    Supplier Standards Manual

    Seat Heat Peel and Stick Heater Control Plan

    Chapter 7 Quality Section

    March 2008 Revision 1.0

    1444481Template - Peel and Stick Heater Control Plan

    N/AN/A

    Deana BorghiJoe HebdaRobert HicksN/A

    ECO #: Rev: Change Description: Date:A Initial Release

    Program Manager

    Phase:

    RFQ # / Basis #:

    Document #:

    Program:

    Model Year:

    Back Office Chief / Manager

    Back Office Lead

  • 8/13/2019 TemplateSeatHeatPeelandStickHeaterControlPlanposted

    2/6

    Supplier Standards Manual

    Seat Heat Peel and Stick Heater Control Plan

    Chapter 7 Quality Section

    March 2008 Revision 1.0

    Control Plan Form Instructions

    Responsibility

    The Quality Manager is responsible for defining the control methods and the reaction plan, and approving and

    maintaining the Control Plan for the system or subsystem (i.e., Components, etc) level product manufacturedat the AG plant.

    The Product Engineer is responsible for delivering the information about the part number and description, the

    product and process characteristics, the significant and critical (SC/CC), and the Design Failure Mode and

    Effects Analysis (DFMEA) results where they relate to the Control Plan.

    The Manufacturing Engineer is responsible for delivering PFMEA and the process steps and description

    information.

    Instruction:

    The AQE/QE develops a Control Plan taking into consideration all requirements applicable to the system or

    subsystem (I.e. , Components, etc) level product manufactured at the AG plant.

    The AQE/QE must review the FMEA forms to identify the necessary controls.

    Special consideration must be given to Critical and Significant characteristics

    The Control Plan form has 3 distinct forms that must be completed at the required phase in the PLUS process:

    DV BuildControl Plan: completed to support the development of prototype builds.

    Pre-launch Control Plan: completed after the Prototype Control Plan with the introduction of saleable vehicle

    builds made from production tools; used until all customer and AG requirements are met.

    Production Control Plan: Provided with Customer Part Submission and becomes effective upon customer

    approval.

    The above Control Plans must include/identify all known Customer Special Characteristics, AG internal

    Special Characteristics and Safety/Regulatory requirements (i.e., All SCs and CCs).

    applicable to the system or subsystem (i.e., Components, etc) level product manufactured at the AG plant.

    Customer SC/CCs,including those controlled at suppliers, must be addressed in the control plan.

    AG SC/CCs controlled in the manufacturing process must be addressed in the control plan.

    Note: System or subsystem level SC/CCs may be controlled at internal or external supplier/s.

    In this case, the AQE should complete all fields on the Control Plan up to and including the Evaluation Method field.

    A suggested reference in the Evaluation Method through Reaction Plan fields would be , "See Supplier Control Plan/s".

    Continuous Compliance Test (CCT) requirements are reflected in the Control plan or the control plan may

    refer to the DVP&R for CCT requirements.

    Customer specific requirements, such as annual dimensional lavout, shall be identified on the Control Plan.

    Refer to the Control Plan Example tab in this document for examples of the above requirements.

    For Customer / Component BU within the scope of VDA:

    Note that the Control Plan shall be identified with "A" in the top right corner whenever there is

    at least 1 critical characteristic mentioned. This identification is required to highlight special

    archiving requirement (eg. 15 years) for this document. See VDA 1 brochure for details.

    Records / LogsThe Control Plan is stored by the Quality Manager.

    References

    Advanced Product Quality Planning and Control Plan (AIAG reference manual)

    Characteristic Management standard (WW-PLUS-ST-02-01)

    WW-PLUS-FR-02-01-E / Rev 08 (01-October-2004) Page 2 of 6

    http://livelink.ag.na.jci.com/livelink/livelink/Characteristic_Management.doc?func=doc.Fetch&nodeId=3518&docTitle=Characteristic+Managementhttp://livelink.ag.na.jci.com/livelink/livelink/Characteristic_Management.doc?func=doc.Fetch&nodeId=3518&docTitle=Characteristic+Management
  • 8/13/2019 TemplateSeatHeatPeelandStickHeaterControlPlanposted

    3/6

    Supplier Standards Manual

    Seat Heat Peel and Stick Heater Control Plan

    Chapter 7 Quality Section

    March 2008 Revision 1.0

    Control PlanDV Build Pre-launch Production Key Contact/Phone Date (Orig.) Date (Rev.)

    Control Plan Number

    Part Number/Latest Change Level Core Team Customer Engineering Approval/Date (If Req'd)

    Seat Heater team

    Part Name/Description Supplier/Plant Approval/Date Customer Quality Approval/Date (If Req'd)

    Supplier/Plant Supplier Code Other Approval/Date (If Req'd) Other Approval/Date (If Req'd)

    Part / Process Name / Machine, Device, Characteristics Special Methods

    Process Operation Jig, Tools No. Process Char. Product / Process Evaluation Sample Control Method Reaction

    Number Description

    For Mfg.

    Class. Specification/Tolerance Measurement

    Technique Size Freq.

    Plan

    Stock seat heater at

    correct station on

    assembly line

    assure correct

    part number per

    ODS

    each

    containervisual

    management

    Remove

    incorrect

    product from

    line.

    Remove seat heater

    assembly from container

    without stress on wire

    harness

    Use handling

    technique which

    does not stress

    harness, perODS

    each

    assemblyvisual

    management

    Aside units

    handled

    improperly

    fordisposition

    Post assembly, assure

    heater is in correct

    position

    assure position

    of heater on

    cover meets

    requirements of

    ODS

    each

    assemblyvisual

    management,

    template

    Aside

    assemblies

    positioned

    improperly

    for

    disposition

    post assembly, assureadhesive backing tape is

    removed

    visually checkeach adhesive

    area such that

    the appropriate

    color is showing

    in the tape

    windows

    each

    assembly visual check Asidecushion

    assemblies

    which do not

    meet criteria

    assure no foreign

    objects traped under

    heater post assembly to

    pad

    run hand over

    heater to detect

    foreign objects

    each

    assemblymanual check Aside

    assemblies

    with poor

    adhesion to

    the pad for

    disposition

    Stock seat heater at

    correct station on

    assembly line

    assure correct

    part number per

    ODS

    Check visually to

    print and ODS

    Remove seat heater

    assembly from container

    without stress on wireharness

    Use handling

    technique which

    does not stressharness per

    ODS

    observe

    handling

    technique used

    Post assembly, assure

    heater is in correct

    position

    assure position

    of heater on

    cover meets

    requirements of

    ODS within +/-

    10 mm

    scale

    Product

    Operator responsibilities

    Auditor responsibilities

    onsecutiveassemblies

    ceperjobrotation

    orwhomuscorrectoperation,quarrentineallproduct

    tsucccessfulauditforverification.

    WW-PLUS-FR-02-01-E / Rev 08 (01-October-2004) Page 3 of 6

  • 8/13/2019 TemplateSeatHeatPeelandStickHeaterControlPlanposted

    4/6

    Supplier Standards Manual

    Seat Heat Peel and Stick Heater Control Plan

    Chapter 7 Quality Section

    March 2008 Revision 1.0

    Part / Process Name / Machine, Device, Characteristics Special Methods

    Process Operation Jig, Tools No. Process Char. Product / Process Evaluation Sample Control Method Reaction

    Number Description

    For Mfg.

    Class. Specification/Tolerance Measurement

    Technique Size Freq.

    Plan

    Product

    post assembly, assure

    adhesive tape backing

    has been removed

    correct color

    shows in tape

    windows

    visual check

    run hand over

    heater to detect

    foreign objects

    manual checkassure no foreign

    objects traped under

    heater post assembly to

    pad

    5c

    o

    Stopoperation,contactsupervis

    builtsincelas

    WW-PLUS-FR-02-01-E / Rev 08 (01-October-2004) Page 4 of 6

  • 8/13/2019 TemplateSeatHeatPeelandStickHeaterControlPlanposted

    5/6

    Supplier Standards Manual

    Seat Heat Peel and Stick Heater Control Plan

    Chapter 7 Quality Section

    March 2008 Revision 1.0

    Control Plan - ExampleDV Build Pre-launch X Production Key Contact/Phone Date (Orig.) Date (Rev.)

    Control Plan Number

    Part Number/Latest Change Level Core Team Customer Engineering Approval/Date (If Req'd)

    Part Name/Description Supplier/Plant Approval/Date Customer Quality Approval/Date (If Req'd)

    Supplier/Plant Supplier Code Other Approval/Date (If Req'd) Other Approval/Date (If Req'd)

    Part / Process Name / Machine, Device, Characteristics Special Methods

    Process Operation Jig, Tools No. Process Char. Product / Process Evaluation Sample Control Method Reaction

    Number Description For Mfg. Class. Specification/Tolerance Measurement

    Technique

    Size Freq. Plan

    A) Control at Supplier

    All

    effected

    parts-see

    list

    Receiving Flammability:

    FMVSS 302

    CC Per FMVSS 302 See Supplier

    Control Plans

    See

    Supplier

    Control

    Plans

    See

    Supplier

    Control

    Plans

    Supplier Control

    Plans

    See

    Supplier

    Control

    Plans

    All

    effected

    parts-see

    list

    Annual Supplier

    PPAP/Recertifcation

    FMVSS 201 CC Per FMVSS 201 Suppliers

    PPAP/Cert

    Review

    Each LF

    part -

    see list

    Annual Annual Supplier

    PPAP/Recertific

    ation. Review

    PPAP.

    Follow

    Corrective

    Action

    procedure

    Cushion

    foam Part

    # abcdefg

    Receiving FMVSS 202 SC Foam ILD See Supplier

    Control Plan

    See

    Supplier

    Control

    Plan

    See

    Supplier

    Control

    Plan

    See Supplier

    Control Plan

    See

    Supplier

    Control Plan

    Part # 123 Annual Supplier

    PPAP/Recertifcation

    FMVSS 201 CC Per FMVSS 201 PPAP/Cert

    Review

    1

    Package

    Annual Annual Supplier

    PPAP/Recertific

    ation. ReviewPPAP.

    Follow

    Corrective

    Actionprocedure

    Plastic

    Part #

    12345

    Receiving Part Length SC 30mm +/- 2mm See Supplier

    Control Plan

    See

    Supplier

    Control

    Plan

    See

    Supplier

    Control

    Plan

    See Supplier

    Control Plan

    See

    Supplier

    Control Plan

    B) Control at AG Plant

    Incoming Inspection

    Seq

    Number/

    Etc

    Incoming Inspection Material

    Specification ABC

    CC Must meet spec DCE Incoming

    Inspection

    1 Cert Each Lot Review Supplier

    Certification

    Return to

    Supplier

    Assembly Process

    Process # Marriage of back to

    track assembly

    Bolt Torque Atlas Copco Torque

    Driver Torque

    Monitoring

    SC 24 NM +/- 4NM Torque

    Monitoring

    System

    Controller

    100% 100% Atlas Copco Follow

    Corrective

    action plan

    on ODS

    Final Inspection

    Station 15 Set-up Shipping position Indexing

    Build fixture

    Shipping Positon SC Seat Angle 30Deg +/-5

    deg

    Station 17

    lasers

    100% Continuo

    us

    Automated

    Inspection

    Part not

    released.

    Following

    NCMaterial/Re

    work

    procedure

    Station P Dimensional inspection Overhead

    System

    Check

    fixture

    SC1, SC2 SC3,

    SC4

    SC Perimeter Inspection

    checklist +10mm/-

    10mm

    Overhead

    System Check

    fixture

    1 Per Shift Check Sheets Follow

    Corrective

    Action plan

    on ODS

    Periodic Checks (at JCI)

    Dimensional inspection Overhead

    System

    Check

    fixture

    Surface Contour

    points A-F

    SC Perimeter Inspection

    checklist +10mm/-

    10mm

    CMM 1 Annual Layout

    Inspection

    Record

    Follow

    Corrective

    Action

    procedure

    Product

    (Optional) Highlight Control of a Key JCI Identified Supplier SC/CC at a Supplier (not a System/Subsystem Characteristic) This would be used to highlight a key SC/CC on components.

    Option 2) System/Subsystem level SC/CC Controlled at a Component/Part SC/CC Level at Multiple/or Single Supplier/s.

    This would be used a) If you choose to list all Supplier SC/CC's in the control plan b) To highlight the key SC/CC components.

    Option 1a)

    Option 1) System/Subsystem level SC/CC Controlled at a Component/Part SC/CC Level at Multiple Suppliers

    Option 1b)

    Option 2a)

    Option 2b)

    WW-PLUS-FR-02-01-E / Rev 08 (01-October-2004) Page 5 of 6

  • 8/13/2019 TemplateSeatHeatPeelandStickHeaterControlPlanposted

    6/6

    Supplier Standards Manual

    Seat Heat Peel and Stick Heater Control Plan

    Chapter 7 Quality Section

    March 2008 Revision 1.0

    Control Plan - ExampleDV Build Pre-launch X Production Key Contact/Phone Date (Orig.) Date (Rev.)

    Control Plan Number

    Part Number/Latest Change Level Core Team Customer Engineering Approval/Date (If Req'd)

    Part Name/Description Supplier/Plant Approval/Date Customer Quality Approval/Date (If Req'd)

    Supplier/Plant Supplier Code Other Approval/Date (If Req'd) Other Approval/Date (If Req'd)

    Part / Process Name / Machine, Device, Characteristics Special Methods

    Process Operation Jig, Tools No. Process Char. Product / Process Evaluation Sample Control Method Reaction

    Number Description For Mfg. Class. Specification/Tolerance Measurement

    Technique

    Size Freq. Plan

    Product

    Continuous Compliance

    Testing - Visor

    Assembly

    Flammability:

    FMVSS 302

    CC Per FMVSS 302 Laboratory Test 6 Annual Continuous

    Compliance

    Testing

    Follow

    Corrective

    Action

    procedure

    Continuous Compliance

    Testing - Console

    Assembly

    Flammability:

    FMVSS 201 and

    302

    CC See DVP&R See DVP&R See

    DVP&R

    Annual Continuous

    Compliance

    Testing

    Follow

    Corrective

    Action

    procedure

    WW-PLUS-FR-02-01-E / Rev 08 (01-October-2004) Page 6 of 6