FoundryScheduling
SCHEDULING
SCHEDULING REQUIRES A TOOLKIT NOT A TOOL
EACH FOUNDRY IS UNIQUE AND REQUIRES A UNIQUE SET OF TOOLS IN ORDER TO SCHEDULE IT
CAPACITY CONSTRAINTS
TIME (INC SETUP TIME)
NUMBER OF MOULDS
CASTING VALUE
WEIGHT (POURED or CASTING)
MOULDING BOX AVAILABILITY
FLOOR AREA (LESS COMMON)
OVEN CAPACITY (LESS COMMON)
Rack or Stack Moulding
MOULDING PROCESS MARKED AS SPECIAL CASE
STORE RACK OR STACK SIZE
NUMBER OF BLOWS CAPACITY
NUMBER OF RACKS/STACKS CAPACITY (SPACE)
CHANGES TO TIME CALCULATION
INVESTMENT FOUNDRIES
STORE 2 BIND QUANTITIES
BIND QUANTITY 1 USED FOR TREE SIZE
BIND QUANTITY 2 USED FOR DIE NUMBER ON
PRESSURE DIECASTING
STORE 2 BIND QUANTITIES
BIND QUANTITY 1 USED FOR CASTINGS PER SHOT
BIND QUANTITY 2 USED FOR CASTINGS TRIMMED PER
CYCLE
SCHEDULING BY TIME
SETUP TIME PER DAY OR PER JOB
ALLOWANCE FOR EFFECIENCY PER SHIFT
MACHINE TIME Vs LABOUR TIME
PROCESS PRECIFIC CALENDARS
DEFINABLE SHIFT PATTERN
UNLIMITED NUMBER OF SHIFTS
JOB SEQUENCING
SHIFT & PRIORITY
SHIFT & METAL GRADE
MELT & POURING TEMPERATURE
METAL & MELT NUMBER
MANY OTHER VARIATIONS
METAL & MELT NUMBER SEQUENCING
SPLITTING PRODUCTION RUNS
PREDEFINE BATCH SIZES
AUTOMATIC SPLIT CREATION
MANUAL SPLIT CREATION
SPLIT AT CAPACITY LEVEL
HIGHLIGHTING ANOMOLIES
SET COLOUR FOR REMAKES
SET COLOUR FOR LATE JOBS
SET COLOUR FOR PROCESS LATE JOBS
SETTING A FIXED PLANNING WINDOW
ADDITIONAL TOOLS
AUTOMATIC RESCHEDULING FOR BREAKDOWNS
MOVE WORK FROM OVERLOADED PROCESSES TO ALTERNATES
BOTTLENECK MONITORING (MULTIPLE PROCESSES)
CONFIGURABLE DATA SCREENS
DATA FILTERS
BOTTLENECK MONITORING