Taipower's Development Status and Prospectors of CCS Technology in Taiwan
CHANGCHANG--REN FEIREN FEI
Former Vice PresidentTai an Po er CompanTaiwan Power Company
September 4 2013
1
-
OutlineOutline
1.Taipower’s Action on CO2 Emission Reduction
2.Preferred Storage Site Investigation
3.Deep Drilling/Coring Launched in 2012
4 Carbon Capture Development4.Carbon Capture Development
5.Conclusion Remarks
2
-
1. Taipower’s Action on CO2 Emission Reduction
L t i i / T i ’ th l l t
3 67
CO2Emission
Coal-fire power Location
2011Emissions
Largest emission source / Taipower’s thermal power plant
1
4
Ranking Plant Name (ton/yr)
1 台中 台中縣龍井鄉 39,700,000
2 興達 高雄縣永安鄉 15,200,000
3 林口 台北縣林口鎮 4 414 1533 林口 台北縣林口鎮 4,414,153
4 通霄 苗栗縣通霄鎮 2,390,666
5 大林 高雄市小港區 2,086,900
6 協和 基隆市 1 597 4842
8
6 協和 基隆市 1,597,484
7 大潭 桃園縣觀音鄉 1,474,815
8 南部 高雄市 998,205(http://www.carma.org)
5 The CO2 annual emission amount of Tai-chung coal-fire power plant were highlighted by CARMA website in 2011, ranked no.1 in Taiwan.
(http://www.carma.org)
TPC Major Thermal Emission in total 67.9Mt-CO2Taiwan Annual Emission 270Mt-CO2
The power generation plant of TPC is the major emission source, around 25 % by all sectors in Taiwan.
2
3
-
CO Ab t t I iti ti f G tCO2 Abatement Initiatives of GovernmentThe government promises to cut domestically the emission amount down to 2005’s level by year of 2020, and down to the 2000’s level by the year 2025.y y , y y
Data after Taiwan BOE (2012)
Business as UsualUsual
4
-
T i ’ GHG Ab t t St t iTaipower’s GHG Abatement Strategies
5
-
2. Preferred Storage Site InvestigationFirst Step : Site Screening in 2008 2009First Step : Site Screening in 2008-2009 10 CO2 Sequestration Candidate
Sites Onshore / Offshore TaiwanTai-Shi Basin has been selected(A deep Saline Aquifer)
6
-
Preferred Site Selected Preferred Site Selected1. Storage Volume : Saline Aquifer is required for
Tai-power (1~4 Giga ton).Tai-hsi Basin is highly expected.
2. Sedimentary rock gently dipping toward E, rather stable and beyond deformable orogenicrather stable and beyond deformable orogenic belt.
3. Cap rock (Chinshui Shale) and storage rock (G i Zh Li f i ) il bl(Gui-Zhu-Lin formations ) are available.
4. Injection depth is about 2,400m underground.
storage storage rockrock cap rockcap rock
Saline AquiferSaline Aquifer
7
-
St C it E l ti (2009)Storage Capacity Evaluation (2009)Specific parameters input and Monte-Carlo Simulation results at Tai-hsi Basin
Q = (Vt × r ×ψ) × ρ × (ε× s)
parameters Min. Most likely Max.
Vt (×103m3) 3 333 4 166 4 999Vt (×10 m ) 3,333 4,166 4,999
r 0.693 0.789 0.792
0.059 0.119 0.235
ρ (kg m-3) 100.0 365.0 500.0ρ (kg m ) 100.0 365.0 500.0
(%) 33.3 50.0 66.7
s (%) 30.0 60.0 90.0
Observed Max. 15 49 Billion tons
Preliminary estimated CO2 storage
capacity 15.49 Billion. tons
Observe Min. capacity 0.564 Billion. tons
Observed Avg y 2 gwith about 4.5 billion tons capacity for Preferred Site of Tai-hsi basin
Observed Avg. capacity 4.518 Billion. tons
10th percentile 2.168 Billion. tons
90th percentile 7.359 Billion. tons
8
-
M i A il bl CO St Ti i YMaximum Available CO2 Storage Time in YearFor Tai-Power Site : S = A/B =113.(Year)
S= Maximum Available CO2 Storage Time in Year Using Tai-hsi BasinS Maximum Available CO2 Storage Time in Year Using Tai hsi Basin Target Aquifer
A= Maximum Storage Capacity in Tai-hsi Basin Target AquiferA= 4 5Gt CO = 4500 Mt COA= 4.5Gt-CO2= 4500 Mt-CO2
B= National Carbon Reduction Target Amount Up to 2020 ×19%(CCS Contribution)
B 210 Mt CO 19%B=210 Mt-CO2 × 19%Carbon Dioxide Reduction:210Mton
9
-
Selected Test Site for Pilot TestSelected Test Site for Pilot Test
Test Site LocationTest Site Location30km Radius30km Radius
Tai-Hsi Basin,South FlankSouth Flank
Chang Hua CoastalChang-Hua Coastal Industrial Park,Chang-Hua County
10
-
Sit I ti ti i 2010 2011 Site Investigation in 2010-2011•• Seismic Survey
14 km, 2-D Reflection14 km, 2 D Reflection•• Sample Coring from Outcrops
200m, for cap/storage rocks Incl. rock formations above
11
-
Seismic Reflection Exploration Results
(a) Seismic Profiles and Ground Surface Seismic Lines (b) Seismic Profiles and Top Surface of Cap Rock
12
-
Tai-Power’s Two Phase Flow Test Apparatus
Injecting end 10ml/min
Out-flowing end
Fixed pressureFixed pressure
Test control temperature : 40 ℃confining pressure :13MPaconfining pressure :13MPaBack pressure :10MPa.
13
-
Constant Flow Simulation
14
-
CO Migration Study for Various Trapping Mechanism
AOR CriteriaReservoir Depth Over 800m
CO2 Migration Study for Various Trapping Mechanism
Reservoir Depth Within 3000mCap Rock Thickness More Than 30mAway From Fault at least 5 km
• Site Scale– Injection rate studyj y– Monitoring by well
configuration– Risk of leakage from well(s)
B i S l• Basin Scale– Fate of injected CO2 plume– Area of review for Regulator
15
-
3.Deep Drilling/Coring Launched in 2012
D D illi /C i L h d i 2012Deep Drilling/Coring Launched in 2012
Drill Rig (50m height)
Test Site
2012/Jul/25 Drilling Start2012/A g/03 Reach 1500 m (C tting) 2012/Aug/03 Reach 1500 m (Cutting)
2012/Aug/11-12 First Round Open-hole Logging (SLB) 2012/September PQ Core Drilling 1500-3000m Start-up Will Become one of the monitoring wells Will Become one of the monitoring wells
Ware HouseWare House
Site Characterization Well, Site Characterization Well, 3000m Deep3000m Deep
20122012--0707--0909
16
-
17
-
2013-05-0818
-
19
-
Progress at a glance Progress at a glance
Well Logging System, Schlumberger Wire-line PQ Core taking Process
Camera Image Scanner smartCIS 1000 M l i S C L i SCamera Image Scanner smartCIS 1000 Multi-Sensor Core Logging System
20
-
TaiTai--power’s Tentative Road Map and Goals Towards CCSpower’s Tentative Road Map and Goals Towards CCS
Fi l Y (Fiscal Year(2000+) 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25Preferred Site Selected
Characterization of Preferred Site
Site Site CharacterizationCharacterization
& Pilot Test& Pilot Test
Wells Preparation for Pilot Test
Storage Design and Construction
Characterization of Preferred Site
(2 Monitoring Wells&1 injecting well Down to 3000 m)
& Pilot Test& Pilot Test g g
Measurement, Monitoring and Validation (MMV)
CO2 Injection
DemonstrationDemonstration
(MMV)
Flue Gas Capturing Tech. ImportedDemonstrationDemonstrationOperationOperation
p g p
Demonstration Plan Ready
TowardsTowardsCommercializationCommercialization
Full Scale Plan
1 Mt/Yr
21
-
4.Carbon Capture Development
Taiwan Power CO2 Capture Roadmap
2011 2014 2016 2018 2020 20252011 2014 2016 2018 2020 2025
domestic & foreign capture capture technology domestic & foreign technology survey
(low cost; ≤20USD)
technology assessment
integration and validation
(low cost; ≤20USD) (small scale ) (full scale )
The Commercial carbon
advanced sorbent development at TPRI
capture method may consider importing the well-defined technology provided by foreign
(less energy intensive)gy p y g
competitive supplier while retaining a domestic research momentum in parallelmomentum in parallel
22
-
Taiwan Power CO2 Capture Technology
Challenges of Current CO2 Capture Technologies:
1 Energy Intensive Regeneration Process1. Energy Intensive Regeneration Process
2. Huge Solvent Consumption
3. High Regeneration Temperature
Advantages of TPRI’s Advanced Absorbent:
1. Less Regeneration Energy Required
2. No Solvent Consumptionp
3. Lower Regeneration Temperature: low-grade waste heat of
ti l l t b tili d ticonventional power plant can be utilized as regeneration energy
23
-
5.Conclusion Remarks (1/2)
Tai-power’s Road Map for Carbon Sequestration Pilot Project is already set and aimed to complete in 2017.j y p
Core study is regarded as an important issue and abundant cores will be used to ensure the data confidence.
History matching works will be employed when upcoming injection test of CO2 begins in 2016.
Risk assessments play an crucial role to the public acceptance Risk assessments play an crucial role to the public acceptance in early phases of Tai-power’s carbon sequestration in deep saline aquifer. On-going efforts are being taken inside project.q g g g p j(to be continued)
24
-
5.Conclusion Remarks (2/2)
To provide the outreach and communication material to the stakeholders, scenario analyses for plume migration and storage safety have been conducted by numerical simulation, based on preliminary rock parameters,
ti l f it d b i lrespectively for site and basin scale scopes. The Commercial carbon capture method may consider
importing the well-defined technology provided byimporting the well defined technology provided by foreign competitive supplier while retaining a domestic research momentum in parallel.
25
-
Thank you for your attention!