Swimming Pool Change Order Request Form Drinking Water Protection Division DATE ( MM/DD/YYYY): Total # Pages Included: *PLEASE TYPE OR PRINT CLEARLY Section 1. Contact Information SENDER NAME: FACILITY OWNER: ADDRESS: STATE: ZIP: PHONE NUMBER: FAX NUMBER: EMAIL: CITY: PHONE NUMBER: FAX NUMBER: STATE: ZIP: EMAIL: CITY: ADDRESS: Section 2. Facility Information NAME: Section 3. Project Description (if more space is required, use the back of this sheet or attach extra pages) Section 4. Equipment Change Information PROPOSED EQUIPMENT (Make & Model #): EXISTING EQUIPMENT (Make & Model #): Are additional plans or sketches attached with this request? ( choose one ): YES NO *PLEASE NOTE: IF CHANGE ORDER REQUEST INVOLVES PIPING OR STRUCTURAL CHANGES, STAMPED ENGINEERING DRAWINGS MUST BE SUBMITTED. COMPANY NAME: PRIMARY CONTACT: ADDRESS: CITY: STATE: ZIP: COUNTY: PERMIT #: POOL TYPE (choose one): A B C D E F Signature of Sender: **THIS AREA FOR DEPARTMENT USE ONLY** Is this change order approved? (choose one) YES NO Are there any special conditions? (choose one) YES NO (if yes, see attached) *PLEASE NOTE: A final inspection is required prior to operation. When modifications have been completed, contact _________________________________ at ( _____ ) ________ 3 days prior to scheduling the inspection. Department Signature:_____________________________ Date:____________________ This change order is valid for one year from the approval date. DHEC 3627 (01/2020) G Pool Surface Area (ft 2 ): Pool Volume (gallons): Recirculation flow (GPM): Pump Make & Model: No. of Pumps: Filter Make & Model: No. of Filters: Disinfection Equipment: Is this Project cost $5000.00 or greater? (choose one):Yes No If Yes provide LLR Contractor License #:

Transcript of Swimming Pool Change Order Request Form - S.C. | DHEC · Swimming Pool Change Order Request Form...

Page 1: Swimming Pool Change Order Request Form - S.C. | DHEC · Swimming Pool Change Order Request Form Drinking Water Protection Division DATE (MM/DD/YYYY): ... When modifications have

Swimming Pool Change Order Request Form

Drinking Water Protection Division

DATE (MM/DD/YYYY): Total # Pages Included:

*PLEASE TYPE OR PRINT CLEARLY

Section 1. Contact InformationSENDER NAME: FACILITY OWNER:

ADDRESS:

STATE: ZIP:

PHONE NUMBER: FAX NUMBER:

EMAIL:

CITY:

PHONE NUMBER: FAX NUMBER:

STATE: ZIP:

EMAIL:

CITY:

ADDRESS:

Section 2. Facility InformationNAME:

Section 3. Project Description (if more space is required, use the back of this sheet or attach extra pages)

Section 4. Equipment Change InformationPROPOSED EQUIPMENT (Make & Model #): EXISTING EQUIPMENT (Make & Model #):

Are additional plans or sketches attached with this request? (choose one ): YES NO

*PLEASE NOTE: IF CHANGE ORDER REQUEST INVOLVES PIPING OR STRUCTURAL CHANGES, STAMPED ENGINEERINGDRAWINGS MUST BE SUBMITTED.

COMPANY NAME: PRIMARY CONTACT:

ADDRESS: CITY: STATE: ZIP:

COUNTY:

PERMIT #:

POOL TYPE (choose one): A B C D E F

Signature of Sender:

**THIS AREA FOR DEPARTMENT USE ONLY**Is this change order approved? (choose one) YES NOAre there any special conditions? (choose one) YES NO (if yes, see attached)

*PLEASE NOTE: A final inspection is required prior to operation. When modifications have been completed, contact_________________________________ at ( _____ ) ________ 3 days prior to scheduling the inspection.

Department Signature:_____________________________ Date:____________________This change order is valid for one year from the approval date.

DHEC 3627 (01/2020)

GPool Surface Area (ft2): Pool Volume (gallons): Recirculation flow (GPM):

Pump Make & Model: No. of Pumps:

Filter Make & Model: No. of Filters:

Disinfection Equipment:

Is this Project cost $5000.00 or greater? (choose one):Yes No If Yes provide LLR Contractor License #:

Page 2: Swimming Pool Change Order Request Form - S.C. | DHEC · Swimming Pool Change Order Request Form Drinking Water Protection Division DATE (MM/DD/YYYY): ... When modifications have

Purpose:This form is to be used by contractors, builders, engineers, architects, and any other party responsible for making changes to a public swimming facility in the state of South Carolina.

This application must be submitted to the following address:

South Carolina DHECDrinking Water Protection DivisionConstruction Permitting Section2600 Bull St.Columbia, SC 29201

ITEM BY ITEM INSTRUCTIONS FOR COMPLETING THIS FORM:

Enter the date in the first space. Enter the total number of pages included in the space to the right.

SECTION 1. CONTACT INFORMATION

In the left column of section 1, enter the SENDER’s information including: name of sender, company

name, address, city, state, zip, phone number, fax number and email address.

In the right column of section 1, enter the FACILITY OWNER’s information including: name of facility owner, primary contact name, address, city, state, zip, phone number, fax number and email address.

SECTION 2. FACILITY INFORMATION

In section 2, enter the FACILITY’s information including: name of facility, address, city, state, zip.

In section 2, enter the FACILITY’s pool information including: permit number, county, the pool

type (A, B, C, D, E, F, G), pool surface area, volume, and recirculation flow.

SECTION 3. PROJECT DESCRIPTION

Using the space provided, describe the proposed changes to the swimming facility. Check (YES or NO)

on if this project cost $5,000.00 or more. If Yes include LLR contractor license number. Check (YES or

NO) whether additional plans or sketches are attached to the change order request.

SECTION 4. EQUIPMENT CHANGE INFORMATION

In the left column of section 4, enter the make and model of the proposed equipment.

In the right column of section 4, enter the make and model of the corresponding existing equipment.

For projects beyond replastering and/or deck work, please provide the pump, filter, and disinfection

equipment make and model.

REMEMBER TO SIGN AT THE BOTTOM. ALL SIGNATURES MUST BE ORIGINAL.

Office Mechanics and Filing: This form should be filed in the Recreational Waters File Room according

to facility permit number.