8/13/2019 TemplateSeatHeatPeelandStickHeaterControlPlanposted
1/6
Supplier Standards Manual
Seat Heat Peel and Stick Heater Control Plan
Chapter 7 Quality Section
March 2008 Revision 1.0
1444481Template - Peel and Stick Heater Control Plan
N/AN/A
Deana BorghiJoe HebdaRobert HicksN/A
ECO #: Rev: Change Description: Date:A Initial Release
Program Manager
Phase:
RFQ # / Basis #:
Document #:
Program:
Model Year:
Back Office Chief / Manager
Back Office Lead
-
8/13/2019 TemplateSeatHeatPeelandStickHeaterControlPlanposted
2/6
Supplier Standards Manual
Seat Heat Peel and Stick Heater Control Plan
Chapter 7 Quality Section
March 2008 Revision 1.0
Control Plan Form Instructions
Responsibility
The Quality Manager is responsible for defining the control methods and the reaction plan, and approving and
maintaining the Control Plan for the system or subsystem (i.e., Components, etc) level product manufacturedat the AG plant.
The Product Engineer is responsible for delivering the information about the part number and description, the
product and process characteristics, the significant and critical (SC/CC), and the Design Failure Mode and
Effects Analysis (DFMEA) results where they relate to the Control Plan.
The Manufacturing Engineer is responsible for delivering PFMEA and the process steps and description
information.
Instruction:
The AQE/QE develops a Control Plan taking into consideration all requirements applicable to the system or
subsystem (I.e. , Components, etc) level product manufactured at the AG plant.
The AQE/QE must review the FMEA forms to identify the necessary controls.
Special consideration must be given to Critical and Significant characteristics
The Control Plan form has 3 distinct forms that must be completed at the required phase in the PLUS process:
DV BuildControl Plan: completed to support the development of prototype builds.
Pre-launch Control Plan: completed after the Prototype Control Plan with the introduction of saleable vehicle
builds made from production tools; used until all customer and AG requirements are met.
Production Control Plan: Provided with Customer Part Submission and becomes effective upon customer
approval.
The above Control Plans must include/identify all known Customer Special Characteristics, AG internal
Special Characteristics and Safety/Regulatory requirements (i.e., All SCs and CCs).
applicable to the system or subsystem (i.e., Components, etc) level product manufactured at the AG plant.
Customer SC/CCs,including those controlled at suppliers, must be addressed in the control plan.
AG SC/CCs controlled in the manufacturing process must be addressed in the control plan.
Note: System or subsystem level SC/CCs may be controlled at internal or external supplier/s.
In this case, the AQE should complete all fields on the Control Plan up to and including the Evaluation Method field.
A suggested reference in the Evaluation Method through Reaction Plan fields would be , "See Supplier Control Plan/s".
Continuous Compliance Test (CCT) requirements are reflected in the Control plan or the control plan may
refer to the DVP&R for CCT requirements.
Customer specific requirements, such as annual dimensional lavout, shall be identified on the Control Plan.
Refer to the Control Plan Example tab in this document for examples of the above requirements.
For Customer / Component BU within the scope of VDA:
Note that the Control Plan shall be identified with "A" in the top right corner whenever there is
at least 1 critical characteristic mentioned. This identification is required to highlight special
archiving requirement (eg. 15 years) for this document. See VDA 1 brochure for details.
Records / LogsThe Control Plan is stored by the Quality Manager.
References
Advanced Product Quality Planning and Control Plan (AIAG reference manual)
Characteristic Management standard (WW-PLUS-ST-02-01)
WW-PLUS-FR-02-01-E / Rev 08 (01-October-2004) Page 2 of 6
http://livelink.ag.na.jci.com/livelink/livelink/Characteristic_Management.doc?func=doc.Fetch&nodeId=3518&docTitle=Characteristic+Managementhttp://livelink.ag.na.jci.com/livelink/livelink/Characteristic_Management.doc?func=doc.Fetch&nodeId=3518&docTitle=Characteristic+Management -
8/13/2019 TemplateSeatHeatPeelandStickHeaterControlPlanposted
3/6
Supplier Standards Manual
Seat Heat Peel and Stick Heater Control Plan
Chapter 7 Quality Section
March 2008 Revision 1.0
Control PlanDV Build Pre-launch Production Key Contact/Phone Date (Orig.) Date (Rev.)
Control Plan Number
Part Number/Latest Change Level Core Team Customer Engineering Approval/Date (If Req'd)
Seat Heater team
Part Name/Description Supplier/Plant Approval/Date Customer Quality Approval/Date (If Req'd)
Supplier/Plant Supplier Code Other Approval/Date (If Req'd) Other Approval/Date (If Req'd)
Part / Process Name / Machine, Device, Characteristics Special Methods
Process Operation Jig, Tools No. Process Char. Product / Process Evaluation Sample Control Method Reaction
Number Description
For Mfg.
Class. Specification/Tolerance Measurement
Technique Size Freq.
Plan
Stock seat heater at
correct station on
assembly line
assure correct
part number per
ODS
each
containervisual
management
Remove
incorrect
product from
line.
Remove seat heater
assembly from container
without stress on wire
harness
Use handling
technique which
does not stress
harness, perODS
each
assemblyvisual
management
Aside units
handled
improperly
fordisposition
Post assembly, assure
heater is in correct
position
assure position
of heater on
cover meets
requirements of
ODS
each
assemblyvisual
management,
template
Aside
assemblies
positioned
improperly
for
disposition
post assembly, assureadhesive backing tape is
removed
visually checkeach adhesive
area such that
the appropriate
color is showing
in the tape
windows
each
assembly visual check Asidecushion
assemblies
which do not
meet criteria
assure no foreign
objects traped under
heater post assembly to
pad
run hand over
heater to detect
foreign objects
each
assemblymanual check Aside
assemblies
with poor
adhesion to
the pad for
disposition
Stock seat heater at
correct station on
assembly line
assure correct
part number per
ODS
Check visually to
print and ODS
Remove seat heater
assembly from container
without stress on wireharness
Use handling
technique which
does not stressharness per
ODS
observe
handling
technique used
Post assembly, assure
heater is in correct
position
assure position
of heater on
cover meets
requirements of
ODS within +/-
10 mm
scale
Product
Operator responsibilities
Auditor responsibilities
onsecutiveassemblies
ceperjobrotation
orwhomuscorrectoperation,quarrentineallproduct
tsucccessfulauditforverification.
WW-PLUS-FR-02-01-E / Rev 08 (01-October-2004) Page 3 of 6
-
8/13/2019 TemplateSeatHeatPeelandStickHeaterControlPlanposted
4/6
Supplier Standards Manual
Seat Heat Peel and Stick Heater Control Plan
Chapter 7 Quality Section
March 2008 Revision 1.0
Part / Process Name / Machine, Device, Characteristics Special Methods
Process Operation Jig, Tools No. Process Char. Product / Process Evaluation Sample Control Method Reaction
Number Description
For Mfg.
Class. Specification/Tolerance Measurement
Technique Size Freq.
Plan
Product
post assembly, assure
adhesive tape backing
has been removed
correct color
shows in tape
windows
visual check
run hand over
heater to detect
foreign objects
manual checkassure no foreign
objects traped under
heater post assembly to
pad
5c
o
Stopoperation,contactsupervis
builtsincelas
WW-PLUS-FR-02-01-E / Rev 08 (01-October-2004) Page 4 of 6
-
8/13/2019 TemplateSeatHeatPeelandStickHeaterControlPlanposted
5/6
Supplier Standards Manual
Seat Heat Peel and Stick Heater Control Plan
Chapter 7 Quality Section
March 2008 Revision 1.0
Control Plan - ExampleDV Build Pre-launch X Production Key Contact/Phone Date (Orig.) Date (Rev.)
Control Plan Number
Part Number/Latest Change Level Core Team Customer Engineering Approval/Date (If Req'd)
Part Name/Description Supplier/Plant Approval/Date Customer Quality Approval/Date (If Req'd)
Supplier/Plant Supplier Code Other Approval/Date (If Req'd) Other Approval/Date (If Req'd)
Part / Process Name / Machine, Device, Characteristics Special Methods
Process Operation Jig, Tools No. Process Char. Product / Process Evaluation Sample Control Method Reaction
Number Description For Mfg. Class. Specification/Tolerance Measurement
Technique
Size Freq. Plan
A) Control at Supplier
All
effected
parts-see
list
Receiving Flammability:
FMVSS 302
CC Per FMVSS 302 See Supplier
Control Plans
See
Supplier
Control
Plans
See
Supplier
Control
Plans
Supplier Control
Plans
See
Supplier
Control
Plans
All
effected
parts-see
list
Annual Supplier
PPAP/Recertifcation
FMVSS 201 CC Per FMVSS 201 Suppliers
PPAP/Cert
Review
Each LF
part -
see list
Annual Annual Supplier
PPAP/Recertific
ation. Review
PPAP.
Follow
Corrective
Action
procedure
Cushion
foam Part
# abcdefg
Receiving FMVSS 202 SC Foam ILD See Supplier
Control Plan
See
Supplier
Control
Plan
See
Supplier
Control
Plan
See Supplier
Control Plan
See
Supplier
Control Plan
Part # 123 Annual Supplier
PPAP/Recertifcation
FMVSS 201 CC Per FMVSS 201 PPAP/Cert
Review
1
Package
Annual Annual Supplier
PPAP/Recertific
ation. ReviewPPAP.
Follow
Corrective
Actionprocedure
Plastic
Part #
12345
Receiving Part Length SC 30mm +/- 2mm See Supplier
Control Plan
See
Supplier
Control
Plan
See
Supplier
Control
Plan
See Supplier
Control Plan
See
Supplier
Control Plan
B) Control at AG Plant
Incoming Inspection
Seq
Number/
Etc
Incoming Inspection Material
Specification ABC
CC Must meet spec DCE Incoming
Inspection
1 Cert Each Lot Review Supplier
Certification
Return to
Supplier
Assembly Process
Process # Marriage of back to
track assembly
Bolt Torque Atlas Copco Torque
Driver Torque
Monitoring
SC 24 NM +/- 4NM Torque
Monitoring
System
Controller
100% 100% Atlas Copco Follow
Corrective
action plan
on ODS
Final Inspection
Station 15 Set-up Shipping position Indexing
Build fixture
Shipping Positon SC Seat Angle 30Deg +/-5
deg
Station 17
lasers
100% Continuo
us
Automated
Inspection
Part not
released.
Following
NCMaterial/Re
work
procedure
Station P Dimensional inspection Overhead
System
Check
fixture
SC1, SC2 SC3,
SC4
SC Perimeter Inspection
checklist +10mm/-
10mm
Overhead
System Check
fixture
1 Per Shift Check Sheets Follow
Corrective
Action plan
on ODS
Periodic Checks (at JCI)
Dimensional inspection Overhead
System
Check
fixture
Surface Contour
points A-F
SC Perimeter Inspection
checklist +10mm/-
10mm
CMM 1 Annual Layout
Inspection
Record
Follow
Corrective
Action
procedure
Product
(Optional) Highlight Control of a Key JCI Identified Supplier SC/CC at a Supplier (not a System/Subsystem Characteristic) This would be used to highlight a key SC/CC on components.
Option 2) System/Subsystem level SC/CC Controlled at a Component/Part SC/CC Level at Multiple/or Single Supplier/s.
This would be used a) If you choose to list all Supplier SC/CC's in the control plan b) To highlight the key SC/CC components.
Option 1a)
Option 1) System/Subsystem level SC/CC Controlled at a Component/Part SC/CC Level at Multiple Suppliers
Option 1b)
Option 2a)
Option 2b)
WW-PLUS-FR-02-01-E / Rev 08 (01-October-2004) Page 5 of 6
-
8/13/2019 TemplateSeatHeatPeelandStickHeaterControlPlanposted
6/6
Supplier Standards Manual
Seat Heat Peel and Stick Heater Control Plan
Chapter 7 Quality Section
March 2008 Revision 1.0
Control Plan - ExampleDV Build Pre-launch X Production Key Contact/Phone Date (Orig.) Date (Rev.)
Control Plan Number
Part Number/Latest Change Level Core Team Customer Engineering Approval/Date (If Req'd)
Part Name/Description Supplier/Plant Approval/Date Customer Quality Approval/Date (If Req'd)
Supplier/Plant Supplier Code Other Approval/Date (If Req'd) Other Approval/Date (If Req'd)
Part / Process Name / Machine, Device, Characteristics Special Methods
Process Operation Jig, Tools No. Process Char. Product / Process Evaluation Sample Control Method Reaction
Number Description For Mfg. Class. Specification/Tolerance Measurement
Technique
Size Freq. Plan
Product
Continuous Compliance
Testing - Visor
Assembly
Flammability:
FMVSS 302
CC Per FMVSS 302 Laboratory Test 6 Annual Continuous
Compliance
Testing
Follow
Corrective
Action
procedure
Continuous Compliance
Testing - Console
Assembly
Flammability:
FMVSS 201 and
302
CC See DVP&R See DVP&R See
DVP&R
Annual Continuous
Compliance
Testing
Follow
Corrective
Action
procedure
WW-PLUS-FR-02-01-E / Rev 08 (01-October-2004) Page 6 of 6