Getting Ready for El Nino
Wednesday, February 8, 2016
TAC Campus Tech Meeting
EL NIÑO FEMA Fullerton Flood Zone
• Text goes here.
IT El Niño Preparation Updates
• Move IT equipment off of the floor– Basement/First Floor sweep - Completed
• POD is delivered and placed on the platform• Temporary Data Centers
– CP -250 • Electrical/Cooling work in progress• Ready to move equipment this week
– Irvine Data Center –• Equipment Move Completed
• Contingency plan for remaining Data Center Equipment– Move IT equipment from the basement to higher floors
Move This Weekend• Complex Move• Requires a lot of collaboration• Coordinated shutdown and restart
procedures• IT Resources are available during the
entire move period• Details to follow
Secondary Data Center Location
POD On Site
POD On Site
Secondary DC Tentative Timeline• February
– 1st week : POD Configuration/Fiber Termination– 2nd week : POD Commissioning– 12th : Move redundant network equipment– 13th 2pm – 14th 6am: Move servers and storage
(Group 1) – Moodle will be down during the move.– 14th 2pm – 15th 6am: Move servers and storage (Group
2) – Titan Card will be down during the move.– 15th POD is operational with backup generator– 20th POD gets utility power and fully operational
POD Move ScheduleFor TAC Only. Do not distribute outside of TAC/IT
Estimated Move Window
Saturday Sunday
Before 2PM Administrators shut down services completely. (Any VM’s not shut down by 2PM will be shut down by IT Server team.)
2PM-6PM NetApp, Moodle, ½ VCL, ½ email, ½ Prod Vmhosts
Compellent, ½ ERP, Equalogic, ½ Email. Web applications/DBs
7PM-11PM ½ VCL, Ironport, Telesoft, and ½ ERP
½ Prod Vmhosts, Colo Vmhosts, Wireless/Wireless housing, Csgold, Authentication services
11PM-Complete
Racking of Servers. Restoration of services. Validation and Testing.
*Titanium (down Sat 2PM-Sun 6am), Adobe Connect and VCL will be completely offline
*Titan Card, Departmental services in our VM /Colo Vmware will be down
**Communication to campus community is degradation of service Fri-Mon 2/12-2/15.
Move Logistics• Command Center (PLS-299)
– Hours of operations (2pm – 11pm) Sat/Sun– Contact numbers
• Skype for Business (657-278-5962) PIN# 779027
• IT PMs at the Command Center, POD and Data Center
• IT Help Desk will be minimally staffed for general campus community calls
• Timely shutdown and restart
What is Expected of Me?• Ensure you are on DL-Campus-Techs• Send cell phone number to [email protected]• Check e-mail continuously for updates during the move on Saturday
and Sunday• By Wednesday 2/10, ensure that your server patches are updated to
prevent delays during actual shutdown time.• Perform a test shut down early this week, if possible. • Pre-shutdown Applications/OS verification• Ensure that your servers are completely shut down by 2PM of the
designated day. • Validate applications hosted on VM’s as they are back online• Call in to Skype Command Center line for questions and updates• Communicating to your respective users of impact and providing
necessary updates.