TaiLing by Duo Crane

9
**3* RIGGING ANALYSIS for STEAM DRUM LIFTING by WINCH Refer to ASME B30.26-2004 Rigging Hardware and Hoisting and Rigging Safety Manual (Book) 11/12/2011 Jakarta HaGun

Transcript of TaiLing by Duo Crane

**3*

RIGGING ANALYSIS for STEAM DRUM LIFTING by WINCH Refer to ASME B30.26-2004 Rigging Hardware and Hoisting and Rigging Safety Manual (Book)

11/12/2011

Jakarta

HaGun

BAB I. RIGGING ANALYSIS

A. Connecting Steam drum to sling by using Double Wrap Basket Hitch

2

E-mail:[email protected]

3

E-mail:[email protected]

Lead Line Load Example A = 25 ton

1 line= 25 ton

Lead Line Load Example B = 25 ton

6 line= 4,167 ton ~ 5 ton

Load on structure A = 25 ton + 25 ton = 50 ton

Load on structure B = 25 ton + 5 ton = 30 ton

B. Angle effect to BLock Load

Analysis:

Load = 25 ton

Lead Line Load = 25 ton

6 line= 4,167 ton ~ 5 ton

Load Block C = Load x Factor α deg angle

Load Block C = 25 ton x 2 = 50 ton

Load on structure = Load + Lead Line Load

Lead Line Load = Load

Parts of Line at Load

4

E-mail:[email protected]

.

Load Block D = Lead Line Load x Factor α deg angle

Load Block D = 5 ton x 1.87 = 9.35 ton

.

Load Block E = Lead Line Load x Factor α deg angle

Load Block E = 5 ton x 0.84 = 4.2 ton

.

Load Block F = Lead Line Load x Factor α deg angle

Load Block F = 5 ton x 1.41 = 7.05 ton

5

E-mail:[email protected]

6

E-mail:[email protected]

7

E-mail:[email protected]

8

E-mail:[email protected]