reviews 12 3.8................................................... References 12 3.9................................................... Appendices 13 RIT KGCOE MSD Program Page 1 Revision:

Transcript of Test Plan Templateedge.rit.edu/edge/P10511/public/Test Plan rev4.docx · Web viewMotor Controller:...

Page 1: Test Plan Templateedge.rit.edu/edge/P10511/public/Test Plan rev4.docx · Web viewMotor Controller: Converts the command signals from the computer’s user interface into electrical

Document Revision No.: 1 Revised: 05/07/23 RIT KGCOE MSD Program

P10511 Miniaturization of XerographyTest Plans & Test Results

By: Derek Meinke, Matthew Liff, Tony Zhang, Zaw Htoo

Table of Contents

1. MSD I: WKS 8-10 PRELIMINARY TEST PLAN..........................................21.1. Introduction; Overview; Summary; Purpose; History, etc..........................................................2

1.2. Project Description; Sub-Systems/ Critical Components Being Tested......................................2

1.3. Approval; Guide, Sponsor...............................................................................................................3

1.4. Test Strategy.....................................................................................................................................4

1.5. Definitions; Important Terminology; Key Words........................................................................8

1.6. References.........................................................................................................................................9

2. MSD II WKS 2-3: FINAL TEST PLAN........................................................102.1. Data Collection Plan; Sampling Plan...........................................................................................10

2.2. Measurement Capability, Equipment..........................................................................................10

2.3. Test Conditions, Setup Instructions.............................................................................................10

2.4. Sponsor/Customer, Site Related, Requests / Considerations.....................................................10

2.5. Test Procedure, Work Breakdown Structure, Schedule............................................................10

2.6. Assumptions....................................................................................................................................11

3. MSD II – WKS 3-10 DESIGN TEST VERIFICATION..................................123.1. Test Results.....................................................................................................................................12

3.2. Logistics and Documentation........................................................................................................12

3.3. Definition of a Successful Test, Pass / Fail Criteria....................................................................12

3.4. Contingencies/ Mitigation for Preliminary or Insufficient Results...........................................12

3.5. Analysis of Data – Design Summary............................................................................................12

3.6. Conclusion or Design Summary....................................................................................................12

3.7. Function/ Performance Reviews...................................................................................................12

3.8. References.......................................................................................................................................12

3.9. Appendices......................................................................................................................................13

RIT KGCOE MSD Program Page 1 Revision:

Page 2: Test Plan Templateedge.rit.edu/edge/P10511/public/Test Plan rev4.docx · Web viewMotor Controller: Converts the command signals from the computer’s user interface into electrical

Document Revision No.: 1 Revised: 05/07/23 RIT KGCOE MSD Program

P10511 Miniaturization of XerographyTest Plans & Test Results

1. MSD I: WKS 8-10 PRELIMINARY TEST PLAN 1.1. Introduction; Overview; Summary; Purpose; History, etc.

1.1.1. Over the past decade the cost of xerographic digital printer hardware has continued to drop while at the same time print quality, print speed, and reliability has continuously improved. Much of this cost reduction is related to what we will call "The Miniaturization of Xerography". One "figure of merit" gauge of this miniaturization is the size of the photoreceptor required to produce a given print rate, (Pr /PPM). It turns out that when tracked over an extended timeframe, the diameter of photoreceptor drum required to produce a particular print rate has fallen by about a factor of two per decade over the last three decades. The current state requires about a 24mm diameter photoreceptor drum for <40 prints per minute, (ppm), a 40mm diameter photoreceptor drum for > 40ppm, and about an 80mm diameter drum for >80ppm. This miniaturization has been vital to offering low cost digital color printing where the number of printer components is multiplied by the number of colors.

This miniaturization is the result of several innovations and advances in sub-system processes, new materials, and process controls. For example: the wear rate of new photoreceptor materials has dramatically improved, thus allowing smaller photoreceptors to be used, with small photoreceptors other sub-systems followed suit. For example the development sub-systems now use low cost high tolerance rolls and semi-conductive or conductive developers that significantly reduced the waterfront for development subsystems, and finally laser exposure requires much less space than early bulky optical systems.

The photoreceptor charging system has also undergone significant changes over this time frame. The major improvement has been the displacement of bulky high voltage corona emitting devices for compact bias charge rolls (BCR's), particularly for low end office and personal printers. While there are tradeoffs in reliability, cost, size, and footprint for corona vs. BCR devices that ultimately determine selection for any particular printer architecture there continues to be a need for reduced footprint for charging devices, particularly for high speed applications.

1.2. Project Description; Sub-Systems/ Critical Components Being Tested 1.2.1. Project Description: This initial project seeks to design a xerographic charging test fixture that

can be used to evaluate these tradeoffs for new emerging and experimental high speed BCR's and compact solid state corona charging devices. The fixture will be fully automated with digital data collection and be used to explore selected experimental charging device configurations and technologies. It will be capable of measuring charging rates on simulated dielectric drums, under numerous critical parameter conditions such as photoreceptor speeds and other spacing and applied voltage set up settings. It will use the waterfront required to charge a photoreceptor to a uniform surface potential per process speed (mm/sec) as its miniaturization figure of merit.

RIT KGCOE MSD Program Page 2 Revision:

Page 3: Test Plan Templateedge.rit.edu/edge/P10511/public/Test Plan rev4.docx · Web viewMotor Controller: Converts the command signals from the computer’s user interface into electrical

Document Revision No.: 1 Revised: 05/07/23 RIT KGCOE MSD Program

1.2.2. Objective Tree

1.3. Approval; Guide, SponsorApproved by:

Team Members: Sign: Derek Meinke _________________________ Matthew Liff _________________________Tony Zhang _________________________Zaw Htoo _________________________

Guide – Bill Nowak _________________________Sponsor – Xerox, Mike Zona _________________________

RIT KGCOE MSD Program Page 3 Revision:

Page 4: Test Plan Templateedge.rit.edu/edge/P10511/public/Test Plan rev4.docx · Web viewMotor Controller: Converts the command signals from the computer’s user interface into electrical

Document Revision No.: 1 Revised: 05/07/23 RIT KGCOE MSD Program

1.4. Test Strategy1.4.1. Product Specifications, Pass/ Fail Criteria, and Block Diagram

Engr. Spec.

#

Engineering Specification Imp. Source Specification (description) Unit of

MeasureMarginal

ValueIdeal Value

ES1Charger Gap

(1-2mm) 14% CN12Scorotron charger should be fixed

with uniform gap. mm 1 - 2 1.5

ES2Surface Charge (-300 to -800V) 12% Implied

Voltage applied to scorotron grid must match the surface bias of P/R V

-300 to -800

-300 to -800

ES3Surface Speed

(≤1m/s) 11% CN10Photoreceptor drum must be

controllable for different speeds. mm/sec <1000 600

ES4 Budget ($2k) 11% CN14The amount of money available for

purchasing components. $ 2000 <2000

ES5Drum Size (30-84mm) 11% CN13

Drums of different diameters will be provided with known range. mm 30 - 84 30 - 84

ES6

Charger Type (BCR or

Scorotron) 10% CN1There are two different chargers we

will be focusing on. N/A N/A N/A

ES7Uniform Erase Charge (-100V) 8% CN9

After being exposed to the erase lamp, the photoreceptor is expected to have an evenly distributed charge

across it. V -100 -100

ES8ESV distance

(1-2mm) 8% CN5The distance the ESV is from the

outer surface of the photoreceptor. mm 1 - 2 1.5

ES9

Dielectric Thickness (~25µm) 8% CN3

Fixture must accommodate photoreceptors with various

dielectric thicknesses µm 10 40

ES10

Coronode Current

(0-2mA) 6% ImpliedConstant current delivered to

coronode for corona generation. mA 0 - 2 0 – 2Engr. Spec. #: enables cross-referencing (traceability) and allows mapping to lower level specs within separate documentsSource: Customer need #, regulatory standard, and/or "implied" (must exist but doesn't have an associated customer need)Description: quantitative, measureable, testable details*This table can be expanded to document test results**Importance percentages only add up to 99%

Pass/Fail Criteria ES1: ±0.1mm. ES2: ±2V. ES3: ±5mm/sec ES4: Purchased and gifted costs may exceed $2,000, but purchased costs alone must

remain below $2,000. ES5: ±0.5mm. ES6: 3 different BCR and 3 different Scorotron chargers. ES7: ±5V. ES8: ±0.1mm. ES9: n/a

RIT KGCOE MSD Program Page 4 Revision:

Page 5: Test Plan Templateedge.rit.edu/edge/P10511/public/Test Plan rev4.docx · Web viewMotor Controller: Converts the command signals from the computer’s user interface into electrical

Document Revision No.: 1 Revised: 05/07/23 RIT KGCOE MSD Program

ES10: ±15µA

Signal Processing and Flow

1.4.2. Functions (hardware) and Features (software, customer needs)1. Erase Lamp: Light emitting device that sets the photoreceptor to a near-positive voltage

(about -100V)2. Chargers:

a. Scorotron: Corona-generating apparatus normally consisting of a micron-width wire housed by a metallic shield

b. Bias-Charge Roll: A shaft enveloped in a polymeric material used to apply a voltage onto the photoreceptor via direct contact

3. Electrostatic Voltmeter (ESV): An instrument used to measure voltage by its placement in close proximities with the bias source

4. High-voltage sources:a. Voltage Source: Outputs a constant voltage b. Current Source: Outputs a variable voltage in order to maintain a constant

current output5. Stepper Motor: A machine that converts electricity into a mechanical motion6. Motor Controller: Converts the command signals from the computer’s user interface into

electrical signals for operating the motor drive. 7. Motor Drive: Offers dynamic smoothing and antiresonance filters for smooth motion and

encoderless stall detection for motor operations8. Data Acquisition Device (DAQ): Any combination of inputs and outputs used for acquiring

electrical measurements and presenting them for data analysis.9. LabVIEW: A software used for graphical programming for measurement and automation

RIT KGCOE MSD Program Page 5 Revision:

Page 6: Test Plan Templateedge.rit.edu/edge/P10511/public/Test Plan rev4.docx · Web viewMotor Controller: Converts the command signals from the computer’s user interface into electrical

Document Revision No.: 1 Revised: 05/07/23 RIT KGCOE MSD Program

10. NI Motion: An additional software used in conjunction with LabVIEW for applications in the domain of motor controls

1.4.3. Test Equipment available1. Multimeter2. Vernier calipers3. Gauge blocks4. Tachometer

1.4.4. Test Equipment needed but not available1. At this current time, all testing equipment has been accounted for.

1.4.5. Phases of Testing1.4.5.1. Component/ Device (wks 2-12)

1. Coronode Current Supply / Grid Voltage Supply2. Motor3. ESV4. Erase lamp5. Photoreceptor

1.4.5.2. Subsystem (wks 6-13)

1. Charger Subsystema. ES1: Charger Gap - Gapping block on each end of charger should have

a just fit condition between the charger and photoreceptori. Take feeler gauges of desired gap, and check both ends and

center of charger between charger and photoreceptorb. ES2: Surface Charge - User’s input for the grid voltage matches with the

bias on a photoreceptor within ±2V. i. Equip a test drum into the fixtureii. Input a voltage (between 0 to -800V) for the grid biasiii. Measure the voltage drop between the surface of the test drum

and ground using a voltmeter and compare measured value with input bias for grid voltage.

c. ES10: Coronode Current – The output of the current supply for the coronode is within ±15µA of the specified current input

i. Input a current value (0 to 2mA) for the coronode current supplyii. Channel the analog current output of the current supply to DAQ

and measure the actual current valueiii. Compare the input value with actual output of the supply

d. ES7: Charger Type - There are two different chargers we will be focusing on. Both are provided by the customer.

2. Motor Subsystema. ES3: Surface Speed - User’s input for surface speed of the

photoreceptor should match with the actual surface speed within 5mm/sec

i. Input a surface speed through the LabVIEW interface

RIT KGCOE MSD Program Page 6 Revision:

Page 7: Test Plan Templateedge.rit.edu/edge/P10511/public/Test Plan rev4.docx · Web viewMotor Controller: Converts the command signals from the computer’s user interface into electrical

Document Revision No.: 1 Revised: 05/07/23 RIT KGCOE MSD Program

ii. While test drum is spinning, apply a tachometer to the surface of the photoreceptor and record the speed

3. ESV Subsystema. ES8: ESV Distance – The ESV’s placement is within 1-2 mm of the

photoreceptor’s surfacei. Apply a Vplate to the photoreceptor through the graphite brushii. Scan the surface charge with the ESV. Desired voltage should

be ±2Viii. Feeler gauges will be used to verify gaps if any voltage

variations existb. Testing the ESV

i. Apply a voltage to a test drum surfaceii. Scan the drum surface with the ESViii. Compare the input voltage with ESV reading and observe the

level of noise in the signal. iv. If any noise is corrupting the signal, add an intermediate filtering

step (through LabVIEW) for the ESV signal before processing it for actual use

v. Increase bandwidth of filter as needed until noise clears

4. Erase Subsystema. ES7: Uniform Erase Charge – Erase lamp should provide a bias near

-100V to the surface of a photoreceptori. Equip a test drum into fixtureii. Allow the photoreceptor to spin at 1m/s and shine the erase lamp

onto the test drumiii. Measure the surface bias with ESV and compare to -100V

Auxiliary Tests (related to Photoreceptor)5. ES5: Drum Size - Drums of different diameters will be provided with known

range.a. Use vernier calipers to measure actual outer diameter of photoreceptor.

6. ES9: Dielectric Thickness - Thickness will be given from manufacturer.a. Thickness of dielectric is so miniscule that it will not impact the fixture’s

ability to fit the photoreceptors

1.4.5.3. Integration (wks 11-15) Summation of tolerances (See Section 1.4.1. Pass/Fail Criteria) Verification of calculations and assumptions

a. Cantilever Beam Deflection

δmax=1

3 EI∑ F l3

δmax=0.02mm

b. Maximum force that Aluminum substrate can withstand without buckling

PCR=π2 EIL2

RIT KGCOE MSD Program Page 7 Revision:

Page 8: Test Plan Templateedge.rit.edu/edge/P10511/public/Test Plan rev4.docx · Web viewMotor Controller: Converts the command signals from the computer’s user interface into electrical

Document Revision No.: 1 Revised: 05/07/23 RIT KGCOE MSD Program

PCR−30mm=16kipPCR−84mm=390 kip

Input/ Output, Signal Processing:

Figure 1.4.5.3.a) Block Diagram for Uniformity Testing (I/O Template)

Figure 1.4.5.3.b) Block Diagram for I-V Slope Testing (I/O Testing)

Noise problems (ESV signal may contain noise; the signal needs to be cleaned up prior to its analysis using digital filters on the LabVIEW)

Operation in the darkness (Address our Light Inhibiting Enclosure)

For software, combine test programs you have developed for subsystem testing to communicate between the sub modules by adding one at a time to configure overall system.•Check the signal integrity and timing

RIT KGCOE MSD Program Page 8 Revision:

Page 9: Test Plan Templateedge.rit.edu/edge/P10511/public/Test Plan rev4.docx · Web viewMotor Controller: Converts the command signals from the computer’s user interface into electrical

Document Revision No.: 1 Revised: 05/07/23 RIT KGCOE MSD Program

•Check the logic levels and signal waveforms •On an oscilloscope

1.4.5.4. Reliability (wks 15-20)

Make sure that charger slides don’t experience wear over time.

Ensure fasteners are tightened to withstand motor vibrations

1.4.5.5. Customer Acceptance (wks 20-21)

Step 1: Unplug erase lamp, ESV and charger. Remove erase holder from fixture (leaving the erase lamp attached to holder). Remove charger from charger mount. Remove strip of double sided tape from charger mount. Remove charger mount from charger support beam and slide charger support beam to its farthest distance outward from photoreceptor.

Step 2: On the free end of the fixture, remove c-clip, spring retainer plate, spring, end cap and photoreceptor from drive shaft.

Step 3: With no photoreceptor on the drive shaft, remove the ESV from the mounting block. Choose which photoreceptor diameter will be tested. Attach the corresponding mounting block to the ESV guide. Attach the ESV on to the ESV guide, with the appropriate side facing upward.

Step 4: Slide the correct photoreceptor onto the drive shaft, making sure it is concentric around the correct flange on the fixed end cap. Slide end cap onto the free end of the drive shaft, making sure the photoreceptor remains concentric around the correct flange. Slide on spring and retainer plate. Attach the c-clip onto the drive shaft.

Step 5: Place erase holder (with erase lamp attached) into the appropriate slot as determined by the photoreceptor diameter being tested.

Step 6: Place a new strip of double sided tape onto the charger mount. Place charger onto exposed strip of tape, assuring that the charger is mated with the charger mount lip. Slide charger mount (with charger attached) onto the charger support beam, attempting to create tangency between the center line on the charger and the surface of the photoreceptor. Tighten the set screws (x2, located on the back side of the charger support beam) so the charger mount is firmly attached to the charger support beam. For a scorotron charger configuration, continue to step 7. For a BCR charger configuration, skip step 7 and continue to step 8.

Step 7: Hold the appropriate gapping block tangent to the photoreceptor (lengthwise toward the charger face). Slide the charger subsystem toward the photoreceptor until the face of the charger is flush with the gapping block face. At this location, tighten the set screws (x2, located on the sides of the charger support beam) so the charger support beam is firmly attached to the charger mount brackets and the gap distance is finalized. Skip step 8 and continue to step 9.

Step 8: Slide the charger subsystem toward the photoreceptor until the face of the charger is flush with the face of the photoreceptor. At this location, tighten the set screws 9x2, located on the sides of the charger support beam) so the charger support beam is firmly attached to the charger mount brackets and the gap distance is finalized.

Step 9: Plug in the erase lamp, charger and ESV to their power sources. Turn on the following power sources: ESV, erase, grid voltage supply, coronode current supply and plate voltage supply (only turn on plate voltage supply if using aluminum substrate and trying to obtain an I-V slope plot, if performing a uniformity plot then leave plate voltage supply off).

RIT KGCOE MSD Program Page 9 Revision:

Page 10: Test Plan Templateedge.rit.edu/edge/P10511/public/Test Plan rev4.docx · Web viewMotor Controller: Converts the command signals from the computer’s user interface into electrical

Document Revision No.: 1 Revised: 05/07/23 RIT KGCOE MSD Program

Step 10: On the LabVIEW user interface select the preferred charge measurement for testing (I-V slope plot or Uniformity plot).

Step 11: Input the following data into the appropriate fields in the corresponding units: Photoreceptor diameter (mm), grid voltage (V), coronode current (mA), photoreceptor speed (m/s), ESV scan resolution (mm/rev) and ESV scans per photoreceptor length (pulses/360mm). For an I-V slope plot continue to step 12. For a Uniformity plot, skip step 12 and continue to step 13.

Step 12: Input the following data in the appropriate fields in the corresponding units: Maximum plate voltage (V) and plate voltage increment (V).

Step 13: Check whether or not you would like a Microsoft Excel spreadsheet print out.Step 14: Click ‘run’ to begin test.Step 15: If you would like the ESV to complete its current cycle and then return home (the

location the ESV begins reading at) then click the ‘complete’ button. If you would like the ESV to immediately stop and return home then click the ‘stop’ button.

Step 16: If a Microsoft Excel spreadsheet print out was chosen prior to running the test, then the spreadsheet will be exported and placed in a default folder labeled with the corresponding date and time.

1.5. Definitions; Important Terminology; Key Words1.5.1. End caps: Concentric V-flange design which each end of the photoreceptor

attached to.

1.5.2. Spring Retainer plate: Plate which retains the photoreceptor compression spring to force the end cap toward the photoreceptor. It is held onto the drive shaft by the c-clip.

1.5.3. C-clip: Keeps the spring retainer plate from slipping off of the drive shaft.

1.5.4. Drive Shaft: The shaft which spins the photoreceptor.

1.5.5. ESV: Electrostatic Voltmeter, which measures the surface charge on the photoreceptor.

1.5.6. Charger Slide: The part in which the charger is secured to with double-sided tape. This slides into the charger support beam.

1.5.7. Charger Support Beam: The part that moves laterally in reference to the photoreceptor. There are grooves for the charger mount to slide into.

1.5.8. Erase holder: This beam holds the erase lamp.

1.5.9. Gapping Blocks: Blocks in 0.5mm increment to measure both charger and ESV distance from photoreceptor surface.

1.5.10. Mounting Blocks: Blocks in increments of photoreceptor radii that attach the ESV to the ESV guide.

1.5.11. ESV Guide: The part that holds the mounting blocks. This moves along the length of the photoreceptor by the lead screw.

1.5.12. Charger Mount: This part holds the charger support beam in place. It allows for the charger support beam to slide toward and away from the photoreceptor. There are two of these on the fixture located on both sides of the charger support beam.

RIT KGCOE MSD Program Page 10 Revision:

Page 11: Test Plan Templateedge.rit.edu/edge/P10511/public/Test Plan rev4.docx · Web viewMotor Controller: Converts the command signals from the computer’s user interface into electrical

Document Revision No.: 1 Revised: 05/07/23 RIT KGCOE MSD Program

1.6. References1.6.1. Mike Zona – Xerox Corporation

1.6.2. Professor Kempski – Rochester Institute of Technology

1.6.3. Mechanics of Materials Textbook by R.C. Hibbeler (7th Edition)

RIT KGCOE MSD Program Page 11 Revision:

Page 12: Test Plan Templateedge.rit.edu/edge/P10511/public/Test Plan rev4.docx · Web viewMotor Controller: Converts the command signals from the computer’s user interface into electrical

Document Revision No.: 1 Revised: 05/07/23 RIT KGCOE MSD Program

2. MSD II WKS 2-3: FINAL TEST PLAN 2.1. Data Collection Plan; Sampling Plan

2.1.1. Data Collection Structure

Introduction: The testing of all subsystems will be completed before interfacing the separate components. The entire testing process will be categorized into subsystem testing and final product testing.

i) Subsystem Testing: The various components of the fixture subsystems are tested before interfacing. The electrical hardware including the high voltage supplies and the motors are tested for accurate output and functionality. The various mounts will be measured again to ensure the critical gapping remains consistent to that defined in the design.

ii) Final Testing: Once the prototype is completed, the final testing of the fixture will include data collection and analysis using the LabVIEW software. The coding will be executed for various photoreceptor sizes along with different charger configurations to ensure proper outputs consistent with the customer needs.

2.2. Measurement Capability, Equipment2.2.1.

Test No.

System Components

Description Pass/Fail Criteria

Person in Charge

Checkoff

1 Charger System

charger gap is checked with feeler gauges as to ensure

maintenance of critical gapping

Gap must be between 1-

2mm

Derek Meinke

Matthew Liff

2 Charger System

Grid voltage is checked against the surface bias of the

test drum for consistency

±2V Tony Zhang

3 Charger System

Current for the coronode is checked

for consistency between supply output and the

measured current reading from the

DAQ

±15uA Tony Zhang

4Motor System

P/R System

P/R drive is tested for accuracy using the LabVIEW 1-D

Interactive

±5mm/secTony Zhang

Zaw Htoo

5Motor System

ESV System

ESV drive is tested for accuracy using the LabVIEW 1-D

Interactive. Forward and reverse spin is

made sure to be enabled.

±5mm/secTony Zhang

Zaw Htoo

RIT KGCOE MSD Program Page 12 Revision:

Page 13: Test Plan Templateedge.rit.edu/edge/P10511/public/Test Plan rev4.docx · Web viewMotor Controller: Converts the command signals from the computer’s user interface into electrical

Document Revision No.: 1 Revised: 05/07/23 RIT KGCOE MSD Program

6 System WiringWiring needs to be

consistent with schematic

Wiring configuration matches with

that in the schematic

Tony Zhang

7 ESV System

Vernier calipers are used to ensure

gapping between the ESV and P/R are

within designated criteria

1-2 mmMatthew Liff

Derek Meinke

8 Eraser System

Vernier calipers are used to ensure

gapping between the erase lamp and

P/R are within designated criteria

1-2mmMatthew Liff

Derek Meinke

9 Erase System

Erase lamp will be used on a test drum which is measured to ensure a near

positive bias

±5VTony Zhang

2.2.2.

S.No Date/Time

Test # (from Test

Structure table)

Configuration #

(from test matrix)

Team members present

Problem description

Reasons (if known)

Suggestions/ actions taken

Problem Fixed (Yes/No/Pending)

1

2

3

4

RIT KGCOE MSD Program Page 13 Revision:

Page 14: Test Plan Templateedge.rit.edu/edge/P10511/public/Test Plan rev4.docx · Web viewMotor Controller: Converts the command signals from the computer’s user interface into electrical

Document Revision No.: 1 Revised: 05/07/23 RIT KGCOE MSD Program

5

6

7

8

2.3. Test Conditions, Setup Instructions2.3.1. Refer to section 1.4.5.5

RIT KGCOE MSD Program Page 14 Revision:

Page 15: Test Plan Templateedge.rit.edu/edge/P10511/public/Test Plan rev4.docx · Web viewMotor Controller: Converts the command signals from the computer’s user interface into electrical

Document Revision No.: 1 Revised: 05/07/23 RIT KGCOE MSD Program

3. MSD II – WKS 3-10 DESIGN TEST VERIFICATION Note to Teams: Populate the templates and test processes established in Final Test Plan.

These elements can be integrated or rearranged to match project characteristics or personal/team preferences.

3.1. Test Results3.1.1. Component

3.1.2. Subsystem.

3.1.3. Integration

3.1.4. Reliability

3.1.5. Customer Acceptance

3.2. Logistics and DocumentationWhere are the test results being performed, logged (i.e. project notebook) and documented (i.e. excel spreadsheet)? EDGE team website structure (i.e. document names, file types, and header location).

3.3. Definition of a Successful Test, Pass / Fail Criteria3.4. Contingencies/ Mitigation for Preliminary or Insufficient Results3.5. Analysis of Data – Design Summary3.6. Conclusion or Design Summary

Can you explain why a particular function doesn’t work? Add here or remove how the conclusions are to be reported or summarized (i.e. significance with confidence, pass/fail, etc.) as applicable.

3.7. Function/ Performance ReviewsNote: Some teams organize reviews on a weekly bases starting in week 4 or 5 and other may wish to wait until week 10 or 11. Discuss with your Guide.

3.7.1. Debriefing your Guide and Faculty ConsultantsShare test results, conclusions, any follow-on recommendations, design summary.

3.7.2. Lab Demo with your Guide and Faculty Consultants Perform each of the specifications and features.

3.7.3. Meeting with Sponsor See Customer Acceptance above. Field Demonstration. Deliver the project. Demonstrate to the Sponsor. Customer needs met / not met.

3.8. References

RIT KGCOE MSD Program Page 15 Revision:

Page 16: Test Plan Templateedge.rit.edu/edge/P10511/public/Test Plan rev4.docx · Web viewMotor Controller: Converts the command signals from the computer’s user interface into electrical

Document Revision No.: 1 Revised: 05/07/23 RIT KGCOE MSD Program

Add here or remove as applicable.

3.8.1. Add here or remove as applicable.

3.9. AppendicesAdd or remove as applicable.

3.9.1. Add here or remove as applicable.