System Building

25
System Building Program Development Part Two Area Plan Goals and Objectives Coordination Service Unit Plan Introduction

description

Service Unit Plan. Part Two Area Plan Goals and Objectives. Coordination. System Building. Introduction. Program Development. Two Types of Objectives. System Building and Administration Objectives Service Unit Plan Objectives. System Building and Administration Objectives. - PowerPoint PPT Presentation

Transcript of System Building

Page 1: System Building

System Building

Program Development

Part Two Area Plan Goals and Objectives

Coordination

Service Unit Plan

Introduction

Page 2: System Building

Two Types ofObjectives

System Building and Administration Objectives

Service Unit Plan Objectives

Page 3: System Building

System Building and Administration Objectives

Outline the desired conditions that the AAA intends to achieve through administration, service delivery, coordination activities, program development and advocacy activities. Title III B funded Program

Development (PD) Objectives Title III B funded Coordination (C)

Objectives Page 14

Page 4: System Building

Part Two:Area Plan Goals &

Objectives

Page 5: System Building

Section A:General Instructions

Goals and Objectives Criteria

a. Purpose

b. Required Content

Page 6: System Building

Section B: Goals and Objectives

Guidelines

1. System-Building and Administrative Goals and Objectives Guidelines

a. Purpose

b. Required Content c. Questionsd. Resources for Development of Goals and Objectives

Page 7: System Building

2. Program Development (PD)

Objective Guidelines (Title III B)

a. Purpose

b. Required Content

January 27 Training

Page 8: System Building

3. Coordination (C) Objectives Guidelines (Title III-B)

a. Purpose

b. Required Content January 27 Training

Page 9: System Building

4. Goals and Objectives Format

~ Purpose

~ Required Content

~ Format

Page 10: System Building

[10] Indicate if Program Development (PD) or Coordination (C) – cannot be both. If a PD or C objective is not completed and is continued the following year, the objective must be revised and restated with the remaining or additional tasks. 

[11] Status: Indicate if objective is New, Continued, Revised, Completed, or Deleted.

Notes & Footnotes

First Year Objectives are ”New”The

requirements must be

followed for all Updates

Page 11: System Building

5. Service Unit Plan (SUP) Objectives Guidelines

a. Purpose

b. Required Content

•What are lacsif & atad ?

Connections

Page 12: System Building

Check box if a service

category is not funded

Complete electronically Insert PSA #

Page 13: System Building

Four-YearsMaintain record for the four-year cycle

If Title V &/or HICAP are

not funded…Insert PSA # and

type in “Not funded”

Page 14: System Building
Page 15: System Building

5. Service Unit Plan Objectives Guidelines (SUP) cont’d.

Title III/VII “Other” Services

Title III D – Disease Prevention/Health Promotion

Medication Management also required

NAPIS Category 15 – “Other” Title III B Services Services not included in NAPIS categories 1-14 Must correspond with the Title III/VII Budget Units are defined in MIS Manual Division 4000

Page 16: System Building

5. Service Unit Plan Objectives Guidelines (SUP) cont’d.

Title III/VII “Other” Services, cont’d.

LTC Ombudsman and Elder Abuse Prevention special requirements

Page 17: System Building

Include only services not in NAPIS 1-14

Required Title III D

Specific name of Service Category & units of service for “Other” Title III B

Services

Page 18: System Building

5. Service Unit Plan (SUP) Objectives Guidelines, cont’d.

Completing the SUPs

a. Title III/VIIb. Title III Ec. CBSPd. Title V *e. HICAP *

* Significant Changes

January 27 Training with

Program Specialists

Page 19: System Building

Part Three: Area Plan Maintenance

Introduction

~Updates~Amendments~Year End Reports

Page 20: System Building

May 1st

Updates:Should be

numbered to insert into

four-year plan

WhenDocumentsAre Due!

Page 21: System Building

KEY at Bottom of Page

*If applicable (only if changes occur). **Objectives may be updated at any time and need not conform to a twelve month time frame. ^If the AAA funds PD and/or C with Title III B.

WhatDocumentsAre Due!

Page 22: System Building

Section B. Updates and Amendments

1. Annual Area Plan Update Process a. Purpose

b. Required Content c. Directions for Submission

Page 23: System Building

Section B: Updates and Amendments

2. How to Amend the Area Plan

a. Purposeb. Required Content c. Directions for Submission

Page 24: System Building

Section B: Updates and Amendments

3. Year-End Reporting

a. Purpose

b. Required Content c. Directions for Submission

Page 25: System Building

More Bridges to Explore ---January 27, 2005, in Sacramento !